Steelcore Builders Inc
- Based in
- Sausalito
- On San Francisco permits
- Aug 2015 to Sep 2025
- Last 24 months
- 3 permits filed
149 permits since 2000: 127 completed, 1 in progress, 20 never finaled, 1 expired or cancelled.
Of the 20 never-finaled permits, 7 are 3 to 5 years old, 13 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 149.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 5, 2025 | Completed final sign-off Feb 2026 | 1133 Fell St | revision to pa #202507150822 addiitonal and remove and replace the dryrotted beam with the same and modify foundation to accept the column's base plate in the garage.Details
revision to pa #202507150822 addiitonal and remove and replace the dryrotted beam with the same and modify foundation to accept the column's base plate in the garage. | $5,000 |
| Aug 14, 2025 | Completed final sign-off Oct 2025 | 230 Gough St | repair damage caused by vehicle striking building at 295 fell entrance -see nov# 202538218. repair to stucco , wood trim, terrazzo steps.Details
repair damage caused by vehicle striking building at 295 fell entrance -see nov# 202538218. repair to stucco , wood trim, terrazzo steps. | $69,000 |
| Jul 15, 2025 | Completed final sign-off Feb 2026 | 1133 Fell St | replacement of 4 damaged wood posts with steel at rear of building in common area at rear of garageDetails
replacement of 4 damaged wood posts with steel at rear of building in common area at rear of garage | $70,000 |
| Jul 10, 2024 | Completed final sign-off Nov 2024 | 76 Webster St | replace kitchen and one bathroom cabinets, countertops, tiles, and appliances in kind. no stud wall removal.Details
replace kitchen and one bathroom cabinets, countertops, tiles, and appliances in kind. no stud wall removal. | $75,000 |
| Apr 8, 2024 | Completed final sign-off Feb 2026 | 645 Congo St | add (n) 6 soldier piles with wood lagging at north side elevation.Details
add (n) 6 soldier piles with wood lagging at north side elevation. | $160,000 |
| Feb 7, 2024 | Completed final sign-off Apr 2025 | 87 Buena Vista Tr | perform permeation grouting to temporary underpin foundation at 87 buena vista terrace and stabilize the clean sand ( sp) for excavation of new foundation at 93 buena vista tr. under a seperate permit. approx 50ftDetails
perform permeation grouting to temporary underpin foundation at 87 buena vista terrace and stabilize the clean sand ( sp) for excavation of new foundation at 93 buena vista tr. under a seperate permit. approx 50ft | $4,800 |
| Feb 7, 2024 | Completed final sign-off Mar 2025 | 93 Buena Vista Tr | perform permeation grouting to temporary underpin foundation at 93 buena vista terrace and stabilize the clean sand ( sp) for excavation of new foundation at 93 buena vista tr. under a seperate permit. plans under pa#2024-0207-5470Details
perform permeation grouting to temporary underpin foundation at 93 buena vista terrace and stabilize the clean sand ( sp) for excavation of new foundation at 93 buena vista tr. under a seperate permit. plans under pa#2024-0207-5470 | $1,200 |
| May 23, 2023 | Completed final sign-off May 2024 | 2 Church St | 25 in feet at one side of the foundation will be repaired to comply with notice of violation 202304465 reform permeation grouting permit under 202303214123.Details
25 in feet at one side of the foundation will be repaired to comply with notice of violation 202304465 reform permeation grouting permit under 202303214123. | $5,000 |
| May 23, 2023 | Completed final sign-off Apr 2025 | 1812 Webster St | revision to pa# 202103257310,structural elements changed due to field conditions.Details
revision to pa# 202103257310,structural elements changed due to field conditions. | |
| Apr 24, 2023 | Expired or cancelled cancelled Aug 2023 | 1818 Webster St | underpinning at south property line to facilitate proposed excavation at 1812 webster, ref pa# 202103257310Details
