Allied Teamwork Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Sep 2006 to Aug 2026
- Last 24 months
- 4 permits filed
166 permits since 2000: 141 completed, 2 in progress, 13 never finaled, 10 expired or cancelled.
Of the 13 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 166.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 31, 2026 | Completed final sign-off Sep 2026 | 195 Eureka St | revision to pa# 202510217820 & 202006299335: provide wood step next to bedroom window, comply w/ eero.Details
revision to pa# 202510217820 & 202006299335: provide wood step next to bedroom window, comply w/ eero. | |
| Apr 1, 2026 | Completed final sign-off Apr 2026 | 1125 Potrero Av | to obtain final inspection for work approved under pa# 202306129894. all work is complete.Details
to obtain final inspection for work approved under pa# 202306129894. all work is complete. | |
| Apr 1, 2026 | Completed final sign-off Apr 2026 | 4 Wright St | to obtain final inspection for work approved under pa#202211216970 and 202310118424. all work is complete.Details
to obtain final inspection for work approved under pa#202211216970 and 202310118424. all work is complete. | |
| Oct 21, 2025 | Completed final sign-off Sep 2026 | 195 Eureka St | revision to pa 202006299335 to reflect correct (e) garage size it takes up full width of lot and adjust floor plan per plansDetails
revision to pa 202006299335 to reflect correct (e) garage size it takes up full width of lot and adjust floor plan per plans | |
| Apr 5, 2024 | In progress issued Apr 2024 | 1642 Grant Av | existing kitchen remodel (like kind) and (e) bath remodel.Details
existing kitchen remodel (like kind) and (e) bath remodel. | $45,000 |
| Mar 8, 2024 | Completed final sign-off Mar 2024 | 2300 Market St | to obtain final inspection for work approved under pa# 202207229075 & 201709117574. all work is complete.Details
to obtain final inspection for work approved under pa# 202207229075 & 201709117574. all work is complete. | |
| Mar 8, 2024 | Completed final sign-off Mar 2024 | 2300 Market St | to obtain final inspection for work approved under pa# 201709117568. all work is complete.Details
to obtain final inspection for work approved under pa# 201709117568. all work is complete. | |
| Oct 11, 2023 | Expired or cancelled expired Apr 2026 | 4 Wright St | to comply with nov# 202313476. rebuild front entry stair in-kind. modify & strengthen rear stair stringers. add stair from 1st to 2nd fl. rebuild stair from 2nd to 3rd fl.Details
to comply with nov# 202313476. rebuild front entry stair in-kind. modify & strengthen rear stair stringers. add stair from 1st to 2nd fl. rebuild stair from 2nd to 3rd fl. | $15,000 |
| Sep 19, 2023 | Completed final sign-off Apr 2026 | 1125 Potrero Av | convert storage into office and game room at 1st flr. add 1-bathroom at 2nd flr.Details
convert storage into office and game room at 1st flr. add 1-bathroom at 2nd flr. | $30,000 |
| Jun 30, 2023 | Completed final sign-off Apr 2024 | 125 Majestic Av | add 1 bedroom, one study, one office, and one bathroom and closet @ 1st flDetails
add 1 bedroom, one study, one office, and one bathroom and closet @ 1st fl | $30,000 |
| Jun 12, 2023 | Expired or cancelled expired Apr 2026 | 1125 Potrero Av | remodel (e) kitchen and full bath on 2nd floor. remodel in kindDetails
remodel (e) kitchen and full bath on 2nd floor. remodel in kind | $40,000 |
| Jun 6, 2023 | Completed final sign-off Jun 2023 | 301 20th Av | to obtain final inspection for bpa#201803022761 (scope: seismic retrofit of soft story to comply with sfebc 4d mandatory seismic retrofit per 2016 cebc appx a4 - residential).Details
to obtain final inspection for bpa#201803022761 (scope: seismic retrofit of soft story to comply with sfebc 4d mandatory seismic retrofit per 2016 cebc appx a4 - residential). | |
