122 permits since 2000 (engineer on 110 permits, architect on 6 permits, designer on 4 permits, authorized agent-others on 2 permits): 98 completed, 8 in progress, 10 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 122.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 29, 2026 | In progress issued Sep 2026 | 265 Avila St | Speedy Building And Construction | repair walls inside and outside due to foundation and slab replacement @ rear of building.Details
repair walls inside and outside due to foundation and slab replacement @ rear of building. | $65,000 |
| Jul 9, 2026 | In progress filed Jul 2026, not yet issued | 1870 24th Av | interior-remodel kitchen, primary bedroom & baths, stairway, finishes, mech, elec, plumbing. exterior-new windows on st facing facade, glass slding drs on rear facade. front facade converting exteriro entryway to interior. reconst rear yard partio, fence wall, canopy w/fire rated walls on both sideDetails
interior-remodel kitchen, primary bedroom & baths, stairway, finishes, mech, elec, plumbing. exterior-new windows on st facing facade, glass slding drs on rear facade. front facade converting exteriro entryway to interior. reconst rear yard partio, fence wall, canopy w/fire rated walls on both side | $425,000 | |
| Apr 20, 2026 | In progress issued May 2026 | 136 Evelyn Wy | Saturn Construction Co | exterior remodel: remove/replace stucco siding @ w+s facades. remove select windows & doors from e,w,+s facades. replace w/ new fiber glass clad wood windows + doors. new rear patio + steps. no work @ n (front) facade. interior remodel: 1st floor: remodel/excavate for new 8'-0" ceiling height/replacDetails
exterior remodel: remove/replace stucco siding @ w+s facades. remove select windows & doors from e,w,+s facades. replace w/ new fiber glass clad wood windows + doors. new rear patio + steps. no work @ n (front) facade. interior remodel: 1st floor: remodel/excavate for new 8'-0" ceiling height/replac | $639,778 |
| Nov 17, 2025 | In progress issued Feb 2026 | 356 Stonecrest Dr | interior remodel including kitchen, primary bedroom and bathroom, stairway, finishes, mep. exterior includes new windows and glass doors on non-street facing facades. horizontal expansion on level 3 on south facade and roof modification. close up two (e) windows and adding (1) casement windowDetails
interior remodel including kitchen, primary bedroom and bathroom, stairway, finishes, mep. exterior includes new windows and glass doors on non-street facing facades. horizontal expansion on level 3 on south facade and roof modification. close up two (e) windows and adding (1) casement window | $380,000 | |
| Jul 28, 2025 | Completed final sign-off Sep 2026 | 650 23rd Av | Perez Construction Llc. | 1st fl addition of doors for fire ladder access, 2nd fl remodeling of bathroom, kitchen/dining, adding a patio door in play area, replacing door with window in e location, 3rd fl, room changes, adding new windows in new location/existing location, remodel of master bath, bathrooms, addition of bedrmDetails
1st fl addition of doors for fire ladder access, 2nd fl remodeling of bathroom, kitchen/dining, adding a patio door in play area, replacing door with window in e location, 3rd fl, room changes, adding new windows in new location/existing location, remodel of master bath, bathrooms, addition of bedrm | $250,000 |
| May 2, 2025 | In progress issued Jun 2025 | 1335 Filbert St | Heirloom Builders Inc | revision to pa 202411265739. unit 306- add weld to (e) steel beam at ceiling and replace support column to address field conditionsDetails
revision to pa 202411265739. unit 306- add weld to (e) steel beam at ceiling and replace support column to address field conditions | $5,000 |
| Mar 12, 2025 | In progress issued Mar 2025 | 2534 Great Hy | Norwood Construction | revision to permit 202308033695 to address discovered shared footing at side property lines. structural work only - update detail 5/s5.1. no other changes or scope.Details
revision to permit 202308033695 to address discovered shared footing at side property lines. structural work only - update detail 5/s5.1. no other changes or scope. | |
