Matthew Tropp
- Listed as
- authorized agent-others, designer, engineer
- Firm
- Ashley & Vance
- Based in
- Oakland
- On San Francisco permits
- Jun 2005 to Feb 2026
99 permits since 2000 (engineer on 96 permits, designer on 2 permits, authorized agent-others on 1 permit): 68 completed, 5 in progress, 13 never finaled, 13 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 11, 2026 | In progress issued Jun 2026 | 538 Peralta Av | create j-adu on 1/f garage (271sf). move washer/dryer from 1/f garage to 2/f kitchen. j-adu will have sep w/d.Details
create j-adu on 1/f garage (271sf). move washer/dryer from 1/f garage to 2/f kitchen. j-adu will have sep w/d. | $100,000 | |
| Nov 21, 2025 | Completed final sign-off May 2026 | 536 44th Av | Gg Resources Services Inc | replace exterior siding of back of house with (n) fire retardant siding; replace windows of back of house with (n) like for like; replace 1 window w/french door at back of house. replace sliding door with new, like for like. expand deck, build new deck stairs, replace concrete patio with new, likeDetails
replace exterior siding of back of house with (n) fire retardant siding; replace windows of back of house with (n) like for like; replace 1 window w/french door at back of house. replace sliding door with new, like for like. expand deck, build new deck stairs, replace concrete patio with new, like | $120,000 |
| Mar 12, 2025 | In progress filed Mar 2025, not yet issued | 235 Roosevelt Wy | remodel of kitchen to include removal of walls. bathroom to be remodeled, expanded into adjacent closet. new privacy fence and automatic gate at driveway behind setback. replace 2 windows at rear, 2 at side.Details
remodel of kitchen to include removal of walls. bathroom to be remodeled, expanded into adjacent closet. new privacy fence and automatic gate at driveway behind setback. replace 2 windows at rear, 2 at side. | $40,000 | |
| Oct 22, 2024 | Completed final sign-off Jul 2025 | 1426 47th Av | replace front stairway with modifications to comply with code. add landing, fix rise/runDetails
replace front stairway with modifications to comply with code. add landing, fix rise/run | $5,000 | |
| May 10, 2024 | In progress issued Oct 2024 | 1883 Funston Av | Mission Home Remodeling Inc | alter site, revision to site pa# 202101132622. reduction in scope of work. extend living/dining rm out 4ft to rear. no additions @ 1st & 2nd flrs. remodel kitchen, family room & bath 2. new windows @ rear. no change to front facade. no work @ 1st flr other than door & repairing stairs to rear yard.Details
alter site, revision to site pa# 202101132622. reduction in scope of work. extend living/dining rm out 4ft to rear. no additions @ 1st & 2nd flrs. remodel kitchen, family room & bath 2. new windows @ rear. no change to front facade. no work @ 1st flr other than door & repairing stairs to rear yard. | $100,000 |
| Jan 5, 2023 | Completed final sign-off Jan 2023 | 621 York St | Edgewood Builders Inc | revision to plan pa#201907176097 to clarify omission of special inspections 18c required for anchors installed in existing concrete. existing concrete was replaced at front & all anchors installed in new concrete.Details
revision to plan pa#201907176097 to clarify omission of special inspections 18c required for anchors installed in existing concrete. existing concrete was replaced at front & all anchors installed in new concrete. | |
| Jul 29, 2022 | Never finaled issued Sep 2022, no final | 20 Palo Alto Av | interior work only: remodel of (e) bathrooms and kitchens @ basement & 1st fl. replace main stair and remodel laundry/ bathrooms on the 2nd fl. update finishes. ref lower level adu permit 2020 0910 3866.Details
interior work only: remodel of (e) bathrooms and kitchens @ basement & 1st fl. replace main stair and remodel laundry/ bathrooms on the 2nd fl. update finishes. ref lower level adu permit 2020 0910 3866. | $235,000 | |
| May 24, 2022 | Never finaled filed May 2022, never issued | 1128 Market St | Rossi Builders Inc. | 3rd flr spec suite: tenant improvement. roof: infrastructure upgrades and mechanical rooms on each floor.Details
3rd flr spec suite: tenant improvement. roof: infrastructure upgrades and mechanical rooms on each floor. | $2,027,534 |
| May 18, 2022 | Expired or cancelled suspend Jan 2023 | 1128 Market St | Rossi Builders Inc. | ground floor: tenant improvement. roof: infrastructure upgrades. new mech on rooftop.Details
ground floor: tenant improvement. roof: infrastructure upgrades. new mech on rooftop. | $1,867,147 |
| May 6, 2022 | Completed final sign-off Jul 2022 | 1901 Union St | Slick Construction | structural revision to pa# 2022-0330-1214Details
structural revision to pa# 2022-0330-1214 | |
| Mar 30, 2022 | Completed final sign-off Jul 2022 | 1901 Union St | Slick Construction | renovation of (e) toilet rooms in (e) bar to create 2 accessible toilet rooms w(n) fixtures and finishes; install (n) powered door operator @ entry door. (e) skylight to be removed.Details
renovation of (e) toilet rooms in (e) bar to create 2 accessible toilet rooms w(n) fixtures and finishes; install (n) powered door operator @ entry door. (e) skylight to be removed. | $124,000 |
| Mar 4, 2022 | Completed final sign-off May 2023 | 200 Glenview Dr | add work permitted to under pa 2021-1118-2718 & 2021-1206-3789 addition and remodel to (e) single family dwelling; convert non-habitable space and basement mezzanine level to habitable space. reconfigure int stairs, hall, bathroom, laundry, add (n) rear lower deck, ext stair in-kind, (n) glaze openDetails
