80 permits since 2000: 67 completed, 2 in progress, 6 never finaled, 5 expired or cancelled.
Of the 6 never-finaled permits, 3 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 16, 2026 | In progress issued Sep 2026 | 468 Jackson St | interior t.i. including non structural partitions and millwork.Details
interior t.i. including non structural partitions and millwork. | $29,400 |
| Apr 27, 2026 | Completed final sign-off Aug 2026 | 468 Jackson St | interior ti to immersion room and studio rooms 1 and 2, lighting and fixtures.Details
interior ti to immersion room and studio rooms 1 and 2, lighting and fixtures. | $30,000 |
| Apr 16, 2026 | In progress issued Apr 2026 | 153 Avila St | demo (e) finshes, doors, rail & damage stucco on rear deck. remodel to include (n) doors, finishes, rail and aesthetic upgrades.Details
demo (e) finshes, doors, rail & damage stucco on rear deck. remodel to include (n) doors, finishes, rail and aesthetic upgrades. | $38,200 |
| Dec 3, 2025 | Completed final sign-off Apr 2026 | 468 Jackson St | deferred mep for 202408198960 and 202408198963 and revision to bpa#'s 202408198960 and 202408198963Details
deferred mep for 202408198960 and 202408198963 and revision to bpa#'s 202408198960 and 202408198963 | $270,000 |
| Mar 26, 2025 | Completed final sign-off Mar 2026 | 153 Avila St | level 1 demo (e) bedroom, bath, closet, new non structural partitions, mech, lighting, power, plumbing, finishes for new bedroom and bath. no structural work. 500 sq ft. no change of conditional space sf.Details
level 1 demo (e) bedroom, bath, closet, new non structural partitions, mech, lighting, power, plumbing, finishes for new bedroom and bath. no structural work. 500 sq ft. no change of conditional space sf. | $116,052 |
| Feb 21, 2025 | Completed final sign-off Apr 2026 | 2649 Greenwich St | kitchen remodel and (2) bathrooms remodelDetails
kitchen remodel and (2) bathrooms remodel | $60,000 |
| Aug 19, 2024 | Completed final sign-off Apr 2026 | 472 Jackson St | interior layout of existing historic building to provide showroom, offices and amenities for staff. connect adjaccent buildings on 1st flr and provide ada bathroom upgrades. mep deferredDetails
interior layout of existing historic building to provide showroom, offices and amenities for staff. connect adjaccent buildings on 1st flr and provide ada bathroom upgrades. mep deferred | $300,000 |
| Aug 19, 2024 | Completed final sign-off Apr 2026 | 468 Jackson St | interior layout of existing historic building to provide showroom, offices and amenities for staff. connect adjaccent buildings on 1st flr and provide ada bathroom upgrades, add new lula elevator. mep deferredDetails
interior layout of existing historic building to provide showroom, offices and amenities for staff. connect adjaccent buildings on 1st flr and provide ada bathroom upgrades, add new lula elevator. mep deferred | $400,000 |
| May 17, 2024 | Completed final sign-off Aug 2025 | 1940 Broadway | 8/f unit 8: interior renovation. new lighting. no structural, hvac, windows, or envelope changes.Details
8/f unit 8: interior renovation. new lighting. no structural, hvac, windows, or envelope changes. | $60,000 |
| Sep 15, 2023 | Completed final sign-off Mar 2026 | 1940 Broadway | deferred mep ref 202110221029: unit 4Details
deferred mep ref 202110221029: unit 4 | $267,120 |
| Apr 6, 2022 | Completed final sign-off Aug 2022 | 1700 California St | revision to pa#202203220591. mechanical revision to duct work. #570Details
revision to pa#202203220591. mechanical revision to duct work. #570 | |
| Mar 22, 2022 | Completed final sign-off Aug 2022 | 1700 California St | 5th fl, ste 570 deferred mechanical work for pa 2019-1227-0850Details
5th fl, ste 570 deferred mechanical work for pa 2019-1227-0850 | |
| Jan 10, 2022 | Completed final sign-off Mar 2022 | 1020 Union St | #12:renewal for final, all work complete bpa#201411070975 & 200702224707Details
