Permit GraphShortlistSan Francisco building permits since 2000

Pak Hui

License
S5227
Look the license up with the state
Listed as
architect, engineer
Firm
Murphy Burr Curry, Inc.
Based in
San Francisco
On San Francisco permits
Feb 2007 to Mar 2018

55 permits since 2000 (engineer on 48 permits, architect on 7 permits): 35 completed, 10 never finaled, 10 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Mar 23, 2018Completed
final sign-off Dec 2022
901 Battery StRichlen Constructionstructural slab infill where (e) stair has been removed. no change in occupancy, use, or area. revision to 201702031863
Details
Permit
201803234407
Status
complete
Filed
Mar 23, 2018
Permit issued
Apr 13, 2018
Final sign-off
Dec 13, 2022
Declared cost
$75,000
Address
901 Battery St

structural slab infill where (e) stair has been removed. no change in occupancy, use, or area. revision to 201702031863

Open the permit page

$75,000
Dec 18, 2017Completed
final sign-off Apr 2018
127 Ellis StTrainor Commercial Construction Inc.1st fl: demolition of existing wall & construction of cross wall.
Details
Permit
201712186715
Status
complete
Filed
Dec 18, 2017
Permit issued
Mar 2, 2018
Final sign-off
Apr 26, 2018
Declared cost
$20,000
Address
127 Ellis St

1st fl: demolition of existing wall & construction of cross wall.

Open the permit page

$20,000
Dec 8, 2017Expired or cancelled
cancelled Jan 2026
1155 Market StAccess Systems & Solutions Inc7th fl - install structural steel member to support window washing equipment. install dav it bases for window washing (interior)
Details
Permit
201712085919
Status
cancelled
Filed
Dec 8, 2017
Declared cost
$50,000
Address
1155 Market St

7th fl - install structural steel member to support window washing equipment. install dav it bases for window washing (interior)

Open the permit page

$50,000
Dec 4, 2017Never finaled
issued Feb 2019, no final
180 Howard StTeam Commercial Construction Inc.voluntary seismic improvments to the 11th fl diaphragm to core wall connections and wall stability of the north and south core walls. maher not req
Details
Permit
201712045433
Status
issued
Filed
Dec 4, 2017
Permit issued
Feb 20, 2019
Declared cost
$150,000
Address
180 Howard St

voluntary seismic improvments to the 11th fl diaphragm to core wall connections and wall stability of the north and south core walls. maher not req

Open the permit page

$150,000
Oct 31, 2017Completed
final sign-off Aug 2020
75 Francis StDome Construction Corpimprovements to (e) school bldg & property. no (n) sq footage. scope includes voluntary seismic upgrades, interior & exterior improvements and ada accessibility. mep and fire/life safety under separate permit. there will be 28.2 cy of (n) footing excavation.comply w/ private school sebc 3428.5.
Details
Permit
201710312724
Status
complete
Filed
Oct 31, 2017
Permit issued
Jun 12, 2018
Final sign-off
Aug 10, 2020
Declared cost
$1,750,000
Address
75 Francis St

improvements to (e) school bldg & property. no (n) sq footage. scope includes voluntary seismic upgrades, interior & exterior improvements and ada accessibility. mep and fire/life safety under separate permit. there will be 28.2 cy of (n) footing excavation.comply w/ private school sebc 3428.5.

Open the permit page

$1,750,000
Sep 27, 2017Completed
final sign-off Apr 2018
1201 Bryant StSkyline Constructiont.i. includes construction of new interior communicating stairs(not egress stairs) and added roof beam and sleepers for future mechanical equipment. n/a for maher
Details
Permit
201709279725
Status
complete
Filed
Sep 27, 2017
Permit issued
Nov 6, 2017
Final sign-off
Apr 5, 2018
Declared cost
$500,000
Address
1201 Bryant St

t.i. includes construction of new interior communicating stairs(not egress stairs) and added roof beam and sleepers for future mechanical equipment. n/a for maher

Open the permit page

$500,000
Aug 22, 2017Never finaled
issued Aug 2017, no final
1201 Bryant StSkyline Constructionrevision to 2017-0530-7865 for revised wall opening design
Details
Permit
201708225591
Status
issued
Filed
Aug 22, 2017
Permit issued
Aug 30, 2017
Address
1201 Bryant St

revision to 2017-0530-7865 for revised wall opening design

Open the permit page

Nov 1, 2016Completed
final sign-off Jan 2018
1201 Bryant Stexterior renovations for barrier removal - new accessable entrance, removal of steel shed, lighting & exterior door & window repair & replacement. ** maher: n/a **
Details
Permit
201611011655
Status
complete
Filed
Nov 1, 2016
Permit issued
Mar 1, 2017
Final sign-off
Jan 16, 2018
Declared cost
$1,200,000
Address
1201 Bryant St

exterior renovations for barrier removal - new accessable entrance, removal of steel shed, lighting & exterior door & window repair & replacement. ** maher: n/a **

