Rylko Builders Inc.
- Based in
- Burlingame
- On San Francisco permits
- Apr 2013 to Jul 2023
- Last 24 months
- 0 permits filed
128 permits since 2000: 84 completed, 40 never finaled, 4 expired or cancelled.
Of the 40 never-finaled permits, 1 is 3 to 5 years old, 28 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 128.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 24, 2023 | Completed final sign-off Oct 2023 | 238 King St | interior demo of (1) ground level suite on 238 king st. demo to include but no limited to removal of non-structural interior partitions and doors and associated light fixtures and millwork. ab-017 applies. space remains vacant; no ceiling work within this scope of workDetails
interior demo of (1) ground level suite on 238 king st. demo to include but no limited to removal of non-structural interior partitions and doors and associated light fixtures and millwork. ab-017 applies. space remains vacant; no ceiling work within this scope of work | $45,000 |
| Jul 24, 2023 | Completed final sign-off Oct 2023 | 272 King St | interior demo of (1) ground level suite on 272 king st. demo to include, but not limited to removal of non-structural interior partions and doors and associted light fixtures and mill work. ab-017 applies; space remains vacant; no ceiling work in this scope of workDetails
interior demo of (1) ground level suite on 272 king st. demo to include, but not limited to removal of non-structural interior partions and doors and associted light fixtures and mill work. ab-017 applies; space remains vacant; no ceiling work in this scope of work | $100,000 |
| May 30, 2023 | Completed final sign-off Sep 2023 | 33 New Montgomery St | 19/f: mechanical/electrical work for t.i. ref bpa#202304044986Details
19/f: mechanical/electrical work for t.i. ref bpa#202304044986 | $10,000 |
| May 30, 2023 | Completed final sign-off Sep 2023 | 33 New Montgomery St | 20/f: mechanical and electrical work for tenant improvement. ref permit 202303173862Details
20/f: mechanical and electrical work for tenant improvement. ref permit 202303173862 | $10,000 |
| May 22, 2023 | Completed final sign-off Sep 2023 | 33 New Montgomery St | suite 1850: mech demo branch ducts/vavs to match new room/space layout, redistribute (e) vav boxes for new zoning, install new inline exhaust fans for increased ventilation, electrical lighting fixtures/associated circuiting/controls, power & signal. ref bpa#202303224138Details
suite 1850: mech demo branch ducts/vavs to match new room/space layout, redistribute (e) vav boxes for new zoning, install new inline exhaust fans for increased ventilation, electrical lighting fixtures/associated circuiting/controls, power & signal. ref bpa#202303224138 | $115,000 |
| May 16, 2023 | Completed final sign-off Jul 2023 | 430 California St | alteration to mechanical and electrical for new office tenant improvement layout. ref ti permit 202301240619Details
alteration to mechanical and electrical for new office tenant improvement layout. ref ti permit 202301240619 | $90,000 |
| Apr 4, 2023 | Completed final sign-off Sep 2023 | 33 New Montgomery St | 19/f- ste# 1900: selective demo of non-load bearing partitions, doors, millwork, ceilings. new partitions, doors & hardware, power, ceiling, lighting & fixtures.Details
19/f- ste# 1900: selective demo of non-load bearing partitions, doors, millwork, ceilings. new partitions, doors & hardware, power, ceiling, lighting & fixtures. | $900,000 |
| Mar 22, 2023 | Completed final sign-off Sep 2023 | 33 New Montgomery St | 18/f: t.i. include new interior partitions, glazing, doors/frames, new lighting and millwork. existing ada compliant restrooms to remain. no structural. mep deferred.Details
18/f: t.i. include new interior partitions, glazing, doors/frames, new lighting and millwork. existing ada compliant restrooms to remain. no structural. mep deferred. | $320,000 |
| Mar 17, 2023 | Completed final sign-off Sep 2023 | 33 New Montgomery St | 20/f: t.i to include new interior partitions, glazaing doors/frames, new lighting and millwork existing ada compliant restrooms to remain. mep and fire life safety under sep permit.Details
20/f: t.i to include new interior partitions, glazaing doors/frames, new lighting and millwork existing ada compliant restrooms to remain. mep and fire life safety under sep permit. | $600,000 |
| Mar 9, 2023 | Completed final sign-off Sep 2023 | 33 New Montgomery St | 14th fl- ti to include new interior partitions, glazing door/frames, new lighting and millwork. mep, sprinkler and fire alarm to be deferred permits.Details
14th fl- ti to include new interior partitions, glazing door/frames, new lighting and millwork. mep, sprinkler and fire alarm to be deferred permits. | $93,000 |
| Jan 31, 2023 | Completed final sign-off Apr 2023 | 601 California St | 14/f: demo most (e) improvements, select partitions, d/f/h, break/copy area casework, sinishes throughout; ceilings/lighting to remain throughout. alteration to mep/sprinkler/life safety systems under separate permit per admin bull ab-017: occupancy/exiting to be addressed under separate permitDetails