#12:renewal for final, all work complete bpa#201411070975 & 200702224707 | |
| Jan 10, 2022 | Completed final sign-off Mar 2022 | 1020 Union St | renewal for final, all work complete bpa#201803123457, 201708154888 & 201706088825Details
renewal for final, all work complete bpa#201803123457, 201708154888 & 201706088825 | |
| Oct 22, 2021 | Completed final sign-off Mar 2026 | 1940 Broadway | unit 4: interior renovation includes replacement of exterior windows and doors with double pane insulated glass, single lite windows changed to divided lite to match street side elevation. kitchen and bathroom remodel.Details
unit 4: interior renovation includes replacement of exterior windows and doors with double pane insulated glass, single lite windows changed to divided lite to match street side elevation. kitchen and bathroom remodel. | $245,000 |
| Aug 27, 2021 | Completed final sign-off Jun 2022 | 156 Lombard St | revision to pa 2021-0415-8647 & 2021-0910-3837 scope includes backing up all emergency egress lighting with new ul924 listed emergency lighting inverters with minimum 90 min battery backup at 100% load; re-circuiting of select light fixtures in residential corridors to (e) emergency lighting circuitDetails
revision to pa 2021-0415-8647 & 2021-0910-3837 scope includes backing up all emergency egress lighting with new ul924 listed emergency lighting inverters with minimum 90 min battery backup at 100% load; re-circuiting of select light fixtures in residential corridors to (e) emergency lighting circuit | |
| Aug 26, 2021 | Completed final sign-off Jun 2022 | 154 Lombard St | revision to pa# 202104158645 & 202009144095. scope includes: 1. backing up of all emergency egress lighting with new ul924 listed emergency lighting inverters with minimum 90 minute battery back up to 100% load. 2. re-circuiting of select light fixtures in residential corridors to existing emergencyDetails
revision to pa# 202104158645 & 202009144095. scope includes: 1. backing up of all emergency egress lighting with new ul924 listed emergency lighting inverters with minimum 90 minute battery back up to 100% load. 2. re-circuiting of select light fixtures in residential corridors to existing emergency | |
| Aug 6, 2021 | Completed final sign-off Jun 2022 | 152 Lombard St | level 1 lighting control revvision to add occupancy sensors. rev to pa202009023303. maher n/a.Details
level 1 lighting control revvision to add occupancy sensors. rev to pa202009023303. maher n/a. | |
| Jun 25, 2021 | Completed final sign-off May 2022 | 150 Lombard St | bldg 1: revision to pa 202009023320. level 1 lighting control revision to add occpancy sensors.Details
bldg 1: revision to pa 202009023320. level 1 lighting control revision to add occpancy sensors. | |
| May 26, 2021 | Completed final sign-off Apr 2022 | 56 Presidio Av | new exterior walkway, stairs, fence and gate. including structrual garden wallDetails
new exterior walkway, stairs, fence and gate. including structrual garden wall | $75,000 |
| Apr 15, 2021 | Completed final sign-off Jun 2022 | 156 Lombard St | arch work under pa# 202009103837. electrical: back-up of all emergency egress lighting w/ new ul listed emergency lighting inverters w/ minimum 90-min battery back-up at 100% load. re-circuit of select light fixtures in residential corridors to (e) emergency lighting circuit serving respective areasDetails
arch work under pa# 202009103837. electrical: back-up of all emergency egress lighting w/ new ul listed emergency lighting inverters w/ minimum 90-min battery back-up at 100% load. re-circuit of select light fixtures in residential corridors to (e) emergency lighting circuit serving respective areas | $20,000 |
| Apr 15, 2021 | Completed final sign-off Jun 2022 | 154 Lombard St | arch work under pa# 202009144095. electrical: back-up of all emergency egress lighting w/ new ul listed emergency lighting inverters w/ minimum 90-min battery back-up at 100% load. re-circuit of select light fixtures in residential corridors to (e) emergency lighting circuit serving respective areasDetails