underpinning at south property line to facilitate proposed excavation at 1812 webster, ref pa# 202103257310 | $5,000 |
| Apr 11, 2023 | In progress issued Sep 2024 | 1490 Willard St | revision to pa# 202012020076, 202107023737, 202103096206 interior remodel including 31sf mudroom & 2nd fl 25sf powder room addition. remove/replace rotted siding and shingles along same wall face.Details
revision to pa# 202012020076, 202107023737, 202103096206 interior remodel including 31sf mudroom & 2nd fl 25sf powder room addition. remove/replace rotted siding and shingles along same wall face. | $20,000 |
| Mar 10, 2023 | Never finaled filed Mar 2023, never issued | 2 Church St | shoring of building wall that is undermined with the next door neighbor at 20 church st excavation. to comply with nov 202304465.Details
shoring of building wall that is undermined with the next door neighbor at 20 church st excavation. to comply with nov 202304465. | $145,000 |
| Feb 7, 2023 | Completed final sign-off Jan 2025 | 1812 Webster St | exploritory demo of interior plaster & demolition of heating ducts lcaed with asbestos (asbestos to be removed by asbestos contractor). exploratory demo of flr in living rm & kitchen & the second flr bedroom, ceiling and some walls plaster at dining & living. patch and replace-in=kind after for allDetails
exploritory demo of interior plaster & demolition of heating ducts lcaed with asbestos (asbestos to be removed by asbestos contractor). exploratory demo of flr in living rm & kitchen & the second flr bedroom, ceiling and some walls plaster at dining & living. patch and replace-in=kind after for all | $2,000 |
| Feb 7, 2023 | Completed final sign-off Jun 2023 | 190 Albion St | remove and replace wood beams with steel beams in the garage. special inspections and tests are required as per building code sec 1701.Details
remove and replace wood beams with steel beams in the garage. special inspections and tests are required as per building code sec 1701. | $22,000 |
| Jul 29, 2022 | Never finaled issued Jul 2022, no final | 807 Ashbury St | unit 1: revision to 2022-0503-3474: remove install additional gas wall heaters in bedroom. add replace existing window in the shower facing street with same size window in fiberglass material. replace bedroom windows in the bedroom with same size in kind facing the street.Details
unit 1: revision to 2022-0503-3474: remove install additional gas wall heaters in bedroom. add replace existing window in the shower facing street with same size window in fiberglass material. replace bedroom windows in the bedroom with same size in kind facing the street. | $5,000 |
| Jul 29, 2022 | Never finaled issued Jul 2022, no final | 807 Ashbury St | unit's :4 &5: revision to permit# 2022-0503-3476: remove install additional gas wall heaters in the bedroomsDetails
unit's :4 &5: revision to permit# 2022-0503-3476: remove install additional gas wall heaters in the bedrooms | |
| May 3, 2022 | Never finaled issued May 2022, no final | 807 Ashbury St | unit #1:remodel kitchen and 1 bathroom in kind in each of the units, add cabinets breakfast bar and contertops, install additional gas wall heaters in bedroom and replace gas wall heater in living roomDetails
unit #1:remodel kitchen and 1 bathroom in kind in each of the units, add cabinets breakfast bar and contertops, install additional gas wall heaters in bedroom and replace gas wall heater in living room | $30,000 |
| May 3, 2022 | Never finaled issued May 2022, no final | 807 Ashbury St | unit #4 and #5: remodel kitchen and 1 bathroom in kind in each of the units, add cabinets breakfast bar and contertops, install additional gas wall heaters in bedroom and replace gas wall heater in living roomDetails
unit #4 and #5: remodel kitchen and 1 bathroom in kind in each of the units, add cabinets breakfast bar and contertops, install additional gas wall heaters in bedroom and replace gas wall heater in living room | $49,000 |