add work permitted to under pa 2021-1118-2718 & 2021-1206-3789 addition and remodel to (e) single family dwelling; convert non-habitable space and basement mezzanine level to habitable space. reconfigure int stairs, hall, bathroom, laundry, add (n) rear lower deck, ext stair in-kind, (n) glaze open | $85,000 | |
| Feb 14, 2022 | Expired or cancelled withdrawn Jun 2023 | 1907 Union St | A M Construction | to comply with nov# 202286294. enlarge roof deck.Details
to comply with nov# 202286294. enlarge roof deck. | $8,000 |
| Jan 27, 2022 | Completed final sign-off May 2022 | 1973 17th Av | David Edward Conroy | remodel to (e) bathroom within footprint for new layout & curbless shower. conversion of (e) hall toilet room into (n) laundry room with side-by-side washer & dryer. conversion of (e) laundry room into a bathroom. replacement of 3 windows added in the (e) bathroom.Details
remodel to (e) bathroom within footprint for new layout & curbless shower. conversion of (e) hall toilet room into (n) laundry room with side-by-side washer & dryer. conversion of (e) laundry room into a bathroom. replacement of 3 windows added in the (e) bathroom. | $20,000 |
| Jan 14, 2022 | Completed final sign-off Oct 2023 | 3865 19th St | Stricklin Construciton | revision to issued permit# 2021-1117-2601. replace existing rotted deck framing in kind. revised height of exterior retaining wall and add structural design.Details
revision to issued permit# 2021-1117-2601. replace existing rotted deck framing in kind. revised height of exterior retaining wall and add structural design. | |
| Dec 6, 2021 | Expired or cancelled expired Apr 2024 | 137 16th Av | revision to permit 201812218953. convert (e) non-habitable attic space into habitable space and add to (e) upper unit 137, new interior access stair, new bathroom, fixtures, finishes, and services to new habitable space.Details
revision to permit 201812218953. convert (e) non-habitable attic space into habitable space and add to (e) upper unit 137, new interior access stair, new bathroom, fixtures, finishes, and services to new habitable space. | $56,000 | |
| Nov 17, 2021 | Completed final sign-off Mar 2024 | 358 Lombard St | Blair Burke General Contractors Inc | rev to 201707313324. structural revisions. lower footing to increase topsoil for back yard garden.Details
rev to 201707313324. structural revisions. lower footing to increase topsoil for back yard garden. | |
| Oct 1, 2021 | Expired or cancelled withdrawn Jan 2022 | 1973 17th Av | remodel to (e) bathroom within footprint for new layout and curbless shower. conversion of (e) hall toilet room into new laundry room with side-by-side washer and dryer. conversion of (e) laundry room into a bathroom. replace 3 windows, and a new window added in (e) bathroom.Details
remodel to (e) bathroom within footprint for new layout and curbless shower. conversion of (e) hall toilet room into new laundry room with side-by-side washer and dryer. conversion of (e) laundry room into a bathroom. replace 3 windows, and a new window added in (e) bathroom. | $20,000 | |
| Sep 2, 2021 | Never finaled issued May 2023, no final | 314 Twin Peaks Bl | addition at (e) roof deck attached to (e) stair enclosure. plus replacing & extending (e) balcony at 1st flr & back yard modification to (e) exterior deck on grade w/ outdoor wet bar & pool / hot tub combination.Details
addition at (e) roof deck attached to (e) stair enclosure. plus replacing & extending (e) balcony at 1st flr & back yard modification to (e) exterior deck on grade w/ outdoor wet bar & pool / hot tub combination. | $185,000 | |
| Aug 19, 2021 | Completed final sign-off Nov 2022 | 885 Duncan St | 1st fl - convert (e) garage & storage space into den, bedrm, bath & laundry; relocate garage door; replace interior stairs; 2nd fl - remodel kitchen & bath; replae and add (n) windows throughout; replace stucco @ front facade w/ipe; replace cementitious siding at rear w/hardie siding; (n) heat-pump;Details
1st fl - convert (e) garage & storage space into den, bedrm, bath & laundry; relocate garage door; replace interior stairs; 2nd fl - remodel kitchen & bath; replae and add (n) windows throughout; replace stucco @ front facade w/ipe; replace cementitious siding at rear w/hardie siding; (n) heat-pump; | $100,000 | |
| Aug 13, 2021 | Completed final sign-off Jul 2025 | 328 Monticello St | revision to pa 2019-0412-7899 near rear yard patio and stair less than 30" in height. revision of property line underpinning detailDetails
revision to pa 2019-0412-7899 near rear yard patio and stair less than 30" in height. revision of property line underpinning detail | $1,800 | |
| Aug 4, 2021 | Expired or cancelled withdrawn Jan 2023 | 85 Joost Av | Breakthrough Builders Llc | revisons to pa: 201910184997 -85 joost avenue 1. replacing window 10 on the rear facade with a sliding door d014 2. adding a cantilevered 4' x 7' deck to the rear facade 3. the kitchen and electrical layout has been updatedDetails
revisons to pa: 201910184997 -85 joost avenue 1. replacing window 10 on the rear facade with a sliding door d014 2. adding a cantilevered 4' x 7' deck to the rear facade 3. the kitchen and electrical layout has been updated | $6,000 |
| May 21, 2021 | Never finaled issued May 2021, no final | 1069 14th St | K O D Construction | int remodel of (e) unit on top fl (1071 14th st). (n) interior doors, finishes, fixtures, skylights & reconf interior walls. minor infill at rear of 1st fl below (e) rear pop-out. ext with (n) repl windows in-kind throughout. (n) solar panel on roof. (n) fence/gate at rear. solar under sep permit.Details