| Jun 6, 2023 | Completed final sign-off Jun 2023 | 301 20th Av | to obtain final inspection for bpa#201803022760 (scope: seismic retrofit of soft story to comply with sfebc 4d mandatory seismic retrofit: 2016 cebc appx a4 - commercial).Details
to obtain final inspection for bpa#201803022760 (scope: seismic retrofit of soft story to comply with sfebc 4d mandatory seismic retrofit: 2016 cebc appx a4 - commercial). | |
| May 19, 2023 | Completed final sign-off Apr 2024 | 125 Majestic Av | remodel kitchn(e) and bathroom at 2nd floor.Details
remodel kitchn(e) and bathroom at 2nd floor. | $35,000 |
| Apr 14, 2023 | Expired or cancelled cancelled Jun 2023 | 301 20th Av | to obtain final inspection for work approved under permits 201803022760 and 201803022761. all work is complete.Details
to obtain final inspection for work approved under permits 201803022760 and 201803022761. all work is complete. | |
| Apr 7, 2023 | Completed final sign-off Apr 2026 | 4 Wright St | add 1 bedroom, bathroom, wet bar and family room at 1st flr. 1-new window visible from street view. add half bath at 3/f.Details
add 1 bedroom, bathroom, wet bar and family room at 1st flr. 1-new window visible from street view. add half bath at 3/f. | $25,000 |
| Jan 10, 2023 | Completed final sign-off Mar 2024 | 375 07th Av | remodel (e) (1) kitchen. replace countertop, cabinets, and sink, like kind remodel.Details
remodel (e) (1) kitchen. replace countertop, cabinets, and sink, like kind remodel. | $15,000 |
| Oct 5, 2022 | Completed final sign-off Oct 2022 | 348 08th Av | to obtain final inspection for work approved under pa#201709137906. all work is complete.Details
to obtain final inspection for work approved under pa#201709137906. all work is complete. | |
| Aug 31, 2022 | Completed final sign-off Nov 2022 | 137 Naglee Av | repair front lower part of stucco walls and right side stucco wall at lower 1st floor for water damage. front of building 80 sf, side of building 250 sf, no structural work.Details
repair front lower part of stucco walls and right side stucco wall at lower 1st floor for water damage. front of building 80 sf, side of building 250 sf, no structural work. | $4,500 |
| Jul 22, 2022 | Expired or cancelled expired Mar 2024 | 2300 Market St | rev to pa201709117574: relocate locations of shear walls on 1/f commercial space per plan. for seismic retrofit. new moment frame on grid a.Details
rev to pa201709117574: relocate locations of shear walls on 1/f commercial space per plan. for seismic retrofit. new moment frame on grid a. | $40,000 |
| May 5, 2022 | Never finaled issued May 2022, no final | 1943 Ocean Av | recommencement and completion of work approved under pa# 201507313080 30% of the work still remaining.Details
recommencement and completion of work approved under pa# 201507313080 30% of the work still remaining. | $1,000 |
| May 4, 2022 | Completed final sign-off Nov 2022 | 137 Naglee Av | construct 2 bedroom, 2 full bath & media room. all work at g/f.Details
construct 2 bedroom, 2 full bath & media room. all work at g/f. | $105,000 |
| Mar 24, 2022 | In progress issued Sep 2024 | 2559 44th Av | new 2-story rear yard addition to (e) 2-story single family dwelling. 1/f: new bedroom, living room, 2 bathrooms, office and media room. 2/f: new bedroom, office & bathroom. new roof deck & spiral staircase at rear.Details
new 2-story rear yard addition to (e) 2-story single family dwelling. 1/f: new bedroom, living room, 2 bathrooms, office and media room. 2/f: new bedroom, office & bathroom. new roof deck & spiral staircase at rear. | $150,000 |
| Jan 25, 2022 | Completed final sign-off Aug 2022 | 45 Grafton Av | room down: add one bedroom, one media room, one family room, 2 bath at ground floor, add one bath at 2nd floor.one family room.Details