Open the permit page

$1,200,000
Feb 12, 2016Never finaled
issued Oct 2016, no final
100 California StSwinerton Buildersrenovate (e) 14th flr, including expansion onto mechanical roof wall, from a mechanical/maintenance space into a cold shell for leasing; move all mech/elec/plumbing systems from 14 to 15th/roof penthouse. plumbing & electrical are under separate permit. n/a for maher ordinance no 155-13.
Details
Permit
201602129534
Status
issued
Filed
Feb 12, 2016
Permit issued
Oct 17, 2016
Declared cost
$6,280,000
Address
100 California St

renovate (e) 14th flr, including expansion onto mechanical roof wall, from a mechanical/maintenance space into a cold shell for leasing; move all mech/elec/plumbing systems from 14 to 15th/roof penthouse. plumbing & electrical are under separate permit. n/a for maher ordinance no 155-13.

Open the permit page

$6,280,000
Oct 22, 2015Never finaled
issued Nov 2015, no final
888 Brannan StHerrero Builders Incorporatedground floor: revision to pa 2015 0320 1442- new structural shear walls. n/a ordinance #155-13
Details
Permit
201510220527
Status
issued
Filed
Oct 22, 2015
Permit issued
Nov 3, 2015
Address
888 Brannan St

ground floor: revision to pa 2015 0320 1442- new structural shear walls. n/a ordinance #155-13

Open the permit page

Jul 2, 2015Completed
final sign-off Aug 2017
1155 Market StDpr Constructionchange of use. t-i includes new partitions, lighting, finishes and fixture throughout. structural work includes new interior connecting stair & floors 9-11 and flat roof skylight. new mechanical, electrical, plumbing and fire alarm will be the in area of work.
Details
Permit
201507020526
Status
complete
Filed
Jul 2, 2015
Permit issued
Dec 1, 2015
Final sign-off
Aug 22, 2017
Declared cost
$2,395,639
Address
1155 Market St

change of use. t-i includes new partitions, lighting, finishes and fixture throughout. structural work includes new interior connecting stair & floors 9-11 and flat roof skylight. new mechanical, electrical, plumbing and fire alarm will be the in area of work.

Open the permit page

$2,395,639
Feb 3, 2015Completed
final sign-off Apr 2016
1355 Market StAlliance Roofing Co Increroofing; removal of copper roofing system (aaprox 1000sqft) installation of stainless steel hat channels to concrete deck. attachment of new copper roofing system. ** maher: compliance with ordinance no# 155-13 not required **
Details
Permit
201502037326
Status
complete
Filed
Feb 3, 2015
Permit issued
Aug 4, 2015
Final sign-off
Apr 19, 2016
Declared cost
$20,000
Address
1355 Market St

reroofing; removal of copper roofing system (aaprox 1000sqft) installation of stainless steel hat channels to concrete deck. attachment of new copper roofing system. ** maher: compliance with ordinance no# 155-13 not required **

Open the permit page

$20,000
Jan 23, 2015Completed
final sign-off Sep 2017
1100 Market StBuild Group Inc.structural upgrade for sidewalk. no building demo under this permit. sidewalk upgrade along mcallister st. maher n/a.
Details
Permit
201501236548
Status
complete
Filed
Jan 23, 2015
Permit issued
Jan 27, 2015
Final sign-off
Sep 25, 2017
Declared cost
$80,000
Address
1100 Market St

structural upgrade for sidewalk. no building demo under this permit. sidewalk upgrade along mcallister st. maher n/a.

Open the permit page

$80,000
Jan 8, 2015Completed
final sign-off Nov 2015
875 Stevenson StHathaway Dinwiddie Co.2nd flr: structural work associated with approved permit 201409307645, support for won doors, roll up doors, naaa doors.
Details
Permit
201501085195
Status
complete
Filed
Jan 8, 2015
Permit issued
Jan 12, 2015
Final sign-off
Nov 19, 2015
Declared cost
$15,000
Address
875 Stevenson St

2nd flr: structural work associated with approved permit 201409307645, support for won doors, roll up doors, naaa doors.