| Feb 24, 2022 | Completed final sign-off Sep 2023 | 74 Webster St | replace portion of existing brick foundation and adjoinin floor. voluntarily add plywood wall sheating in work area for good measure.Details
replace portion of existing brick foundation and adjoinin floor. voluntarily add plywood wall sheating in work area for good measure. | $80,000 |
| Feb 24, 2022 | Completed final sign-off Sep 2023 | 78 Webster St | replace kitchen and bathroom cabinets, fixtures, tiles, and appliances.. in kind for one unit (no wall stud removal)Details
replace kitchen and bathroom cabinets, fixtures, tiles, and appliances.. in kind for one unit (no wall stud removal) | $90,000 |
| Jan 20, 2022 | Never finaled issued Feb 2022, no final | 1490 Willard St | revision to pa 2021-1209-4035 & 2021-0309-6206 include replacement of deck @ 2nd fl & updating the steel strong wall toward strong wall @ 2nd fl along grid line h & gDetails
revision to pa 2021-1209-4035 & 2021-0309-6206 include replacement of deck @ 2nd fl & updating the steel strong wall toward strong wall @ 2nd fl along grid line h & g | |
| Dec 9, 2021 | Never finaled issued Dec 2021, no final | 1490 Willard St | revision to 202103096206: change of doors and windows - no new square footage. new skylight. change unconditioned basement to conditioned art studio. revised title 24. new deck rail @ 42" height.Details
revision to 202103096206: change of doors and windows - no new square footage. new skylight. change unconditioned basement to conditioned art studio. revised title 24. new deck rail @ 42" height. | $10,800 |
| Jul 2, 2021 | Never finaled issued Jul 2021, no final | 1490 Willard St | revision to app#202012020076. add plywood to cripple wall and replace hand dug with drilled piers.Details
revision to app#202012020076. add plywood to cripple wall and replace hand dug with drilled piers. | |
| Mar 25, 2021 | Completed final sign-off Apr 2025 | 1812 Webster St | remodel of 2-story single family home.work includes:excavation under house to add 1-car garage,include new interior stair to 1st floor, remodel of kitchen and dining, w/new 1/2 bath; addition at rear of house at 2nd floor lvl to replace(e)deck;(n)roof deck w/stairs penthouseDetails
remodel of 2-story single family home.work includes:excavation under house to add 1-car garage,include new interior stair to 1st floor, remodel of kitchen and dining, w/new 1/2 bath; addition at rear of house at 2nd floor lvl to replace(e)deck;(n)roof deck w/stairs penthouse | $350,000 |
| Mar 9, 2021 | Never finaled issued Oct 2021, no final | 1490 Willard St | interior remodel all floors including adding (1) bedroom. lowering rear half of 1st floor. wood floor assembly & removing stair @ rear yard.Details
interior remodel all floors including adding (1) bedroom. lowering rear half of 1st floor. wood floor assembly & removing stair @ rear yard. | $110,000 |
| Dec 2, 2020 | Never finaled issued May 2021, no final | 1490 Willard St | partially excavating basement & 1st floor in order to level them & create new foundations. both levels will be unconditioned storage rooms.Details
partially excavating basement & 1st floor in order to level them & create new foundations. both levels will be unconditioned storage rooms. | $68,000 |
| Sep 2, 2020 | Completed final sign-off Dec 2020 | 530 Lake St | garage ceiling strengthening to support walls above at locations shown on s2.0.Details
garage ceiling strengthening to support walls above at locations shown on s2.0. | $30,000 |
| Mar 2, 2020 | Completed final sign-off Mar 2020 | 2 Church St | rev to pa201609309307: deismic strengthening revision to shear walls. maher n/a.Details
rev to pa201609309307: deismic strengthening revision to shear walls. maher n/a. | |
| Feb 28, 2020 | Completed final sign-off Jul 2020 | 59 Rosewood Dr | redo stucco siding that is cracked and leaking, entire building amend to pa#201910174783.Details
redo stucco siding that is cracked and leaking, entire building amend to pa#201910174783. | $30,000 |