14/f: demo most (e) improvements, select partitions, d/f/h, break/copy area casework, sinishes throughout; ceilings/lighting to remain throughout. alteration to mep/sprinkler/life safety systems under separate permit per admin bull ab-017: occupancy/exiting to be addressed under separate permit | $30,000 |
| Jan 24, 2023 | Completed final sign-off Jun 2023 | 430 California St | t.i. as a partial reconfiguration of an (e) tenant space, bif, at level b1 this includes selective demo and installation of walls, ceilings and doorsDetails
t.i. as a partial reconfiguration of an (e) tenant space, bif, at level b1 this includes selective demo and installation of walls, ceilings and doors | $85,000 |
| Oct 20, 2022 | Never finaled issued Oct 2022, no final | 601 California St | 7th fl ste 750: vav's moved, demo'd & replaced. rebalancing. ref pa# 202208019619.Details
7th fl ste 750: vav's moved, demo'd & replaced. rebalancing. ref pa# 202208019619. | $5,000 |
| Aug 26, 2022 | Completed final sign-off Jan 2023 | 601 California St | 9/f-ste980: minor demo of (e) partitions, d/f/h, break area casework, lighting & finishes througout. new construction consists of new brea area with new casewood, new lighting, and new finishes. any alt to mep, f/s and fls systems will be sep permits. maher n/aDetails
9/f-ste980: minor demo of (e) partitions, d/f/h, break area casework, lighting & finishes througout. new construction consists of new brea area with new casewood, new lighting, and new finishes. any alt to mep, f/s and fls systems will be sep permits. maher n/a | $95,000 |
| Aug 1, 2022 | Completed final sign-off Jan 2023 | 601 California St | 7/f: 750:minor demo of (e) partitions, d/f/h, brea area casewood, acoustic ceiling tile, lighting & finishes throughout. new construction of new break area with new casewood, new acoustic clg tile, lighitng & (n) finishes. alt to mep,f/s, and/or fire life safety system will be under separate permit.Details
7/f: 750:minor demo of (e) partitions, d/f/h, brea area casewood, acoustic ceiling tile, lighting & finishes throughout. new construction of new break area with new casewood, new acoustic clg tile, lighitng & (n) finishes. alt to mep,f/s, and/or fire life safety system will be under separate permit. | $155,000 |
| May 24, 2022 | Completed final sign-off Jul 2022 | 601 California St | suite 1800-demo only; full flr unoccupied vacant suite - all exclusive improvement (paritions, electrical, plumbing, millwork, cailing, lighting, fixtures, hvac, etc. to be demolished to shell condition. any alteration to mep, sprinkler and lifht safety systems will be under seperate permit.Details
suite 1800-demo only; full flr unoccupied vacant suite - all exclusive improvement (paritions, electrical, plumbing, millwork, cailing, lighting, fixtures, hvac, etc. to be demolished to shell condition. any alteration to mep, sprinkler and lifht safety systems will be under seperate permit. | $95,000 |
| Jul 6, 2021 | Completed final sign-off Nov 2021 | 301 Brannan St | all floors: power, lighting, and signal. new duct and grilles from existing system to serve new phone rooms ref 202105120261Details
all floors: power, lighting, and signal. new duct and grilles from existing system to serve new phone rooms ref 202105120261 | $127,481 |
| May 12, 2021 | Completed final sign-off Sep 2021 | 301 Brannan St | floors 2-6: add 14 phone rooms to existing open office spaceDetails
floors 2-6: add 14 phone rooms to existing open office space | |
| Sep 26, 2020 | Completed final sign-off Aug 2021 | 301 Brannan St | 1/f & roof: demo & add ductwork & grills to (e) wshp, rebalance (e) wshp zones, add (n) vrv unit. demo & safe off (e) generator on roof. ref pa202009023298. maher n/aDetails
1/f & roof: demo & add ductwork & grills to (e) wshp, rebalance (e) wshp zones, add (n) vrv unit. demo & safe off (e) generator on roof. ref pa202009023298. maher n/a | $350,000 |
| Sep 26, 2020 | Completed final sign-off Dec 2021 | 301 Brannan St | 5/f: demo & add ductwork & grills to (e) wshp, rebalance (e) wshp zones, add (n) vrv unit to service i.t. room. power, lighting & data. ref pa202009144164. maher n/aDetails
5/f: demo & add ductwork & grills to (e) wshp, rebalance (e) wshp zones, add (n) vrv unit to service i.t. room. power, lighting & data. ref pa202009144164. maher n/a | $350,000 |
| Sep 26, 2020 | Completed final sign-off Aug 2021 | 301 Brannan St | level 2: demo & add new duct work & grilles to (e) wshp, rebalance (e) whsp zones, add (n) vrv unit to serve it room. power & lgihting & data. reference pa #2020-0902-3298.Details
level 2: demo & add new duct work & grilles to (e) wshp, rebalance (e) whsp zones, add (n) vrv unit to serve it room. power & lgihting & data. reference pa #2020-0902-3298. | $350,000 |
| Sep 26, 2020 | Completed final sign-off Aug 2021 | 301 Brannan St | 4/f: demo & add ductwork & grills to (e) wshp, rebalance (e) wshp zones, add (n) vrv unit. add (n) osa supply. ref pa202009023298. maher n/aDetails
4/f: demo & add ductwork & grills to (e) wshp, rebalance (e) wshp zones, add (n) vrv unit. add (n) osa supply. ref pa202009023298. maher n/a | $350,000 |
| Sep 26, 2020 | Completed final sign-off Aug 2021 | 301 Brannan St | 3/f: demo & add ductwork & grills to (e) wshp, rebalance (e) wshp zones, add (n) vrv unit to service i.t. room. power, lighting & data. ref pa202009023298. maher n/aDetails
