Daniel Kelly Construction
- Based in
- San Rafael
- On San Francisco permits
- Jun 2016 to Aug 2026
- Last 24 months
- 4 permits filed
31 permits since 2000: 26 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 7, 2026 | Completed final sign-off Aug 2026 | 304 Eureka St | to obtain final inspection for work approved under pa#: 202504295397. all work is complete.Details
to obtain final inspection for work approved under pa#: 202504295397. all work is complete. | |
| Jul 7, 2026 | Completed final sign-off Jul 2026 | 69 Fountain St | to obtain final inspection for work approved under pa 202502110068 and 202505025691. all work is completeDetails
to obtain final inspection for work approved under pa 202502110068 and 202505025691. all work is complete | |
| May 2, 2025 | Expired or cancelled expired Jul 2026 | 69 Fountain St | interior stair addition & remodel (315 sf) no exterior work, no habitable space added. remove e) foyer stair from 2nd to 3rd fl & infill flooring (interior stair). replace e) stiar from 1st to 2nd fl. add new stair from 2nd to 3rd fl. relocate e) half bathDetails
interior stair addition & remodel (315 sf) no exterior work, no habitable space added. remove e) foyer stair from 2nd to 3rd fl & infill flooring (interior stair). replace e) stiar from 1st to 2nd fl. add new stair from 2nd to 3rd fl. relocate e) half bath | $30,000 |
| Apr 29, 2025 | Expired or cancelled expired Aug 2026 | 304 Eureka St | remodel kitchen and bathroomDetails
remodel kitchen and bathroom | $80,000 |
| May 24, 2024 | Completed final sign-off Jun 2024 | 745 Clementina St | repair siding on building and install hardie siding at rear of building, not visible from street. no structural sheathing or structural framing will be removed or replaced.Details
repair siding on building and install hardie siding at rear of building, not visible from street. no structural sheathing or structural framing will be removed or replaced. | $30,000 |
| Dec 8, 2023 | Completed final sign-off Mar 2024 | 424 Blanken Av | remodel bath and kitchen in kind add wall to storage area. revision to bpa 202307252917. two replacement windows at rear facade (same size and location) u=.30maxDetails
remodel bath and kitchen in kind add wall to storage area. revision to bpa 202307252917. two replacement windows at rear facade (same size and location) u=.30max | $4,000 |
| Sep 6, 2023 | Completed final sign-off Feb 2024 | 614 28th Av | install a roof hatch & access from the sunroom on the 3rd fl for solar panel maintenanceDetails
install a roof hatch & access from the sunroom on the 3rd fl for solar panel maintenance | $3,000 |
| Aug 16, 2023 | Completed final sign-off Mar 2024 | 3065 Market St | remove/ replace (e) dry rout damaged non conforming rear 2-story staircase which provide access to (e) wood deck. new 1hr fire wall. ref to 202211035855Details
remove/ replace (e) dry rout damaged non conforming rear 2-story staircase which provide access to (e) wood deck. new 1hr fire wall. ref to 202211035855 | $7,500 |
| Jul 25, 2023 | Completed final sign-off Mar 2024 | 424 Blanken Av | remodel kitchen and bathroom, same configuration.Details
remodel kitchen and bathroom, same configuration. | $40,000 |
| Nov 3, 2022 | Completed final sign-off Mar 2024 | 3065 Market St | partil foundation replacement (4) 8ft sections on each corner of building approx. 32ft. lateral strengthening at basement level. demo/rebuild+30sf expansion of 1st floor/lower level deck. remove and replace rear siding.Details
partil foundation replacement (4) 8ft sections on each corner of building approx. 32ft. lateral strengthening at basement level. demo/rebuild+30sf expansion of 1st floor/lower level deck. remove and replace rear siding. | $30,000 |
| Feb 25, 2022 | Completed final sign-off Jun 2023 | 44 Dellbrook Av | revision to 202103045892: 2nd fl ceiling and layout changes to create a cathedral ceiling by extending the (e) pitched roof.Details
revision to 202103045892: 2nd fl ceiling and layout changes to create a cathedral ceiling by extending the (e) pitched roof. | $20,000 |
| Dec 17, 2021 | Completed final sign-off May 2023 | 4316 23rd St | main fl: remodel kitchen, bath, 1/2 bath addition, replace stair to upper level, convert (e) bdrm to new family room, (e) dining to new bdrm [(e) window is conforming egress); upper fl: remodel (e) bath; lower fl: convert (e) wine rm to officeDetails
main fl: remodel kitchen, bath, 1/2 bath addition, replace stair to upper level, convert (e) bdrm to new family room, (e) dining to new bdrm [(e) window is conforming egress); upper fl: remodel (e) bath; lower fl: convert (e) wine rm to office | $200,000 |
| May 21, 2021 | Completed final sign-off Feb 2022 | 658 Andover St | removal of an illegal unit at basement level to comply w/ 201990203.Details
removal of an illegal unit at basement level to comply w/ 201990203. | $8,000 |
| Mar 16, 2021 | Completed final sign-off Apr 2021 | 2010 Keith St | fix drywall, lights, paint, test plumbing. to comply with violation nov 202173241. repair in kind.Details
fix drywall, lights, paint, test plumbing. to comply with violation nov 202173241. repair in kind. | $10,000 |