| Feb 14, 2020 | Completed final sign-off Feb 2020 | 2045 Cabrillo St | revision to 201708296189, soft story retrofit to conform with chapter 4d of the sfebc per ab107 utilizing fema p807 designDetails
revision to 201708296189, soft story retrofit to conform with chapter 4d of the sfebc per ab107 utilizing fema p807 design | |
| Dec 9, 2019 | Completed final sign-off Jul 2020 | 59 Rosewood Dr | new deck at rear yardDetails
new deck at rear yard | $35,000 |
| Nov 12, 2019 | Completed final sign-off Jun 2020 | 1230 Hyde St | revision to 201712227305, soft story retrofit new moment frame 2 bays to 1 bayDetails
revision to 201712227305, soft story retrofit new moment frame 2 bays to 1 bay | |
| Oct 17, 2019 | Completed final sign-off Jul 2020 | 59 Rosewood Dr | amend to pa#201908229512 & 201907024917: new exterior widnows , doors, reroofing. full interior remodel including addition of one bedroom, 2 full baths & 1/2 baths. removal of interior walls not to exceed 75%. deck removal under seperate permit.Details
amend to pa#201908229512 & 201907024917: new exterior widnows , doors, reroofing. full interior remodel including addition of one bedroom, 2 full baths & 1/2 baths. removal of interior walls not to exceed 75%. deck removal under seperate permit. | $350,000 |
| Oct 1, 2019 | Completed final sign-off Nov 2019 | 2419 44th Av | front set back paving and planting. to comply with complaint #201983261Details
front set back paving and planting. to comply with complaint #201983261 | $9,000 |
| Aug 22, 2019 | Completed final sign-off Jul 2020 | 59 Rosewood Dr | foundation improvements.Details
foundation improvements. | $60,000 |
| Aug 7, 2019 | Completed final sign-off Feb 2020 | 170 Parnassus Av | repair (e) stairway support. add new cages to (e) storage areaDetails
repair (e) stairway support. add new cages to (e) storage area | $20,000 |
| Jul 2, 2019 | Completed final sign-off Jul 2020 | 59 Rosewood Dr | two bathrooms and one kitchen remodelDetails
two bathrooms and one kitchen remodel | $73,500 |
| Jun 26, 2019 | Completed final sign-off Dec 2019 | 568 28th Av | permeation grouting of dune sandDetails
permeation grouting of dune sand | $24,500 |
| Jun 17, 2019 | Completed final sign-off Jan 2020 | 298 Gough St | revision to app#201811135648: repair dryrot and replace unsufficient extg foundation. move wall and shorten simpson moment frame.Details
revision to app#201811135648: repair dryrot and replace unsufficient extg foundation. move wall and shorten simpson moment frame. | $50,000 |
| Jun 13, 2019 | Completed final sign-off Jan 2020 | 30 Wayne Pl | rev to pa# 201706290672; project involves seismic strenghening measures to comply with the sf soft story ordinance design iebc appx. a-4Details
rev to pa# 201706290672; project involves seismic strenghening measures to comply with the sf soft story ordinance design iebc appx. a-4 | |
| Jun 7, 2019 | Completed final sign-off Feb 2021 | 301 Edgehill Wy | renovation of laundry room and storage space. addition and replacement of doors & windows. structural work consists of reinforcement of (e) basement and lowering of floor for increased storage. bathroom remodel at basement. (n) shear wall.Details
renovation of laundry room and storage space. addition and replacement of doors & windows. structural work consists of reinforcement of (e) basement and lowering of floor for increased storage. bathroom remodel at basement. (n) shear wall. | $15,000 |
| May 30, 2019 | Completed final sign-off Aug 2019 | 1801 Hayes St | rev to pa# 201708255974; this project involves seismic strenthening measures to comply with the san francisco soft story oridnace design per iebc appex. a-4Details
rev to pa# 201708255974; this project involves seismic strenthening measures to comply with the san francisco soft story oridnace design per iebc appex. a-4 | |
