Joseph Remling
- Listed as
- architect, designer, engineer
- Firm
- Asd Sky
- Based in
- San Francisco
- On San Francisco permits
- Jan 2013 to Jul 2024
398 permits since 2000 (architect on 376 permits, designer on 11 permits, engineer on 11 permits): 324 completed, 54 never finaled, 20 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 398.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 26, 2024 | Completed final sign-off Mar 2025 | 566 Lombard St | address drainage/leakage issue along east property line foundation wall adj to neighbors rear yard install 20 linear ft capped stem wall w/drainage and waterproofing work will require new toilet/shower in (e) bathroomDetails
address drainage/leakage issue along east property line foundation wall adj to neighbors rear yard install 20 linear ft capped stem wall w/drainage and waterproofing work will require new toilet/shower in (e) bathroom | $46,000 | |
| Feb 10, 2023 | Never finaled issued Feb 2023, no final | 187 16th Av | Daaron Builders | rev to pa# 2022-1212-8109 modify cantillver bay strengtheningDetails
rev to pa# 2022-1212-8109 modify cantillver bay strengthening | |
| Nov 15, 2022 | Never finaled filed Nov 2022, never issued | 46 Eagle St | comply w/ nov 202172279. replace (e) substandard retaining walls at rearyard adjacent to downhill properties(north 4757 19th street, weast - 30 eagle st. new reinforced concrete retaining wall with drilled piers . structural foundation system to be shared with neighbors.Details
comply w/ nov 202172279. replace (e) substandard retaining walls at rearyard adjacent to downhill properties(north 4757 19th street, weast - 30 eagle st. new reinforced concrete retaining wall with drilled piers . structural foundation system to be shared with neighbors. | $78,000 | |
| Jan 4, 2022 | Completed final sign-off Sep 2022 | 55 02nd St | Principal Builders Inc. | 4th fl - interior tenant improvement to include (n) non structural partitions, finishes, lighting & equipmentDetails
4th fl - interior tenant improvement to include (n) non structural partitions, finishes, lighting & equipment | $2,366,525 |
| May 24, 2021 | Completed final sign-off Mar 2022 | 233 Grant Av | M C S Construction Services | 4th fl - ti incluldes new non-structural partitions and finishes. all new or revised. hvac, electrical, plumbing and life safety work will be design build and submitted for permit separately if neededDetails
4th fl - ti incluldes new non-structural partitions and finishes. all new or revised. hvac, electrical, plumbing and life safety work will be design build and submitted for permit separately if needed | $200,000 |
| May 7, 2021 | Completed final sign-off Dec 2021 | 1 Embarcadero Center | Skyline Construction | 9th fl: revision to pa# 202010096255. selective demo of (e) suite & construct (n) single tenant fi including future sublease space. build (n) nono-structural partitions, finishes, revised ceiling, lighting, & life safety. ref pa# 202102054164.Details
9th fl: revision to pa# 202010096255. selective demo of (e) suite & construct (n) single tenant fi including future sublease space. build (n) nono-structural partitions, finishes, revised ceiling, lighting, & life safety. ref pa# 202102054164. | $110,000 |
| Apr 9, 2021 | Completed final sign-off Jan 2023 | 101 Utah St | Skyline Capital Builders Llc | revision to arch/structural pa 201905312103 and mep pa 201906254344. elimanate large roof skylights; rr (new) removed from shell scope: electrical scope changed; adjust stair #2 layout; see page ao.01r for more specifics.Details
revision to arch/structural pa 201905312103 and mep pa 201906254344. elimanate large roof skylights; rr (new) removed from shell scope: electrical scope changed; adjust stair #2 layout; see page ao.01r for more specifics. | |
| Mar 15, 2021 | Completed final sign-off Oct 2021 | 1160 Battery St | Bcci Construction Company | 1st fl: demo and rebuild back of non-structural partitions. m.e.p./structural included. ref pa# 202011068411. water sump closed. 6'x6'x5'.Details
1st fl: demo and rebuild back of non-structural partitions. m.e.p./structural included. ref pa# 202011068411. water sump closed. 6'x6'x5'. | $40,000 |
| Mar 1, 2021 | Completed final sign-off Dec 2021 | 420 Taylor St | Novo Construction Inc | administrative review of pa 202009265171. previous submission was approved without benefit of planning preservation review, and this submission is to allow planning preservative review.Details
administrative review of pa 202009265171. previous submission was approved without benefit of planning preservation review, and this submission is to allow planning preservative review. | |
| Feb 5, 2021 | Completed final sign-off Dec 2021 | 1 Embarcadero Center | Skyline Construction | 9/f-revision to pa# 202010096255. structural reinforcement of floor at high density files. revised structural solution under delta 04 revision dated 2/1/21.Details
9/f-revision to pa# 202010096255. structural reinforcement of floor at high density files. revised structural solution under delta 04 revision dated 2/1/21. | |
| Jan 28, 2021 | Completed final sign-off Nov 2022 | 580 California St | Novo Construction Inc | 9/f: t.i. single tenant-demo non-structural partitions and building new non-structural partitions. new and revised mep under this permit, life safety & sprinkler under sep permit. maher n/a.Details
9/f: t.i. single tenant-demo non-structural partitions and building new non-structural partitions. new and revised mep under this permit, life safety & sprinkler under sep permit. maher n/a. | $1,725,959 |