int remodel of (e) unit on top fl (1071 14th st). (n) interior doors, finishes, fixtures, skylights & reconf interior walls. minor infill at rear of 1st fl below (e) rear pop-out. ext with (n) repl windows in-kind throughout. (n) solar panel on roof. (n) fence/gate at rear. solar under sep permit. | $210,000 |
| Apr 14, 2021 | Completed final sign-off Jan 2023 | 621 York St | Edgewood Builders Inc | revision to pa# 201907176097. reconfiguration of 1st fl layout. new internal stair, skylight hatch, roof deck, & reconfiguration of rear exterior stairs.Details
revision to pa# 201907176097. reconfiguration of 1st fl layout. new internal stair, skylight hatch, roof deck, & reconfiguration of rear exterior stairs. | $30,000 |
| Apr 8, 2021 | Completed final sign-off Oct 2023 | 2419 42nd Av | Ken O'sullivan Construction And Renovati | remodel of (e) kitchen and living room including relocation of (e) gas range, appliances, plumbing fixtures, electrical fixtures, and the addition of 1 skylight. demolition of framing members and (e) dropped ceiling. new lighting, finishes, appliances, and fixtures thrughout.Details
remodel of (e) kitchen and living room including relocation of (e) gas range, appliances, plumbing fixtures, electrical fixtures, and the addition of 1 skylight. demolition of framing members and (e) dropped ceiling. new lighting, finishes, appliances, and fixtures thrughout. | $40,000 |
| Mar 24, 2021 | In progress issued Sep 2025 | 900 Sansome St | Gci, Inc | change of use and occupancy from s-2 (parking garage) to b (office) use, including: a new elevator, egress and ada bathroom upgradesDetails
change of use and occupancy from s-2 (parking garage) to b (office) use, including: a new elevator, egress and ada bathroom upgrades | $260,000 |
| Mar 17, 2021 | Never finaled issued Apr 2021, no final | 2000 Judah St | Robert B Lewis Renovations | replace & widen existing load-in roll-up door.Details
replace & widen existing load-in roll-up door. | $15,000 |
| Mar 9, 2021 | Completed final sign-off Feb 2026 | 155 Flood Av | Golden Hammer | addition & remodel at main level for new kitchen, bedroom, full bath, & powder room. addition & remodel to convert to habitable space w/ 2 bedrooms, bathroom, laundry room, & closets. garage & (e) storage to remain, create new mechanical enclosure. new decks at main level in rear w/ stairs to yard.Details
addition & remodel at main level for new kitchen, bedroom, full bath, & powder room. addition & remodel to convert to habitable space w/ 2 bedrooms, bathroom, laundry room, & closets. garage & (e) storage to remain, create new mechanical enclosure. new decks at main level in rear w/ stairs to yard. | $300,000 |
| Mar 9, 2021 | Completed final sign-off Feb 2022 | 1232 Treat Av | Finbarr O'donovan Construction | voluntary seismic strengthening consisting of (n) wall anchors and in-plane bolting/blocking at (e) brick wall lines at roof and 2nd floor and (n) moment frame at rear wall at ground floor.Details
voluntary seismic strengthening consisting of (n) wall anchors and in-plane bolting/blocking at (e) brick wall lines at roof and 2nd floor and (n) moment frame at rear wall at ground floor. | $50,000 |
| Jan 29, 2021 | Completed final sign-off Jun 2023 | 38 Hearst Av | Daniel Kelly Construction | remodel lower level washer/dryer room and bedroom. add bathroom at lower level. remodel (e) upstair kitchen and bath.Details
remodel lower level washer/dryer room and bedroom. add bathroom at lower level. remodel (e) upstair kitchen and bath. | $30,000 |
| Jan 23, 2021 | Completed final sign-off Oct 2022 | 1324 Willard St | legalize one unauthorized dwelling unit in upper garage level, above garage, by lowering the hallway floor (wood joist floor) at the unit entry and installing a new entry door. unit legalization ordinance#: 43-14Details
legalize one unauthorized dwelling unit in upper garage level, above garage, by lowering the hallway floor (wood joist floor) at the unit entry and installing a new entry door. unit legalization ordinance#: 43-14 | $11,800 | |
| Nov 24, 2020 | Completed final sign-off Dec 2021 | 4832 California St | Jason Liu Construction Company | home renovaton to include remodel to upper unit for better flow and open floor plan of main spaces with remodel of kitchen, bathroom, and laundry room.Details
home renovaton to include remodel to upper unit for better flow and open floor plan of main spaces with remodel of kitchen, bathroom, and laundry room. | $75,000 |
| Nov 12, 2020 | Completed final sign-off May 2022 | 100 Saint Germain Av | R J Builder | repair (e) fence at sidewalk, including (n) vehicle gate, repair (e) car port, and replace front yeard entry deck & steps / landing to (e) house. exterior work. no work to main house.Details
repair (e) fence at sidewalk, including (n) vehicle gate, repair (e) car port, and replace front yeard entry deck & steps / landing to (e) house. exterior work. no work to main house. | $78,800 |
| Nov 9, 2020 | Completed final sign-off Apr 2022 | 33 Capra Wy | Alex Construction & Electric Inc | rev to pa201806010822-s1: revision to shear wall at front facade, lower floor elevatoin at rear, relocate egress gate at r.o.w., infill recesed garage 7 entray at 2/f.Details
rev to pa201806010822-s1: revision to shear wall at front facade, lower floor elevatoin at rear, relocate egress gate at r.o.w., infill recesed garage 7 entray at 2/f. | $25,000 |
| Nov 4, 2020 | Completed final sign-off Apr 2022 | 3645 Scott St | Citywest Construction Inc. | revisions to previously approved deck and stairs at rear yard. previously approved pa # 201806071224Details
revisions to previously approved deck and stairs at rear yard. previously approved pa # 201806071224 | $1,000 |
