Dawson - Clinton Gen Contr Corp
- Based in
- San Francisco
- On San Francisco permits
- Apr 2002 to Aug 2026
- Last 24 months
- 8 permits filed
205 permits since 2000: 130 completed, 10 in progress, 26 never finaled, 39 expired or cancelled.
Of the 26 never-finaled permits, 4 are 3 to 5 years old, 3 are 5 to 10 years old, 19 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 205.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2026 | In progress issued Sep 2026 | 1272 California St | revision to pa#202607084677: interior remodel, reconfigure all (e) bathrooms & kitchen layout. (e) 5 front windows to be replaced in kind, reframe interior walls & doors. (n) 2 skylights. new mini split, water heater & elec throughout. no work in living, dining, foyer, entry stairs & bedroom#1.Details
revision to pa#202607084677: interior remodel, reconfigure all (e) bathrooms & kitchen layout. (e) 5 front windows to be replaced in kind, reframe interior walls & doors. (n) 2 skylights. new mini split, water heater & elec throughout. no work in living, dining, foyer, entry stairs & bedroom#1. | $25,000 |
| Jul 8, 2026 | In progress issued Jul 2026 | 1272 California St | remove lather and plaster in all bedrooms and hallways, install new sheetrock and insulation, kitchen and bathroom remodels,, plumbing and electrical, dining room ceiling install new insullation and sheetrock.exterior walls to be upgreded with minDetails
remove lather and plaster in all bedrooms and hallways, install new sheetrock and insulation, kitchen and bathroom remodels,, plumbing and electrical, dining room ceiling install new insullation and sheetrock.exterior walls to be upgreded with min | $75,000 |
| Jun 11, 2026 | In progress issued Aug 2026 | 516 Diamond St | revision to bpa202603046908 to add foundation strengthening, add windows to basement storage, relocation of gas meter and stair extension to basement level, add lighting to extg, bedroom, garage and bath door. work not visible from street and work at 516a diamond street.Details
revision to bpa202603046908 to add foundation strengthening, add windows to basement storage, relocation of gas meter and stair extension to basement level, add lighting to extg, bedroom, garage and bath door. work not visible from street and work at 516a diamond street. | $50,000 |
| Apr 27, 2026 | In progress issued May 2026 | 1274 California St | revision to permit# 2025-1110-9254. unit 1274: interior remodel, reconfigure all (e) barhrooms & kitchen layout. (e) front windows to be replaced in-kind. replace interior walls & doors, new mini-split, water heater and electrical throughout.Details
revision to permit# 2025-1110-9254. unit 1274: interior remodel, reconfigure all (e) barhrooms & kitchen layout. (e) front windows to be replaced in-kind. replace interior walls & doors, new mini-split, water heater and electrical throughout. | $50,000 |
| Mar 4, 2026 | In progress issued Mar 2026 | 516 Diamond St | to abate nov 202651567 remove (e) masonary fire place and relocate (e) non bearing wall.Details
to abate nov 202651567 remove (e) masonary fire place and relocate (e) non bearing wall. | $10,000 |
| Jan 30, 2026 | In progress issued Jan 2026 | 488 Folsom St | remodel of an (e) condo, including the removal of (e) and installation of new non structural walls, new light coves, new cabinetry, new interior doors, new outlets and new hvac vents to replace existing.Details
remodel of an (e) condo, including the removal of (e) and installation of new non structural walls, new light coves, new cabinetry, new interior doors, new outlets and new hvac vents to replace existing. | $100,000 |
| Nov 13, 2025 | In progress issued Nov 2025 | 585 Ortega St | revision to pa# 202210053832: resize window along n and s facade. (n) electrical panel location, structural changes/minor modifications to layout to reduce framing capacity.Details
revision to pa# 202210053832: resize window along n and s facade. (n) electrical panel location, structural changes/minor modifications to layout to reduce framing capacity. | $1,000 |
| Nov 10, 2025 | In progress issued Nov 2025 | 1274 California St | replace kitchen and barthroom remodel in kind, replace kitchen cabinets, bathroom cabinets, and all plumbing fixtures, new tiles in bathroom, new insulation in ceiling and walls. like for like remodels.Details
replace kitchen and barthroom remodel in kind, replace kitchen cabinets, bathroom cabinets, and all plumbing fixtures, new tiles in bathroom, new insulation in ceiling and walls. like for like remodels. | $55,000 |