| Jan 27, 2021 | Completed final sign-off Feb 2023 | 580 California St | 10/f: t.i. single tenant-demo non-structural partitions and building new non-structural partitions. new and revised mep under this permit. life safety & sprinkler under sep permit. maher n/a.Details
10/f: t.i. single tenant-demo non-structural partitions and building new non-structural partitions. new and revised mep under this permit. life safety & sprinkler under sep permit. maher n/a. | $2,002,819 | |
| Jan 15, 2021 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | 23rd fl: adminstrative permit to document a-2 assembly occupancy on floor per fire inspector. a-2 assembly was not on application for previously approved permit. ref pa# 201911147260Details
23rd fl: adminstrative permit to document a-2 assembly occupancy on floor per fire inspector. a-2 assembly was not on application for previously approved permit. ref pa# 201911147260 | |
| Dec 28, 2020 | Completed final sign-off Nov 2021 | 44 Montgomery St | Peacock Construction | suite #1300: ti include demo of non-structural partitions, build new non-structural partitions. revised or new mep, life safety, or sprinklers will be design build and submitted separately. bldg is fully sprinklered.Details
suite #1300: ti include demo of non-structural partitions, build new non-structural partitions. revised or new mep, life safety, or sprinklers will be design build and submitted separately. bldg is fully sprinklered. | $74,000 |
| Dec 14, 2020 | Completed final sign-off Mar 2021 | 1390 Market St | M C S Construction Services | 2nd fl, suite 210. demo scope only. per ab-017. ti under separate permit, sprinkler permit under pa# 202011259686. maher naDetails
2nd fl, suite 210. demo scope only. per ab-017. ti under separate permit, sprinkler permit under pa# 202011259686. maher na | $36,000 |
| Dec 14, 2020 | Completed final sign-off May 2021 | 600 California St | 5th fl: barrier removal, non structural modifications of (e) restrooms to fully accessible. new or revised mep, life safety & sprinklers under separate permit if needed (bldg is fully sprinklered)Details
5th fl: barrier removal, non structural modifications of (e) restrooms to fully accessible. new or revised mep, life safety & sprinklers under separate permit if needed (bldg is fully sprinklered) | $170,000 | |
| Dec 8, 2020 | Completed final sign-off Sep 2021 | 44 Montgomery St | Peacock Construction | 5th, 7th, 8th fl: capital improvement/barrier removal. demo of existing restrooms & building back. new fully accessible compliant building standard restrooms.Details
5th, 7th, 8th fl: capital improvement/barrier removal. demo of existing restrooms & building back. new fully accessible compliant building standard restrooms. | $250,000 |
| Dec 8, 2020 | Expired or cancelled expired Feb 2026 | 55 New Montgomery St | M C S Construction Services | 4th fl: tenant improvement. new non-structured partitions & new restrooms. mep's, life safety, sprinklers if needed design build & submitted separately. demo under pa# 201909192136.Details
4th fl: tenant improvement. new non-structured partitions & new restrooms. mep's, life safety, sprinklers if needed design build & submitted separately. demo under pa# 201909192136. | $451,707 |
| Nov 6, 2020 | Completed final sign-off Nov 2021 | 1160 Battery St | Bcci Construction Company | (1st fl ste# 50) t.i. includes demo of non-structural partitions & building (n) non-structural partitions. not visible from street. m.e.p. life safety & sprinklers under separate permit if needed.Details
(1st fl ste# 50) t.i. includes demo of non-structural partitions & building (n) non-structural partitions. not visible from street. m.e.p. life safety & sprinklers under separate permit if needed. | $500,000 |
| Nov 3, 2020 | Completed final sign-off Oct 2021 | 155 Greenwich St | Bcci Construction Company | 1st fl: partial ground fl t.i. includes demo of non-structural partitions and building (n) non-structural partitions. mep, life safety & sprinklers under separate permits. area of work provides accessory use for 1255 battery street office (b).Details
1st fl: partial ground fl t.i. includes demo of non-structural partitions and building (n) non-structural partitions. mep, life safety & sprinklers under separate permits. area of work provides accessory use for 1255 battery street office (b). | $500,000 |
| Oct 9, 2020 | Completed final sign-off Dec 2021 | 1 Embarcadero Center | Skyline Construction | 9/f: demo of (e) suite & construction of t.i for single tenant future sublease space. new ceiling, lighting & partitions etc. meps, life safety, sprinklers & structural if needed under separate permit. (bldg fully sprinklered)Details
9/f: demo of (e) suite & construction of t.i for single tenant future sublease space. new ceiling, lighting & partitions etc. meps, life safety, sprinklers & structural if needed under separate permit. (bldg fully sprinklered) | $4,300,000 |
| Sep 26, 2020 | Completed final sign-off Nov 2020 | 420 Taylor St | Novo Construction Inc | rev to pa202005277869/bb434455232: new vestible with double doors and electrical connections for 2 turnsiles w/ emergency swing gate at main entry. (turnstle provided by vendor). maher n/aDetails
rev to pa202005277869/bb434455232: new vestible with double doors and electrical connections for 2 turnsiles w/ emergency swing gate at main entry. (turnstle provided by vendor). maher n/a | $73,500 |