3/f: demo & add ductwork & grills to (e) wshp, rebalance (e) wshp zones, add (n) vrv unit to service i.t. room. power, lighting & data. ref pa202009023298. maher n/a | $350,000 |
| Sep 14, 2020 | Completed final sign-off Aug 2021 | 301 Brannan St | 5th-6th fl: demo of non-structural walls, glazing, ceiling & millwork. construction of new millwork, new finishes. mep deferred.Details
5th-6th fl: demo of non-structural walls, glazing, ceiling & millwork. construction of new millwork, new finishes. mep deferred. | $690,000 |
| Sep 2, 2020 | Completed final sign-off Aug 2021 | 301 Brannan St | demo non-structural partitions, glazing, ceiling & millwork. new millwork, finishes, ceilings. new restrooms. mep deferred.Details
demo non-structural partitions, glazing, ceiling & millwork. new millwork, finishes, ceilings. new restrooms. mep deferred. | $800,000 |
| Jul 22, 2020 | Expired or cancelled withdrawn Sep 2020 | 301 Brannan St | non-structural commercial t.i. floor 1-4, mep under separate permit demo of non-structural wall, glazing, ceilings & millwork, finishes, ceilings, restrooms. nochange in occupancy in building.Details
non-structural commercial t.i. floor 1-4, mep under separate permit demo of non-structural wall, glazing, ceilings & millwork, finishes, ceilings, restrooms. nochange in occupancy in building. | $2,000,000 |
| Jun 12, 2020 | Never finaled issued Oct 2020, no final | 100 Bush St | 9th fl/suite 900, t.i. includes demo of non-str. partitions and building new non-str. partitions; ada upgrades; new electrical work included in this permit; mech., plumbing, life safety and sprinklers will be design build if needed and submitted separately. building is fully sprinklered.Details
9th fl/suite 900, t.i. includes demo of non-str. partitions and building new non-str. partitions; ada upgrades; new electrical work included in this permit; mech., plumbing, life safety and sprinklers will be design build if needed and submitted separately. building is fully sprinklered. | $150,000 |
| Feb 18, 2020 | Completed final sign-off Jun 2020 | 845 Market St | space 10: wall demolition (2 walls and ceiling) instide tenant space. ab-017. maher n/a.Details
space 10: wall demolition (2 walls and ceiling) instide tenant space. ab-017. maher n/a. | $5,000 |
| Sep 24, 2019 | Never finaled issued Nov 2019, no final | 865 Market St | (e) storefront redesign. nordstrom display (d2) fire life safety and fire sprinklers to be under sep permit. ti storefront under sep permit. landlord shell work refer to 201702099047 new ada post w high low door opener within property lineDetails
(e) storefront redesign. nordstrom display (d2) fire life safety and fire sprinklers to be under sep permit. ti storefront under sep permit. landlord shell work refer to 201702099047 new ada post w high low door opener within property line | $80,000 |
| Sep 17, 2019 | Never finaled issued Dec 2019, no final | 865 Market St | suite #144: rev to pa#201907256991: t.i. on 1st floor includes: new non-load bearing walls, storefront finishes, interior finishes, ceiling lighting, furniture and fixtures. n/a for maherDetails
suite #144: rev to pa#201907256991: t.i. on 1st floor includes: new non-load bearing walls, storefront finishes, interior finishes, ceiling lighting, furniture and fixtures. n/a for maher | |
| Jul 31, 2019 | Completed final sign-off Mar 2020 | 865 Market St | base building improvement to provide (n) utility stubouts to tenant space 202, 204, and 206 at level 2. work t0 include, but not limited to redemising (e) tenant spaces 204 and 2046 into (3) tenant spaces 202, 204, and (n) 206. (n) future t.i permit shall provide proper rated finish, smoke damps,Details
base building improvement to provide (n) utility stubouts to tenant space 202, 204, and 206 at level 2. work t0 include, but not limited to redemising (e) tenant spaces 204 and 2046 into (3) tenant spaces 202, 204, and (n) 206. (n) future t.i permit shall provide proper rated finish, smoke damps, | $3,000 |
| Jul 25, 2019 | Never finaled issued Sep 2019, no final | 865 Market St | ste:144: ti build out of an (e) mall on 1st fl, suite #144: inclueds construction of new non-load bearing walls; new interior storefront finishes, new finishes, new cieling, and lighting, new furniture & fixtures; utility work as required to accommodate project scope.Details
ste:144: ti build out of an (e) mall on 1st fl, suite #144: inclueds construction of new non-load bearing walls; new interior storefront finishes, new finishes, new cieling, and lighting, new furniture & fixtures; utility work as required to accommodate project scope. | $195,000 |
| May 31, 2019 | Completed final sign-off Jan 2020 | 845 Market St | space 129. ti of interior retail store. work includes new partitions, finishes, furnishing & lighting. signage under separate permitDetails
space 129. ti of interior retail store. work includes new partitions, finishes, furnishing & lighting. signage under separate permit | $180,000 |
| Apr 22, 2019 | Never finaled issued Jul 2019, no final | 3060 Fillmore St | ti - quick service restaurant with exterior patio seating change of use to a2, determine occupant load.Details