room down: add one bedroom, one media room, one family room, 2 bath at ground floor, add one bath at 2nd floor.one family room. | $70,888 |
| Oct 12, 2021 | Completed final sign-off Aug 2022 | 45 Grafton Av | remodel one existing kitchen and one bathroom.Details
remodel one existing kitchen and one bathroom. | $35,000 |
| Feb 3, 2021 | Completed final sign-off Oct 2021 | 10 Bronte St | remodel 1st floor space to new bedroom, bathroom, walk-in & laundry. 2nd floor remodel kitchen & bathroom. new rear deck on 2nd levelDetails
remodel 1st floor space to new bedroom, bathroom, walk-in & laundry. 2nd floor remodel kitchen & bathroom. new rear deck on 2nd level | $98,000 |
| Jan 19, 2021 | Completed final sign-off Jun 2021 | 759 Jackson St | revision to pa 2019-09131566 (commercial soft story and 2019-0913-1570 (residential soft story). provide additional shear wall system per plan in kindDetails
revision to pa 2019-09131566 (commercial soft story and 2019-0913-1570 (residential soft story). provide additional shear wall system per plan in kind | $5,000 |
| Jan 11, 2021 | Never finaled issued Mar 2021, no final | 2426 Bryant St | revise shear walls and footing in the first floor. revision to pa 201705176828.Details
revise shear walls and footing in the first floor. revision to pa 201705176828. | $16,000 |
| Nov 24, 2020 | Completed final sign-off Oct 2021 | 4360 19th St | recommencement & completion of work approved under permit # 2016-0818-5376. 50% of work remaining.Details
recommencement & completion of work approved under permit # 2016-0818-5376. 50% of work remaining. | $40,000 |
| Oct 19, 2020 | Completed final sign-off Jun 2021 | 3365 20th St | remodel (e) kitchen, 3 bathrooms in kind.Details
remodel (e) kitchen, 3 bathrooms in kind. | $70,000 |
| Jul 16, 2020 | Completed final sign-off Nov 2021 | 355 Grove St | renovation of (1) apartment: unit 254-a on 1st level. inkind kitchen & inkind bathroom remodel. (n) kitchen cabinet & plumbing fixtures. (n) lighting @ (e) j-boxes. no change to mechanical. no exterior work. no fire alarm/sprinkler. no structural workDetails
renovation of (1) apartment: unit 254-a on 1st level. inkind kitchen & inkind bathroom remodel. (n) kitchen cabinet & plumbing fixtures. (n) lighting @ (e) j-boxes. no change to mechanical. no exterior work. no fire alarm/sprinkler. no structural work | $65,000 |
| Jun 29, 2020 | Completed final sign-off Sep 2026 | 195 Eureka St | new dwelling unit (adu) (195 eureka st.)per government code section 66314, state adu law. at basement floor. modify (e) storage space and garage space for 1 new adu. new unit to include bathroom, bedroom & kitchen. maher n/a.Details
new dwelling unit (adu) (195 eureka st.)per government code section 66314, state adu law. at basement floor. modify (e) storage space and garage space for 1 new adu. new unit to include bathroom, bedroom & kitchen. maher n/a. | $50,000 |
| Mar 10, 2020 | Completed final sign-off Apr 2021 | 2333 Market St | remodel (e) kitchen and 2 bathroomsDetails
remodel (e) kitchen and 2 bathrooms | $22,000 |
| Mar 3, 2020 | Completed final sign-off Nov 2021 | 355 Grove St | soft story retrofit involving new foundations and adding plywood to e wals per sfebg ch 4d and 2016 cebc appendix a4. comply with abe 51-16. commercialDetails
soft story retrofit involving new foundations and adding plywood to e wals per sfebg ch 4d and 2016 cebc appendix a4. comply with abe 51-16. commercial | $50,000 |
| Feb 26, 2020 | Never finaled issued Feb 2020, no final | 3038 Jackson St | replace existing masonry stair with p.t. hd framing. less than 50% replacement, all in kind. partial repair of entry stair front.Details
replace existing masonry stair with p.t. hd framing. less than 50% replacement, all in kind. partial repair of entry stair front. | $7,000 |