| May 10, 2023 | Completed final sign-off May 2023 | 271 Upper Tr | to obtain final inpsection for work approved under pa# 2017-0331-2951. all work is completed.Details
to obtain final inpsection for work approved under pa# 2017-0331-2951. all work is completed. | |
| Oct 28, 2022 | Completed final sign-off Aug 2024 | 246 Carl St | removal of penthouse structure and addition of skylight to restore to last approved conditions under pa# 201603081422. interior renovation on the 4th floor:a) demolition of extg walls, doors, and millwork. b) conversion of extg bathroom to sauna.Details
removal of penthouse structure and addition of skylight to restore to last approved conditions under pa# 201603081422. interior renovation on the 4th floor:a) demolition of extg walls, doors, and millwork. b) conversion of extg bathroom to sauna. | $50,000 |
| Oct 5, 2022 | In progress issued Sep 2025 | 585 Ortega St | vertical and horizontal expansion. renovation and gut interior remodel of (e) 2-story, single family home. work includes 1 story vertical addition, partial expansion of front facade, and rear addition. (n) 3rd fl includes 2 (n) bedrooms and 2 (n) bathrooms, as well as (n) office space.Details
vertical and horizontal expansion. renovation and gut interior remodel of (e) 2-story, single family home. work includes 1 story vertical addition, partial expansion of front facade, and rear addition. (n) 3rd fl includes 2 (n) bedrooms and 2 (n) bathrooms, as well as (n) office space. | $1,000,000 |
| Sep 8, 2021 | Completed final sign-off Dec 2022 | 3563 Sacramento St | replace guardrail. reconfigure storage closet, install fixed window at storage closet lightwellDetails
replace guardrail. reconfigure storage closet, install fixed window at storage closet lightwell | $5,000 |
| Apr 30, 2021 | Completed final sign-off Mar 2023 | 1117 Church St | to obtain final inspection for work approved under permit application #200912163343. all work is complete.Details
to obtain final inspection for work approved under permit application #200912163343. all work is complete. | |
| Apr 30, 2021 | Completed final sign-off Mar 2023 | 1117 Church St | to obtain final inspection for work approved under permit application #200809040827, 200911201796, and 200912032554. all work is completed.Details
to obtain final inspection for work approved under permit application #200809040827, 200911201796, and 200912032554. all work is completed. | |
| Oct 28, 2020 | Expired or cancelled cancelled Jan 2026 | 368 San Carlos St | remodel of unit 368 on 2/f. minor floor plan revision of unit 366 on 3/f. ref bpa# 202003126911.Details
remodel of unit 368 on 2/f. minor floor plan revision of unit 366 on 3/f. ref bpa# 202003126911. | |
| Oct 14, 2020 | Expired or cancelled expired Apr 2026 | 368 San Carlos St | remodel in kind bathroom (6x12.9), kitchen (11.8x12.9) and laundry room (10.1x5.4). full electrical and plumbing upgrade throughout the unitDetails
remodel in kind bathroom (6x12.9), kitchen (11.8x12.9) and laundry room (10.1x5.4). full electrical and plumbing upgrade throughout the unit | $25,000 |
| Sep 10, 2020 | Never finaled issued May 2022, no final | 368 San Carlos St | mimic trim around 3/f bay window, 2/f bay window & above side gate. (n) garage door, escavation of south walkway for (n) door to garage. reconfigure (e) windows/doors @ 1/f. (n) window 3/f living area, replace all windows 45 min rated aluminum clad & aluminum clad double hung, double pane windows,Details
mimic trim around 3/f bay window, 2/f bay window & above side gate. (n) garage door, escavation of south walkway for (n) door to garage. reconfigure (e) windows/doors @ 1/f. (n) window 3/f living area, replace all windows 45 min rated aluminum clad & aluminum clad double hung, double pane windows, | $15,000 |
| Mar 16, 2020 | Never finaled issued Aug 2020, no final | 209 Elsie St | interior remodel at 3 floors including (e) kitchen & baths. demo (1) bath at 2nd fl, add (1) bath & (1) bed at 1st fl. full foundation replacement.Details
interior remodel at 3 floors including (e) kitchen & baths. demo (1) bath at 2nd fl, add (1) bath & (1) bed at 1st fl. full foundation replacement. | $300,000 |
| Mar 12, 2020 | Expired or cancelled expired Jan 2025 | 366 San Carlos St | new foundation. repair water damage in laundry and storage room. reconfiguration of storage.Details
new foundation. repair water damage in laundry and storage room. reconfiguration of storage. | $25,000 |
| Feb 26, 2020 | Completed final sign-off Jul 2021 | 1274 De Haro St | revision to bpa #201612024063: reconfigure kitchen layout at 3rd level, eliminate deck at 3rd level; eliminate skylight at 4th level; reconfigure deck at roof level (reduce from 465sf to 372 sf); change facade material.Details