arch work under pa# 202009144095. electrical: back-up of all emergency egress lighting w/ new ul listed emergency lighting inverters w/ minimum 90-min battery back-up at 100% load. re-circuit of select light fixtures in residential corridors to (e) emergency lighting circuit serving respective areas | $20,000 |
| Jan 29, 2021 | Completed final sign-off Mar 2021 | 595 Clipper St | revision - as builts changes from 2019-0124-1098/ and clear enforcement -2020.008812enf legalize as builts revisionDetails
revision - as builts changes from 2019-0124-1098/ and clear enforcement -2020.008812enf legalize as builts revision | |
| Dec 21, 2020 | Completed final sign-off Feb 2021 | 190 Seacliff Av | to obtain final inspection for work approved under permit application no. 201608306314. all work is complete.Details
to obtain final inspection for work approved under permit application no. 201608306314. all work is complete. | |
| Dec 21, 2020 | Completed final sign-off Feb 2021 | 190 Seacliff Av | to obtain final inspection for work approved under permit application no(s): 9913568, 200002071245, 200111022356. all work is complete.Details
to obtain final inspection for work approved under permit application no(s): 9913568, 200002071245, 200111022356. all work is complete. | |
| Dec 11, 2020 | Completed final sign-off May 2022 | 150 Lombard St | reference to pa #202009023320 - minor interior framing revision to add metal stud and gypboard clad "pilasters" to support permitted light cove. fixtures at floor 2-9Details
reference to pa #202009023320 - minor interior framing revision to add metal stud and gypboard clad "pilasters" to support permitted light cove. fixtures at floor 2-9 | |
| Dec 11, 2020 | Completed final sign-off Jun 2022 | 152 Lombard St | reference to pa #202009023303 - minor interior framing revision to add metal stud and gyp board clad "pilasters" to support permitted light cove fixture at floors 2-7Details
reference to pa #202009023303 - minor interior framing revision to add metal stud and gyp board clad "pilasters" to support permitted light cove fixture at floors 2-7 | |
| Sep 2, 2020 | Never finaled issued Oct 2020, no final | 150 Lombard St | bldg #1: interior remodel of existing building interior common corridors: new tile flooring on level 1, new finishes (wall to wall carpet, wall covering, paint) and replacing exisitng light fixtures with new low energy (lep) light fixtures; new led lighting at select locations as required by code.Details
bldg #1: interior remodel of existing building interior common corridors: new tile flooring on level 1, new finishes (wall to wall carpet, wall covering, paint) and replacing exisitng light fixtures with new low energy (lep) light fixtures; new led lighting at select locations as required by code. | $35,000 |
| Feb 6, 2020 | Completed final sign-off Jun 2021 | 601 04th St | improvement to unit #222 including: expand study/home office with higher walls & new adjoining bath, new kitchen cabinets, & appliances, kitchen & bath replacement will be in kind.Details
improvement to unit #222 including: expand study/home office with higher walls & new adjoining bath, new kitchen cabinets, & appliances, kitchen & bath replacement will be in kind. | $45,000 |
| Jan 9, 2020 | Completed final sign-off Aug 2020 | 601 04th St | unit 222 - remodel 1 kitchen and 1 bath in kindDetails
unit 222 - remodel 1 kitchen and 1 bath in kind | $40,000 |
| Dec 27, 2019 | Completed final sign-off Aug 2022 | 1700 California St | office remodel and addition-interior remodel to (e) office & expansion into (e) vacant space. design/ build new offices and exam rooms.relocate reception and waiting room. mep defferred submittal.Details
office remodel and addition-interior remodel to (e) office & expansion into (e) vacant space. design/ build new offices and exam rooms.relocate reception and waiting room. mep defferred submittal. | $100,000 |