ti - quick service restaurant with exterior patio seating change of use to a2, determine occupant load. | $1,500,000 |
| Apr 17, 2019 | Completed final sign-off May 2019 | 601 California St | suite 1710: minimal demo of (e) power/tele/data & millwork, construction of minimal (n) power/tele/data, millwork, wing wall at break area & new finishes throughout. no clg demo scope as a part of this project: (e) ceilings, grid, tile. lights, exit signs, sprinklers, etc tp remain.Details
suite 1710: minimal demo of (e) power/tele/data & millwork, construction of minimal (n) power/tele/data, millwork, wing wall at break area & new finishes throughout. no clg demo scope as a part of this project: (e) ceilings, grid, tile. lights, exit signs, sprinklers, etc tp remain. | $100,000 |
| Apr 10, 2019 | Completed final sign-off Jan 2020 | 865 Market St | existing storefront re-design, nordstrom display (d1). fire life safety and fire sprinklers to be under separate permit. ti under separate permit. nordstrom display (d2) is under separate permitDetails
existing storefront re-design, nordstrom display (d1). fire life safety and fire sprinklers to be under separate permit. ti under separate permit. nordstrom display (d2) is under separate permit | $80,000 |
| Mar 22, 2019 | Completed final sign-off Feb 2020 | 845 Market St | space #100: interior ti of e retail space on gr fl includes non structural partitions, doors, fixtures, finishes, electrical, mech, plumb.Details
space #100: interior ti of e retail space on gr fl includes non structural partitions, doors, fixtures, finishes, electrical, mech, plumb. | $1,000,000 |
| Feb 12, 2019 | Completed final sign-off Jun 2020 | 845 Market St | #129: electric wall sign rolexDetails
#129: electric wall sign rolex | $2,500 |
| Feb 12, 2019 | Completed final sign-off Feb 2020 | 845 Market St | replacement of existing window display near the storefront and installation of new anti burglary system. no exterior work. work to be done near the front of the store only. existing exterior features to remainDetails
replacement of existing window display near the storefront and installation of new anti burglary system. no exterior work. work to be done near the front of the store only. existing exterior features to remain | $25,000 |
| Feb 12, 2019 | Never finaled issued Jan 2020, no final | 845 Market St | #129: electric wall signDetails
#129: electric wall sign | $2,500 |
| Feb 5, 2019 | Never finaled issued Feb 2019, no final | 601 California St | basement: title 24 compliance for pa #201810042295. upgrade finishes & replacing fixtures & lighting in core restrooms//vif emergency lights, 2295 in restrooms and basements.Details
basement: title 24 compliance for pa #201810042295. upgrade finishes & replacing fixtures & lighting in core restrooms//vif emergency lights, 2295 in restrooms and basements. | |
| Feb 5, 2019 | Completed final sign-off Mar 2019 | 601 California St | 12th & 17th fl: title 24 compliance for pa #201810021995. upgrade finishes & replacing fixtures & lighting in core restrooms.Details
12th & 17th fl: title 24 compliance for pa #201810021995. upgrade finishes & replacing fixtures & lighting in core restrooms. | |
| Nov 21, 2018 | Completed final sign-off Jan 2020 | 845 Market St | new build out of e tenant space uncluding non structural framing, plumbinb, electrical, mechanical and interior decorative materials and surfacesDetails
new build out of e tenant space uncluding non structural framing, plumbinb, electrical, mechanical and interior decorative materials and surfaces | $800,000 |
| Oct 23, 2018 | Completed final sign-off Jun 2020 | 845 Market St | base bldg improvement to provide (n) utility stubouts to (e) tenant space #7, 8 & 10 at bart level (lower lvl) demo (e) space for future tenant (under sep permit)(3) tenant spaces & reallocating mall common area to (n) proposed tenant spaces and (n) mall common area rep work. (e) tenant space toDetails
base bldg improvement to provide (n) utility stubouts to (e) tenant space #7, 8 & 10 at bart level (lower lvl) demo (e) space for future tenant (under sep permit)(3) tenant spaces & reallocating mall common area to (n) proposed tenant spaces and (n) mall common area rep work. (e) tenant space to | $15,000 |
| Oct 4, 2018 | Completed final sign-off May 2019 | 601 California St | basement - ada barrier removal upgrades to (e) shower/lockers/restrooms including demo of and new partitions/plumbing fixtures/light fixtures/toilet partitions & accesories. under separate permit - alterations to mep, sprinkler and fire life safetyDetails
basement - ada barrier removal upgrades to (e) shower/lockers/restrooms including demo of and new partitions/plumbing fixtures/light fixtures/toilet partitions & accesories. under separate permit - alterations to mep, sprinkler and fire life safety | $224,000 |
| Oct 2, 2018 | Completed final sign-off Mar 2019 | 601 California St | floors 12 & 17: upgrading finishes & replacing fixtures & lighting in core restrooms. maher n/a.Details
floors 12 & 17: upgrading finishes & replacing fixtures & lighting in core restrooms. maher n/a. | $136,000 |
| Sep 13, 2018 | Completed final sign-off Jun 2019 | 90 New Montgomery St | 13th floor, ste. 1301: interior only t.i. demolition of non-bearing walls and ceiling. new construction of walls, doors, ceiling and finishes. n/a for maherDetails