| Jan 31, 2020 | Completed final sign-off Feb 2020 | 3214 Balboa St | revision to app#201812117957 including relocation of fire door, modified bath layout and removal of fire protected openings not serving light/vent.Details
revision to app#201812117957 including relocation of fire door, modified bath layout and removal of fire protected openings not serving light/vent. | |
| Jan 23, 2020 | Completed final sign-off Jul 2022 | 2426 Bryant St | 1st fl remodel of (e) unit e. work including remodel/relocate kitchen, remodel (e) bathroom, add 1 new bathroom, modify (e) dining and convert (e) living room to bedroom and kitchen to bedroom.Details
1st fl remodel of (e) unit e. work including remodel/relocate kitchen, remodel (e) bathroom, add 1 new bathroom, modify (e) dining and convert (e) living room to bedroom and kitchen to bedroom. | $80,000 |
| Dec 27, 2019 | Completed final sign-off Nov 2020 | 555 Union St | revision to approved soft story permit #201905231488. replace (2) brick foundation at the front & new foundation for shearwalls.Details
revision to approved soft story permit #201905231488. replace (2) brick foundation at the front & new foundation for shearwalls. | $90,000 |
| Dec 26, 2019 | Completed final sign-off Jul 2024 | 2339 38th Av | interior remodel for both floors, remodel (e) kitchen, bathroom bedroom @ 2nd fl. new media, laundry,baths & bedroom @ 1st floor. rear 2nd story horizontal addition for new mater suite with rook deck & stair.Details
interior remodel for both floors, remodel (e) kitchen, bathroom bedroom @ 2nd fl. new media, laundry,baths & bedroom @ 1st floor. rear 2nd story horizontal addition for new mater suite with rook deck & stair. | $150,000 |
| Oct 2, 2019 | Completed final sign-off Oct 2021 | 195 Eureka St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $30,000 |
| Sep 13, 2019 | Never finaled issued Sep 2019, no final | 474 27th Av | revision to pa#201803163871. to clarify unit count to be (7) units and not one unit.Details
revision to pa#201803163871. to clarify unit count to be (7) units and not one unit. | |
| Sep 13, 2019 | Completed final sign-off Jun 2021 | 759 Jackson St | commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 201909131570Details
commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 201909131570 | $25,000 |
| Sep 10, 2019 | Completed final sign-off Jun 2025 | 278 Howth St | add a horizontal addtion to the rear of an (e) dwelling. the addition will include a new bedroom & bathroom on the 1st fl. the 2nd fl will have a new family room & bathroom. the 3rd fl will have a new study & bathroom. new decks @ rearDetails
add a horizontal addtion to the rear of an (e) dwelling. the addition will include a new bedroom & bathroom on the 1st fl. the 2nd fl will have a new family room & bathroom. the 3rd fl will have a new study & bathroom. new decks @ rear | $185,000 |
| Aug 19, 2019 | Completed final sign-off Feb 2020 | 3214 Balboa St | revision to pa 2018-1211-7957 including modification of proposed steps serving existing units & unit to be legalized; revision of fire rated assemblies, and revision of utility room accessDetails
revision to pa 2018-1211-7957 including modification of proposed steps serving existing units & unit to be legalized; revision of fire rated assemblies, and revision of utility room access | |
| Jul 12, 2019 | Completed final sign-off Apr 2021 | 484 Guerrero St | revision to app#201709158601. replace extg footing with new concrete footings in the 1st floor.Details
revision to app#201709158601. replace extg footing with new concrete footings in the 1st floor. | $30,000 |
| Jul 5, 2019 | Never finaled issued Aug 2019, no final | 1325 11th Av | voluntary seismic retrofit - strongwall installs.Details
voluntary seismic retrofit - strongwall installs. | $25,000 |