| Dec 6, 2019 | Completed final sign-off Jul 2020 | 1796 Union St | 1/f: tenant improvement of existing restaurant. cosmetic, title 24 upgrades.Details
1/f: tenant improvement of existing restaurant. cosmetic, title 24 upgrades. | $75,000 |
| Nov 14, 2019 | Completed final sign-off Nov 2019 | 250 Beach St | revision to app#201910174861. revision to lighting and electical outlets plans.Details
revision to app#201910174861. revision to lighting and electical outlets plans. | |
| Oct 30, 2019 | Completed final sign-off May 2020 | 56 Presidio Av | replace area of foundation at front tradesman entranceDetails
replace area of foundation at front tradesman entrance | $7,000 |
| Sep 12, 2019 | Completed final sign-off Mar 2020 | 56 Presidio Av | dry rot repair at front facade of aprox. 500 sq feet; replace stucco in-kind. no window or trim will be affected in this permit. dry rot repair on south side also of about 500 square feet.Details
dry rot repair at front facade of aprox. 500 sq feet; replace stucco in-kind. no window or trim will be affected in this permit. dry rot repair on south side also of about 500 square feet. | $20,000 |
| Aug 9, 2019 | Completed final sign-off Feb 2020 | 56 Presidio Av | replace elevator mechanic room roof( associated with stucco work- separate permit)Details
replace elevator mechanic room roof( associated with stucco work- separate permit) | $30,000 |
| Aug 9, 2019 | Completed final sign-off Mar 2020 | 56 Presidio Av | repair and replace stucco at south elevation and stair terrace/landing, tile and water proofing 50% max. replace tile finishes in kind at garage hallway. work not visible from public right of way.Details
repair and replace stucco at south elevation and stair terrace/landing, tile and water proofing 50% max. replace tile finishes in kind at garage hallway. work not visible from public right of way. | $60,000 |
| Aug 7, 2019 | Expired or cancelled expired Apr 2026 | 2606 Jackson St | remove front panels repair dry rot replace panels in kind like for likeDetails
remove front panels repair dry rot replace panels in kind like for like | $50,000 |
| May 31, 2019 | Completed final sign-off Mar 2021 | 595 Clipper St | revision to pa# 2019-0124-1098. remove and replace gable roof and supporting fron wall structures due to dry rot. remove skylightrs and do not replace in new roof. to comply with nov 201954721.Details
revision to pa# 2019-0124-1098. remove and replace gable roof and supporting fron wall structures due to dry rot. remove skylightrs and do not replace in new roof. to comply with nov 201954721. | $10,000 |
| Jan 24, 2019 | Completed final sign-off Jul 2020 | 1940 Broadway | revision pa 201712186771. unit 10. add a (n) electrical meter for increased electric loads. pull conduit & cable to connect to panelsDetails
revision pa 201712186771. unit 10. add a (n) electrical meter for increased electric loads. pull conduit & cable to connect to panels | $30,000 |
| Jan 24, 2019 | Completed final sign-off Mar 2021 | 595 Clipper St | comply with 201806761 rev. to pa 201107079682, 201711073406, 201803093281. remodel of (e) lower unit remodel @ 1st floor inc kitchen and bath structural upgrades @ 1st floor inc foundation replacement (n) spiral stair clear, 2 (n) fire rated pl as ab-009 to abate 2018015629enf bid 201806761Details
comply with 201806761 rev. to pa 201107079682, 201711073406, 201803093281. remodel of (e) lower unit remodel @ 1st floor inc kitchen and bath structural upgrades @ 1st floor inc foundation replacement (n) spiral stair clear, 2 (n) fire rated pl as ab-009 to abate 2018015629enf bid 201806761 | $40,000 |
| Jan 9, 2019 | Completed final sign-off Oct 2020 | 1940 Vallejo St | unit#2 - residential unit, partial int remodel, no struct, no change to footprint, bld, hvac or ext envelope (2) ground flr add insulation and mechanical conditioningDetails