13th floor, ste. 1301: interior only t.i. demolition of non-bearing walls and ceiling. new construction of walls, doors, ceiling and finishes. n/a for maher | $450,000 |
| Sep 6, 2018 | Never finaled issued Sep 2018, no final | 601 California St | hvac: replace 17 double duct and 7 cooling vavs. replace diffusers. install 1 new cooling vav and change pneumatic controls to ddc. elec. new lighting, outlets, switching. ref. pa# 201806262955. maher n/a.Details
hvac: replace 17 double duct and 7 cooling vavs. replace diffusers. install 1 new cooling vav and change pneumatic controls to ddc. elec. new lighting, outlets, switching. ref. pa# 201806262955. maher n/a. | $460,000 |
| Sep 6, 2018 | Never finaled issued Sep 2018, no final | 845 Market St | install metal storage shelvingDetails
install metal storage shelving | $40,000 |
| Aug 31, 2018 | Completed final sign-off Jun 2020 | 845 Market St | base building improvement to provide new utility stubouts to extg tenant space #1 and #4 at bart level (lower level 1). extg tenant space to remain vacant per ab-07Details
base building improvement to provide new utility stubouts to extg tenant space #1 and #4 at bart level (lower level 1). extg tenant space to remain vacant per ab-07 | $6,000 |
| Aug 2, 2018 | Never finaled issued Oct 2018, no final | 865 Market St | 3rd fl. tenant improvement of (e) retail space: new store front, interior store finishes & fixture, new interior wall. # 338Details
3rd fl. tenant improvement of (e) retail space: new store front, interior store finishes & fixture, new interior wall. # 338 | $129,000 |
| Jul 26, 2018 | Completed final sign-off Dec 2018 | 845 Market St | space fe-11: interior tenant improvement for restaurant in (e) mall food court. new equipment at (e) kitchen, new interior partitions, new casework, new lighting and finishes. maher n/a.Details
space fe-11: interior tenant improvement for restaurant in (e) mall food court. new equipment at (e) kitchen, new interior partitions, new casework, new lighting and finishes. maher n/a. | $140,000 |
| Jul 24, 2018 | Completed final sign-off Nov 2018 | 90 New Montgomery St | 15th fl, ste 1500 ti inlcudes, demo of non structural partitions and install (n) non structural partitions. all (n) or revised hvac, electrical, plumbing life safety, sprinklers under separate permits (bldg is fully sprinklered). maher n/a.Details
15th fl, ste 1500 ti inlcudes, demo of non structural partitions and install (n) non structural partitions. all (n) or revised hvac, electrical, plumbing life safety, sprinklers under separate permits (bldg is fully sprinklered). maher n/a. | $269,000 |
| Jul 23, 2018 | Expired or cancelled cancelled Oct 2022 | 845 Market St | revision to pa #2018-0508-8522. revision to architectural, finishes, mep's, storefront & landlord notes. note: no change of use, occupancy or egress.Details
revision to pa #2018-0508-8522. revision to architectural, finishes, mep's, storefront & landlord notes. note: no change of use, occupancy or egress. | |
| Jul 16, 2018 | Never finaled issued Oct 2018, no final | 865 Market St | basement - interior tenant improvement to include new fixtures, finishes, ceiling over sales area, lighting changes and replacement of hvac. sunglass hut space.Details
basement - interior tenant improvement to include new fixtures, finishes, ceiling over sales area, lighting changes and replacement of hvac. sunglass hut space. | $136,682 |
| Jun 26, 2018 | Never finaled issued Jul 2018, no final | 601 California St | 5th flr - new fire smk dampers (14 total) and associated rated duct enclosures/assemblies at corner and core shaft locations. new mechanical workDetails
5th flr - new fire smk dampers (14 total) and associated rated duct enclosures/assemblies at corner and core shaft locations. new mechanical work | $35,000 |
| Jun 26, 2018 | Completed final sign-off Nov 2018 | 601 California St | 5th flr - demo (e) partition, ceilin tiles, lighting, finishes & millwork, power/data. new: partitions, doors, frames & lighting. renovate restrms, elevator lobby. space us currently unoccupied. mep/fire/life safety under sep permitDetails
5th flr - demo (e) partition, ceilin tiles, lighting, finishes & millwork, power/data. new: partitions, doors, frames & lighting. renovate restrms, elevator lobby. space us currently unoccupied. mep/fire/life safety under sep permit | $125,000 |
| May 30, 2018 | Completed final sign-off Aug 2018 | 575 Market St | 38th flr, suite 3800 - new door between 2 (e) suites maher naDetails
38th flr, suite 3800 - new door between 2 (e) suites maher na | $5,000 |
| May 8, 2018 | Never finaled issued Jul 2018, no final | 845 Market St | space 241: ti-minor non-structural demolition, (n) interior drywall partitions, (n) interior ceilings, lighting, electrical, plumbing and storefront. alarm and sprinkler deferred. associated work done by landlord under 2018-0326-4585.Details
space 241: ti-minor non-structural demolition, (n) interior drywall partitions, (n) interior ceilings, lighting, electrical, plumbing and storefront. alarm and sprinkler deferred. associated work done by landlord under 2018-0326-4585. | $650,000 |