Open the permit page

$15,000
Dec 24, 2014Completed
final sign-off Aug 2017
1400 16th StCharles Pankow Builders Ltdseismic strengthening of building and addition of new skylight.
Details
Permit
201412244457
Status
complete
Filed
Dec 24, 2014
Permit issued
Apr 23, 2015
Final sign-off
Aug 11, 2017
Declared cost
$1,100,000
Address
1400 16th St

seismic strengthening of building and addition of new skylight.

Open the permit page

$1,100,000
Sep 10, 2014Completed
final sign-off Mar 2015
1600 Van Ness AvMidstate Construction Corporationinstallation of fire escape, replace in kind per reference pa201311252751
Details
Permit
201409106013
Status
complete
Filed
Sep 10, 2014
Permit issued
Oct 6, 2014
Final sign-off
Mar 27, 2015
Declared cost
$47,000
Address
1600 Van Ness Av

installation of fire escape, replace in kind per reference pa201311252751

Open the permit page

$47,000
Aug 11, 2014Expired or cancelled
cancelled Jan 2026
1333 Gough Stnew room for emergency generator at ground floor maher not required-155-13
Details
Permit
201408113546
Status
cancelled
Filed
Aug 11, 2014
Declared cost
$85,000
Address
1333 Gough St

new room for emergency generator at ground floor maher not required-155-13

Open the permit page

$85,000
Jul 16, 2014Never finaled
filed Jul 2014, never issued
1355 Market StTerra Nova Industriesrevision to pa# 2012/11/08/3877. build mezzanine for office & storage space on ground floor. mep under separate permit. ** maher: compliance with ordinance no# 155-13 not required **
Details
Permit
201407161426
Status
plancheck
Filed
Jul 16, 2014
Declared cost
$134,000
Address
1355 Market St

revision to pa# 2012/11/08/3877. build mezzanine for office & storage space on ground floor. mep under separate permit. ** maher: compliance with ordinance no# 155-13 not required **

Open the permit page

$134,000
Jun 27, 2014Completed
final sign-off Jul 2015
160 Spear StSkyline Constructioncreate interconnecting stair floors for 17th and 18th floors. ** maher: compliance with ordinance no# 155-13 not required **
Details
Permit
201406279708
Status
complete
Filed
Jun 27, 2014
Permit issued
Sep 24, 2014
Final sign-off
Jul 31, 2015
Declared cost
$260,000
Address
160 Spear St

create interconnecting stair floors for 17th and 18th floors. ** maher: compliance with ordinance no# 155-13 not required **

Open the permit page

$260,000
Jun 4, 2014Expired or cancelled
expired May 2022
1550 Bryant StD A Pope Inct.i. includes demo of portion existing concrete slab for new communication stair between existing 8/f & 9/f tenant suites. permit for new stair and 9/f t.i. submitted seperately. ti on both floors separate permit. building fully sprinklers. n/a ordinance #155-13
Details
Permit
201406047437
Status
expired
Filed
Jun 4, 2014
Permit issued
Jun 20, 2014
Declared cost
$1,000
Address
1550 Bryant St

t.i. includes demo of portion existing concrete slab for new communication stair between existing 8/f & 9/f tenant suites. permit for new stair and 9/f t.i. submitted seperately. ti on both floors separate permit. building fully sprinklers. n/a ordinance #155-13

Open the permit page

$1,000
Feb 18, 2014Completed
final sign-off Aug 2014
875 Stevenson StTruebeck Constructionblock 3508 lot 055. (n) entry gate to market square commons located directly off 10th st & accessibility deferred by ab-056.
Details
Permit
201402188757
Status
complete
Filed
Feb 18, 2014
Permit issued
Jun 18, 2014
Final sign-off
Aug 15, 2014
Declared cost
$200,000
Address
875 Stevenson St

block 3508 lot 055. (n) entry gate to market square commons located directly off 10th st & accessibility deferred by ab-056.

Open the permit page

$200,000
Nov 26, 2013Expired or cancelled
cancelled Nov 2024
1355 Market StTruebeck Constructionrevision to exterior openings no structural work. new interior demising partition.revision to pa #201211214719 and pa #201307121775. this work under ab-017 for unoccupied space.
Details
Permit
201311262882
Status
cancelled
Filed
Nov 26, 2013
Declared cost
$30,000
Address
1355 Market St

revision to exterior openings no structural work. new interior demising partition.revision to pa #201211214719 and pa #201307121775. this work under ab-017 for unoccupied space.