| Aug 20, 2020 | Completed final sign-off Apr 2021 | 153 Townsend St | Skyline Construction | ti includes demo on non-structural partitions and building new non-structural partitions. all new or revised mep will be fully engineered & part of this submittal. life safety and sprinklers if needed will be design buils & submitted separately. building is fully sprinklered.Details
ti includes demo on non-structural partitions and building new non-structural partitions. all new or revised mep will be fully engineered & part of this submittal. life safety and sprinklers if needed will be design buils & submitted separately. building is fully sprinklered. | $3,900,000 |
| Aug 7, 2020 | Completed final sign-off Feb 2021 | 1 California St | Hp Build | 30th flr. - t.i, demo of non-struct paritions & replace w/ new. meps included. life safety and sprinklers under separate permit. bldg fully sprinklered.Details
30th flr. - t.i, demo of non-struct paritions & replace w/ new. meps included. life safety and sprinklers under separate permit. bldg fully sprinklered. | $1,500,000 |
| Jul 24, 2020 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | 23rd fl - revision to pa 2019-1114-7260, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope addedDetails
23rd fl - revision to pa 2019-1114-7260, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope added | |
| Jul 24, 2020 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | 20th fl - revision to pa 2019-1121-7836, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope addedDetails
20th fl - revision to pa 2019-1121-7836, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope added | |
| Jul 24, 2020 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | 21st fl - revision to pa 2019-1121-7840, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope addedDetails
21st fl - revision to pa 2019-1121-7840, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope added | |
| Jul 24, 2020 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | 22nd fl - revision to pa 2019-1121-7838, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope addedDetails
22nd fl - revision to pa 2019-1121-7838, modifications to fecs, door hardware, plumbing fixtures, layout of door near the core central stair, and revise scope at the core restrooms. all affected areas were previously reviewed as part of the original permit. no new scope added | |
| Jul 22, 2020 | Expired or cancelled cancelled Jan 2026 | 430 California St | 2nd fl ti new non structural partitions, ceilings. new finishes, new or revised meps, ls and sprinklers under sep permit. fully sprinkleredDetails
2nd fl ti new non structural partitions, ceilings. new finishes, new or revised meps, ls and sprinklers under sep permit. fully sprinklered | $2,000,000 | |
| Jun 12, 2020 | Never finaled issued Oct 2020, no final | 100 Bush St | Rylko Builders Inc. | 9th fl/suite 900, t.i. includes demo of non-str. partitions and building new non-str. partitions; ada upgrades; new electrical work included in this permit; mech., plumbing, life safety and sprinklers will be design build if needed and submitted separately. building is fully sprinklered.Details
9th fl/suite 900, t.i. includes demo of non-str. partitions and building new non-str. partitions; ada upgrades; new electrical work included in this permit; mech., plumbing, life safety and sprinklers will be design build if needed and submitted separately. building is fully sprinklered. | $150,000 |
| Jun 4, 2020 | Completed final sign-off Dec 2020 | 1455 Market St | sf abe program. barrier removal includes restriping of existing parking lots nad addition of required parking signage, as well as addition of accessible ev charging spaces. all new or revised mep. life safety work will be submitted separately. building fully sprinklered.Details
sf abe program. barrier removal includes restriping of existing parking lots nad addition of required parking signage, as well as addition of accessible ev charging spaces. all new or revised mep. life safety work will be submitted separately. building fully sprinklered. | $29,300 | |
| May 27, 2020 | Completed final sign-off Nov 2020 | 420 Taylor St | 2nd floor - tenant improvement includes the building of new non-structural partitions. all new or revised mep, life safety, and sprinkler work will be design build and submitted under separate permit if needed. building is fully sprinklered.Details
2nd floor - tenant improvement includes the building of new non-structural partitions. all new or revised mep, life safety, and sprinkler work will be design build and submitted under separate permit if needed. building is fully sprinklered. | $42,000 | |
| Mar 4, 2020 | Expired or cancelled cancelled Mar 2021 | 650 California St | Principal Builders Inc. | 26th fl: partial floor ti to demo and construct new partitions, finishes, doors, ceilings, millwork. mep, ls, sprinklers under sep permitDetails
26th fl: partial floor ti to demo and construct new partitions, finishes, doors, ceilings, millwork. mep, ls, sprinklers under sep permit | $697,000 |
| Mar 4, 2020 | Completed final sign-off Jul 2020 | 650 California St | Richlen Construction | revision to pa #202001131736, ti includes providing non-structural partitions. 29th flDetails
revision to pa #202001131736, ti includes providing non-structural partitions. 29th fl | $10,000 |
| Feb 13, 2020 | Completed final sign-off Sep 2020 | 555 Montgomery St | Rudolph Commercial Interiors Inc, Rci | rev to pa# 201907176142 (new partition locations). n/a maherDetails