| Oct 29, 2020 | Expired or cancelled withdrawn Nov 2022 | 200 Glenview Dr | convert (e) non-habitable basement into habitable. add new structure, fixtures, finishes & services to convert (e) basement. crawl space into 2 floors of habitable space. remodel (e) throughout. add new 3rd floor deck to rear elevation. reconfigure (e) exterior window / door. add new openings.Details
convert (e) non-habitable basement into habitable. add new structure, fixtures, finishes & services to convert (e) basement. crawl space into 2 floors of habitable space. remodel (e) throughout. add new 3rd floor deck to rear elevation. reconfigure (e) exterior window / door. add new openings. | $455,604 | |
| Oct 10, 2020 | In progress issued Jul 2026 | 458 Castro St | replace in kind all interior doors & walls. renovate/repair (e) 4776 sq ft building heavily damaged by fire and replace rear stairs & storage room that were destroyed.Details
replace in kind all interior doors & walls. renovate/repair (e) 4776 sq ft building heavily damaged by fire and replace rear stairs & storage room that were destroyed. | $900,000 | |
| Sep 29, 2020 | Completed final sign-off Jun 2024 | 324 Locust St | Richard Avelar &Assoc Reconstr/Dba Recon | enclosure of exterior deck at 2nd floor with new roof and walls. 2 new windows and skylight to be added - not visible from street. interior remodel of master bathroom includes new fixtures and finishes.Details
enclosure of exterior deck at 2nd floor with new roof and walls. 2 new windows and skylight to be added - not visible from street. interior remodel of master bathroom includes new fixtures and finishes. | $28,000 |
| Aug 20, 2020 | Completed final sign-off Sep 2023 | 4315 21st St | Urbnbuild Inc | remodel and addition to an (e) single family home. remodel 1st floor interior. replace (e) rear lower sloped roof with (n) flat roof. replace(e) rear at grade deck with(n) deck. remodel 2nd floor bathrooms. replace (e) windows and doors in kind. replace select (e) windows and doors with (n) windows.Details
remodel and addition to an (e) single family home. remodel 1st floor interior. replace (e) rear lower sloped roof with (n) flat roof. replace(e) rear at grade deck with(n) deck. remodel 2nd floor bathrooms. replace (e) windows and doors in kind. replace select (e) windows and doors with (n) windows. | $255,000 |
| Aug 10, 2020 | Completed final sign-off Jul 2022 | 454 Shotwell St | C C I Commercial Construction & Improv | demolition of extg storefront at 454 shotwell, fire escape and rollup door at facade. new construction of storefront, brick infill and windows.Details
demolition of extg storefront at 454 shotwell, fire escape and rollup door at facade. new construction of storefront, brick infill and windows. | $250,000 |
| Mar 13, 2020 | Completed final sign-off Apr 2020 | 2412 Funston Av | Mannon Construction | voluntary seismic strengthening at basement only. 2 shearwalls, 2 holdowns, anchor bolts, clipsDetails
voluntary seismic strengthening at basement only. 2 shearwalls, 2 holdowns, anchor bolts, clips | $6,000 |
| Mar 11, 2020 | Completed final sign-off Oct 2021 | 402 29th Av | Pacific Engineering & Construction Inc. | voluntary seismic structural upgrade soft story oridinance per sfbc ch34b, based on the 2019 ibc app ch a4.Details
voluntary seismic structural upgrade soft story oridinance per sfbc ch34b, based on the 2019 ibc app ch a4. | $55,000 |
| Mar 10, 2020 | Expired or cancelled withdrawn Jan 2021 | 3401 California St | (n) partitions, fixtures, finishes. (n) stair to replace (e) stair. (n) structural work to extend length of mezzanine & modify (e) structural roof trusses. no change to existing exterior facade. mep, life safety under separate permit.Details
(n) partitions, fixtures, finishes. (n) stair to replace (e) stair. (n) structural work to extend length of mezzanine & modify (e) structural roof trusses. no change to existing exterior facade. mep, life safety under separate permit. | $600,000 | |
| Feb 20, 2020 | Completed final sign-off Dec 2021 | 1415 Cole St | O'dwyer Construction Inc | revision to pa #202001293021. changes to shearwall type.Details
revision to pa #202001293021. changes to shearwall type. | |
| Feb 14, 2020 | Never finaled issued Aug 2022, no final | 2242 09th Av | Gorman Construction | foundation work (cement pour and lay / helical pier drill & install); install of endless pool; (n) deck construction & placement of cement pavers.Details
foundation work (cement pour and lay / helical pier drill & install); install of endless pool; (n) deck construction & placement of cement pavers. | $100,000 |
| Jan 2, 2020 | Expired or cancelled cancelled Jan 2026 | 2634 36th Av | Velasquez Construction | renovation of unfinished garage space for one bedroom and one bathroom. electrical update, heating, & plumbing work.Details
renovation of unfinished garage space for one bedroom and one bathroom. electrical update, heating, & plumbing work. | $65,000 |
| Nov 6, 2019 | Completed final sign-off Oct 2020 | 661 Alvarado St | Bradford Construction | rev to 201907256905. reconfig interior layout to e basement lvl to include a powder rm, workshop, new rear deck at basement lvl w/stairs down to rear yard, replace e concrete slab on grade in bsmt in kind. revised scope includes removal of prev approved replacement windows at front & int lightwell.Details
rev to 201907256905. reconfig interior layout to e basement lvl to include a powder rm, workshop, new rear deck at basement lvl w/stairs down to rear yard, replace e concrete slab on grade in bsmt in kind. revised scope includes removal of prev approved replacement windows at front & int lightwell. | $25,000 |