| May 30, 2019 | Completed final sign-off Sep 2019 | 1133 Fell St | rev to pa# 201710201834; this project involves seismic strengthening measures to comply with the san francisco soft story ordinance design per iebc appx.a-4Details
rev to pa# 201710201834; this project involves seismic strengthening measures to comply with the san francisco soft story ordinance design per iebc appx.a-4 | |
| May 2, 2019 | Completed final sign-off Aug 2019 | 959 Haight St | revision to soft story pa #201710100804. for modification of moment frames and shearwalls.Details
revision to soft story pa #201710100804. for modification of moment frames and shearwalls. | $26,000 |
| Apr 25, 2019 | Completed final sign-off Apr 2019 | 1137 Montgomery St | field revision set for changes to moment frame & stron walls details to pa# 201611303803, this project involves seismic strengthing measures to comply with the sf soft story ordinance design per iebx approx a-4Details
field revision set for changes to moment frame & stron walls details to pa# 201611303803, this project involves seismic strengthing measures to comply with the sf soft story ordinance design per iebx approx a-4 | |
| Apr 17, 2019 | Completed final sign-off Dec 2019 | 461 Noriega St | voluntary structural strengthening steel frame shearwall, foundation reinforceDetails
voluntary structural strengthening steel frame shearwall, foundation reinforce | $70,000 |
| Mar 28, 2019 | Completed final sign-off Jan 2020 | 298 Gough St | revision to app#201811135648 for minor changes to ada restroom.Details
revision to app#201811135648 for minor changes to ada restroom. | |
| Mar 14, 2019 | Completed final sign-off May 2019 | 195 14th Av | revision to 201709158725 foundation and moment frame changesDetails
revision to 201709158725 foundation and moment frame changes | $12,000 |
| Nov 30, 2018 | Completed final sign-off Apr 2019 | 170 Corwin St | remove/replace all damaged members with like members of the deck to comply with nov 201802621Details
remove/replace all damaged members with like members of the deck to comply with nov 201802621 | $25,000 |
| Nov 13, 2018 | Completed final sign-off Jan 2020 | 298 Gough St | (e) restaurant - voluntary soft story wood frame seismic retrofit ab-094, barrier removal & ada compliant restroomDetails
(e) restaurant - voluntary soft story wood frame seismic retrofit ab-094, barrier removal & ada compliant restroom | $200,000 |
| Oct 9, 2018 | Completed final sign-off Jan 2022 | 230 Oak St | ref 201608054353 structural work onlyDetails
ref 201608054353 structural work only | |
| Aug 2, 2018 | Completed final sign-off Jun 2019 | 180 Corwin St | madatory soft-story seismic retrofit per sfbc ordinance 66-13 2016 cebc appendix a-4Details
madatory soft-story seismic retrofit per sfbc ordinance 66-13 2016 cebc appendix a-4 | $60,000 |
| Jul 20, 2018 | Completed final sign-off Sep 2018 | 236 Hugo St | revision to 201609087055 soft story retrofit, relocate front moment frame a few feet back, a few ft back revise tranverse grade beams add deepen see foundations, relocate some shear walls reinforce some foundations & joist & staircase.Details
revision to 201609087055 soft story retrofit, relocate front moment frame a few feet back, a few ft back revise tranverse grade beams add deepen see foundations, relocate some shear walls reinforce some foundations & joist & staircase. | |
| Jul 20, 2018 | Completed final sign-off Aug 2018 | 1031 Leavenworth St | revision to 201609147629 soft story retrofitDetails
revision to 201609147629 soft story retrofit | |
| Jul 10, 2018 | Never finaled issued Jul 2018, no final | 3140 Octavia St | remodel (e) unit 2 on second floorDetails
remodel (e) unit 2 on second floor | $89,000 |
| Jul 3, 2018 | Completed final sign-off Jan 2019 | 3201 Washington St | rev to pa#201604184991: revise shear walls due to conflicts with (e) utilities & (e) conditions.Details
rev to pa#201604184991: revise shear walls due to conflicts with (e) utilities & (e) conditions. | |