rev to pa# 201907176142 (new partition locations). n/a maher | |
| Feb 13, 2020 | Completed final sign-off Apr 2021 | 555 Montgomery St | Rudolph Commercial Interiors Inc, Rci | ste 1210 - ti improvement to include the demo of non-structural partitions and building of new non-structural partitions mep & fire life safety under sep permit n/a maherDetails
ste 1210 - ti improvement to include the demo of non-structural partitions and building of new non-structural partitions mep & fire life safety under sep permit n/a maher | $394,000 |
| Jan 27, 2020 | Completed final sign-off Jul 2020 | 1550 Bryant St | D A Pope Inc | 7th fl, ste 760 & 770 - ti include demo of non-structural partitions and build (n) non structural partitions; mep, life safety & sprinklers will be design build & submitted separately if needed. (bldg fully sprinklered)Details
7th fl, ste 760 & 770 - ti include demo of non-structural partitions and build (n) non structural partitions; mep, life safety & sprinklers will be design build & submitted separately if needed. (bldg fully sprinklered) | $217,000 |
| Jan 15, 2020 | Completed final sign-off Jan 2021 | 4 Embarcadero Center | Source Planning And Construction Inc | 25th floor: (suite 2570) t.i. bldg new non-structural partitions, meps, life safety, and sprinklers under separate permit(design build. bldg is fully sprinklered.Details
25th floor: (suite 2570) t.i. bldg new non-structural partitions, meps, life safety, and sprinklers under separate permit(design build. bldg is fully sprinklered. | $250,000 |
| Jan 13, 2020 | Completed final sign-off Jul 2020 | 650 California St | Richlen Construction | 29th fl, ste 2950 - ti building of (n) non-structural partitions. electrical included. bldg is fully sprinklered (mech, plumbing, life safety & sprinklers under separate permit if needed)Details
29th fl, ste 2950 - ti building of (n) non-structural partitions. electrical included. bldg is fully sprinklered (mech, plumbing, life safety & sprinklers under separate permit if needed) | $70,000 |
| Jan 13, 2020 | Completed final sign-off May 2021 | 4 Embarcadero Center | Source Planning And Construction Inc | 39th fl, ste 3950 - ti include the modification to the exterior opening to comply with ada code and the addition of a guardrail at the existing parapet. (life safety work will be design build under separate permit. bldg fully sprinkleredDetails
39th fl, ste 3950 - ti include the modification to the exterior opening to comply with ada code and the addition of a guardrail at the existing parapet. (life safety work will be design build under separate permit. bldg fully sprinklered | $100,000 |
| Dec 24, 2019 | Completed final sign-off Jan 2021 | 4 Embarcadero Center | Source Planning And Construction Inc | 37th flr. tenant improvement to incl demo of non-structural partitions, building of new non-structural partitions. mep and fire life safety under separate permitDetails
37th flr. tenant improvement to incl demo of non-structural partitions, building of new non-structural partitions. mep and fire life safety under separate permit | $250,000 |
| Dec 24, 2019 | Completed final sign-off Jan 2021 | 4 Embarcadero Center | Source Planning And Construction Inc | 36th frl. tenant improvement to incl demo of non-structural partitions, building of new non-structural partitions. mep and fire life safety under separate permitsDetails
36th frl. tenant improvement to incl demo of non-structural partitions, building of new non-structural partitions. mep and fire life safety under separate permits | $250,000 |
| Dec 19, 2019 | Never finaled issued Feb 2020, no final | 1 Embarcadero Center | Hathaway Dinwiddie Co. | 5th fl- t.i. includes demo of non-structural partitions, ceiling etc. and building, new non-structural partitions, mep's, life safety and sprinklers under separate permit (building fully sprinklered). add power door actuator per plans.Details
5th fl- t.i. includes demo of non-structural partitions, ceiling etc. and building, new non-structural partitions, mep's, life safety and sprinklers under separate permit (building fully sprinklered). add power door actuator per plans. | $1,800,000 |
| Dec 10, 2019 | Completed final sign-off Mar 2022 | 600 Townsend St | Novo Construction Inc | 2nd fl ti demo of non structural partitions, build non struc paritions including moveable. mep ls and sp separate permit. building fully sprinkleredDetails
2nd fl ti demo of non structural partitions, build non struc paritions including moveable. mep ls and sp separate permit. building fully sprinklered | $2,464,000 |
| Dec 10, 2019 | Completed final sign-off Jun 2020 | 1725 Montgomery St | Marchetti Group | ti include only demo work per ab-017. the existing building ceiling is currently an open/exposed ceiling with all of the fire spriknkler heads already turned up facing open ceiling. a new ti permit will be sumitted under separate permit for the new construction. the building is fully sprinkleredDetails
ti include only demo work per ab-017. the existing building ceiling is currently an open/exposed ceiling with all of the fire spriknkler heads already turned up facing open ceiling. a new ti permit will be sumitted under separate permit for the new construction. the building is fully sprinklered | $75,000 |
| Nov 25, 2019 | Completed final sign-off May 2020 | 430 California St | Sc Builders, Inc | 7th fl - revision to pa 2019-0830-9236. correction of fsd's going from 17 fsd's to 13 fsd's etsDetails
7th fl - revision to pa 2019-0830-9236. correction of fsd's going from 17 fsd's to 13 fsd's ets | |