| Mar 4, 2021 | Completed final sign-off Jun 2023 | 44 Dellbrook Av | interior remodel of lower level and partial upper level. select window upgrades. all new finishes.Details
interior remodel of lower level and partial upper level. select window upgrades. all new finishes. | $45,000 |
| Jan 29, 2021 | Completed final sign-off Jun 2023 | 38 Hearst Av | remodel lower level washer/dryer room and bedroom. add bathroom at lower level. remodel (e) upstair kitchen and bath.Details
remodel lower level washer/dryer room and bedroom. add bathroom at lower level. remodel (e) upstair kitchen and bath. | $30,000 |
| Dec 30, 2019 | Completed final sign-off Sep 2022 | 321 Dellbrook Av | rear single story horizontal addition to an existing 2 story single family residence. remodel lower level & provide deck on top of addition in location of (e) deck.Details
rear single story horizontal addition to an existing 2 story single family residence. remodel lower level & provide deck on top of addition in location of (e) deck. | $99,000 |
| Dec 23, 2019 | Completed final sign-off Jun 2022 | 128 04th Av | new 1 story deck & stair at rear yard.Details
new 1 story deck & stair at rear yard. | $10,000 |
| Sep 10, 2019 | Completed final sign-off Sep 2019 | 1150 Fell St | administrative permit to add $250,000 to the value of building permit application #201809170445.Details
administrative permit to add $250,000 to the value of building permit application #201809170445. | $250,000 |
| May 29, 2019 | Completed final sign-off Dec 2020 | 1152 Fell St | build staircase at rear of propertyDetails
build staircase at rear of property | $1,600 |
| Jan 31, 2019 | Completed final sign-off Apr 2019 | 435 China Basin St | ( unit # 639 ) enitre paint job (interior) new tile in bathroom, replace toilet change pendant & some outletsDetails
( unit # 639 ) enitre paint job (interior) new tile in bathroom, replace toilet change pendant & some outlets | $50,000 |
| Nov 20, 2018 | Completed final sign-off Dec 2020 | 1152 Fell St | create 3rd unit at ground/basement floorDetails
create 3rd unit at ground/basement floor | $100,000 |
| Sep 24, 2018 | Never finaled issued Sep 2018, no final | 580 Howard St | replace a new (e) cabinets, paint & touch up. n/a for maher.Details
replace a new (e) cabinets, paint & touch up. n/a for maher. | $40,000 |
| Aug 24, 2018 | Completed final sign-off Aug 2024 | 131 03rd Av | rear yard addition (horizontal) remodel interior all floors including existing kitchen (no additional kitchen) and remodel habitable space @ 1st floor.Details
rear yard addition (horizontal) remodel interior all floors including existing kitchen (no additional kitchen) and remodel habitable space @ 1st floor. | $300,000 |
| Jul 3, 2018 | Completed final sign-off Feb 2020 | 129 11th Av | remodel (e) kitchen and 3 baths. replace selected windows at rear of building, new rear deck and stairs (less than 10ft from grade), voluntary strengthening.Details
remodel (e) kitchen and 3 baths. replace selected windows at rear of building, new rear deck and stairs (less than 10ft from grade), voluntary strengthening. | $22,500 |
| Apr 17, 2018 | Completed final sign-off Feb 2020 | 129 11th Av | new rear deck & stair to replace existing.Details
new rear deck & stair to replace existing. | $10,000 |
| Jul 28, 2017 | Completed final sign-off Oct 2017 | 32 Carl St | remove existing cedar shingle siding on front facade and replace with 1x10 v rustic as found on original building permit - no other work.Details
remove existing cedar shingle siding on front facade and replace with 1x10 v rustic as found on original building permit - no other work. | $20,000 |
| Apr 25, 2017 | Never finaled issued Mar 2018, no final | 153 Santa Ynez Av | horizontal addition.fill litewell to expand kitchen.divide garage to create sep living space,create living rm,bedrm&laundry&bath in lower level garage.expand lower level below cantilevered bedrm&deck.create stair to access space in lower level.reconf bathrm,bedrm,mstr bedrm.Details
horizontal addition.fill litewell to expand kitchen.divide garage to create sep living space,create living rm,bedrm&laundry&bath in lower level garage.expand lower level below cantilevered bedrm&deck.create stair to access space in lower level.reconf bathrm,bedrm,mstr bedrm. | $160,000 |
| Feb 10, 2017 | Completed final sign-off Feb 2017 | 104 Prentiss St | dry rot repair, front stair railing. inkindDetails
dry rot repair, front stair railing. inkind | $5,000 |
| Jan 30, 2017 | Never finaled issued Jan 2017, no final | 815 Corbett Av | dry rot repair to (e) lightwell, tile floor which was leaking inmto the basemnt which has dry rot. approx. 10 sf. all work in kind.Details
dry rot repair to (e) lightwell, tile floor which was leaking inmto the basemnt which has dry rot. approx. 10 sf. all work in kind. | $18,000 |
| Jun 6, 2016 | Completed final sign-off Oct 2016 | 1129 Tennessee St | kitchen alteration - remove current cabinets & appliances; replace with new cabients, appliances, tile, floor. no change in plumbing location.Details
kitchen alteration - remove current cabinets & appliances; replace with new cabients, appliances, tile, floor. no change in plumbing location. | $60,000 |