revision to bpa #201612024063: reconfigure kitchen layout at 3rd level, eliminate deck at 3rd level; eliminate skylight at 4th level; reconfigure deck at roof level (reduce from 465sf to 372 sf); change facade material. | |
| Jan 22, 2020 | Expired or cancelled expired Jan 2025 | 366 San Carlos St | remodel of unit #366 on the 3rd fl. replace kitchen cabinets in kind. interior remodel of two unit building per plans. demo (e) bedroom wall to create new open living room and relocate 2nd bedroom to front. add second bathroom at (e) dining nook. no exterior work.Details
remodel of unit #366 on the 3rd fl. replace kitchen cabinets in kind. interior remodel of two unit building per plans. demo (e) bedroom wall to create new open living room and relocate 2nd bedroom to front. add second bathroom at (e) dining nook. no exterior work. | $10,000 |
| Sep 5, 2019 | Completed final sign-off Sep 2019 | 2752 Filbert St | revision to 201806273189 as built condition. minor revision related to framingDetails
revision to 201806273189 as built condition. minor revision related to framing | |
| Mar 19, 2019 | Completed final sign-off Mar 2020 | 3841 18th St | to obtain a final inspection for work approved under previous permit 201604205224. all work is complete.Details
to obtain a final inspection for work approved under previous permit 201604205224. all work is complete. | |
| Jun 27, 2018 | Completed final sign-off Sep 2019 | 2752 Filbert St | 1/f: int renovation of (e) bath. new wall & ceiling paint for whole flr. 2/f: spacial rearrangement done w/new kitchen, living rm & great rm with relocation of din rm. new coffered ceiling added to the grt rm. new wall paneling and new hardwood flr. new wall and ceiling paint for whole flr.Details
1/f: int renovation of (e) bath. new wall & ceiling paint for whole flr. 2/f: spacial rearrangement done w/new kitchen, living rm & great rm with relocation of din rm. new coffered ceiling added to the grt rm. new wall paneling and new hardwood flr. new wall and ceiling paint for whole flr. | $35,000 |
| Jun 22, 2018 | In progress issued May 2024 | 3847 18th St | nov 2018002303enf: remove 4'-8" white laminated glass screen @ front yard. (n) painted solid raised paneling & trim around entry door sidelites. reduce height of stucco wall @ rear yard. reduce window size @ front facade level 3. (n) ogee lugs @ all double hung windows @ front facade.Details
nov 2018002303enf: remove 4'-8" white laminated glass screen @ front yard. (n) painted solid raised paneling & trim around entry door sidelites. reduce height of stucco wall @ rear yard. reduce window size @ front facade level 3. (n) ogee lugs @ all double hung windows @ front facade. | $175,000 |
| Jan 5, 2018 | Completed final sign-off Jun 2021 | 650 De Haro St | legalize (e) 400 sf dwelling unit at 650a de haro st(rear building, lower unit) per ordinance 43-14. provide 20% lanscaping area at front setback, provide 62.5% pearmeable area at front setback, provide 1 (n) 24"box tree within public right of way, provide (n)bicycle parkingDetails
legalize (e) 400 sf dwelling unit at 650a de haro st(rear building, lower unit) per ordinance 43-14. provide 20% lanscaping area at front setback, provide 62.5% pearmeable area at front setback, provide 1 (n) 24"box tree within public right of way, provide (n)bicycle parking | $10,000 |
| May 8, 2017 | Completed final sign-off Jun 2021 | 650 De Haro St | rear bldg. to comply with nov #201653731 (ces). reconfigure front facade. interior remodel. legalize (e) dwelling unit 650b at rear bldg under separate permit 201801057944.Details
rear bldg. to comply with nov #201653731 (ces). reconfigure front facade. interior remodel. legalize (e) dwelling unit 650b at rear bldg under separate permit 201801057944. | $200,000 |
| May 8, 2017 | Completed final sign-off Jun 2021 | 650 De Haro St | front bldg. comply with nov #201653731. new facades , add two floors to frong bldg (650), interior remodel. new elevator front bldg (separate permit).Details
front bldg. comply with nov #201653731. new facades , add two floors to frong bldg (650), interior remodel. new elevator front bldg (separate permit). | $200,000 |
| Mar 31, 2017 | Expired or cancelled expired May 2023 | 271 Upper Tr | slope stabilization in response to nov# 201761992, scaling & removal of loose rocks approx 10 cubic yards.Details
slope stabilization in response to nov# 201761992, scaling & removal of loose rocks approx 10 cubic yards. | $2,000 |