| Nov 25, 2019 | Completed final sign-off Dec 2020 | 625 02nd St | Bay Cities Painters & Decorators Inc | to comply with abe ord 51-16 parking garage restripping, signage and associated barrier removal work (garage & 1st fl)Details
to comply with abe ord 51-16 parking garage restripping, signage and associated barrier removal work (garage & 1st fl) | $5,000 |
| Nov 25, 2019 | Expired or cancelled cancelled Jan 2026 | 140 Maiden Ln | 1st fl - barrier removal only: provide (n) ada compliant actuator. button ballard tied to existing poiwer door actuator. remove existing power door operator (high only) and replace light fixture to match existing original conditionDetails
1st fl - barrier removal only: provide (n) ada compliant actuator. button ballard tied to existing poiwer door actuator. remove existing power door operator (high only) and replace light fixture to match existing original condition | $5,000 | |
| Nov 25, 2019 | Completed final sign-off May 2020 | 430 California St | Sc Builders, Inc | 11th fl - revision to pa 2019-0820-9238 correcting fsd's, going from 11 fsd's to 8 fsd's etcDetails
11th fl - revision to pa 2019-0820-9238 correcting fsd's, going from 11 fsd's to 8 fsd's etc | |
| Nov 21, 2019 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | 20th fl - ti, single tenant floor, building (n) non-structural partitions: (mep, life safety & sprinkler under separate permit if needed). bldg fully sprinkleredDetails
20th fl - ti, single tenant floor, building (n) non-structural partitions: (mep, life safety & sprinkler under separate permit if needed). bldg fully sprinklered | $4,200,000 |
| Nov 21, 2019 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | 21st fl - ti, single tenant floor, building (n) non-structural partitions: (mep, life safety & sprinkler under separate permit if needed). bldg fully sprinkleredDetails
21st fl - ti, single tenant floor, building (n) non-structural partitions: (mep, life safety & sprinkler under separate permit if needed). bldg fully sprinklered | $4,200,000 |
| Nov 21, 2019 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | 22nd fl - ti, single tenant floor, building (n) non-structural partitions: (mep, life safety & sprinkler under separate permit if needed). bldg fully sprinkleredDetails
22nd fl - ti, single tenant floor, building (n) non-structural partitions: (mep, life safety & sprinkler under separate permit if needed). bldg fully sprinklered | $4,200,000 |
| Nov 19, 2019 | Completed final sign-off Feb 2020 | 430 California St | Sc Builders, Inc | evacation signage for floor 7, 8, 9, 10, 11Details
evacation signage for floor 7, 8, 9, 10, 11 | |
| Nov 14, 2019 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | ti on 23rd fl to consist of new non-structural partitions. mep & fire life safety under separate permit.Details
ti on 23rd fl to consist of new non-structural partitions. mep & fire life safety under separate permit. | $4,200,000 |
| Nov 4, 2019 | Completed final sign-off Feb 2020 | 4 Embarcadero Center | Principal Builders Inc. | 39th fl. barrier removal, altering (e) handrails to meet accessible requirement, adding a guardrail to (e) patio parapet, (life sagety work will be design built, bldg is fully sprinkleredDetails
39th fl. barrier removal, altering (e) handrails to meet accessible requirement, adding a guardrail to (e) patio parapet, (life sagety work will be design built, bldg is fully sprinklered | $100,800 |
| Oct 10, 2019 | Completed final sign-off Nov 2020 | 353 Sacramento St | Novo Construction Inc | 13th and 14th fl: ti includes demo of on structural partitions, new non structural partitions, mep, life safety, sprinklers under sep permitDetails
13th and 14th fl: ti includes demo of on structural partitions, new non structural partitions, mep, life safety, sprinklers under sep permit | $2,560,000 |
| Oct 4, 2019 | Completed final sign-off Aug 2021 | 2 Shaw Al | Field Construction Inc. | 5th fl: ti includes demolishing of non-structural partitions, building of new non-structural partitions, mep included.Details
5th fl: ti includes demolishing of non-structural partitions, building of new non-structural partitions, mep included. | $720,000 |
| Sep 30, 2019 | Completed final sign-off Sep 2020 | 353 Sacramento St | Novo Construction Inc | ti on the 19th & 21st fl to include non-structural demo. new partitions to create conference, open office, break rooms. mep, life safety under separate permit. maher naDetails
ti on the 19th & 21st fl to include non-structural demo. new partitions to create conference, open office, break rooms. mep, life safety under separate permit. maher na | $1,770,000 |
| Sep 24, 2019 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | deferred mep, fire protection & fire alarm. 20th - 23rd interior remodel of four unoccupied single tenant floors including demo of non structural partitions and construction of a (n) communication stair within floors 21-23. structural work included selective demo of existing concrete floor slab andDetails
deferred mep, fire protection & fire alarm. 20th - 23rd interior remodel of four unoccupied single tenant floors including demo of non structural partitions and construction of a (n) communication stair within floors 21-23. structural work included selective demo of existing concrete floor slab and | $1,110,270 |
| Sep 23, 2019 | Never finaled issued Oct 2019, no final | 430 California St | Sc Builders, Inc | 9th fl - revision to pa 2019-0701-4741 modification fsdsDetails
