Velasquez Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2018 to Aug 2024
- Last 24 months
- 0 permits filed
16 permits since 2000: 15 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 5, 2024 | Completed final sign-off Oct 2024 | 1560 Greenwich St | paint front and rear of house, replace 2-metal flashing trims in rear of house, replace siding as needed in-kind. other than painting, no work visible from street. siding replacement in rear, approx. 25 sq. ft.Details
paint front and rear of house, replace 2-metal flashing trims in rear of house, replace siding as needed in-kind. other than painting, no work visible from street. siding replacement in rear, approx. 25 sq. ft. | $12,500 |
| Aug 3, 2021 | Completed final sign-off Jul 2024 | 592 Wildwood Wy | revision to permit #2021/0510/0052 (no plans). first floor: remodel(e)bathroom, remove(e) front door. second floor: remodel (e) bathroom & kitchen.Details
revision to permit #2021/0510/0052 (no plans). first floor: remodel(e)bathroom, remove(e) front door. second floor: remodel (e) bathroom & kitchen. | $20,000 |
| May 10, 2021 | Completed final sign-off Dec 2021 | 592 Wildwood Wy | remodeling 2 bathroms, 1 kitchen. update electrical service 100 amp to 200 amps. plumbing update 3/4" to 1" to existing bathroom and kitchen. replace (5) windows not visible from street.Details
remodeling 2 bathroms, 1 kitchen. update electrical service 100 amp to 200 amps. plumbing update 3/4" to 1" to existing bathroom and kitchen. replace (5) windows not visible from street. | $70,000 |
| Sep 17, 2020 | Completed final sign-off Oct 2020 | 5 Surrey St | revision to building permit #2019.0507.9912 for final inspection: show as-built skylights at kitchen & sun room.Details
revision to building permit #2019.0507.9912 for final inspection: show as-built skylights at kitchen & sun room. | |
| Jan 2, 2020 | Expired or cancelled cancelled Jan 2026 | 2634 36th Av | renovation of unfinished garage space for one bedroom and one bathroom. electrical update, heating, & plumbing work.Details
renovation of unfinished garage space for one bedroom and one bathroom. electrical update, heating, & plumbing work. | $65,000 |
| Oct 29, 2019 | Completed final sign-off Oct 2020 | 5 Surrey St | revision to app#201905079912. no exterior work visible from street. add pre-fabricated spiral stair and sliding door at rear yard.Details
revision to app#201905079912. no exterior work visible from street. add pre-fabricated spiral stair and sliding door at rear yard. | $1,000 |
| May 7, 2019 | Completed final sign-off Oct 2020 | 5 Surrey St | no exterior work visible from street. changes rear sunroom roof slope. kitchen & bathroom remodel. new windows & skylights at sunroomDetails
no exterior work visible from street. changes rear sunroom roof slope. kitchen & bathroom remodel. new windows & skylights at sunroom | $100,000 |
| Apr 12, 2019 | Completed final sign-off Aug 2019 | 1809 Lake St | replace 7 windows and replace rotted wood/ water damage around window 1 window. work not visible from street.Details
replace 7 windows and replace rotted wood/ water damage around window 1 window. work not visible from street. | $3,500 |
| Mar 27, 2019 | Completed final sign-off Apr 2019 | 1807 Lake St | replace rotted wood around windows damaged by water. replace windows (4). not visible from street.Details
replace rotted wood around windows damaged by water. replace windows (4). not visible from street. | $2,000 |
| Mar 26, 2019 | Completed final sign-off Jan 2020 | 2135 Balboa St | new roof deck over (e) sun room roof at rear. replace (2) windows & add (1) exterior door at rear.Details
new roof deck over (e) sun room roof at rear. replace (2) windows & add (1) exterior door at rear. | $30,000 |
| Mar 11, 2019 | Completed final sign-off Sep 2019 | 1807 Lake St | interior remodel on ly - no exterior work. ktichen remodel & add full bath @ existing pantry. new mechanical, electrical & plumbing as req for new work. cabinets, fixtures & finishesDetails
interior remodel on ly - no exterior work. ktichen remodel & add full bath @ existing pantry. new mechanical, electrical & plumbing as req for new work. cabinets, fixtures & finishes | $45,000 |
| Mar 4, 2019 | Completed final sign-off Mar 2019 | 1807 Lake St | replace in kind (2) exterior wood post and sill plates due to water damage and dryrot. located at sunroom in the rear yard.Details
replace in kind (2) exterior wood post and sill plates due to water damage and dryrot. located at sunroom in the rear yard. | $1,000 |
| Jan 14, 2019 | Completed final sign-off Jan 2020 | 2133 Balboa St | remodel kitchen, bath, bedrooms, convert (e) wc to full bath, add internal stair to (e) ground floor habitable space, add 2 bedrooms and 1 bath, fill-in under (e) sunroom. no work to 2135 balboa upper floor unit.Details
remodel kitchen, bath, bedrooms, convert (e) wc to full bath, add internal stair to (e) ground floor habitable space, add 2 bedrooms and 1 bath, fill-in under (e) sunroom. no work to 2135 balboa upper floor unit. | $120,000 |
| Oct 26, 2018 | Completed final sign-off Sep 2019 | 1635 Bush St | unit 10: turn hallway into laundry, move electrical panel, outside closet with min clearance, refinish kitchen cabinets, new kitchen counter tops, non bearing wall, change bedroom door to sliding, new flooring throughout, repaint walls, bathroom shower niche install in master bath, non rated wall.Details
unit 10: turn hallway into laundry, move electrical panel, outside closet with min clearance, refinish kitchen cabinets, new kitchen counter tops, non bearing wall, change bedroom door to sliding, new flooring throughout, repaint walls, bathroom shower niche install in master bath, non rated wall. | $35,000 |
| May 17, 2018 | Completed final sign-off Mar 2020 | 2133 Balboa St | revision to pa# 201804206993. water repair from leak, interior bathroom work only. replace damaged drywall and tile as needed in unit 2133Details
revision to pa# 201804206993. water repair from leak, interior bathroom work only. replace damaged drywall and tile as needed in unit 2133 | $2,000 |
| Apr 20, 2018 | Completed final sign-off Mar 2020 | 2133 Balboa St | tub/shower remodel in lower unit # 2133Details
tub/shower remodel in lower unit # 2133 | $5,000 |