| Jun 6, 2018 | Completed final sign-off Nov 2018 | 807 Burnett Av | detail change to 201709127724Details
detail change to 201709127724 | |
| Apr 6, 2018 | Never finaled issued Apr 2018, no final | 1859 Vallejo St | street spaceDetails
street space | |
| Apr 6, 2018 | Never finaled issued Apr 2018, no final | 3140 Octavia St | street spaceDetails
street space | |
| Apr 6, 2018 | Never finaled issued Apr 2018, no final | 568 28th Av | street spaceDetails
street space | |
| Apr 6, 2018 | Never finaled issued Apr 2018, no final | 3201 Washington St | street spaceDetails
street space | |
| Apr 6, 2018 | Never finaled issued Apr 2018, no final | 2744 Balboa St | street spaceDetails
street space | |
| Apr 6, 2018 | Never finaled issued Apr 2018, no final | 1231 Grove St | street spaceDetails
street space | |
| Apr 6, 2018 | Never finaled issued Apr 2018, no final | 3990 Sacramento St | street spaceDetails
street space | |
| Apr 3, 2018 | Completed final sign-off Jan 2019 | 1231 Grove St | revision to 201605127294 revise interior walls, kitchen and bath at 1st flr front unit. maher na sprinkler per nfpa 13 in unit. does not have to comply 1103.7.6.1 for value of job- orginal submitted before code change. n/a maherDetails
revision to 201605127294 revise interior walls, kitchen and bath at 1st flr front unit. maher na sprinkler per nfpa 13 in unit. does not have to comply 1103.7.6.1 for value of job- orginal submitted before code change. n/a maher | |
| Mar 8, 2018 | Completed final sign-off Jul 2018 | 2419 44th Av | exploratory demo. remove 3x8 sheet rock at dining rm location for inspection of water damage and replace in kind afterDetails
exploratory demo. remove 3x8 sheet rock at dining rm location for inspection of water damage and replace in kind after | $2,000 |
| Feb 7, 2018 | Completed final sign-off Aug 2018 | 1231 Grove St | add new concrete footing, new wood frame floor and new walls in the 1st floor. ref. #2016-0512-7294. n/a for maherDetails
add new concrete footing, new wood frame floor and new walls in the 1st floor. ref. #2016-0512-7294. n/a for maher | $25,000 |
| Jan 19, 2018 | Completed final sign-off Jul 2018 | 1231 Grove St | relocate new concrete footings. revision to 201611223390 maher naDetails
relocate new concrete footings. revision to 201611223390 maher na | $3,000 |
| Dec 22, 2017 | Completed final sign-off Jun 2020 | 1230 Hyde St | mandatory soft story seismic retrofit per sfebc chapter 4d ordiance 2016 cebc appendix a-4Details
mandatory soft story seismic retrofit per sfebc chapter 4d ordiance 2016 cebc appendix a-4 | $150,000 |
| Dec 15, 2017 | Completed final sign-off Feb 2018 | 516 Fell St | revision for soft sotry retrofit pa #201701308206. minor engineering changes.Details
revision for soft sotry retrofit pa #201701308206. minor engineering changes. | |
| Dec 15, 2017 | Completed final sign-off Mar 2019 | 80 Putnam St | repair of dry rot in bathroom, new fixtures.Details
repair of dry rot in bathroom, new fixtures. | $20,000 |
| Nov 15, 2017 | Completed final sign-off Apr 2019 | 793 Clayton St | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $55,000 |
| Nov 3, 2017 | Completed final sign-off Nov 2017 | 1335 Union St | administrative correction to 201705085930 to correct type of construction from 1a to 5Details
administrative correction to 201705085930 to correct type of construction from 1a to 5 | |
| Oct 20, 2017 | Completed final sign-off Sep 2019 | 1133 Fell St | seismic strenthening measure to comply with sf soft story ordinance 2016 cebc appendix a4.Details
seismic strenthening measure to comply with sf soft story ordinance 2016 cebc appendix a4. | $50,000 |
| Oct 20, 2017 | Completed final sign-off Dec 2019 | 1671 Lombard St | seismic strengthening measure to comply with sf soft story ordinance 2016 cebc appendix a4.Details
seismic strengthening measure to comply with sf soft story ordinance 2016 cebc appendix a4. | $70,000 |