| Apr 26, 2018 | Never finaled issued Apr 2018, no final | 601 California St | #600: t-24 electrical. ref app#201803143598Details
#600: t-24 electrical. ref app#201803143598 | $30,000 |
| Apr 20, 2018 | Never finaled issued Apr 2018, no final | 601 California St | suite #600: title 24 mechanical only. ref app#201803143598Details
suite #600: title 24 mechanical only. ref app#201803143598 | $50,000 |
| Apr 5, 2018 | Completed final sign-off May 2018 | 1098 Harrison St | renew pa# 201212115895. for final only.Details
renew pa# 201212115895. for final only. | |
| Mar 14, 2018 | Completed final sign-off Jun 2018 | 601 California St | unit #600:demo extg partitions, doors/frames, power/tele/data, ceiling/lighting, plumbing fixtures & millwork, construction of new partitions, nw ceiling/lighting, nw power/tele/data & finishes. space is currently unoccupied. mep, sprinkler & life safty systems will be under seperate permit.Details
unit #600:demo extg partitions, doors/frames, power/tele/data, ceiling/lighting, plumbing fixtures & millwork, construction of new partitions, nw ceiling/lighting, nw power/tele/data & finishes. space is currently unoccupied. mep, sprinkler & life safty systems will be under seperate permit. | $175,367 |
| Mar 7, 2018 | Expired or cancelled cancelled Jul 2024 | 865 Market St | to erect a non-electric projecting single faced sign.Details
to erect a non-electric projecting single faced sign. | $8,000 |
| Jan 11, 2018 | Completed final sign-off Mar 2018 | 601 California St | elec/mech ti: title 24 and modification of existing hvac stystem, add 2 vav with congrols, 4 duct vav box with control, air balance ref elec: partial scope office tenant retrofit, lighting, power, signal controls, no new fsds. ref pa# 201710262302Details
elec/mech ti: title 24 and modification of existing hvac stystem, add 2 vav with congrols, 4 duct vav box with control, air balance ref elec: partial scope office tenant retrofit, lighting, power, signal controls, no new fsds. ref pa# 201710262302 | $70,000 |
| Dec 27, 2017 | Never finaled issued Apr 2018, no final | 865 Market St | storefront revision to replace existing storefront with similar glass and new hardware maher not reqDetails
storefront revision to replace existing storefront with similar glass and new hardware maher not req | $97,516 |
| Dec 15, 2017 | Completed final sign-off Jul 2018 | 814 Mission St | revision to 201710020080. office storefront alteration, maher not reqDetails
revision to 201710020080. office storefront alteration, maher not req | |
| Dec 15, 2017 | Completed final sign-off May 2018 | 845 Market St | remodel (e) 662 sq ftpandora jewelery store within mall. maher naDetails
remodel (e) 662 sq ftpandora jewelery store within mall. maher na | $50,000 |
| Oct 27, 2017 | Completed final sign-off Mar 2018 | 90 New Montgomery St | suite 500: title 24 for mech & electrical for pa 2017-0918-8881. maher n/a.Details
suite 500: title 24 for mech & electrical for pa 2017-0918-8881. maher n/a. | $5,000 |
| Oct 26, 2017 | Completed final sign-off Mar 2018 | 601 California St | #1307 on 13th fl: minor alterations to tenant suite & relocation of exit door at adjacent suite. new and/or alterations to mep, sprinklers & life safety systems will be under separate permits.Details
#1307 on 13th fl: minor alterations to tenant suite & relocation of exit door at adjacent suite. new and/or alterations to mep, sprinklers & life safety systems will be under separate permits. | $165,891 |
| Oct 18, 2017 | Never finaled issued Nov 2017, no final | 865 Market St | paint a 2 hr intumescent on exposed steel member within retail space at gr fl. maher n/aDetails
paint a 2 hr intumescent on exposed steel member within retail space at gr fl. maher n/a | $2,300 |
| Oct 3, 2017 | Completed final sign-off Jan 2018 | 601 California St | 5/f: hvac work for ada compliant restrooms ref pa 2017-0811-4568Details
5/f: hvac work for ada compliant restrooms ref pa 2017-0811-4568 | $1,500 |
| Oct 3, 2017 | Never finaled issued Oct 2017, no final | 601 California St | 5&6/f: electrical lighting & controls for ada restroom for 5th & 6th floor. ref pa 2017-0810-4525 and 2017-0811-4568Details
5&6/f: electrical lighting & controls for ada restroom for 5th & 6th floor. ref pa 2017-0810-4525 and 2017-0811-4568 | $9,500 |
| Oct 2, 2017 | Never finaled issued Dec 2017, no final | 814 Mission St | office storefront revision to replace door, landing area & glazing to accomodate door opening to the path of travel within the property line. glazing & fenestration to match (e) as close as possibleDetails
office storefront revision to replace door, landing area & glazing to accomodate door opening to the path of travel within the property line. glazing & fenestration to match (e) as close as possible | $12,500 |
| Sep 18, 2017 | Completed final sign-off Apr 2018 | 90 New Montgomery St | 5th fl - ti includes the demo of non structural partitions and installing (n) power/data outlets. all (n) or revised mep, life safety/srpinklers will be design build and submitted for permit separately (bldg full sprinklered) (n) rest room workDetails