| Sep 27, 2019 | Completed final sign-off Aug 2020 | 2131 24th St | Trim Fit Constr. - O'reilly Engineering | removal of existing foundation, replace new foundation. strengthen lower unit floor framingDetails
removal of existing foundation, replace new foundation. strengthen lower unit floor framing | $38,000 |
| Sep 17, 2019 | Completed final sign-off Sep 2021 | 756 Chestnut St | modifications of int layout on 1st, 2nd, 3rd fl. n basement addition, n int walls, doors, ceilings, lights, fixtures, & finishes. ext work to include replacement of windows at front facade, new windows & doors throughout. n finishes @ rear facade, n balconies at 4th/3rd fl & roof deck above 4th fl.Details
modifications of int layout on 1st, 2nd, 3rd fl. n basement addition, n int walls, doors, ceilings, lights, fixtures, & finishes. ext work to include replacement of windows at front facade, new windows & doors throughout. n finishes @ rear facade, n balconies at 4th/3rd fl & roof deck above 4th fl. | $150,000 | |
| Aug 13, 2019 | Expired or cancelled cancelled Jun 2025 | 1582 Funston Av | adu in (e) 2-unit residential bldg. ord #162-16. convert (e)non-habitable storage space @ 1st fl to (n)(1)bed studio adu. add (n)fixtures, finishes & services, upgrade (e) passage way & add (n) passage way for entry/egress. (n)glazing units in (n),(e) & modified (e) openings, upgrade fire separationDetails
adu in (e) 2-unit residential bldg. ord #162-16. convert (e)non-habitable storage space @ 1st fl to (n)(1)bed studio adu. add (n)fixtures, finishes & services, upgrade (e) passage way & add (n) passage way for entry/egress. (n)glazing units in (n),(e) & modified (e) openings, upgrade fire separation | $90,515 | |
| Aug 13, 2019 | Completed final sign-off May 2024 | 1011 Hyde St | Pacific Engineering & Construction Inc. | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $56,400 |
| Aug 6, 2019 | Never finaled issued Mar 2021, no final | 15 Park Hill Av | North Bay Construction | remodel/add to (e) single fmy home. enlarge (e) basement (n) 2nd unit. (n) 4th flr vert add. hori add to front & back. update facade/enlarge entry. interior remodel. (n) nfpa 13r fire sprinklers thruout & monitoring under sep permits. (n) residential elevator for 1 unit under sep permit.Details
remodel/add to (e) single fmy home. enlarge (e) basement (n) 2nd unit. (n) 4th flr vert add. hori add to front & back. update facade/enlarge entry. interior remodel. (n) nfpa 13r fire sprinklers thruout & monitoring under sep permits. (n) residential elevator for 1 unit under sep permit. | $709,962 |
| Jul 23, 2019 | Completed final sign-off Mar 2021 | 270 27th Av | Pacific Engineering & Construction Inc. | structural upgrade for soft story ordinance per sfbc chapter 4d. based on 2012 international (e) bldg code appendix chapter a4.Details
structural upgrade for soft story ordinance per sfbc chapter 4d. based on 2012 international (e) bldg code appendix chapter a4. | $75,000 |
| Jul 5, 2019 | Never finaled issued Aug 2019, no final | 1325 11th Av | Allied Teamwork Construction Co | voluntary seismic retrofit - strongwall installs.Details
voluntary seismic retrofit - strongwall installs. | $25,000 |
| Jul 3, 2019 | Completed final sign-off Oct 2020 | 565 Ortega St | Floyd Construction Inc | revision to pa #201704043128. removal of (e) canopy @ rear yard & replace with (n) canopy, not visible from st; extend screening @ front facade to enclose garbage recycling areaDetails
revision to pa #201704043128. removal of (e) canopy @ rear yard & replace with (n) canopy, not visible from st; extend screening @ front facade to enclose garbage recycling area | $9,500 |
| Jun 11, 2019 | Never finaled issued Aug 2019, no final | 3084 Market St | Ue Construction | framing upgrade: structural upgrades of the floor framing, replacement of existing tension system.Details
framing upgrade: structural upgrades of the floor framing, replacement of existing tension system. | $15,000 |
| May 29, 2019 | Completed final sign-off Dec 2020 | 1152 Fell St | Daniel Kelly Construction | build staircase at rear of propertyDetails
build staircase at rear of property | $1,600 |
| May 21, 2019 | Completed final sign-off Aug 2020 | 115 Brighton Av | Lcy Contruciton Inc | new adu per ordinance# 95-17, (1 bedroom & 1 bath) in existing accessory garage per ordinance 95-17, structure shall undergo mandatory seismic upgrade per sfebc 403.4 & be raised three feetDetails
new adu per ordinance# 95-17, (1 bedroom & 1 bath) in existing accessory garage per ordinance 95-17, structure shall undergo mandatory seismic upgrade per sfebc 403.4 & be raised three feet | $70,000 |
| Apr 26, 2019 | Completed final sign-off May 2021 | 1638 Haight St | voluntary soft-story retrofit. structural upgrade. plywood shearwalls & steel frame. no exterior work.Details
voluntary soft-story retrofit. structural upgrade. plywood shearwalls & steel frame. no exterior work. | $150,000 | |
| Apr 12, 2019 | Completed final sign-off Jul 2025 | 328 Monticello St | addition & interior remodel to (e) sfd - infill (e) central lightwell, infill below (e) overhanging structure at rear; convert (e) non-habitable storage into habitable sapce; (n) kitchen, 2x (n) bathrooms, (n) laundry, (n) interior stair from 1st to 2nd fl to roof; (n) skylights, (n) roof deck,Details
addition & interior remodel to (e) sfd - infill (e) central lightwell, infill below (e) overhanging structure at rear; convert (e) non-habitable storage into habitable sapce; (n) kitchen, 2x (n) bathrooms, (n) laundry, (n) interior stair from 1st to 2nd fl to roof; (n) skylights, (n) roof deck, | $282,100 | |