| Aug 1, 2024 | Expired or cancelled expired Dec 2025 | 210 Spruce St | Krekow Jennings Inc. | expand (e) dormer at north roof & upgrade structure at roof to support expanded dormer. no addition of new habitable/conditioned space.Details
expand (e) dormer at north roof & upgrade structure at roof to support expanded dormer. no addition of new habitable/conditioned space. | $10,000 |
| Jul 2, 2024 | In progress issued Jan 2025 | 4121 20th St | Doran Construction & Design | revision to permit application 2023-0823-5085. basement: excavate crawl space to create additional storage room, convert south storage room to mechanical room. omit spiral stair and construct new 3rd stair and landing. first floor: relocate kitchen, relocate bedroom, create new exterior grade-levelDetails
revision to permit application 2023-0823-5085. basement: excavate crawl space to create additional storage room, convert south storage room to mechanical room. omit spiral stair and construct new 3rd stair and landing. first floor: relocate kitchen, relocate bedroom, create new exterior grade-level | $40,000 |
| Mar 25, 2024 | Completed final sign-off Mar 2024 | 3311 Pacific Av | Matarozzi/Pelsinger Builders Inc. | revison 202206226803- to remove (1) steel post and welding inspection 5b(1): all other welding.Details
revison 202206226803- to remove (1) steel post and welding inspection 5b(1): all other welding. | |
| Jul 12, 2023 | Completed final sign-off Aug 2024 | 844 Page St | C H Burnham Inc | rear bldg/ revision to 202206297404: 1st fl-construct new laundry room, remove powder rm, modify 1st fl bedroom from original. 2nd fl: modify bathroom from originalDetails
rear bldg/ revision to 202206297404: 1st fl-construct new laundry room, remove powder rm, modify 1st fl bedroom from original. 2nd fl: modify bathroom from original | |
| Mar 20, 2023 | Completed final sign-off Jul 2024 | 336 Cumberland St | Planart Construction Corp | 1/f: interior remodel. primary bedroom, primary bath, primary wic , desk area. 2/f: interior remodel. bath, sheetrock repair and paint.Details
1/f: interior remodel. primary bedroom, primary bath, primary wic , desk area. 2/f: interior remodel. bath, sheetrock repair and paint. | $200,000 |
| Mar 2, 2023 | Completed final sign-off Nov 2023 | 2154 Leavenworth St | Hive Builds Inc. | to comply w/nov# 202303547,revision to pa# 2021021245804,202201125863 & 202203049222.for adding scope of interior skylights,architectural metal sleeves/liner to interior wells @ 201a-e, 202 & 205.revised location of indoor hvac unit shown on a2.2 to comply w/nov, previously on roof,now in bedrm #4.Details
to comply w/nov# 202303547,revision to pa# 2021021245804,202201125863 & 202203049222.for adding scope of interior skylights,architectural metal sleeves/liner to interior wells @ 201a-e, 202 & 205.revised location of indoor hvac unit shown on a2.2 to comply w/nov, previously on roof,now in bedrm #4. | $4,000 |
| Dec 30, 2022 | In progress issued Jul 2024 | 782 Lakeview Av | C H Burnham Inc | 1) vertical addition of 1120sf to (e) 1-story house with basement. 2) interior remodel of (e) house, add laundry, office, mudroom and stairs to addition.Details
1) vertical addition of 1120sf to (e) 1-story house with basement. 2) interior remodel of (e) house, add laundry, office, mudroom and stairs to addition. | $400,000 |
| Sep 8, 2022 | Completed final sign-off Dec 2022 | 1620 Broadway | C H Burnham Inc | unit 6: rev to pa 202106142341. revise scope to include 5 new replacement windows at sides and rear (not visible from street) only second floor roof safety rail. omit third flr roof. review roof curb detail and rail designDetails
unit 6: rev to pa 202106142341. revise scope to include 5 new replacement windows at sides and rear (not visible from street) only second floor roof safety rail. omit third flr roof. review roof curb detail and rail design | |
| Jul 8, 2022 | Expired or cancelled withdrawn Aug 2023 | 1147 Lake St | interior remodel renovation; new roof deck, replacement of non-profit facade exterior windows and doors. no foundation work; no wor; no site work; no building envelope expansion.Details