| May 23, 2019 | Completed final sign-off Nov 2020 | 555 Union St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. to comply with nov #201803406.Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. to comply with nov #201803406. | $40,000 |
| Apr 25, 2019 | Completed final sign-off May 2021 | 1277 09th Av | seismic retrofit of soft-story comply w/ sfc hd mandatory sesimic retrofit per 2016 iebc appendix a4.Details
seismic retrofit of soft-story comply w/ sfc hd mandatory sesimic retrofit per 2016 iebc appendix a4. | $90,000 |
| Mar 15, 2019 | Completed final sign-off Oct 2022 | 1575 Sacramento St | seismic retrofit to comply with mandatory soft story program per ordinance 66-13. 2016 cebc appendix a-4Details
seismic retrofit to comply with mandatory soft story program per ordinance 66-13. 2016 cebc appendix a-4 | $40,000 |
| Mar 12, 2019 | Completed final sign-off Feb 2020 | 3035 Gough St | add new concrete retaining wall and tie beams in the first floorDetails
add new concrete retaining wall and tie beams in the first floor | $40,000 |
| Mar 8, 2019 | Completed final sign-off Oct 2019 | 2245 Cabrillo St | relocate moment frame in the 1st floor. revision to app#201709056862Details
relocate moment frame in the 1st floor. revision to app#201709056862 | |
| Feb 21, 2019 | Completed final sign-off Oct 2019 | 895 34th Av | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a4. to comply with nov 201812851.Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a4. to comply with nov 201812851. | $20,000 |
| Jan 18, 2019 | Completed final sign-off Dec 2019 | 1655 Jones St | soft story retrofit per sfebc chapter 4d enginering criteria 2016 cebc appendix a4Details
soft story retrofit per sfebc chapter 4d enginering criteria 2016 cebc appendix a4 | $60,000 |
| Dec 11, 2018 | Completed final sign-off Feb 2020 | 3214 Balboa St | legalization (ul) of (1) unauthorized dwelling unit per ordinance 43-14 in an (e) 2-units building. total -> (3) dwelling units.Details
legalization (ul) of (1) unauthorized dwelling unit per ordinance 43-14 in an (e) 2-units building. total -> (3) dwelling units. | $52,750 |
| Nov 6, 2018 | Completed final sign-off Jan 2020 | 231 Howth St | to comply with nov# 201836093 ,1st floor:add 2 bedrooms, 1 bath, 1 media and laundry. 2nd floor: remove extg kitchen and bath.Details
to comply with nov# 201836093 ,1st floor:add 2 bedrooms, 1 bath, 1 media and laundry. 2nd floor: remove extg kitchen and bath. | $75,000 |
| Oct 12, 2018 | Never finaled issued Nov 2018, no final | 25 Scotland St | convert the (e) storage room to new bathroom inside unit on the 2nd fl.Details
convert the (e) storage room to new bathroom inside unit on the 2nd fl. | $15,000 |
| Oct 5, 2018 | Completed final sign-off Apr 2019 | 638 Broadway | soft story seismic retrofit basement, ground level only per 2016 iebc appendix a-4Details
soft story seismic retrofit basement, ground level only per 2016 iebc appendix a-4 | $120,000 |
| Oct 5, 2018 | Completed final sign-off Apr 2019 | 638 Broadway | ada complianceDetails
ada compliance | |
| Sep 14, 2018 | Completed final sign-off Jan 2022 | 1628 Bush St | seismic retrofit of soft story comply with sfebc 4d mandatory seismic retrofit per 2015 cebc appendix a4 commercialDetails
seismic retrofit of soft story comply with sfebc 4d mandatory seismic retrofit per 2015 cebc appendix a4 commercial | $60,000 |
| Sep 14, 2018 | Completed final sign-off Jan 2022 | 1628 Bush St | seismic retrofit of soft story comply with sfebc 4d mandatory seismic retrofit per 2015 cebc appendix a4 commercialDetails
seismic retrofit of soft story comply with sfebc 4d mandatory seismic retrofit per 2015 cebc appendix a4 commercial | $20,000 |
| Sep 11, 2018 | Completed final sign-off Feb 2020 | 3538 18th St | soft story mitigation per chapter 4d 2016 sfebc per 2016 ifbc app a4 maher not reqDetails
soft story mitigation per chapter 4d 2016 sfebc per 2016 ifbc app a4 maher not req | $95,000 |