| Feb 15, 2017 | Completed final sign-off Apr 2017 | 80 Sycamore St | to obtain a final inspection for work already approved under pa# 201408204233, 201407070620 & 201408063152, all work is completeDetails
to obtain a final inspection for work already approved under pa# 201408204233, 201407070620 & 201408063152, all work is complete | |
| Dec 2, 2016 | Completed final sign-off Jul 2021 | 1274 De Haro St | (n) front door, (n) front entry stairs, (n) ext. siding, (n) roof deck w/ glass guard rails, (n) stair to roof deck, remodel kitchen, add powder room, modify lightwell, fill in deck @ west elevation, remodel master suite.Details
(n) front door, (n) front entry stairs, (n) ext. siding, (n) roof deck w/ glass guard rails, (n) stair to roof deck, remodel kitchen, add powder room, modify lightwell, fill in deck @ west elevation, remodel master suite. | $200,000 |
| Dec 1, 2016 | Completed final sign-off May 2021 | 650 De Haro St | rear bldg -revision to pa #201607202832, property line retaining walls not included in previous permit to be replaced in kind.Details
rear bldg -revision to pa #201607202832, property line retaining walls not included in previous permit to be replaced in kind. | $25,000 |
| Oct 5, 2016 | Completed final sign-off May 2021 | 650 De Haro St | front bldg - revision to pa #201607202830: replace walls & stairs in kind.Details
front bldg - revision to pa #201607202830: replace walls & stairs in kind. | |
| Oct 5, 2016 | Completed final sign-off May 2021 | 650 De Haro St | rear bldg - revision to pa #201607202832: replace stairs in kind not visible from street.Details
rear bldg - revision to pa #201607202832: replace stairs in kind not visible from street. | |
| Oct 3, 2016 | Never finaled issued Oct 2016, no final | 1635 Indiana St | use change from industrial condo to office use. new restrooms and casework , new lighting and elecDetails
use change from industrial condo to office use. new restrooms and casework , new lighting and elec | $50,000 |
| Aug 31, 2016 | Completed final sign-off Feb 2021 | 246 Carl St | interior remodel, (n) windows & doors in the rear, (n) hydraulic elevator. replace street-facing windows, in kind. seismic upgrade under bpa #201603101729 & #201512034126. full nfpa 13r under separate permit. (n) bedroom & bathroom at basement & 1st floor.Details
interior remodel, (n) windows & doors in the rear, (n) hydraulic elevator. replace street-facing windows, in kind. seismic upgrade under bpa #201603101729 & #201512034126. full nfpa 13r under separate permit. (n) bedroom & bathroom at basement & 1st floor. | $300,000 |
| Aug 15, 2016 | Never finaled issued Aug 2016, no final | 756 Church St | remodel 2 kitchens, 1 per unit. no walls added or removed.Details
remodel 2 kitchens, 1 per unit. no walls added or removed. | $30,000 |
| Aug 9, 2016 | Expired or cancelled cancelled Oct 2017 | 3923 19th St | remodel 1 kitchen & 1 bathroom. no structural / wall changes.Details
remodel 1 kitchen & 1 bathroom. no structural / wall changes. | $20,000 |
| Aug 9, 2016 | Expired or cancelled cancelled Oct 2017 | 3925 19th St | remodel 1 kitchen & 1 bathroom. no structural / wall changes.Details
remodel 1 kitchen & 1 bathroom. no structural / wall changes. | $20,000 |
| Aug 9, 2016 | Expired or cancelled cancelled Oct 2017 | 3921 19th St | remodel 1 kitchen & 1 bathroom. no structural / wall changes.Details
remodel 1 kitchen & 1 bathroom. no structural / wall changes. | $20,000 |
| Jul 20, 2016 | Completed final sign-off May 2021 | 650 De Haro St | (front bldg)replace foundation in-kind.Details
(front bldg)replace foundation in-kind. | $30,000 |
| Jul 20, 2016 | Completed final sign-off May 2021 | 650 De Haro St | (rear bldg) replace foundation in-kind.Details
(rear bldg) replace foundation in-kind. | $30,000 |
| Jun 30, 2016 | Completed final sign-off Oct 2017 | 3847 18th St | excavate to expand rear yard storage space beyond year deckDetails
excavate to expand rear yard storage space beyond year deck | $10,000 |
| May 26, 2016 | Completed final sign-off Jun 2021 | 650 De Haro St | front building: remodel 1 kitchen and 1 bath, replace all interior finishes. new drywall and insulaton. new plumbing fixtures and lighting & casework. no changes to location of, removal of, or addition of walls. no changes to existing layout. all new drywall to be 5/8" type x.Details
front building: remodel 1 kitchen and 1 bath, replace all interior finishes. new drywall and insulaton. new plumbing fixtures and lighting & casework. no changes to location of, removal of, or addition of walls. no changes to existing layout. all new drywall to be 5/8" type x. | $20,000 |