| Oct 16, 2017 | Never finaled issued Aug 2019, no final | 230 Oak St | add unit. demo(e) garage doors and slab, construct 2(n) residences, construct(n) walls, cabinets, applicances, plumbing fixtures and finshes, (n) elect and communication lightign and ventilation. under ordinance #162-16Details
add unit. demo(e) garage doors and slab, construct 2(n) residences, construct(n) walls, cabinets, applicances, plumbing fixtures and finshes, (n) elect and communication lightign and ventilation. under ordinance #162-16 | $200,000 |
| Oct 10, 2017 | Completed final sign-off Sep 2019 | 959 Haight St | seismic strengthening measure to comply with soft story ordinance. disnged per iebc appendix a-4.Details
seismic strengthening measure to comply with soft story ordinance. disnged per iebc appendix a-4. | $66,000 |
| Sep 22, 2017 | Completed final sign-off Oct 2017 | 1445 Eddy St | revision to 2019157852: seismic strengthening measures to comply with sf soft story design per ibec app a2Details
revision to 2019157852: seismic strengthening measures to comply with sf soft story design per ibec app a2 | |
| Sep 15, 2017 | Completed final sign-off Sep 2019 | 5441 California St | soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. | $92,000 |
| Sep 15, 2017 | Completed final sign-off Feb 2019 | 3990 Sacramento St | mandatory soft story seismic retrofit epr sf ordinance 66-13, sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.Details
mandatory soft story seismic retrofit epr sf ordinance 66-13, sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $110,000 |
| Sep 15, 2017 | Completed final sign-off Nov 2018 | 730 Powell St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. n/a ordinance #155-13Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. n/a ordinance #155-13 | $95,600 |
| Sep 15, 2017 | Completed final sign-off Nov 2018 | 720 Powell St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. n/a ordinance #155-13Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. n/a ordinance #155-13 | $47,800 |
| Sep 15, 2017 | Completed final sign-off Apr 2019 | 700 Masonic Av | soft story retrofit to comply with sf ciry ordinance per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4, plywood shear walls hav beenb added or strenghtened & concrete foundations hav been added where addedDetails
soft story retrofit to comply with sf ciry ordinance per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4, plywood shear walls hav beenb added or strenghtened & concrete foundations hav been added where added | $95,000 |
| Sep 15, 2017 | Completed final sign-off May 2019 | 195 14th Av | soft story retrofitto comply with sf city ordinance per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4, plywood shearwalls have been added or strenghtened and concrete foundations hav ebeen added where addedDetails
soft story retrofitto comply with sf city ordinance per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4, plywood shearwalls have been added or strenghtened and concrete foundations hav ebeen added where added | $78,000 |
| Sep 15, 2017 | Completed final sign-off Nov 2019 | 530 Lake St | soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. | $85,000 |
| Sep 12, 2017 | Completed final sign-off Nov 2018 | 807 Burnett Av | mandatory soft story seismic retrofit pler sfbc 2016 ordinance 66-13 cebc 2016 appendix a-4Details
mandatory soft story seismic retrofit pler sfbc 2016 ordinance 66-13 cebc 2016 appendix a-4 | $85,000 |
| Sep 11, 2017 | Completed final sign-off Feb 2020 | 205 Chattanooga St | compliance with mandatory seismic retrofit program per 2016 sfebc chapter 4d & 2016 cebc appendix a-4.Details
compliance with mandatory seismic retrofit program per 2016 sfebc chapter 4d & 2016 cebc appendix a-4. | $31,000 |
| Aug 25, 2017 | Completed final sign-off Feb 2020 | 1832 Franklin St | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. plywood shear walls are being added for lateral resistance with simpson special steel moment frames at garage concrete fdns where needed. n/a for maherDetails