5th fl - ti includes the demo of non structural partitions and installing (n) power/data outlets. all (n) or revised mep, life safety/srpinklers will be design build and submitted for permit separately (bldg full sprinklered) (n) rest room work | $443,388 |
| Aug 22, 2017 | Never finaled issued Aug 2017, no final | 865 Market St | revision to pa 2017-0209-5055. demo portion of concrete slab, near escalator opening. new concrete infill at edge of escalator @ level 2. structural work included. life safety deferred, if required.Details
revision to pa 2017-0209-5055. demo portion of concrete slab, near escalator opening. new concrete infill at edge of escalator @ level 2. structural work included. life safety deferred, if required. | $20,000 |
| Aug 11, 2017 | Completed final sign-off Jan 2018 | 601 California St | 5/f- barrier removal, construction of single accomodation unisex (all gender) ada compliant restroom, new ada accessible drinking fountain & associated elevator lobby extension to accomodate accessible upgrades. mep., life safety & sprinklers on seperate permit.Details
5/f- barrier removal, construction of single accomodation unisex (all gender) ada compliant restroom, new ada accessible drinking fountain & associated elevator lobby extension to accomodate accessible upgrades. mep., life safety & sprinklers on seperate permit. | $72,000 |
| Aug 10, 2017 | Completed final sign-off Jan 2018 | 601 California St | 6th floor: upgrade finishes and replacement fixtures in core restrooms.Details
6th floor: upgrade finishes and replacement fixtures in core restrooms. | $140,000 |
| Aug 10, 2017 | Never finaled issued Aug 2017, no final | 601 California St | 1st floor: demo of extg partitions and associated power/data, floor finishes, lighting, millwork/plumbing. mep, sprinkler, & life safty systems under seperate permits.Details
1st floor: demo of extg partitions and associated power/data, floor finishes, lighting, millwork/plumbing. mep, sprinkler, & life safty systems under seperate permits. | $70,000 |
| Jun 5, 2017 | Never finaled issued Oct 2017, no final | 865 Market St | space 148: tenant improvement of (e) retail space which includes architectural, mechanical, electrical plans; shelving at stockroom. exluding all exterior work on market st - under seperate permit. maherDetails
space 148: tenant improvement of (e) retail space which includes architectural, mechanical, electrical plans; shelving at stockroom. exluding all exterior work on market st - under seperate permit. maher | $3,181,500 |
| May 9, 2017 | Completed final sign-off Jun 2017 | 301 Howard St | suite 1050,10th flr: addition of one room in (e) occupied tenant suite, millwork modification, new non structural partition door, light in (e) ceiling. upgrade to (e) restrooms to meet 20% of the evaluation threshold. only to include (n) restroom entry door auto door openers and actuators. mep def.Details
suite 1050,10th flr: addition of one room in (e) occupied tenant suite, millwork modification, new non structural partition door, light in (e) ceiling. upgrade to (e) restrooms to meet 20% of the evaluation threshold. only to include (n) restroom entry door auto door openers and actuators. mep def. | $39,000 |
| Mar 16, 2017 | Completed final sign-off Jun 2017 | 301 Howard St | ste. #870: title 24 electrical lighting control. ref pa 2016-1202-4010Details
ste. #870: title 24 electrical lighting control. ref pa 2016-1202-4010 | $25,000 |
| Feb 24, 2017 | Never finaled issued Mar 2017, no final | 601 California St | title 24 electrical - indoor lighting control, interior lighting system. ref pa 2016-1110-2398Details
title 24 electrical - indoor lighting control, interior lighting system. ref pa 2016-1110-2398 | |
| Feb 24, 2017 | Never finaled issued Mar 2017, no final | 601 California St | mech title 24 ductwork, vav boxes, supply & return register. ref pa 2016-1110-2398Details
mech title 24 ductwork, vav boxes, supply & return register. ref pa 2016-1110-2398 | |
| Jan 25, 2017 | Never finaled issued Feb 2017, no final | 845 Market St | landlord demolition and space preparation for new tenant with mep. ada, fire life safety, sprinklers under separate tenant work permitDetails
landlord demolition and space preparation for new tenant with mep. ada, fire life safety, sprinklers under separate tenant work permit | $210,000 |
| Jan 9, 2017 | Completed final sign-off Jan 2017 | 865 Market St | revision to 201607051601. move ada power operators, move infant change table. n/a for maher.Details
revision to 201607051601. move ada power operators, move infant change table. n/a for maher. | |
| Jan 9, 2017 | Expired or cancelled cancelled Jan 2026 | 865 Market St | revisions to 201607051601, moving ada stall operators, move infant change table maher not reqDetails
revisions to 201607051601, moving ada stall operators, move infant change table maher not req | |
| Dec 19, 2016 | Completed final sign-off Apr 2017 | 845 Market St | landlord to demo (e) tenant spaces under ab-017. spaces to be left unoccupied maher naDetails
landlord to demo (e) tenant spaces under ab-017. spaces to be left unoccupied maher na | $180,000 |
| Dec 2, 2016 | Completed final sign-off Jun 2017 | 301 Howard St | 8th flr, ste 870: modifications to an existing tenant suite: demo of non-structural partitions, doors, ceilings, finishes. new non-structural partitions, ceilings, lighting, finish door/hardware; maher n/aDetails