| Apr 10, 2019 | Never finaled issued Apr 2019, no final | 1128 Market St | C C I Commercial Construction & Improv | ground floor demolition with cleaned up finishes and new modified entry lobby. maher n/a.Details
ground floor demolition with cleaned up finishes and new modified entry lobby. maher n/a. | $85,000 |
| Feb 28, 2019 | Completed final sign-off Nov 2019 | 2011 Golden Gate Av | North Bay Construction | scope includes removal of (e) and the construction of interior walls, doors, finishes & fixtures. replacement windows on the front & side yard shall be in kind; replacement windows on front elevation shall be all wood, sash only.Details
scope includes removal of (e) and the construction of interior walls, doors, finishes & fixtures. replacement windows on the front & side yard shall be in kind; replacement windows on front elevation shall be all wood, sash only. | $70,000 |
| Dec 10, 2018 | Completed final sign-off Dec 2019 | 1000 Tompkins Av | Midstate Construction Corporation | selected replacement of unit interior items & finishes per unit interior replacement schedule; paint ext surfaces; replacement of e w/h: see units; renovate of e leasing office & laundry; new community rm, kitchen, & accessible restrms; new landscape & play structure & ground finishes @ e courtyard;Details
selected replacement of unit interior items & finishes per unit interior replacement schedule; paint ext surfaces; replacement of e w/h: see units; renovate of e leasing office & laundry; new community rm, kitchen, & accessible restrms; new landscape & play structure & ground finishes @ e courtyard; | $2,900,000 |
| Oct 5, 2018 | Completed final sign-off May 2019 | 729 27th Av | Lee & Company Contractors Inc | removal of interior finishes in kitchen and powder bath, new appliances, cabinetry, recessed lighting throughout main level, relocation of interior wall to include new structural beams, renovation of power bath to include new plumbing fixtures, aeras of work in main level include entry hall,Details
removal of interior finishes in kitchen and powder bath, new appliances, cabinetry, recessed lighting throughout main level, relocation of interior wall to include new structural beams, renovation of power bath to include new plumbing fixtures, aeras of work in main level include entry hall, | $400,000 |
| Aug 24, 2018 | Completed final sign-off Jan 2019 | 116 Beaumont Av | Lee & Company Contractors Inc | revision to pa 2018-0725-5457 addition o f sun tunnel and opening in load bearing wall for cabinetryDetails
revision to pa 2018-0725-5457 addition o f sun tunnel and opening in load bearing wall for cabinetry | $10,000 |
| Aug 8, 2018 | Completed final sign-off Sep 2021 | 2206 48th Av | California Construction Center Inc | structural revision to the issued pa# 2018-0521-9641.Details
structural revision to the issued pa# 2018-0521-9641. | $15,000 |
| Jun 11, 2018 | Completed final sign-off Apr 2022 | 869 North Point St | Devlin/Mcnally Construction | retrofit of rear yard retaining wall at 850 bay street. work includes installation of 6 tie-backs and 4 anchors at (e) conc wall. installation to happen at 869 north point street, ref pa #201805219711 (850 bay street).Details
retrofit of rear yard retaining wall at 850 bay street. work includes installation of 6 tie-backs and 4 anchors at (e) conc wall. installation to happen at 869 north point street, ref pa #201805219711 (850 bay street). | $10,000 |
| May 30, 2018 | Completed final sign-off Apr 2019 | 45 Deming St | O'shaughnessy Construction | remodeling to existing residence for kitchen & dining room on main level, reconfig of stairs to access mid level, reconfig existing bedroom, bathrooms and office on mid level.Details
remodeling to existing residence for kitchen & dining room on main level, reconfig of stairs to access mid level, reconfig existing bedroom, bathrooms and office on mid level. | $150,000 |
| May 21, 2018 | Completed final sign-off Sep 2021 | 2206 48th Av | California Construction Center Inc | interior remodel to (e) sfd: convert 1st fl non-habitable space- remodel (e) 1st floor bathrm, add closet- remove (e) interior walls @ 2nd fl & replace with (n) structure in ceiling- remodel (e) kitchen & 2nd fl bathrm- remodel (e) 3rd fl closet- (n) windows (e) or modified (e) openings.Details
interior remodel to (e) sfd: convert 1st fl non-habitable space- remodel (e) 1st floor bathrm, add closet- remove (e) interior walls @ 2nd fl & replace with (n) structure in ceiling- remodel (e) kitchen & 2nd fl bathrm- remodel (e) 3rd fl closet- (n) windows (e) or modified (e) openings. | $85,000 |
| May 21, 2018 | Expired or cancelled revoked Aug 2018 | 121 Gates St | Kanler Inc | to comply with nov #201767361; removal of (e) interior walls, post, fixtures, and finishes and construction of (n) interior walls, doors, stair, fixtures and finshes. exterior work includes (n) windows, door and deck stair, and repair to (e) fire damaged roof, balcony and wall,Details
to comply with nov #201767361; removal of (e) interior walls, post, fixtures, and finishes and construction of (n) interior walls, doors, stair, fixtures and finshes. exterior work includes (n) windows, door and deck stair, and repair to (e) fire damaged roof, balcony and wall, | $300,000 |
| May 21, 2018 | Completed final sign-off Apr 2022 | 850 Bay St | Devlin/Mcnally Construction | retrofit of rear yard retaining wall. install 6 tie-backs at wall. install wall anchors. installation to happen at 869 north point street (pa# 201806111552).Details