Open the permit page

$30,000
Nov 26, 2013Completed
final sign-off Aug 2014
1355 Market StTruebeck Constructionrevision to exterior openings w/ structural work per a-3.1 & s-1. new exterior deck & ground floor. revision to pa #201211214719 and pa #201307121775. this work under ab-017 for unoccupied space. compliance with ordinance no. 155-13 not required.
Details
Permit
201311262878
Status
complete
Filed
Nov 26, 2013
Permit issued
Jun 3, 2014
Final sign-off
Aug 15, 2014
Declared cost
$50,000
Address
1355 Market St

revision to exterior openings w/ structural work per a-3.1 & s-1. new exterior deck & ground floor. revision to pa #201211214719 and pa #201307121775. this work under ab-017 for unoccupied space. compliance with ordinance no. 155-13 not required.

Open the permit page

$50,000
Nov 25, 2013Completed
final sign-off Mar 2015
1600 Van Ness AvMidstate Construction Corporationti @(e) bldg demolition of structure @1/f columns and addition of (n) long span beams; (n) elevator, update (e) toilets, (n) toilet rm, conference/breakrm, locker area, parts storage rm on 3rd; (n) flooring on 2nd, (n) light fixtures all floors; (n) pg & e service in basement and (n) fire escape
Details
Permit
201311252751
Status
complete
Filed
Nov 25, 2013
Permit issued
Jun 5, 2014
Final sign-off
Mar 27, 2015
Declared cost
$1,200,000
Address
1600 Van Ness Av

ti @(e) bldg demolition of structure @1/f columns and addition of (n) long span beams; (n) elevator, update (e) toilets, (n) toilet rm, conference/breakrm, locker area, parts storage rm on 3rd; (n) flooring on 2nd, (n) light fixtures all floors; (n) pg & e service in basement and (n) fire escape

Open the permit page

$1,200,000
Nov 6, 2013Completed
final sign-off Feb 2020
580 Capp StCahill Contractors Incremodel (e) bsmnt and grnd flr.of (e) 8-story bldg. add 2 units on grd. flr. and 1 unit level 2. new floor & ground finishes floor 2-8. new fire sprkler syst. thru-out. fire alarm throughout.
Details
Permit
201311061273
Status
complete
Filed
Nov 6, 2013
Permit issued
Jul 17, 2015
Final sign-off
Feb 10, 2020
Declared cost
$200,000
Address
580 Capp St

remodel (e) bsmnt and grnd flr.of (e) 8-story bldg. add 2 units on grd. flr. and 1 unit level 2. new floor & ground finishes floor 2-8. new fire sprkler syst. thru-out. fire alarm throughout.

Open the permit page

$200,000
Oct 7, 2013Completed
final sign-off Feb 2015
1411 Market StSwinerton Buildersinstall 150 car lifts on b-2 and b3 under approved building permit application #200903234623s. anchorage of car lifts only under this permit. approved sp and arch 2009.0323.4623s4/s3.
Details
Permit
201310078677
Status
complete
Filed
Oct 7, 2013
Permit issued
Oct 11, 2013
Final sign-off
Feb 26, 2015
Address
1411 Market St

install 150 car lifts on b-2 and b3 under approved building permit application #200903234623s. anchorage of car lifts only under this permit. approved sp and arch 2009.0323.4623s4/s3.

Open the permit page

Sep 27, 2013Completed
final sign-off Nov 2013
3251 20th AvDickinson Cameron Construction Company Istructural revision to pa# 201303202673 & pa# 201305207407 changes to include removal of portion of structural steel transfer ginders, welding of new steel plates and minor furring out of the mall bulkhead fascia and column wrap.
Details
Permit
201309277980
Status
complete
Filed
Sep 27, 2013
Permit issued
Sep 27, 2013
Final sign-off
Nov 19, 2013
Declared cost
$5,000
Address
3251 20th Av

structural revision to pa# 201303202673 & pa# 201305207407 changes to include removal of portion of structural steel transfer ginders, welding of new steel plates and minor furring out of the mall bulkhead fascia and column wrap.

Open the permit page

$5,000
Sep 18, 2013Never finaled
filed Sep 2013, never issued
1355 Market StTruebeck Constructionab-056 ineffect to defer access under future sep permit.minor permit to alter constr new storefrt sys to infill opening prev pking garage entry ramp entrance to be demo under sep permit.new storefrt located on 10th st side bet gridline i/j&21.pkg incl plns,elevation,detail&schedules.no excavation.
Details
Permit
201309187163
Status
filed
Filed
Sep 18, 2013
Declared cost
$50,000
Address
1355 Market St

ab-056 ineffect to defer access under future sep permit.minor permit to alter constr new storefrt sys to infill opening prev pking garage entry ramp entrance to be demo under sep permit.new storefrt located on 10th st side bet gridline i/j&21.pkg incl plns,elevation,detail&schedules.no excavation.