unit#2 - residential unit, partial int remodel, no struct, no change to footprint, bld, hvac or ext envelope (2) ground flr add insulation and mechanical conditioning | $200,000 |
| Nov 8, 2018 | Expired or cancelled cancelled Jan 2026 | 2233 Lyon St | replace (e) garage door. (e) windows at rear yard & rear terrace stair relocationDetails
replace (e) garage door. (e) windows at rear yard & rear terrace stair relocation | $18,000 |
| Sep 12, 2018 | Completed final sign-off Dec 2021 | 170 King St | remodel kitchen & bath in-kind, approximately 200 sq. ft. kitchen, 80 sq. ft. bath, no change of (e) floor plans.Details
remodel kitchen & bath in-kind, approximately 200 sq. ft. kitchen, 80 sq. ft. bath, no change of (e) floor plans. | $40,000 |
| Aug 16, 2018 | Completed final sign-off Sep 2023 | 115 Telegraph Hill Bl | install structural platform. reference #2015-0522-7051.Details
install structural platform. reference #2015-0522-7051. | $100,000 |
| Aug 8, 2018 | Completed final sign-off Sep 2023 | 115 Telegraph Hill Bl | tower crane footing. dig 18x18x8ft pit into bedrook for tower crane foundation footing. install rebar, pour concrete per structural engineer.Details
tower crane footing. dig 18x18x8ft pit into bedrook for tower crane foundation footing. install rebar, pour concrete per structural engineer. | $100,000 |
| Jul 31, 2018 | Never finaled issued Aug 2018, no final | 2021 Pacific Av | remodel kitchen in-kind 300 sq approx.Details
remodel kitchen in-kind 300 sq approx. | $40,000 |
| May 7, 2018 | Completed final sign-off May 2019 | 1170 Sacramento St | renovation of unit 18d including renovate of ktiche, bathroom,s laundry, new partitions, lighting, fixtures and finished. no change to mechanical system, no exterior changes.Details
renovation of unit 18d including renovate of ktiche, bathroom,s laundry, new partitions, lighting, fixtures and finished. no change to mechanical system, no exterior changes. | $350,000 |
| Apr 6, 2018 | Completed final sign-off Sep 2020 | 1940 Broadway | unit 10: revision to approved app#201712186708. scope is to remove extg clay tile, and construct new 2 hour rated walls around openings in penthouse.Details
unit 10: revision to approved app#201712186708. scope is to remove extg clay tile, and construct new 2 hour rated walls around openings in penthouse. | $30,000 |
| Mar 14, 2018 | Completed final sign-off Jul 2020 | 1940 Broadway | 10th floor: minor temporary shoring to facilitate penthouse remodel approved under app#201712186708Details
10th floor: minor temporary shoring to facilitate penthouse remodel approved under app#201712186708 | $5,000 |
| Mar 9, 2018 | Completed final sign-off Mar 2021 | 595 Clipper St | revision to app#201107079682 & 201711073406. extg rear deck to be expanded and,new stl. guardrail installed. new exterior padio doors to rear deck facade, window at front to be replaced. extg bath at 2nd floor to be remodeled. new kitchen island and cabinatory0.Details
revision to app#201107079682 & 201711073406. extg rear deck to be expanded and,new stl. guardrail installed. new exterior padio doors to rear deck facade, window at front to be replaced. extg bath at 2nd floor to be remodeled. new kitchen island and cabinatory0. | $32,500 |
| Dec 18, 2017 | Completed final sign-off Jul 2020 | 1940 Broadway | two (n) rooftop mechanical units and replacement of 10th story glazing in-kind. mep for penthouse renovationDetails
two (n) rooftop mechanical units and replacement of 10th story glazing in-kind. mep for penthouse renovation | $85,000 |
| Dec 18, 2017 | Completed final sign-off Jul 2020 | 1940 Broadway | 10th floor penthouse: interior alterationsDetails
10th floor penthouse: interior alterations | $550,000 |
| Nov 7, 2017 | Completed final sign-off Mar 2021 | 595 Clipper St | revision to pa#201107079682, structural remediation of existing canted foundation wall at 1/f and revise to footing. floor & w2all framing at 2nd floor. front to be upgraded to address (e) substandard condition.Details