| Jun 7, 2018 | Completed final sign-off Jul 2018 | 3214 Balboa St | work on # 3214: remodel (e) kitchen (10'x8')with new cabinets and countertop. remodel (e) two baths (5'x7-1/2 ft.); replace in kind.Details
work on # 3214: remodel (e) kitchen (10'x8')with new cabinets and countertop. remodel (e) two baths (5'x7-1/2 ft.); replace in kind. | $35,000 |
| May 1, 2018 | Completed final sign-off Nov 2021 | 355 Grove St | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-201805017855Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-201805017855 | $100,000 |
| Mar 16, 2018 | Completed final sign-off Sep 2019 | 474 27th Av | seismic retrofit of soft story to comply with sfebc 4d mandatory seismic retrofit per 2016 cebc appendix a-4Details
seismic retrofit of soft story to comply with sfebc 4d mandatory seismic retrofit per 2016 cebc appendix a-4 | $90,000 |
| Mar 2, 2018 | Expired or cancelled expired Jun 2023 | 301 20th Av | seismic retrofit of soft story to comply with sfebc 4d mandatory seismic retrofit: 2016 cebc appx a4 - commercial. residential - 201803022761Details
seismic retrofit of soft story to comply with sfebc 4d mandatory seismic retrofit: 2016 cebc appx a4 - commercial. residential - 201803022761 | $20,000 |
| Mar 2, 2018 | Never finaled issued Mar 2018, no final | 2075 30th Av | repair tiles in bathroom. replace bath tub, repair shower, replace fixtures.Details
repair tiles in bathroom. replace bath tub, repair shower, replace fixtures. | $2,500 |
| Mar 2, 2018 | Expired or cancelled expired Jun 2023 | 301 20th Av | seismic retrofit of soft story to comply with sfebc 4d mandatory seismic retrofit oer 2016 cebc appx a4 - residential commercail - 201803022760Details
seismic retrofit of soft story to comply with sfebc 4d mandatory seismic retrofit oer 2016 cebc appx a4 - residential commercail - 201803022760 | $70,000 |
| Feb 23, 2018 | Completed final sign-off Jul 2019 | 2007 30th Av | revision to pa 2017-1128-4886 - reconfigure 2nd floor master bathroom, replace front windows with aluminum clad wood window. underpin partial north foundation and (n) ceiling joist @ living roomDetails
revision to pa 2017-1128-4886 - reconfigure 2nd floor master bathroom, replace front windows with aluminum clad wood window. underpin partial north foundation and (n) ceiling joist @ living room | $5,000 |
| Feb 5, 2018 | Completed final sign-off Mar 2018 | 418 Arlington St | remodel (e) guess bath in kind. no wall relocation.Details
remodel (e) guess bath in kind. no wall relocation. | $5,500 |
| Feb 2, 2018 | Completed final sign-off Apr 2018 | 500 09th Av | per approved app#201708306372. revise foundation details per soft story retrofitDetails
per approved app#201708306372. revise foundation details per soft story retrofit | $100 |
| Nov 28, 2017 | Completed final sign-off Jul 2019 | 2007 30th Av | at 1st fl, new bedroom, bath, family, laundry and new entry 2nd fl. remodel e kitchen bath, bedrooms, 1 new bath. 1 new 1 level wood deck. infill lighttwell and replace e front and rear windowsDetails
at 1st fl, new bedroom, bath, family, laundry and new entry 2nd fl. remodel e kitchen bath, bedrooms, 1 new bath. 1 new 1 level wood deck. infill lighttwell and replace e front and rear windows | $80,000 |
| Oct 2, 2017 | Completed final sign-off Nov 2017 | 350 Valley St | replace/repair (e) dryrot wood siding at the east side (right side) of the house. not visible from street. inkind r/r.Details
replace/repair (e) dryrot wood siding at the east side (right side) of the house. not visible from street. inkind r/r. | $5,000 |
| Sep 19, 2017 | Completed final sign-off Dec 2019 | 2576 Folsom St | revision to pa #201611031859 - reinforce concrete footing at rear of bldg per plan.Details
revision to pa #201611031859 - reinforce concrete footing at rear of bldg per plan. | |