interior remodel renovation; new roof deck, replacement of non-profit facade exterior windows and doors. no foundation work; no wor; no site work; no building envelope expansion. | $155,000 | |
| Jun 29, 2022 | Completed final sign-off Aug 2024 | 844 Page St | C H Burnham Inc | rear building: new internal stair to connect (e) conditioned 1/ to 2/f. interior remodel 1/f: construction of (2) bedroos, convert (e) door to eero windows.construction (n) powder room. construction (n) media room. interior remodel, 2/f: convert (e) bedroom to living room, convert (e) bed to (n)ofceDetails
rear building: new internal stair to connect (e) conditioned 1/ to 2/f. interior remodel 1/f: construction of (2) bedroos, convert (e) door to eero windows.construction (n) powder room. construction (n) media room. interior remodel, 2/f: convert (e) bedroom to living room, convert (e) bed to (n)ofce | $275,000 |
| Jun 22, 2022 | Completed final sign-off Mar 2024 | 3311 Pacific Av | Matarozzi/Pelsinger Builders Inc. | 107.3 sf new bay addition at 2/f only. rear elevation of house-with crawl space below and roof. materials to match existing. (3) new french door units at new bay added. (1) large door unit removed. existing wood deck to be extended at new bay.Details
107.3 sf new bay addition at 2/f only. rear elevation of house-with crawl space below and roof. materials to match existing. (3) new french door units at new bay added. (1) large door unit removed. existing wood deck to be extended at new bay. | $50,000 |
| May 17, 2022 | Completed final sign-off May 2023 | 3577 Pacific Av | Arrow Builders Inc | resurfacing of (e) exterior roof deck, stair and walkway. replace (e) guardrails skylight. new and resurfaced built in planter boxes new low level sedum plantings on existing adjacent roof areas, matching (e) height roof curbs. no envelope changes.Details
resurfacing of (e) exterior roof deck, stair and walkway. replace (e) guardrails skylight. new and resurfaced built in planter boxes new low level sedum plantings on existing adjacent roof areas, matching (e) height roof curbs. no envelope changes. | $165,000 |
| Apr 26, 2022 | Completed final sign-off Apr 2024 | 340 Jersey St | Alpha Construction Company | rear yard landscape retaining walls steps on grade. approx. less than 65 cu.yds.Details
rear yard landscape retaining walls steps on grade. approx. less than 65 cu.yds. | $12,000 |
| Mar 14, 2022 | Completed final sign-off Mar 2023 | 86 Ellsworth St | kitchen and half bath remodel of a single family residence. relocation of washer/dryer. new door to rear yardDetails
kitchen and half bath remodel of a single family residence. relocation of washer/dryer. new door to rear yard | $80,000 | |
| Mar 9, 2022 | Never finaled issued Mar 2022, no final | 254 28th Av | S A Baxter Inc. | remodel 2 existing full bathrooms at 3rd floor. remodel to include high efficiency lighting controlled via vacancy sensor, new ventillation fan with roof termination not less than 3' from property line. no work at front or visible from street.Details
remodel 2 existing full bathrooms at 3rd floor. remodel to include high efficiency lighting controlled via vacancy sensor, new ventillation fan with roof termination not less than 3' from property line. no work at front or visible from street. | $35,000 |
| Mar 4, 2022 | Completed final sign-off Nov 2023 | 2154 Leavenworth St | Hive Builds Inc. | to comply with nov202287128. revise pa202102124580: recifty north lightwell stasireway. reconstruction of (e) main entry staircase.Details
to comply with nov202287128. revise pa202102124580: recifty north lightwell stasireway. reconstruction of (e) main entry staircase. | $6,000 |
| Feb 14, 2022 | Completed final sign-off Jul 2023 | 220 San Marcos Av | Cs Construction Co | 2/f: remodel (e) kitchen and 2 bathrooms. replace window and remove wall at kitchen. add recessed lighting and replace wood flooring. construct new cabinet at dining room. work to repair/comply with nov 202183505.Details
2/f: remodel (e) kitchen and 2 bathrooms. replace window and remove wall at kitchen. add recessed lighting and replace wood flooring. construct new cabinet at dining room. work to repair/comply with nov 202183505. | $200,000 |