revision to pa#201107079682, structural remediation of existing canted foundation wall at 1/f and revise to footing. floor & w2all framing at 2nd floor. front to be upgraded to address (e) substandard condition. | $7,350 |
| May 8, 2017 | Completed final sign-off Feb 2019 | 2233 Lyon St | interior renovation 4 floors. remodel kitchen. all baths, stairs & new elevator. structural strenghthen. ** maher: n/a **Details
interior renovation 4 floors. remodel kitchen. all baths, stairs & new elevator. structural strenghthen. ** maher: n/a ** | $1,800,000 |
| Apr 5, 2017 | Completed final sign-off Jul 2017 | 2856 Scott St | bathroom upgrades: replace all (e) finishes, new plumbing fixtures, new electricalt o code, new vanity & stovetop, new frameless shower door enclosure, floor & paint.Details
bathroom upgrades: replace all (e) finishes, new plumbing fixtures, new electricalt o code, new vanity & stovetop, new frameless shower door enclosure, floor & paint. | $12,400 |
| Oct 4, 2016 | Completed final sign-off Feb 2020 | 2620 Buchanan St | revision to 201504012576 & 201510099357: new basement slab, garage & elevator. reconfig 2 apt units, change layouts all floors.ext door & windows change. replace masonry chimney. shoring & fire under sep permit. new curb cut to be 10' max. ** maner: n/a **Details
revision to 201504012576 & 201510099357: new basement slab, garage & elevator. reconfig 2 apt units, change layouts all floors.ext door & windows change. replace masonry chimney. shoring & fire under sep permit. new curb cut to be 10' max. ** maner: n/a ** | |
| Aug 10, 2016 | Expired or cancelled cancelled Jan 2017 | 63 Rico Wy | complete interior paint, refinish all (e) hardwood floorsDetails
complete interior paint, refinish all (e) hardwood floors | $76,750 |
| Jun 7, 2016 | Completed final sign-off Jan 2017 | 2540 Vallejo St | minor work at 1st floor garage level incl demo mechanical equip & relocate water heater, new post & footing. kitchen remodel at 2nd floor, bathroom remodel at 3rd floor, replace existing hvac units with new.Details
minor work at 1st floor garage level incl demo mechanical equip & relocate water heater, new post & footing. kitchen remodel at 2nd floor, bathroom remodel at 3rd floor, replace existing hvac units with new. | $150,000 |
| May 27, 2016 | Completed final sign-off Jan 2017 | 2540 Vallejo St | master bath/guest bath & 1/2 bath remodel; full demo of 3 locations, bring electrical & plumbing to current s.f. building codes, new insulation, sheetrock, paint, all new electrical & plumbing fixtures, tile, vanity & mirrors.Details
master bath/guest bath & 1/2 bath remodel; full demo of 3 locations, bring electrical & plumbing to current s.f. building codes, new insulation, sheetrock, paint, all new electrical & plumbing fixtures, tile, vanity & mirrors. | $123,500 |
| Apr 14, 2016 | Completed final sign-off Jan 2017 | 2540 Vallejo St | kitchen remodel: demo complete kitchen - bring plumbing & electrical to current sf bldg codes, supply & install new drywall to level 5 finish, supply & install new custom cabinets, new appliances & fixtures, new gravite counter tops, new hardwood floors & paint, new plumbing & light fixtures. compleDetails
kitchen remodel: demo complete kitchen - bring plumbing & electrical to current sf bldg codes, supply & install new drywall to level 5 finish, supply & install new custom cabinets, new appliances & fixtures, new gravite counter tops, new hardwood floors & paint, new plumbing & light fixtures. comple | $104,000 |
| Nov 18, 2015 | Completed final sign-off Feb 2016 | 564 Market St | 7th floor mechanical work - (1) new split ac unit is being added, (2) new transfer air fans are being added. no new fsd's are being added. ref #2015-0928-8254.Details
7th floor mechanical work - (1) new split ac unit is being added, (2) new transfer air fans are being added. no new fsd's are being added. ref #2015-0928-8254. | $32,613 |