| Sep 15, 2017 | Completed final sign-off Jun 2019 | 643 Oak St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a4. maher naDetails
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a4. maher na | $90,000 |
| Sep 15, 2017 | Completed final sign-off Oct 2023 | 484 Guerrero St | soft story retrofit per sfebc chapter 4d engineering criteria per 2016 cebc appendix a4.Details
soft story retrofit per sfebc chapter 4d engineering criteria per 2016 cebc appendix a4. | $90,000 |
| Sep 13, 2017 | Completed final sign-off Feb 2020 | 3035 Gough St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $100,000 |
| Sep 13, 2017 | Completed final sign-off Mar 2019 | 225 Bay St | seismic retrofit of soft story comply with sfebc chpater 4d, mandatory seismic retrofit per 2016 cebc appendix a-4. n/a maher ordinanceDetails
seismic retrofit of soft story comply with sfebc chpater 4d, mandatory seismic retrofit per 2016 cebc appendix a-4. n/a maher ordinance | $100,000 |
| Sep 13, 2017 | Expired or cancelled expired Oct 2022 | 348 08th Av | soft story retrofit per sfebc chapter 4d per engineering criteria fema p-807.Details
soft story retrofit per sfebc chapter 4d per engineering criteria fema p-807. | $50,000 |
| Sep 11, 2017 | Completed final sign-off May 2019 | 684 48th Av | soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d in accordance with 2016 cebc appendix a-4 | $80,000 |
| Sep 5, 2017 | Completed final sign-off Oct 2019 | 2245 Cabrillo St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $100,000 |
| Aug 30, 2017 | Completed final sign-off Apr 2018 | 500 09th Av | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 | $70,000 |
| Jun 22, 2017 | Completed final sign-off Nov 2018 | 4539 18th St | remove bearing post in kitchen, new gas fireplace, and new recessed ltg in kitchenDetails
remove bearing post in kitchen, new gas fireplace, and new recessed ltg in kitchen | $15,000 |
| Jun 1, 2017 | Completed final sign-off Sep 2018 | 2153 Sacramento St | seismic retrofit of soft story to comply with sfebc 4d mandatory seismic retrofit per 2016 iebc appx a4. maher naDetails
seismic retrofit of soft story to comply with sfebc 4d mandatory seismic retrofit per 2016 iebc appx a4. maher na | $150,000 |
| May 19, 2017 | Completed final sign-off Jul 2024 | 1722 27th Av | vertical & horizontal addition. rear 3 story horizontal addition: third story vertical addition w/roof deck over (e) 2nd flr. roof for upper unit. new accessory dwelling unit at first floor.Details
vertical & horizontal addition. rear 3 story horizontal addition: third story vertical addition w/roof deck over (e) 2nd flr. roof for upper unit. new accessory dwelling unit at first floor. | $150,000 |
| May 17, 2017 | Completed final sign-off Nov 2018 | 1855 Sacramento St | apt #6: remodel existing (1) full bath with new tub, sink.Details
apt #6: remodel existing (1) full bath with new tub, sink. | $10,000 |
| May 17, 2017 | Completed final sign-off Mar 2022 | 2426 Bryant St | soft story retrofit per sfebc chapter 4d engineering criteria per 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria per 2016 cebc appendix a-4 | $80,000 |
| May 3, 2017 | Completed final sign-off Jul 2018 | 334 26th Av | soft story retrofit to comply with sfebc 4d mandatory seismic retrofit per 2016 cebc appx a4Details
soft story retrofit to comply with sfebc 4d mandatory seismic retrofit per 2016 cebc appx a4 | $90,000 |
| Apr 6, 2017 | Completed final sign-off Aug 2018 | 479 03rd St | soft story seismic retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. ref #201704063351. n/a maher ordinanceDetails
soft story seismic retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. ref #201704063351. n/a maher ordinance | $80,000 |
| Apr 6, 2017 | Completed final sign-off Aug 2018 | 479 03rd St | disabled access check list for ground floor retail space fully compliant per p.a. # 201411050830; 201507212072Details