retrofit of rear yard retaining wall. install 6 tie-backs at wall. install wall anchors. installation to happen at 869 north point street (pa# 201806111552). | $20,000 |
| Mar 16, 2018 | Expired or cancelled withdrawn Jan 2024 | 2595 Folsom St | project proposes converting (e) 2f single dwelling unit to (3) dwelling units. work includes structural upgrade & new sprinklers throughout.Details
project proposes converting (e) 2f single dwelling unit to (3) dwelling units. work includes structural upgrade & new sprinklers throughout. | $200,000 | |
| Jan 25, 2018 | Completed final sign-off Aug 2019 | 867 Hampshire St | Hammerhouse Construction | remodeling and infill expansion on 2nd fl. reorganize kitchen, living, dining rooms for open plan. relocate bathrm. new pantry & storage. relocate 2 bedrm to 1st fl. convert 1st fl storage rooms & laundry to habitable space including media rm, bedrm, bathrm, & master suite. remove masonry fireplace.Details
remodeling and infill expansion on 2nd fl. reorganize kitchen, living, dining rooms for open plan. relocate bathrm. new pantry & storage. relocate 2 bedrm to 1st fl. convert 1st fl storage rooms & laundry to habitable space including media rm, bedrm, bathrm, & master suite. remove masonry fireplace. | $174,731 |
| Jan 10, 2018 | Completed final sign-off Jul 2018 | 1845 Leavenworth St | Pacific Engineering & Construction Inc. | revision to app#201609026733 for soft story retrofit. 2016 cebc appendix a-4Details
revision to app#201609026733 for soft story retrofit. 2016 cebc appendix a-4 | |
| Dec 20, 2017 | Completed final sign-off Mar 2019 | 4250 26th St | D K G Construction Inc | to comply with nov201773191 ces: correction of unsafe retaining wall consisting of the following work: demo of an (e) rubble wall in rear yard along east prop line. construction of a new soldier beam & lagging retaining wall @ east prop line in rear yard.Details
to comply with nov201773191 ces: correction of unsafe retaining wall consisting of the following work: demo of an (e) rubble wall in rear yard along east prop line. construction of a new soldier beam & lagging retaining wall @ east prop line in rear yard. | $15,000 |
| Nov 7, 2017 | Completed final sign-off Mar 2021 | 595 Clipper St | Quinlan Construction, Centric Building Inc. | revision to pa#201107079682, structural remediation of existing canted foundation wall at 1/f and revise to footing. floor & w2all framing at 2nd floor. front to be upgraded to address (e) substandard condition.Details
revision to pa#201107079682, structural remediation of existing canted foundation wall at 1/f and revise to footing. floor & w2all framing at 2nd floor. front to be upgraded to address (e) substandard condition. | $7,350 |
| Oct 4, 2017 | Completed final sign-off Jul 2025 | 115 Belgrave Av | Art Of Construction Inc | erect (n) 3-story, 1 basement, single family dwelling.Details
erect (n) 3-story, 1 basement, single family dwelling. | $1,500,000 |
| Sep 26, 2017 | Completed final sign-off Jun 2018 | 9 Jade Pl | Norwood Construction | replacing existing lanai on 2nd fl deck.Details
replacing existing lanai on 2nd fl deck. | $48,000 |
| Sep 15, 2017 | Completed final sign-off Oct 2019 | 1755 Mcallister St | Pacific Engineering & Construction Inc. | soft story retrofit per sfebc ch4d, 2016 cebc appx a-4.Details
soft story retrofit per sfebc ch4d, 2016 cebc appx a-4. | $46,300 |
| Jun 28, 2017 | Never finaled issued Aug 2017, no final | 275 Olympia Wy | Acg Construction Inc | removal o f not applicable special inspections. ref pa 2016-1103-1810Details
removal o f not applicable special inspections. ref pa 2016-1103-1810 | |
| May 5, 2017 | Completed final sign-off Jan 2018 | 310 Santa Ana Av | Nima Construction | interior renovation & finish upgrade. maintain (e) area with new wall layout for lower floor including family room, media room, office, wine room, game room & full bath. adjust walls for master bedroom, bathroom, guest bathroom to make spaces functional. enlarge connecting stair to meet codeDetails
interior renovation & finish upgrade. maintain (e) area with new wall layout for lower floor including family room, media room, office, wine room, game room & full bath. adjust walls for master bedroom, bathroom, guest bathroom to make spaces functional. enlarge connecting stair to meet code | $80,000 |
| Apr 28, 2017 | Never finaled issued May 2017, no final | 170 Pacific Av | Cook Construction | unit #16: revision to pa#201612144937 for field fabrication of steel moment frames (2). n/a ordinance #155-13Details
unit #16: revision to pa#201612144937 for field fabrication of steel moment frames (2). n/a ordinance #155-13 | |
| Feb 17, 2017 | Completed final sign-off Dec 2017 | 1929 Stockton St | strengthening existing roof sturcture.Details
strengthening existing roof sturcture. | $10,000 | |
| Jan 17, 2017 | Completed final sign-off Feb 2017 | 335 Congo St | Steelcore Builders Inc | this project consist of the voluntary strengthening of an existing floor beam.Details
this project consist of the voluntary strengthening of an existing floor beam. | $8,600 |
| Jan 9, 2017 | Completed final sign-off Apr 2017 | 1056 Haight St | Devlin/Mcnally Construction | revision to pa #201502178466 (orig # 200412292309) - structural plans based on discovered existing conditions.Details
revision to pa #201502178466 (orig # 200412292309) - structural plans based on discovered existing conditions. | |
| Sep 7, 2016 | Completed final sign-off Aug 2017 | 112 Upper Tr | Caruso Construction Inc. | structural work includes new concrete footings, new slab & steel work due to discovery of faulty grade conditions, sectins of deteriorated brick footing and rotting mudsil.Details