Open the permit page

$50,000
Sep 18, 2013Completed
final sign-off Aug 2014
1355 Market StTruebeck Constructionab-056 inplace to defer access to future submital.remove portn of ext wall&roll down drs,pking entry ramp.constr new g/fl concrete slab&bsmt slab.new storefrt sys along 10th st to infill e g/fl openg new renlita dr at stevenson st loading bay,new partn walls in entire tenant space.l/s&mep sep permit
Details
Permit
201309187153
Status
complete
Filed
Sep 18, 2013
Permit issued
Feb 11, 2014
Final sign-off
Aug 4, 2014
Declared cost
$375,000
Address
1355 Market St

ab-056 inplace to defer access to future submital.remove portn of ext wall&roll down drs,pking entry ramp.constr new g/fl concrete slab&bsmt slab.new storefrt sys along 10th st to infill e g/fl openg new renlita dr at stevenson st loading bay,new partn walls in entire tenant space.l/s&mep sep permit

Open the permit page

$375,000
Aug 2, 2013Completed
final sign-off Dec 2013
1550 Bryant StRainbow Waterproofing & Restorbrace interior hollow clay tile in chimney
Details
Permit
201308023398
Status
complete
Filed
Aug 2, 2013
Permit issued
Aug 7, 2013
Final sign-off
Dec 19, 2013
Declared cost
$8,000
Address
1550 Bryant St

brace interior hollow clay tile in chimney

Open the permit page

$8,000
Jun 18, 2013Completed
final sign-off Mar 2014
875 Stevenson StTruebeck Constructionbasemt & 1/f select area as indicated in loc. zone 1. new const, new vehicle ramp,new mail rm & new basemt storage rm. mep & life safety will be designed/build under separate permit. ada accessibility will be deferred under ab-056
Details
Permit
201306189795
Status
complete
Filed
Jun 18, 2013
Permit issued
Aug 26, 2013
Final sign-off
Mar 12, 2014
Declared cost
$250,000
Address
875 Stevenson St

basemt & 1/f select area as indicated in loc. zone 1. new const, new vehicle ramp,new mail rm & new basemt storage rm. mep & life safety will be designed/build under separate permit. ada accessibility will be deferred under ab-056

Open the permit page

$250,000
May 16, 2013Completed
final sign-off Mar 2014
875 Stevenson StTruebeck Constructionwork in basement & 1st flr-includes exterior & interior demolition work, structural work in the indicated locations, zone 1 & 2. select areas of demolition including hole in 1st flr slab for new vehicle ramp, removal of (e) trash chute at basement & 1st flrs. (e) future trash enclosure & removal of
Details
Permit
201305167079
Status
complete
Filed
May 16, 2013
Permit issued
Jul 11, 2013
Final sign-off
Mar 12, 2014
Declared cost
$50,000
Address
875 Stevenson St

work in basement & 1st flr-includes exterior & interior demolition work, structural work in the indicated locations, zone 1 & 2. select areas of demolition including hole in 1st flr slab for new vehicle ramp, removal of (e) trash chute at basement & 1st flrs. (e) future trash enclosure & removal of

Open the permit page

$50,000
May 15, 2013Never finaled
issued May 2013, no final
1355 Market StSkyline Construction2nd floor suite 220 - revision to appl #2013.04.15.4506 - structural work for fold partition.
Details
Permit
201305156990
Status
issued
Filed
May 15, 2013
Permit issued
May 16, 2013
Declared cost
$25,000
Address
1355 Market St

2nd floor suite 220 - revision to appl #2013.04.15.4506 - structural work for fold partition.

Open the permit page

$25,000
Apr 11, 2013Expired or cancelled
cancelled Jan 2020
130 08th StSource Planning And Construction Incbasement & floors 1, 2, & 3 - demolition of int walls, partial floor structure, plumbing fixtures, millwork & finishes, construction of new toilet rooms, stairs, new elevator, hvac & elec systems & lighting. all upgrades are base bldg only including front door & mech equipment on roof.
Details
Permit
201304114315
Status
cancelled
Filed
Apr 11, 2013
Declared cost
$1,000,000
Address
130 08th St

basement & floors 1, 2, & 3 - demolition of int walls, partial floor structure, plumbing fixtures, millwork & finishes, construction of new toilet rooms, stairs, new elevator, hvac & elec systems & lighting. all upgrades are base bldg only including front door & mech equipment on roof.