disabled access check list for ground floor retail space fully compliant per p.a. # 201411050830; 201507212072 | $18,000 |
| Mar 21, 2017 | Completed final sign-off Dec 2018 | 62 San Jose Av | foundation strengthening and structural strenthening at ground floor.Details
foundation strengthening and structural strenthening at ground floor. | $20,000 |
| Mar 8, 2017 | Completed final sign-off May 2018 | 150 Dolores St | soft story retrofit per sfbc chapter 4d, 2012 iebc appendix a-4.Details
soft story retrofit per sfbc chapter 4d, 2012 iebc appendix a-4. | $100,000 |
| Feb 2, 2017 | Completed final sign-off May 2017 | 335 10th St | work only in unit #337a. 1)kitchen remodel. 2)new wall between living room and hallway. n/a for maher.Details
work only in unit #337a. 1)kitchen remodel. 2)new wall between living room and hallway. n/a for maher. | $12,000 |
| Dec 9, 2016 | Completed final sign-off Apr 2017 | 1859 26th Av | remodel (e) kitchen, bathroom, remove/replace cabinets, counter & fixtures at 2/f, convert (e) family room to 2 bedroom & 1 bathroom to 2 bathrooms at g/f, construct staircase to (e) deck at rear of deck, less than 10' height.Details
remodel (e) kitchen, bathroom, remove/replace cabinets, counter & fixtures at 2/f, convert (e) family room to 2 bedroom & 1 bathroom to 2 bathrooms at g/f, construct staircase to (e) deck at rear of deck, less than 10' height. | $48,000 |
| Dec 5, 2016 | Completed final sign-off Jan 2017 | 408 Duboce Av | remodel existing kitchen with new cabinets & countertop. no structural work.Details
remodel existing kitchen with new cabinets & countertop. no structural work. | $15,000 |
| Nov 16, 2016 | Completed final sign-off Nov 2018 | 1855 Sacramento St | mandatory soft story retrofit per sf ordinance per sfbc chapter 34b 2012 iebc a4.Details
mandatory soft story retrofit per sf ordinance per sfbc chapter 34b 2012 iebc a4. | $10,000 |
| Nov 3, 2016 | Completed final sign-off Dec 2019 | 2576 Folsom St | 1st fl add 3 bedrooms, 1 study, 1 entertmt, 1 computer rm, 3 full bath. 2nd fl add 2 bdrm, 1 office, 2 full baths, 1 powder, relocate e kitchen,living rm, 3rd fl relocate e kitchn, remodel 2 e baths, add 2 bedrooms, 1 gamerm, 1 study rm, eliminate curb cutDetails
1st fl add 3 bedrooms, 1 study, 1 entertmt, 1 computer rm, 3 full bath. 2nd fl add 2 bdrm, 1 office, 2 full baths, 1 powder, relocate e kitchen,living rm, 3rd fl relocate e kitchn, remodel 2 e baths, add 2 bedrooms, 1 gamerm, 1 study rm, eliminate curb cut | $60,000 |
| Nov 2, 2016 | Completed final sign-off May 2017 | 43 Cole St | seismic retrofit of soft story to comply with sfbc 34b mandatory seismic retrofit per 2012 iebc app a4Details
seismic retrofit of soft story to comply with sfbc 34b mandatory seismic retrofit per 2012 iebc app a4 | $75,000 |
| Nov 1, 2016 | Completed final sign-off Jun 2017 | 4624 18th St | 2/f:infill (e) lightwell for new bathroom, lighting & plumbing for new bath.Details
2/f:infill (e) lightwell for new bathroom, lighting & plumbing for new bath. | $25,000 |
| Oct 20, 2016 | Completed final sign-off Sep 2019 | 895 31st Av | soft story retrofit per sfbc chapter 34b. n/a maher ordinanceDetails
soft story retrofit per sfbc chapter 34b. n/a maher ordinance | $25,000 |
| Oct 18, 2016 | Completed final sign-off Dec 2018 | 62 San Jose Av | remodel powder room, add bedrooms, 1 office, bath, mudroom on 1st fl, remodel kitchen/dining rm and bath, add 3 bedrooms, baths, game room on 2nd fl. remodel kitchen/dining and bath, add 2 bedrooms, office bath on 3rd flDetails
remodel powder room, add bedrooms, 1 office, bath, mudroom on 1st fl, remodel kitchen/dining rm and bath, add 3 bedrooms, baths, game room on 2nd fl. remodel kitchen/dining and bath, add 2 bedrooms, office bath on 3rd fl | $55,000 |