| May 26, 2016 | Completed final sign-off Jun 2021 | 650 De Haro St | rear bld: revision to ref pa 201601217654: per inspectors comments: for increased scope of work. replace "all" interior finishes throughout. no changes to, addition of, or removal of walls. all new drywall to be 5/8" type x. no additional fixtures.Details
rear bld: revision to ref pa 201601217654: per inspectors comments: for increased scope of work. replace "all" interior finishes throughout. no changes to, addition of, or removal of walls. all new drywall to be 5/8" type x. no additional fixtures. | $15,000 |
| Apr 6, 2016 | Never finaled issued Apr 2016, no final | 1130 De Haro St | replace approx 180 sq ft type x gyp board under roof sheathing.Details
replace approx 180 sq ft type x gyp board under roof sheathing. | $1,000 |
| Mar 10, 2016 | Completed final sign-off Feb 2021 | 246 Carl St | full seismic upgrade 4 new moment frames new shearwalls, replace e roof and ciling 2x4 joists with new tji joists, replace e wood columns and beams with new steel beamsDetails
full seismic upgrade 4 new moment frames new shearwalls, replace e roof and ciling 2x4 joists with new tji joists, replace e wood columns and beams with new steel beams | $15,000 |
| Mar 8, 2016 | Completed final sign-off Mar 2021 | 246 Carl St | vertical addition at 4th floor. add (3) bedrooms. add (3) bathrooms. addition of roof decks.Details
vertical addition at 4th floor. add (3) bedrooms. add (3) bathrooms. addition of roof decks. | $220,000 |
| Feb 18, 2016 | Completed final sign-off Mar 2021 | 246 Carl St | horizontal addition at rear. extend bedrooms, add full bathroom.Details
horizontal addition at rear. extend bedrooms, add full bathroom. | $240,000 |
| Jan 21, 2016 | Completed final sign-off Jun 2021 | 650 De Haro St | rear building: remodel 2 kitchens & 2 bathrooms in kind , install new insulation & drywall at affected areas install new plumbing fixtures, lighting, casework & flooring, work located at rear building, no structural work or removal/ or relocate wall. in kitchen lighting & control per cec 150kDetails
rear building: remodel 2 kitchens & 2 bathrooms in kind , install new insulation & drywall at affected areas install new plumbing fixtures, lighting, casework & flooring, work located at rear building, no structural work or removal/ or relocate wall. in kitchen lighting & control per cec 150k | $35,000 |
| Dec 24, 2015 | Completed final sign-off Oct 2017 | 3847 18th St | interior remodel, relocate lower unit from 1st level to basement level. (n) windows and door on north elevation, (n) hydrolic elevator, model 950-15 by acme home. (n) dormer windows per za bulletin no. 3. deferred submittal: (n) sprinkler system under separate permit.Details
interior remodel, relocate lower unit from 1st level to basement level. (n) windows and door on north elevation, (n) hydrolic elevator, model 950-15 by acme home. (n) dormer windows per za bulletin no. 3. deferred submittal: (n) sprinkler system under separate permit. | $100,000 |
| Sep 29, 2015 | Never finaled issued Dec 2016, no final | 80 Sycamore St | revision to app#201409126253. eliminate all plmg fixtures in level 2 bedroom 2 and bath 2. increase voluation by $150,000.00Details
revision to app#201409126253. eliminate all plmg fixtures in level 2 bedroom 2 and bath 2. increase voluation by $150,000.00 | $150,000 |
| Aug 27, 2015 | Completed final sign-off Feb 2018 | 166 Palo Alto Av | legalize (e) unit on lower level (418 sqft). two new 24" box tree to be added with in the public right-of-way. two new 2'-0"x6'-0" area to be devoted to bicycle parking. per unit legalization ordinance 43-14.Details
legalize (e) unit on lower level (418 sqft). two new 24" box tree to be added with in the public right-of-way. two new 2'-0"x6'-0" area to be devoted to bicycle parking. per unit legalization ordinance 43-14. | $35,000 |
| Aug 6, 2015 | Completed final sign-off Sep 2015 | 3060 Jackson St | to obtain a final inspectoin for work approved under pa#., all work is complete. 1Details
to obtain a final inspectoin for work approved under pa#., all work is complete. 1 | |
| Aug 6, 2015 | Never finaled issued Aug 2015, no final | 80 Sycamore St | street spaceDetails
street space | |
| Aug 6, 2015 | Completed final sign-off Sep 2015 | 3060 Jackson St | to obtain a final inspection for work approved under pa#201306129306. all work is complete.Details
to obtain a final inspection for work approved under pa#201306129306. all work is complete. | |
| Aug 6, 2015 | Completed final sign-off Sep 2015 | 3060 Jackson St | to obtain a final inspection for work approved under pa#201407090786. all work is complete.Details