9th fl - revision to pa 2019-0701-4741 modification fsds | |
| Sep 23, 2019 | Never finaled issued Oct 2019, no final | 430 California St | Sc Builders, Inc | 8th fl - revision to pa 2019-0731-7409 modification fsdsDetails
8th fl - revision to pa 2019-0731-7409 modification fsds | |
| Sep 23, 2019 | Never finaled issued Oct 2019, no final | 430 California St | Sc Builders, Inc | 10th fl - revision to pa 2019-0731-7404 modification of fsds and ceilingDetails
10th fl - revision to pa 2019-0731-7404 modification of fsds and ceiling | |
| Sep 16, 2019 | Completed final sign-off Feb 2020 | 555 Montgomery St | Rudolph Commercial Interiors Inc, Rci | tenant improvement to include demo of non structural partitons building new non structural partitions mep and fire life safety under sep permitDetails
tenant improvement to include demo of non structural partitons building new non structural partitions mep and fire life safety under sep permit | $483,513 |
| Sep 10, 2019 | Completed final sign-off Nov 2021 | 1 Market St | Bcci Construction Company | 5th fl - ti includes demo of non-structural partition and building (n) structural partitions. building fully sprinklered/meps. life safety & sprinkler under separate permitDetails
5th fl - ti includes demo of non-structural partition and building (n) structural partitions. building fully sprinklered/meps. life safety & sprinkler under separate permit | $2,880,000 |
| Sep 5, 2019 | Completed final sign-off Mar 2020 | 160 Pine St | Rudolph Commercial Interiors Inc, Rci | suite 350 - ti demo of non structural partitions and bld new non structural partitions. mep/fire/life safety under seperat permitDetails
suite 350 - ti demo of non structural partitions and bld new non structural partitions. mep/fire/life safety under seperat permit | $890,000 |
| Sep 5, 2019 | Completed final sign-off Jan 2020 | 1098 Harrison St | Novo Construction Inc | 1st fl - ti consists of build out of catering kitchen and serving/dining area. updating finishes, (n) non-structural partitions, bike storage. mep included. life safety & sprinkler under separate permitDetails
1st fl - ti consists of build out of catering kitchen and serving/dining area. updating finishes, (n) non-structural partitions, bike storage. mep included. life safety & sprinkler under separate permit | $800,000 |
| Aug 29, 2019 | Completed final sign-off Feb 2022 | 1390 Market St | Skyline Construction | 3rd flr - ti, non structural partitions. all new revised meps will be design build/submitted separatelyDetails
3rd flr - ti, non structural partitions. all new revised meps will be design build/submitted separately | $850,000 |
| Aug 21, 2019 | Completed final sign-off Jan 2020 | 185 Berry St | Bay Area Builders Inc. | 1st & 2nd fl - ti includes demo of non-structural partitions and build back (n) non-structural partitions. mechanical & electrical includedDetails
1st & 2nd fl - ti includes demo of non-structural partitions and build back (n) non-structural partitions. mechanical & electrical included | $1,069,000 |
| Aug 20, 2019 | Completed final sign-off May 2020 | 430 California St | Sc Builders, Inc | 7th flr - new nion structural partitions and ceiling new finishes, new or revised mep (life safety & sprinklers under sep permit) bld is fully sprinkleredDetails
7th flr - new nion structural partitions and ceiling new finishes, new or revised mep (life safety & sprinklers under sep permit) bld is fully sprinklered | $2,000,000 |
| Aug 20, 2019 | Completed final sign-off Nov 2019 | 555 Montgomery St | Ayoob & Peery Plumbing Co Inc | 16th flr: add 2, relocate 55, plug 12 sprinklers to conform with new wall ceiling layout of ti. job 19-696Details
16th flr: add 2, relocate 55, plug 12 sprinklers to conform with new wall ceiling layout of ti. job 19-696 | $13,425 |
| Aug 20, 2019 | Completed final sign-off Dec 2019 | 33 New Montgomery St | Peacock Construction | 19th fl - ti to consist of new counters in the breakroomDetails
19th fl - ti to consist of new counters in the breakroom | $75,000 |
| Aug 20, 2019 | Completed final sign-off May 2020 | 430 California St | Sc Builders, Inc | 11th flr - new nion structural partitions and ceiling new finishes, new or revised mep (life safety & sprinklers under sep permit) bld is fully sprinkleredDetails
11th flr - new nion structural partitions and ceiling new finishes, new or revised mep (life safety & sprinklers under sep permit) bld is fully sprinklered | $2,000,000 |
| Aug 14, 2019 | Never finaled issued Aug 2019, no final | 625 Market St | Yerba Buena Builders Inc | 15th floor t.i includes the demo of non structural partitions and building new nono structural partitions. mep's, life safety and sprinklers design build submitted under separate permit. building fully sprinklered.Details
15th floor t.i includes the demo of non structural partitions and building new nono structural partitions. mep's, life safety and sprinklers design build submitted under separate permit. building fully sprinklered. | $450,000 |
| Aug 8, 2019 | Completed final sign-off Feb 2022 | 1 Embarcadero Center | Peacock Construction | 1st fl - retail & sales space ti including demo of non-structural partitions and bldg new non structural partitions, mep. life safety and sprinklers under separate permit/design build. (building is fully sprinklered)Details
1st fl - retail & sales space ti including demo of non-structural partitions and bldg new non structural partitions, mep. life safety and sprinklers under separate permit/design build. (building is fully sprinklered) | $580,000 |