| Nov 10, 2015 | Completed final sign-off Mar 2016 | 2646 Broderick St | 2/f bathroom remodel, electrical, plumbing, new stonetile fixtures, vanity, drywall & paint. no walls moved, removed, added or infilled. all (e) layouts to remain unchanged.Details
2/f bathroom remodel, electrical, plumbing, new stonetile fixtures, vanity, drywall & paint. no walls moved, removed, added or infilled. all (e) layouts to remain unchanged. | $67,000 |
| Sep 28, 2015 | Completed final sign-off Feb 2016 | 564 Market St | new tenant space 7th fl, new interior partitions, finishings. complete interior paint and floor coverings, lighting, card readers, barrier removal in 2 existing toilet facilities.Details
new tenant space 7th fl, new interior partitions, finishings. complete interior paint and floor coverings, lighting, card readers, barrier removal in 2 existing toilet facilities. | $441,000 |
| Aug 10, 2015 | Never finaled issued Oct 2015, no final | 555 Post St | this permit includes the alteration of (1) existing passenger elevator,new compliant stair & door, will be added at elevator penthouse on roof, mep shall be part of a separate permit.Details
this permit includes the alteration of (1) existing passenger elevator,new compliant stair & door, will be added at elevator penthouse on roof, mep shall be part of a separate permit. | $16,000 |
| Jun 15, 2015 | Never finaled issued Oct 2015, no final | 545 Post St | equipment upgrades of 2 existing elevators with modification to (e) elevator #1 machine room on roof. mep. under seperate permit.Details
equipment upgrades of 2 existing elevators with modification to (e) elevator #1 machine room on roof. mep. under seperate permit. | $40,000 |
| May 22, 2015 | Completed final sign-off Sep 2023 | 115 Telegraph Hill Bl | to erect 3 stories, 2 basements, type i/v b, 3 units residential building.Details
to erect 3 stories, 2 basements, type i/v b, 3 units residential building. | $4,750,000 |
| Jan 14, 2015 | Completed final sign-off Oct 2015 | 250 Beach St | remodel 490 sq ft side lobby of hotel. work will include demolition and replacement of floor, wall finishes, and ceiling. electrical, fire alarm, and sprinklers under seperate permit. compliance with maher ordinance no 155-13 not required.Details
remodel 490 sq ft side lobby of hotel. work will include demolition and replacement of floor, wall finishes, and ceiling. electrical, fire alarm, and sprinklers under seperate permit. compliance with maher ordinance no 155-13 not required. | $15,000 |
| Dec 10, 2014 | Never finaled issued Jan 2015, no final | 250 Beach St | relocation of 2 standard parking stalls, 2 ada stalls, 3 bollards. demolition of 8' portion of exterior wall, construct of equipment room, no change in number of stalls. maher not reqDetails
relocation of 2 standard parking stalls, 2 ada stalls, 3 bollards. demolition of 8' portion of exterior wall, construct of equipment room, no change in number of stalls. maher not req | $15,000 |
| Sep 16, 2014 | Completed final sign-off Feb 2015 | 2675 California St | replace (e) shower trim, shower valve & tub. remove and reuse (e) frameless glass shower door. remove two tilewalls. supply & install new tub @ (e) location with related hardware. supply & install new 18x18in marble tile @ 2 (e) walls. reinstall all (e) trim - head, spout & tub. waterproofing.Details
replace (e) shower trim, shower valve & tub. remove and reuse (e) frameless glass shower door. remove two tilewalls. supply & install new tub @ (e) location with related hardware. supply & install new 18x18in marble tile @ 2 (e) walls. reinstall all (e) trim - head, spout & tub. waterproofing. | $25,000 |
| Mar 7, 2014 | Expired or cancelled cancelled Jan 2026 | 1771 North Point St | replace in kind existing lattice privacy screens at existing 2nd and 3rd decks. same material, same size, same locationDetails
replace in kind existing lattice privacy screens at existing 2nd and 3rd decks. same material, same size, same location | $3,400 |