to obtain a final inspection for work approved under pa#201407090786. all work is complete. | |
| Jul 27, 2015 | Completed final sign-off Feb 2021 | 246 Carl St | remdoel 2 kitchens and 2 bathrooms in kind. repalce insulation and drywalls at affected areas. new caswork, finishes, plubing and lighting fixtures; to comply with cec150.0(k)3 & 5Details
remdoel 2 kitchens and 2 bathrooms in kind. repalce insulation and drywalls at affected areas. new caswork, finishes, plubing and lighting fixtures; to comply with cec150.0(k)3 & 5 | $100,000 |
| Jul 24, 2015 | Completed final sign-off Oct 2017 | 3847 18th St | voluntary full seismic upgrade, 4 new rigid frames, new shear wall & new steel beams.Details
voluntary full seismic upgrade, 4 new rigid frames, new shear wall & new steel beams. | $50,000 |
| Jul 23, 2015 | Completed final sign-off Apr 2016 | 26 Buena Vista Tr | replace kitchen cabinets, master bathroom fixtures and flooring, powder room in kind, new toilet and vanity and 13 windows to be replaced with wood windows in kind. floor finishingDetails
replace kitchen cabinets, master bathroom fixtures and flooring, powder room in kind, new toilet and vanity and 13 windows to be replaced with wood windows in kind. floor finishing | $250,000 |
| Jun 4, 2015 | Expired or cancelled cancelled Feb 2020 | 3921 19th St | a new garage to be constructed under existing residential building. a new garage door is needed in the existing foundation wall. a new slab and structure are required. *all work subterranean except garage door.Details
a new garage to be constructed under existing residential building. a new garage door is needed in the existing foundation wall. a new slab and structure are required. *all work subterranean except garage door. | $125,000 |
| Mar 20, 2015 | Expired or cancelled withdrawn Jul 2019 | 301 Upper Tr | demolish three story single family dwelling.Details
demolish three story single family dwelling. | $50,000 |
| Mar 20, 2015 | Expired or cancelled cancelled Jul 2024 | 4500 17th St | erect 4-story, 1 basement, type 5a, single family dwelling unit bldg.Details
erect 4-story, 1 basement, type 5a, single family dwelling unit bldg. | $2,000,000 |
| Mar 20, 2015 | Expired or cancelled cancelled Jul 2024 | 271 Upper Tr | (front bldg) erect 4-story, 1 basement, type 5a, single family dwelling unit bldg.Details
(front bldg) erect 4-story, 1 basement, type 5a, single family dwelling unit bldg. | $2,000,000 |
| Mar 20, 2015 | Expired or cancelled cancelled Jul 2024 | 271 Upper Tr | (back bldg) erect 4-story, 1 basement, type 5a, single family dwelling unit bldg.Details
(back bldg) erect 4-story, 1 basement, type 5a, single family dwelling unit bldg. | $2,000,000 |
| Mar 20, 2015 | Expired or cancelled cancelled Jul 2024 | 271 Upper Tr | demolish single family dwelling.Details
demolish single family dwelling. | $50,000 |
| Mar 20, 2015 | Expired or cancelled cancelled Jul 2024 | 301 Upper Tr | (back bldg) erect 4-story, 1 basement, type 5a, single family dwelling unit bldg. rear bldg.Details
(back bldg) erect 4-story, 1 basement, type 5a, single family dwelling unit bldg. rear bldg. | $2,000,000 |
| Mar 20, 2015 | Expired or cancelled cancelled Jul 2024 | 301 Upper Tr | (front bldg) erect 4-story, 1 basement, type 5a, single family dwelling unit bldg.Details
(front bldg) erect 4-story, 1 basement, type 5a, single family dwelling unit bldg. | $2,000,000 |
| Nov 4, 2014 | Completed final sign-off Jan 2015 | 3133 Harrison St | to obtain final inspection for work approved under pa #200804250687. all work is complete.Details
to obtain final inspection for work approved under pa #200804250687. all work is complete. | |
| Nov 3, 2014 | Never finaled issued Nov 2014, no final | 1130 De Haro St | (2) (n) skylights, remove (3) property line windows at south elevation, replace (1) (e) window, in kind at west (rear) elevation, (1) (n) window at west (rear) elevation to match existing.Details
(2) (n) skylights, remove (3) property line windows at south elevation, replace (1) (e) window, in kind at west (rear) elevation, (1) (n) window at west (rear) elevation to match existing. | $2,000 |
| Oct 1, 2014 | Completed final sign-off Apr 2017 | 80 Sycamore St | addition of penthouse @ level 4 with roof deck with one bedroom and bathroom (add one story total 4 stories)Details
addition of penthouse @ level 4 with roof deck with one bedroom and bathroom (add one story total 4 stories) | $175,000 |
| Sep 22, 2014 | Completed final sign-off Oct 2017 | 3847 18th St | correct n.o.v. #201310261. remove illegal dwelling unit at basement. remove all unapproved wiring, plmb, kitchen and bathroom at basement. remove plywood sheathing at 1st floor to restore original stair access from 1st floor to basement.Details