8th flr, ste 870: modifications to an existing tenant suite: demo of non-structural partitions, doors, ceilings, finishes. new non-structural partitions, ceilings, lighting, finish door/hardware; maher n/a | $293,046 |
| Dec 1, 2016 | Completed final sign-off May 2017 | 301 Howard St | suite #950:provide power and lighting for restroom upgrade. ref pa#2016 0921 8336 n/a for maher.Details
suite #950:provide power and lighting for restroom upgrade. ref pa#2016 0921 8336 n/a for maher. | $5,000 |
| Dec 1, 2016 | Completed final sign-off May 2017 | 301 Howard St | suite #550:provide power and lighting for restroom upgrade. n/a for maher.Details
suite #550:provide power and lighting for restroom upgrade. n/a for maher. | $5,000 |
| Nov 28, 2016 | Never finaled issued Dec 2016, no final | 845 Market St | 3rd floor: tenant improvement of extg retail space. interior and storefront demo and renovation. n/a for maherDetails
3rd floor: tenant improvement of extg retail space. interior and storefront demo and renovation. n/a for maher | $500,000 |
| Nov 15, 2016 | Completed final sign-off May 2017 | 301 Howard St | suite 950 - ref. t.i. appl #2016-1018-0536. title 24 elec lighting only. limited modification to (e) occupied tenant suite. (5) f-1, (7) f-2, (1) f-4, (1) f-5 light fixtures, and emergency and exit lighting, motion sensors. (8) receptacles and switches. maher ord 155-13 naDetails
suite 950 - ref. t.i. appl #2016-1018-0536. title 24 elec lighting only. limited modification to (e) occupied tenant suite. (5) f-1, (7) f-2, (1) f-4, (1) f-5 light fixtures, and emergency and exit lighting, motion sensors. (8) receptacles and switches. maher ord 155-13 na | $45,000 |
| Nov 15, 2016 | Completed final sign-off May 2017 | 301 Howard St | suite 550 - ref. ti appl #2016-1018-0533. title 24 only -install power and lighting in spec suits, limited mod to (e) unoccupied tennant suite. install (10) f-2 light fixtures, (5) f-1 2x4 fixtures, (2) f-4 2x2 fixtures and (1) f-5 fixtures, motion sensors & exit signs. (8) receptacles and switches.Details
suite 550 - ref. ti appl #2016-1018-0533. title 24 only -install power and lighting in spec suits, limited mod to (e) unoccupied tennant suite. install (10) f-2 light fixtures, (5) f-1 2x4 fixtures, (2) f-4 2x2 fixtures and (1) f-5 fixtures, motion sensors & exit signs. (8) receptacles and switches. | $50,000 |
| Nov 10, 2016 | Never finaled issued Dec 2016, no final | 601 California St | suite #820: build-out of (e) vacant shell suite to a new tenant suite. project consists of new non-rated partitions, new doors, new finishes, new lighting and electrical. new entry, break area, private offices and open work areas and conference rooms. the balance of the floor is occupied. mepDetails
suite #820: build-out of (e) vacant shell suite to a new tenant suite. project consists of new non-rated partitions, new doors, new finishes, new lighting and electrical. new entry, break area, private offices and open work areas and conference rooms. the balance of the floor is occupied. mep | $115,000 |
| Oct 18, 2016 | Completed final sign-off May 2017 | 301 Howard St | suite #950:this project entails limited modification to an extg unoccupied tenant suite on a multi tenant floor. project scope includes new non-structural partitions, ceilings and lighting, finishes, doors, frames and hardware. n/a for maher.Details
suite #950:this project entails limited modification to an extg unoccupied tenant suite on a multi tenant floor. project scope includes new non-structural partitions, ceilings and lighting, finishes, doors, frames and hardware. n/a for maher. | $203,034 |
| Oct 18, 2016 | Completed final sign-off Mar 2017 | 301 Howard St | suite #550:this project entails limited modification to an extg unoccupied tenant suite on a multi tenant floor. project scope includes new non-structural partitions, ceilings and lighting, finishes, doors, frames and hardware. n/a for maher.Details
suite #550:this project entails limited modification to an extg unoccupied tenant suite on a multi tenant floor. project scope includes new non-structural partitions, ceilings and lighting, finishes, doors, frames and hardware. n/a for maher. | $335,322 |
| Sep 21, 2016 | Completed final sign-off Mar 2017 | 301 Howard St | restroom remodel 5th flDetails
restroom remodel 5th fl | $45,240 |
| Sep 21, 2016 | Completed final sign-off Mar 2017 | 301 Howard St | restroom remodel 9th fl - barrier removal.Details
restroom remodel 9th fl - barrier removal. | $45,240 |
| Aug 19, 2016 | Completed final sign-off Feb 2017 | 222 Kearny St | provide new lighting & branch circuiting to (e) panel. install 32 new 2x4 light fixtures, 3 strip lights, 4 exit signs 18 duplex receptacles, 2 quad receptacles, 4 emergency ltx, 9 wall mounted furniture feeds, 1 floor mounemt. ref. ti appl#. 2016-0803-4085.Details
provide new lighting & branch circuiting to (e) panel. install 32 new 2x4 light fixtures, 3 strip lights, 4 exit signs 18 duplex receptacles, 2 quad receptacles, 4 emergency ltx, 9 wall mounted furniture feeds, 1 floor mounemt. ref. ti appl#. 2016-0803-4085. | $60,000 |