| Jan 21, 2014 | Completed final sign-off Apr 2014 | 1771 North Point St | revision to 201309045955 - repair 150 sq ft existing tile roof & valle flashingDetails
revision to 201309045955 - repair 150 sq ft existing tile roof & valle flashing | $7,100 |
| Oct 23, 2013 | Completed final sign-off Apr 2014 | 1771 North Point St | revision to 201309045955: adjust existing deck joist and add additional joist to correct deck slope for drainage. per engineered drawing 10/22/13Details
revision to 201309045955: adjust existing deck joist and add additional joist to correct deck slope for drainage. per engineered drawing 10/22/13 | $7,500 |
| Sep 16, 2013 | Expired or cancelled cancelled Jan 2026 | 2200 Sacramento St | revision to 201308265174: add new 60" metal stud wal with 5/8 rock both sides. install 1 3x68 1 3/4 thick fire rated door with metal jamb. back wall and side walls are existing concrete.Details
revision to 201308265174: add new 60" metal stud wal with 5/8 rock both sides. install 1 3x68 1 3/4 thick fire rated door with metal jamb. back wall and side walls are existing concrete. | $12,000 |
| Sep 4, 2013 | Completed final sign-off Apr 2014 | 1771 North Point St | replace 3rd floor stucco @ n elevation replace 1st 2nd 3rd floor stucco @ s elevation repair existing plumbing, repair existing electri c repaint interior & exterior, replace misc, ext. doors misc, drywall repairs @ interior.Details
replace 3rd floor stucco @ n elevation replace 1st 2nd 3rd floor stucco @ s elevation repair existing plumbing, repair existing electri c repaint interior & exterior, replace misc, ext. doors misc, drywall repairs @ interior. | $163,000 |
| Aug 26, 2013 | Completed final sign-off Jan 2014 | 2200 Sacramento St | cosmetic upgrade to (e) lobby to include replace damaged sheetrock ceiling, maintain fire restive rating 5/8 type x sheetrock. replace (e) lights, replace lobby doors (interior) & floor coveringDetails
cosmetic upgrade to (e) lobby to include replace damaged sheetrock ceiling, maintain fire restive rating 5/8 type x sheetrock. replace (e) lights, replace lobby doors (interior) & floor covering | $25,000 |
| Apr 27, 2012 | Completed final sign-off Apr 2013 | 799 Van Ness Av | voluntary seismic strengthening. new shotcrete walls, new steel brace frames and roof diaphram strengthening. work is structural only. no tenant improvement. no ada work per abo17. ada improvements under separate permitDetails
voluntary seismic strengthening. new shotcrete walls, new steel brace frames and roof diaphram strengthening. work is structural only. no tenant improvement. no ada work per abo17. ada improvements under separate permit | $650,000 |
| Jul 7, 2011 | Never finaled issued Oct 2016, no final | 595 Clipper St | addition of new third floor bedroom and bath with new stair from second to third floor. renovation of exterior facade including new windows.Details
addition of new third floor bedroom and bath with new stair from second to third floor. renovation of exterior facade including new windows. | $240,000 |
| Apr 22, 2011 | Completed final sign-off May 2011 | 164 Hartford St | additional footing and sheerwall. replace cripplewallDetails
additional footing and sheerwall. replace cripplewall | $40,000 |
| Oct 29, 2008 | Completed final sign-off Jun 2013 | 301 Twin Peaks Bl | inter/exter on all 3 fls existing house, three story sfd w/ two car garage, enclosed of 324 eq ft at exist deck to be habitable space & add 312 sq ft of storae w/ foundation space, addition of 70 sq ft will be to the 2nd fl balcony & 285 sq ft roof deck will relocated to 3rd level. stru & skylight.Details
inter/exter on all 3 fls existing house, three story sfd w/ two car garage, enclosed of 324 eq ft at exist deck to be habitable space & add 312 sq ft of storae w/ foundation space, addition of 70 sq ft will be to the 2nd fl balcony & 285 sq ft roof deck will relocated to 3rd level. stru & skylight. | $750,000 |