correct n.o.v. #201310261. remove illegal dwelling unit at basement. remove all unapproved wiring, plmb, kitchen and bathroom at basement. remove plywood sheathing at 1st floor to restore original stair access from 1st floor to basement. | $5,000 |
| Sep 18, 2014 | Completed final sign-off Mar 2015 | 166 Palo Alto Av | replace existing drywall and interior finishes damaged by moldew at home office/den.Details
replace existing drywall and interior finishes damaged by moldew at home office/den. | $5,000 |
| Sep 15, 2014 | Completed final sign-off Mar 2015 | 166 Palo Alto Av | replace 1 new window & 1 exterior door in-kind not facing public street, u-factor =0.32 max.Details
replace 1 new window & 1 exterior door in-kind not facing public street, u-factor =0.32 max. | $5,000 |
| Aug 20, 2014 | Completed final sign-off Apr 2017 | 80 Sycamore St | voluntary foundaiton upgrade at ground floor.Details
voluntary foundaiton upgrade at ground floor. | $45,000 |
| Aug 6, 2014 | Completed final sign-off Apr 2017 | 80 Sycamore St | remove and replace drywall at garage level and first level 5/8" type ; install insulation. no new wallsDetails
remove and replace drywall at garage level and first level 5/8" type ; install insulation. no new walls | $30,000 |
| Jul 17, 2014 | Completed final sign-off Dec 2014 | 2945 Scott St | revision to app#201311152022. substitute steel moment frame for hardy frame, re-use extg w 18 bmDetails
revision to app#201311152022. substitute steel moment frame for hardy frame, re-use extg w 18 bm | |
| Jul 9, 2014 | Expired or cancelled expired Sep 2015 | 3060 Jackson St | revision to approved permits 201303293369 and 201305036101; redesign of some interior partition walls. no change in volume/envelope; maher n/aDetails
revision to approved permits 201303293369 and 201305036101; redesign of some interior partition walls. no change in volume/envelope; maher n/a | $8,000 |
| Jul 7, 2014 | Completed final sign-off Apr 2017 | 80 Sycamore St | remodel kitchen. no structural work. no change to layout.Details
remodel kitchen. no structural work. no change to layout. | $15,000 |
| Jul 2, 2014 | Completed final sign-off Feb 2024 | 923 Kansas St | erect 3-story, 2 dwelling units with 1 basement residential building.Details
erect 3-story, 2 dwelling units with 1 basement residential building. | $1,900,000 |
| Jul 2, 2014 | Completed final sign-off Mar 2025 | 931 Kansas St | erect 3-story, 2 dwelling units with 1 basement residential building.Details
erect 3-story, 2 dwelling units with 1 basement residential building. | $1,692,250 |
| Jul 2, 2014 | Completed final sign-off Feb 2024 | 927 Kansas St | erect 3-story, 2 dwelling units with 1 basement residential building.Details
erect 3-story, 2 dwelling units with 1 basement residential building. | $1,877,250 |
| Jul 2, 2014 | Completed final sign-off Feb 2024 | 939 Kansas St | erect 3-story, 1 dwelling unit with 1 basement residential building.Details
erect 3-story, 1 dwelling unit with 1 basement residential building. | $1,235,500 |
| Jul 2, 2014 | Completed final sign-off Mar 2026 | 935 Kansas St | erect 3-story, 2 dwelling units with 1 basement residential building.Details
erect 3-story, 2 dwelling units with 1 basement residential building. | $1,692,000 |
| Jun 23, 2014 | Completed final sign-off Oct 2014 | 2945 Scott St | install new hvac system and ductwork. exposed ductwork in garage min. 26 gauge ductings.Details
install new hvac system and ductwork. exposed ductwork in garage min. 26 gauge ductings. | $10,000 |
| Jan 14, 2014 | Completed final sign-off Feb 2015 | 2555 Larkin St | interior remodel at unit #2: replace windows in-kind throughout. refinish existing wood flooring. replace existing bathtub and toilet at master bath. install recessed cans at bedroom. upgrade interior finishes and new paint throughout. install new furnace unit at storage room.Details
interior remodel at unit #2: replace windows in-kind throughout. refinish existing wood flooring. replace existing bathtub and toilet at master bath. install recessed cans at bedroom. upgrade interior finishes and new paint throughout. install new furnace unit at storage room. | $35,000 |
| Dec 3, 2013 | Completed final sign-off May 2018 | 1136 De Haro St | 210 sq. ft horizontal addition, (n) kitchen, dinning room. powder room & stair @ 2nd flr. 1300 sq.ft vertical addition, (n) bedrooms, closets, bathroom powder room & stair @ 3rd flr. (n) roof deck.Details