structural work includes new concrete footings, new slab & steel work due to discovery of faulty grade conditions, sectins of deteriorated brick footing and rotting mudsil. | $50,000 |
| Sep 2, 2016 | Completed final sign-off Jul 2018 | 1845 Leavenworth St | Pacific Engineering & Construction Inc. | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. | $36,000 |
| Aug 16, 2016 | Completed final sign-off Apr 2017 | 2466 Francisco St | Design Draw Build Inc | unit 105 - removal of interior walls, addition of walls, renovation of kitchen, bathroom, living room.Details
unit 105 - removal of interior walls, addition of walls, renovation of kitchen, bathroom, living room. | $40,000 |
| Jul 15, 2016 | Completed final sign-off Feb 2018 | 72 Madrone Av | vertical addition at second floor enclosing (e) deck to create new bathroom, new windows at additionDetails
vertical addition at second floor enclosing (e) deck to create new bathroom, new windows at addition | $55,000 | |
| Jul 14, 2016 | Completed final sign-off Jan 2018 | 69 Henry St | conversion of (e) garage into a (n) accessory dwelling unit at rear yard. (n) windows, doors, plumbing & electrical work, (n) bicycle parking.Details
conversion of (e) garage into a (n) accessory dwelling unit at rear yard. (n) windows, doors, plumbing & electrical work, (n) bicycle parking. | $63,850 | |
| May 19, 2016 | Expired or cancelled expired Nov 2019 | 1929 Stockton St | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 | $100,000 | |
| May 17, 2016 | Completed final sign-off Dec 2019 | 2451 Folsom St | Hammerhouse Construction | remodel (e) family dwelling, convert unconditioned space @ 1/f & attic to be conditioned. 1/f: (n) sleeping nook, playroom, laundry, bath, mudroom, stairway & expanded garage. attic: remodel master bedroom. upgrade foundation & structure. add (n) entry powder room.Details
remodel (e) family dwelling, convert unconditioned space @ 1/f & attic to be conditioned. 1/f: (n) sleeping nook, playroom, laundry, bath, mudroom, stairway & expanded garage. attic: remodel master bedroom. upgrade foundation & structure. add (n) entry powder room. | $391,494 |
| Nov 2, 2015 | Completed final sign-off Mar 2017 | 1125 Mission St | Skyline Construction | change of use from (e) s-2 parking & storage building to a b-office building, scope includes construction of (n) mezzanine & stairs, (n) store front glazing, (n) window replacement of (e) windows and sidewalk improvement. n/a ordinance# 155-13Details
change of use from (e) s-2 parking & storage building to a b-office building, scope includes construction of (n) mezzanine & stairs, (n) store front glazing, (n) window replacement of (e) windows and sidewalk improvement. n/a ordinance# 155-13 | $350,000 |
| Oct 14, 2015 | Completed final sign-off May 2016 | 37 Ramona Av | Steelcore Builders Inc | this project consists of the voluntary strengthening of the (e) site retiaining wall.Details
this project consists of the voluntary strengthening of the (e) site retiaining wall. | $43,000 |
| Apr 21, 2015 | Completed final sign-off Apr 2016 | 2214 Clay St | Robert B Lewis Renovations | renovation to e 3rd fl. new layout with new access to e flat roofs with new roof guardrails, minor work to 2nd fl bath and closetDetails
renovation to e 3rd fl. new layout with new access to e flat roofs with new roof guardrails, minor work to 2nd fl bath and closet | $200,000 |
| Feb 5, 2014 | Completed final sign-off Apr 2016 | 687 28th St | Bryce C B Construction Inc | (n)2-story addition to rear&(n)3rd fl addition.(n)3rd fl roof deck.(n)habitable space on grd fl-(n)int stair,(n)bath,(n)bedrm. exterior remodel-(n) windows&doorsin (e)&(n)openings&(n)finishes-full interior remodel thruout, incl(n) casework, fixtures&finishes-(n)street tree in(n) sidewalk planter.Details
(n)2-story addition to rear&(n)3rd fl addition.(n)3rd fl roof deck.(n)habitable space on grd fl-(n)int stair,(n)bath,(n)bedrm. exterior remodel-(n) windows&doorsin (e)&(n)openings&(n)finishes-full interior remodel thruout, incl(n) casework, fixtures&finishes-(n)street tree in(n) sidewalk planter. | $339,470 |
| Dec 20, 2013 | Never finaled issued Sep 2016, no final | 1560 Sanchez St | remodel + addition to (e) single family dwelling: add (n) 2nd story, including front + rear roof decks, extend (e) 1st flr into req. rear yard as 'pop out' structure, add 2 (n) bathrooms, add (n) interior stair, remodel throughout including (e) bathroom + kitchen.Details
remodel + addition to (e) single family dwelling: add (n) 2nd story, including front + rear roof decks, extend (e) 1st flr into req. rear yard as 'pop out' structure, add 2 (n) bathrooms, add (n) interior stair, remodel throughout including (e) bathroom + kitchen. | $248,689 | |
| Sep 27, 2013 | Completed final sign-off Jun 2015 | 440 27th St | Quinlan Construction | expansion of rear top level (e) 3-story single family residence. wk incl remove roof at rear and replace w/ flat roof, build walls and windows as shown on plans. add bathroom and expand master bedroom. structure work as req, plumbing & electrical in affected areas.Details
expansion of rear top level (e) 3-story single family residence. wk incl remove roof at rear and replace w/ flat roof, build walls and windows as shown on plans. add bathroom and expand master bedroom. structure work as req, plumbing & electrical in affected areas. | $75,000 |
| Jun 22, 2005 | Expired or cancelled expired Oct 2005 | 428 28th St | revise permit 200505051642 for as built condition.work on 2nd flr onlyDetails
revise permit 200505051642 for as built condition.work on 2nd flr only |