| Jul 31, 2019 | Completed final sign-off Jan 2020 | 430 California St | Sc Builders, Inc | 8th fl ti - building of (n) non-structural partitions, ceilings, finishes etc. meps; life safety and sprinklers under separate permitsDetails
8th fl ti - building of (n) non-structural partitions, ceilings, finishes etc. meps; life safety and sprinklers under separate permits | $2,000,000 |
| Jul 31, 2019 | Completed final sign-off Jan 2020 | 430 California St | Sc Builders, Inc | 10th fl ti - building of (n) non-structural partitions, ceilings, finishes etc. meps; life safety and sprinklers under separate permitsDetails
10th fl ti - building of (n) non-structural partitions, ceilings, finishes etc. meps; life safety and sprinklers under separate permits | $2,000,000 |
| Jul 23, 2019 | Completed final sign-off Sep 2019 | 55 Stockton St | Paradigm General Contractors | 4th fl - revision to pa 2019-0416-8103 adding a sink in women's room accessible stallDetails
4th fl - revision to pa 2019-0416-8103 adding a sink in women's room accessible stall | |
| Jul 17, 2019 | Completed final sign-off Sep 2020 | 555 Montgomery St | Rudolph Commercial Interiors Inc, Rci | 16th flr - ti - includes the demo of non structural partitions and building new non-structural partitions. (mep/fire/life safety under sep permit)Details
16th flr - ti - includes the demo of non structural partitions and building new non-structural partitions. (mep/fire/life safety under sep permit) | $500,000 |
| Jul 15, 2019 | Completed final sign-off May 2020 | 90 New Montgomery St | Commercial Interior Builders Inc | 11th floor: t.i. includes of non structural partitions and bldg new nonstructural partitions. mep's, life safety and sprinklers under seperate permit. bldg fully sprinklered. n/a for maherDetails
11th floor: t.i. includes of non structural partitions and bldg new nonstructural partitions. mep's, life safety and sprinklers under seperate permit. bldg fully sprinklered. n/a for maher | $274,618 |
| Jul 8, 2019 | Completed final sign-off Jan 2020 | 4 Embarcadero Center | Source Planning And Construction Inc | suite 3740: tenant improvements to consist of demolition of non-load bearing partitions. building of new non-structural partitions. mep & fire life safety under separate permit.Details
suite 3740: tenant improvements to consist of demolition of non-load bearing partitions. building of new non-structural partitions. mep & fire life safety under separate permit. | $250,000 |
| Jun 24, 2019 | Completed final sign-off Aug 2019 | 555 Montgomery St | Rudolph Commercial Interiors Inc, Rci | 13th fl/1300: revision to 201904188368 breakroom counter, changes to conf room, offices, bath finishesDetails
13th fl/1300: revision to 201904188368 breakroom counter, changes to conf room, offices, bath finishes | |
| Jun 20, 2019 | Completed final sign-off Nov 2021 | 1 Market St | Bcci Construction Company | rev to pa# 201906103013; removing code section 1010.1.9.12.cbc no 2-way comm in building to date n/a maherDetails
rev to pa# 201906103013; removing code section 1010.1.9.12.cbc no 2-way comm in building to date n/a maher | |
| Jun 13, 2019 | Completed final sign-off Feb 2020 | 4 Embarcadero Center | Principal Builders Inc. | 39th floor: ti: demo of non-str partitions and building back of new non str partitions. mep, life safety, and sprinklers under separate permit.Details
39th floor: ti: demo of non-str partitions and building back of new non str partitions. mep, life safety, and sprinklers under separate permit. | $740,000 |
| Jun 13, 2019 | Completed final sign-off Feb 2020 | 4 Embarcadero Center | Principal Builders Inc. | 40th floor: ti: demo of non-str partitions and building back of new non str partitions. mep, life safety, and sprinklers under separate permit.Details
40th floor: ti: demo of non-str partitions and building back of new non str partitions. mep, life safety, and sprinklers under separate permit. | $974,000 |
| Jun 10, 2019 | Completed final sign-off Nov 2021 | 1 Market St | Bcci Construction Company | 4th fl - ti include the demo of non-structural partitions & building (n) non-structural partitions. bldg full sprinklered, meps, life safety, sprinklers under separate permit.Details
4th fl - ti include the demo of non-structural partitions & building (n) non-structural partitions. bldg full sprinklered, meps, life safety, sprinklers under separate permit. | $2,144,000 |
| Jun 4, 2019 | Completed final sign-off Sep 2019 | 251 Post St | Marchetti Group | suite 520, tenant improvements. demo of non load bearing partitions. new non structural partitions. mep & fire life safety under separate permit.Details
suite 520, tenant improvements. demo of non load bearing partitions. new non structural partitions. mep & fire life safety under separate permit. | $275,000 |
| May 31, 2019 | Completed final sign-off Jan 2023 | 101 Utah St | Skyline Capital Builders Llc, Level 10 Construction Lp | ada upgrade entrance / rrs / parking / ramp. ti include structural seismic upgrade in conformances with attached pre application letter. alterations include modifying exterior wall openings, add skylights & floor openings. new non structural partitions. mep & fire life safety under separate permitDetails
ada upgrade entrance / rrs / parking / ramp. ti include structural seismic upgrade in conformances with attached pre application letter. alterations include modifying exterior wall openings, add skylights & floor openings. new non structural partitions. mep & fire life safety under separate permit | $6,000,000 |