Open the permit page

$1,000,000
Jan 22, 2013Completed
final sign-off Mar 2013
900 Potrero AvGrand Industries Inccar damage near corner of bldg - install temp shoring, repair stem wall w/new re-enforced concrets doweled into existing. replace posts & 2x6 studs. replace necessary siding. comply w/nov #201384921
Details
Permit
201301228462
Status
complete
Filed
Jan 22, 2013
Permit issued
Jan 24, 2013
Final sign-off
Mar 5, 2013
Declared cost
$14,000
Address
900 Potrero Av

car damage near corner of bldg - install temp shoring, repair stem wall w/new re-enforced concrets doweled into existing. replace posts & 2x6 studs. replace necessary siding. comply w/nov #201384921

Open the permit page

$14,000
Nov 28, 2012Completed
final sign-off Jun 2014
888 Brannan StRichlen Constructionrevision to pa #201203146059. for interior only.
Details
Permit
201211285027
Status
complete
Filed
Nov 28, 2012
Permit issued
Apr 3, 2013
Final sign-off
Jun 6, 2014
Declared cost
$499,000
Address
888 Brannan St

revision to pa #201203146059. for interior only.

Open the permit page

$499,000
Sep 5, 2012Completed
final sign-off May 2014
875 Stevenson StTruebeck Constructioninterior demo (e) tenant build outs, base building core-shell upgrades & new finishes. exterior envelope renovation of floors 3-10 including. removal of (e) precast concrete panels and replaced with a new glass curtain wall skin.
Details
Permit
201209058914
Status
complete
Filed
Sep 5, 2012
Permit issued
May 17, 2013
Final sign-off
May 16, 2014
Declared cost
$17,000,000
Address
875 Stevenson St

interior demo (e) tenant build outs, base building core-shell upgrades & new finishes. exterior envelope renovation of floors 3-10 including. removal of (e) precast concrete panels and replaced with a new glass curtain wall skin.

Open the permit page

$17,000,000
Sep 5, 2012Completed
final sign-off Oct 2013
1355 Market Stdemo portion of (e) south facade ground floor windows & window openings to finish floor. remove (e) boiler file at ground & 2nd floor. remove (e) slab at 2nd floor for future stair. remove (e) louvers in (e) window openings & remove (e) windows. 2nd flooor slab removal as per strucutral drawing.
Details
Permit
201209058954
Status
complete
Filed
Sep 5, 2012
Permit issued
Feb 1, 2013
Final sign-off
Oct 16, 2013
Declared cost
$375,000
Address
1355 Market St

demo portion of (e) south facade ground floor windows & window openings to finish floor. remove (e) boiler file at ground & 2nd floor. remove (e) slab at 2nd floor for future stair. remove (e) louvers in (e) window openings & remove (e) windows. 2nd flooor slab removal as per strucutral drawing.

Open the permit page

$375,000
Jun 15, 2012Never finaled
issued Jul 2012, no final
1060 Key AvGrand Industries Increplace concrete retaining wall with reinforced concrete masonry retaining wall along 3rd st and key ave, total length of 143 feet, new retaining wall will be same height as existing retaining wall.
Details
Permit
201206152696
Status
issued
Filed
Jun 15, 2012
Permit issued
Jul 13, 2012
Declared cost
$57,006
Address
1060 Key Av

replace concrete retaining wall with reinforced concrete masonry retaining wall along 3rd st and key ave, total length of 143 feet, new retaining wall will be same height as existing retaining wall.

Open the permit page

$57,006
Apr 23, 2012Expired or cancelled
cancelled Nov 2024
1355 Market StTruebeck Constructioninterior demolition of portion of 2nd fl concrete slab diaphragm. addition of frp strips around the openings perimeter & at columns will be added to strengthen the floor. minor hss tube is to be added to act as a chord tie. the bldg has been seismically rehabilitated under separate permit.
Details
Permit
201204238899
Status
cancelled
Filed
Apr 23, 2012
Declared cost
$250,000
Address
1355 Market St

interior demolition of portion of 2nd fl concrete slab diaphragm. addition of frp strips around the openings perimeter & at columns will be added to strengthen the floor. minor hss tube is to be added to act as a chord tie. the bldg has been seismically rehabilitated under separate permit.