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. plywood shear walls are being added for lateral resistance with simpson special steel moment frames at garage concrete fdns where needed. n/a for maher | $85,000 |
| Aug 25, 2017 | Completed final sign-off Aug 2019 | 1801 Hayes St | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. plywood shear walls are being added for lateral resistance. n/a for maherDetails
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. plywood shear walls are being added for lateral resistance. n/a for maher | $90,000 |
| Aug 22, 2017 | Completed final sign-off Jul 2019 | 1495 22nd Av | revisions to 201703161631. relocate moment frameDetails
revisions to 201703161631. relocate moment frame | $5,000 |
| Aug 15, 2017 | Completed final sign-off Oct 2019 | 20 Parker Av | soft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4 | $83,300 |
| Jul 27, 2017 | Completed final sign-off Sep 2017 | 2534 Polk St | revision to pa 2017-0123-7656 seismic strengthening measures to comply with sf soft story ordinance. design per iebc appendix a-4Details
revision to pa 2017-0123-7656 seismic strengthening measures to comply with sf soft story ordinance. design per iebc appendix a-4 | |
| Jun 29, 2017 | Completed final sign-off Jan 2020 | 30 Wayne Pl | soft story retrofit of four story wood framed residential building. retrofit includes addition of shear walls and spiral steel moment framesDetails
soft story retrofit of four story wood framed residential building. retrofit includes addition of shear walls and spiral steel moment frames | $60,000 |
| Jun 20, 2017 | Completed final sign-off Apr 2019 | 2645 Van Ness Av | soft story retrofit per sfbc chapter 4b per 2016 cebc appendix a-4.Details
soft story retrofit per sfbc chapter 4b per 2016 cebc appendix a-4. | $130,000 |
| Jun 14, 2017 | Completed final sign-off Sep 2019 | 764 Cole St | soft story retrofit per sfebc chapter 4d engineering criteria: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria: 2016 cebc appendix a-4 | $65,000 |
| Jun 14, 2017 | Completed final sign-off Nov 2019 | 1642 Larkin St | soft story retrofit to comply w/sfebc chapter 4d. plywood shear walls & steel smfs added @ ground floor. conc. ftgs added as needed. 2016 cebc appendix a-4.Details
soft story retrofit to comply w/sfebc chapter 4d. plywood shear walls & steel smfs added @ ground floor. conc. ftgs added as needed. 2016 cebc appendix a-4. | $77,000 |
| Jun 13, 2017 | Completed final sign-off Aug 2019 | 170 Parnassus Av | mandatory soft story retrofit per sf ordinance 6613 sf building code chapter 34 b sf admin bulletin 106 and 107. analysis per iebc a4Details
mandatory soft story retrofit per sf ordinance 6613 sf building code chapter 34 b sf admin bulletin 106 and 107. analysis per iebc a4 | $100,000 |
| Jun 13, 2017 | Completed final sign-off Jul 2017 | 2070 Fell St | revision to pa#201607283589 shear wall modifications & construction details. n/a ordinance #155-13.Details
revision to pa#201607283589 shear wall modifications & construction details. n/a ordinance #155-13. | $16,820 |
| Jun 8, 2017 | Completed final sign-off Aug 2017 | 2900 Franklin St | revision pa#201610271275, relocation of front steel frame & back shear wall (interior shear walls), detail change to pa#201610271275. n/a ordinance #155-13Details
revision pa#201610271275, relocation of front steel frame & back shear wall (interior shear walls), detail change to pa#201610271275. n/a ordinance #155-13 | |
| May 22, 2017 | Completed final sign-off Mar 2018 | 2206 Greenwich St | residential - soft story retrofit per sfebc chapter 4d engineering 2016 cebc appendix a-4. commercial pa under 201705227296Details
residential - soft story retrofit per sfebc chapter 4d engineering 2016 cebc appendix a-4. commercial pa under 201705227296 | $10,000 |