| May 20, 2019 | Completed final sign-off Jan 2020 | 1098 Harrison St | Novo Construction Inc | 1st & 2nd fl ti of single tenant bldg including (n) non-structural partitions. (n) or revised meps, life safety & sprinklers under separate permit. (e) ceiling, lighting & sprinklers to remain in place. sprinkler system modified as needed.Details
1st & 2nd fl ti of single tenant bldg including (n) non-structural partitions. (n) or revised meps, life safety & sprinklers under separate permit. (e) ceiling, lighting & sprinklers to remain in place. sprinkler system modified as needed. | $733,200 |
| Apr 25, 2019 | Completed final sign-off Sep 2019 | 101 California St | Field Construction Inc. | 30th flr - demo of non struct partitions. selective ceiling and millword/finsihes. ti under sep per (bldg is fully sprinklered) ab-017 space is unoccupied. n/a for maher.Details
30th flr - demo of non struct partitions. selective ceiling and millword/finsihes. ti under sep per (bldg is fully sprinklered) ab-017 space is unoccupied. n/a for maher. | $10,000 |
| Apr 18, 2019 | Completed final sign-off Aug 2019 | 555 Montgomery St | Rudolph Commercial Interiors Inc, Rci | 13th fl, ste 1300 - ti includes demo of non structural partitions and build (n) structural partitions. mep's life safety & sprinkler under separate permit (bldg fully sprinklered)Details
13th fl, ste 1300 - ti includes demo of non structural partitions and build (n) structural partitions. mep's life safety & sprinkler under separate permit (bldg fully sprinklered) | $885,000 |
| Apr 17, 2019 | Completed final sign-off Oct 2019 | 185 Berry St | Bay Area Builders Inc. | 2/f: t.i. including demo of non-structural partitions and building (n) non-structural partitions. meps included. maher n/a.Details
2/f: t.i. including demo of non-structural partitions and building (n) non-structural partitions. meps included. maher n/a. | $366,000 |
| Apr 16, 2019 | Completed final sign-off Sep 2019 | 55 Stockton St | Paradigm General Contractors | 4th fl ti demo of on structural partitions and buildin new non str partitions. mep under separate permit, life safety and sprinkler under sep permit. bldg is fully sprinkleredDetails
4th fl ti demo of on structural partitions and buildin new non str partitions. mep under separate permit, life safety and sprinkler under sep permit. bldg is fully sprinklered | $480,000 |
| Apr 11, 2019 | Completed final sign-off Sep 2019 | 1390 Market St | demo on the 3rd floor non load bearing partition and finishes abo17Details
demo on the 3rd floor non load bearing partition and finishes abo17 | $12,000 | |
| Apr 10, 2019 | Expired or cancelled cancelled Jan 2026 | 185 Berry St | 1st & 2nd & roof - demo permit only ab-017. non structural partitions raised flr system and mep infrastructure to create a "cold shell" space, (e) sprinklers system shall remain - not be affected in this scope. bld fully sprinklered. ab-017.Details
1st & 2nd & roof - demo permit only ab-017. non structural partitions raised flr system and mep infrastructure to create a "cold shell" space, (e) sprinklers system shall remain - not be affected in this scope. bld fully sprinklered. ab-017. | $163,000 | |
| Mar 21, 2019 | Completed final sign-off May 2019 | 760 Market St | Sc Builders, Inc | 7th fl revision to 201809139951, remove some wall from scopeDetails
7th fl revision to 201809139951, remove some wall from scope | |
| Mar 20, 2019 | Completed final sign-off Sep 2019 | 4 Embarcadero Center | Source Planning And Construction Inc | 39th flr , suite 3950 - ti - demo non struct partitions and bld new non struct partitions. mep/fire/life safety under sep permit. bld is fully sprinkleredDetails
39th flr , suite 3950 - ti - demo non struct partitions and bld new non struct partitions. mep/fire/life safety under sep permit. bld is fully sprinklered | $234,000 |
| Mar 20, 2019 | Completed final sign-off Mar 2020 | 1 Embarcadero Center | Source Planning And Construction Inc | 38th flr - suite 3860 - ti - demo non struct partitions and bld new non struct partitions. mep/fire/life safety under sep permit. bld is fully sprinkleredDetails
38th flr - suite 3860 - ti - demo non struct partitions and bld new non struct partitions. mep/fire/life safety under sep permit. bld is fully sprinklered | $218,834 |
| Mar 20, 2019 | Completed final sign-off Nov 2019 | 1 Embarcadero Center | Source Planning And Construction Inc | 3/f, suite 340/360 - ti - demo non struct partitions and bld new non struct partitions. mep/fire/life safety under sep permit. bld is fully sprinkleredDetails
3/f, suite 340/360 - ti - demo non struct partitions and bld new non struct partitions. mep/fire/life safety under sep permit. bld is fully sprinklered | $448,602 |
| Mar 20, 2019 | Completed final sign-off Nov 2019 | 1 Embarcadero Center | Source Planning And Construction Inc | 13th flr, suite 1230/1360- ti - demo non struct partitions and bld new non struct partitions. mep/fire/life safety under sep permit. bld is fully sprinkleredDetails
13th flr, suite 1230/1360- ti - demo non struct partitions and bld new non struct partitions. mep/fire/life safety under sep permit. bld is fully sprinklered | $375,000 |
| Mar 12, 2019 | Completed final sign-off Nov 2019 | 44 Montgomery St | Peacock Construction | 30th flr - revision to 201811085373 change in layout of bathrooms maher naDetails
30th flr - revision to 201811085373 change in layout of bathrooms maher na |