Open the permit page

$250,000
Apr 2, 2012Completed
final sign-off Oct 2013
60 Spear StSkyline Constructionbuilding wide structural system upgrades (seismic) only. all work will be voluntary seismic improvement. the work is not intended to meet with the 2010 sfbc, section 3401.8
Details
Permit
201204027310
Status
complete
Filed
Apr 2, 2012
Permit issued
Jun 21, 2012
Final sign-off
Oct 17, 2013
Declared cost
$322,382
Address
60 Spear St

building wide structural system upgrades (seismic) only. all work will be voluntary seismic improvement. the work is not intended to meet with the 2010 sfbc, section 3401.8

Open the permit page

$322,382
Jan 19, 2012Completed
final sign-off Jun 2012
166 Geary StBuild Group Inc.build out of (n) canopy, re-cladding of (e) storefront and replacing of existing entry doors . entry doors to be replaced in-kind. canopy will not block any fire escape, rescue window, or exit. additional permits to be submitted for interior work.
Details
Permit
201201192567
Status
complete
Filed
Jan 19, 2012
Permit issued
May 1, 2012
Final sign-off
Jun 21, 2012
Declared cost
$50,000
Address
166 Geary St

build out of (n) canopy, re-cladding of (e) storefront and replacing of existing entry doors . entry doors to be replaced in-kind. canopy will not block any fire escape, rescue window, or exit. additional permits to be submitted for interior work.

Open the permit page

$50,000
Aug 31, 2011Never finaled
issued Oct 2011, no final
386 Geary StMarchetti Construction Inc.voluntary seismic/structural strengthening, new concrete shear walls on interior face of (e) walls from basement to 8th floor.
Details
Permit
201108313615
Status
issued
Filed
Aug 31, 2011
Permit issued
Oct 19, 2011
Declared cost
$2,000,000
Address
386 Geary St

voluntary seismic/structural strengthening, new concrete shear walls on interior face of (e) walls from basement to 8th floor.

Open the permit page

$2,000,000
Jul 19, 2011Completed
final sign-off Oct 2013
1355 Market StTruebeck Constructionrevision to pa# 2009/02/26/2951/r2. voluntary seismic rehabilitation & superstructure collapse prevention per bse-2. construction of new concrete shear core surrounding elevators. new shear walls to supply supplemental strength from basement to roof.
Details
Permit
201107190532
Status
complete
Filed
Jul 19, 2011
Permit issued
Sep 9, 2011
Final sign-off
Oct 15, 2013
Declared cost
$450,000
Address
1355 Market St

revision to pa# 2009/02/26/2951/r2. voluntary seismic rehabilitation & superstructure collapse prevention per bse-2. construction of new concrete shear core surrounding elevators. new shear walls to supply supplemental strength from basement to roof.

Open the permit page

$450,000
Jul 19, 2011Completed
final sign-off Oct 2013
1355 Market StTruebeck Constructionfoundation revision to pa# 2008/09/29/2954. voluntary seismic rehabilitation & collapse prevention per bse-2. new spread footings at shearwall locations. new mat foundation to support new elevator core. no underpinning or shoring required.
Details
Permit
201107190537
Status
complete
Filed
Jul 19, 2011
Permit issued
Aug 16, 2011
Final sign-off
Oct 15, 2013
Declared cost
$125,000
Address
1355 Market St

foundation revision to pa# 2008/09/29/2954. voluntary seismic rehabilitation & collapse prevention per bse-2. new spread footings at shearwall locations. new mat foundation to support new elevator core. no underpinning or shoring required.

Open the permit page

$125,000
May 11, 2010Completed
final sign-off Jul 2010
3166 23rd StDawson - Clinton Gen Contr Corpvoluntary structural upgrade. new wall anchorages at roof level of existing 1 story cmu block wall builing. reinforce existing skylights. note: there is nov 200672189 requiring 1-hr separation between garage and offices. garage is no longer part of building.
Details
Permit
201005112175
Status
complete
Filed
May 11, 2010
Permit issued
May 21, 2010
Final sign-off
Jul 7, 2010
Declared cost
$3,500
Address
3166 23rd St

voluntary structural upgrade. new wall anchorages at roof level of existing 1 story cmu block wall builing. reinforce existing skylights. note: there is nov 200672189 requiring 1-hr separation between garage and offices. garage is no longer part of building.

Open the permit page

$3,500
Nov 7, 2008Never finaled
issued Dec 2008, no final
660 Market Ststructural strengthening. ground fl. addition of steel braced frams with friction dampers east/west direction. gr. fl. addition of shotcrete wall panels at east perimeter wall (improve north/south direction).
Details
Permit
200811076105
Status
issued
Filed
Nov 7, 2008
Permit issued
Dec 10, 2008
Declared cost
$50,000
Address
660 Market St

structural strengthening. ground fl. addition of steel braced frams with friction dampers east/west direction. gr. fl. addition of shotcrete wall panels at east perimeter wall (improve north/south direction).