210 sq. ft horizontal addition, (n) kitchen, dinning room. powder room & stair @ 2nd flr. 1300 sq.ft vertical addition, (n) bedrooms, closets, bathroom powder room & stair @ 3rd flr. (n) roof deck. | $80,000 |
| Nov 26, 2013 | Completed final sign-off Jan 2015 | 1450 Greenwich St | #202:remodel kitchen, bath, and living areas including finishes, lighting casework and plumbing.Details
#202:remodel kitchen, bath, and living areas including finishes, lighting casework and plumbing. | $45,000 |
| Nov 15, 2013 | Completed final sign-off Dec 2014 | 2945 Scott St | remodel existing bathroom, new door and railing at existing 3rd floor roof deck. seismic improvements at garageDetails
remodel existing bathroom, new door and railing at existing 3rd floor roof deck. seismic improvements at garage | $50,000 |
| Nov 1, 2013 | Completed final sign-off Mar 2014 | 435 China Basin St | unit #631: replace (6) cfl recessed luminaires 3/six led luminaires (1 @ entry, 4 @ kitchen, 1 @ hallway). install (6) additional led recessed luminaires @ dining room. all work to be performed within the residential unit.Details
unit #631: replace (6) cfl recessed luminaires 3/six led luminaires (1 @ entry, 4 @ kitchen, 1 @ hallway). install (6) additional led recessed luminaires @ dining room. all work to be performed within the residential unit. | $3,500 |
| Jul 30, 2013 | Completed final sign-off Jan 2014 | 1 Hawthorne St | unit 24d: new dropped ceilings in living, master bed and powder. replace all finishes in powder room. new lighting fixtures in living, dining, kitchen, hallway, master bed and bath and powder room.Details
unit 24d: new dropped ceilings in living, master bed and powder. replace all finishes in powder room. new lighting fixtures in living, dining, kitchen, hallway, master bed and bath and powder room. | $60,000 |
| Jul 3, 2013 | Completed final sign-off Aug 2013 | 44 Diamond St | revision to app#201211295156. revise deck dimensions.no change to height, no (n) firewall requiredDetails
revision to app#201211295156. revise deck dimensions.no change to height, no (n) firewall required | |
| Jun 27, 2013 | Completed final sign-off Jan 2014 | 301 Mission St | unit 56 a:kitchen renovation including the removal of a few walls, new cabinetry, electrical and plumbing, small bath revision. sprinklers under separate permit.Details
unit 56 a:kitchen renovation including the removal of a few walls, new cabinetry, electrical and plumbing, small bath revision. sprinklers under separate permit. | $10,000 |
| Jun 12, 2013 | Expired or cancelled expired Sep 2015 | 3060 Jackson St | replace lath & plaster with sheetrock inside the top 3 floors. and add insulation.Details
replace lath & plaster with sheetrock inside the top 3 floors. and add insulation. | $25,000 |
| May 3, 2013 | Expired or cancelled expired Sep 2015 | 3060 Jackson St | addition to (e) roof top dormer. 53 sq ft.Details
addition to (e) roof top dormer. 53 sq ft. | $10,000 |
| May 3, 2013 | Completed final sign-off Mar 2015 | 117 Delmar St | interior renovation, convert extg crawl space to living space, renovate kitchen and foyer.Details
interior renovation, convert extg crawl space to living space, renovate kitchen and foyer. | $150,000 |
| Mar 29, 2013 | Completed final sign-off Sep 2015 | 3060 Jackson St | interior renovation thruout convert crawl space at ground level to living space add dormers to top floor living space new elevatorDetails
interior renovation thruout convert crawl space at ground level to living space add dormers to top floor living space new elevator | $475,000 |
| Nov 29, 2012 | Completed final sign-off Aug 2013 | 44 Diamond St | seismic upgrade, (n) siliding doors at rear elevation, 2 skylights, fixtures, interior walls & int stair. (n) deck, eliminate (1) bedroom & (1) bathroom on upper floor, add (1) bedroom & (1) bathroom on lower floor, (n) plbg & elec fixtures.Details
seismic upgrade, (n) siliding doors at rear elevation, 2 skylights, fixtures, interior walls & int stair. (n) deck, eliminate (1) bedroom & (1) bathroom on upper floor, add (1) bedroom & (1) bathroom on lower floor, (n) plbg & elec fixtures. | $175,000 |
| Oct 15, 2012 | Completed final sign-off Jun 2013 | 44 Diamond St | kitchen remodel: replace cabinets & fixtures. upgrade lighting to comply with t-24.Details
kitchen remodel: replace cabinets & fixtures. upgrade lighting to comply with t-24. | $20,000 |
| Aug 9, 2012 | Never finaled issued Aug 2012, no final | 67 Fresno St | to obtain final inspection for work approved under pa# 200803036108. all work is complete.Details
to obtain final inspection for work approved under pa# 200803036108. all work is complete. |