Open the permit page

$50,000
Sep 29, 2008Completed
final sign-off Oct 2013
1355 Market StPlant Construction Company Lpconstruction of new spread footings and mat foundation only, for new concrete shearwalls. a new pilelap & micropile foundation system will be received at one location, all above work is for voluntary strengthening of (e) bldg. superstructure to be submitted as a separate permit.
Details
Permit
200809292954
Status
complete
Filed
Sep 29, 2008
Permit issued
Feb 5, 2009
Final sign-off
Oct 23, 2013
Declared cost
$670,000
Address
1355 Market St

construction of new spread footings and mat foundation only, for new concrete shearwalls. a new pilelap & micropile foundation system will be received at one location, all above work is for voluntary strengthening of (e) bldg. superstructure to be submitted as a separate permit.

Open the permit page

$670,000
Jan 30, 2008Completed
final sign-off Aug 2008
1520 Taylor Stvoluntary seismic upgrade involving strenghtening of 2 columns on 2 floors and 1 shear wall on three floors.
Details
Permit
200801303558
Status
complete
Filed
Jan 30, 2008
Permit issued
Apr 15, 2008
Final sign-off
Aug 6, 2008
Declared cost
$111,113
Address
1520 Taylor St

voluntary seismic upgrade involving strenghtening of 2 columns on 2 floors and 1 shear wall on three floors.

Open the permit page

$111,113
Jan 24, 2008Expired or cancelled
expired Aug 2008
127 Ellis Strevision to application 200708170189 r-3, add concrete moment frames at 1st floor, revise out-of-plane wall bracing at 5th floor.
Details
Permit
200801243189
Status
expired
Filed
Jan 24, 2008
Permit issued
Feb 19, 2008
Declared cost
$15,000
Address
127 Ellis St

revision to application 200708170189 r-3, add concrete moment frames at 1st floor, revise out-of-plane wall bracing at 5th floor.

Open the permit page

$15,000
Oct 11, 2007Completed
final sign-off May 2008
1550 Bryant Stvoluntary seismic improvement of existing concrete chimney stack and containment of the hollow clay tile. infill wall surrounding the stack. purpose of this permit is to decrease the probable maxi.loss value of bldg. by improving seismic. strengthening of existing concrete c.s. 10th floor and up.
Details
Permit
200710115133
Status
complete
Filed
Oct 11, 2007
Permit issued
Nov 29, 2007
Final sign-off
May 6, 2008
Declared cost
$475,000
Address
1550 Bryant St

voluntary seismic improvement of existing concrete chimney stack and containment of the hollow clay tile. infill wall surrounding the stack. purpose of this permit is to decrease the probable maxi.loss value of bldg. by improving seismic. strengthening of existing concrete c.s. 10th floor and up.

Open the permit page

$475,000
Mar 29, 2007Completed
final sign-off Jun 2009
49 Geary Stprovide voluntary seismic upgrade. not in full compliance with sec. 3403.6, sfbc, 2001.
Details
Permit
200703297622
Status
complete
Filed
Mar 29, 2007
Permit issued
Sep 20, 2007
Final sign-off
Jun 22, 2009
Declared cost
$5,000,000
Address
49 Geary St

provide voluntary seismic upgrade. not in full compliance with sec. 3403.6, sfbc, 2001.

Open the permit page

$5,000,000
Mar 22, 2007Expired or cancelled
expired May 2009
888 Brannan Stvoluntary seismic repair, work at 1st floor below street level. 2nd floor street level, 3rd & 4th floor which will strengthening existing concrete columns with fiber wrap and infilling new sheerwall panels.
Details
Permit
200703227009
Status
expired
Filed
Mar 22, 2007
Permit issued
Jun 8, 2007
Declared cost
$100,000
Address
888 Brannan St

voluntary seismic repair, work at 1st floor below street level. 2nd floor street level, 3rd & 4th floor which will strengthening existing concrete columns with fiber wrap and infilling new sheerwall panels.

Open the permit page

$100,000
Feb 2, 2007Expired or cancelled
expired Mar 2009
900 Minnesota Stexcavation and shoring of (e) west building. reference site pa# 200512029382s.
Details
Permit
200702023273
Status
expired
Filed
Feb 2, 2007
Permit issued
Apr 11, 2007
Declared cost
$170,000
Address
900 Minnesota St

excavation and shoring of (e) west building. reference site pa# 200512029382s.

Open the permit page

$170,000
Feb 2, 2007Expired or cancelled
expired Mar 2009
900 Minnesota Stexcavation and shoring for (e) east building. reference site pa# 200512029382s.
Details
Permit
200702023275
Status
expired
Filed
Feb 2, 2007
Permit issued
Apr 11, 2007
Declared cost
$170,000
Address
900 Minnesota St

excavation and shoring for (e) east building. reference site pa# 200512029382s.

Open the permit page

$170,000