| Nov 2, 2021 | Completed final sign-off Nov 2023 | 22 Flint St | Urban Builder General Contracting Inc | rev to pa 202104027846: structural revision to shear wall, skylight, parapet walls.Details
rev to pa 202104027846: structural revision to shear wall, skylight, parapet walls. | $1,500 |
| Jun 15, 2021 | Completed final sign-off Jul 2024 | 1746 Great Hy | Hunter Dale Builders Inc., Kingfish Construction Llc. | new vertical / horizontal addition above and to the rear of the existing garage.Details
new vertical / horizontal addition above and to the rear of the existing garage. | $192,338 |
| Jun 14, 2021 | Completed final sign-off Dec 2022 | 1620 Broadway | C H Burnham Inc | 3rd flr #6 - replace 5 (e) winoows at side & rear of unit 6 (non visible from st). replace (e) safety rail at non-occupied 3rd fl roof. add safety rail @ 4th fl roof. add skylight at unit 6 kitchen. no roof deck existing or proposed.Details
3rd flr #6 - replace 5 (e) winoows at side & rear of unit 6 (non visible from st). replace (e) safety rail at non-occupied 3rd fl roof. add safety rail @ 4th fl roof. add skylight at unit 6 kitchen. no roof deck existing or proposed. | $30,000 |
| Apr 21, 2021 | Completed final sign-off Jul 2022 | 85 Midcrest Wy | Alward Const. Co Inc A Ca Corp | revision to pa 20181206757 with following scope: 3 new non street facing fenestrations to be replaced in kind at (e) openings due to damage. 2 fenestration size reduced compared to originally approved. minor framing change at rear wall, floor/ceiling and exterior steps. 1 window removed.Details
revision to pa 20181206757 with following scope: 3 new non street facing fenestrations to be replaced in kind at (e) openings due to damage. 2 fenestration size reduced compared to originally approved. minor framing change at rear wall, floor/ceiling and exterior steps. 1 window removed. | |
| Apr 2, 2021 | Completed final sign-off Mar 2024 | 22 Flint St | Urban Builder General Contracting Inc | convert part of open entry way on ground flr into interior conditioned space. repair and replace (e) batten system in kind. replace street facing windows in kind. replace roll up door and sheetrock to (e) garage with exposed framing. kitchen/bathroom remodel. replace windows and skylights.Details
convert part of open entry way on ground flr into interior conditioned space. repair and replace (e) batten system in kind. replace street facing windows in kind. replace roll up door and sheetrock to (e) garage with exposed framing. kitchen/bathroom remodel. replace windows and skylights. | $325,000 |
| Mar 5, 2021 | Completed final sign-off Apr 2022 | 2044 Great Hy | Hive Builds Inc. | interiorize (e) tunnel entry. add new bathroom and den in (e) at 1/f garage space. new window and door at den. replace (e) windows in kind. new wood siding at front. remove (e) single siding at rear to uncover (e) redwood siding underneath.Details
interiorize (e) tunnel entry. add new bathroom and den in (e) at 1/f garage space. new window and door at den. replace (e) windows in kind. new wood siding at front. remove (e) single siding at rear to uncover (e) redwood siding underneath. | $55,000 |
| Feb 12, 2021 | Completed final sign-off Nov 2023 | 2154 Leavenworth St | Hive Builds Inc. | interior remodel of 3rd floor residence. no change to sqft or lower levels. new kitchen and bathrooms w/ associated new plumbing, electrical and mechanical. addition of 480 sqft roofdeck. no vertical addition. access to roofdeck is existing.Details
interior remodel of 3rd floor residence. no change to sqft or lower levels. new kitchen and bathrooms w/ associated new plumbing, electrical and mechanical. addition of 480 sqft roofdeck. no vertical addition. access to roofdeck is existing. | $350,000 |
| Feb 8, 2021 | Never finaled issued May 2021, no final | 130 Vicksburg St | interior remodel: new bathroom and dormer (exempt from section 311), dmeo rear pop-out. replace windows (alum to wood-clad. new exterior stairs in rear.Details
interior remodel: new bathroom and dormer (exempt from section 311), dmeo rear pop-out. replace windows (alum to wood-clad. new exterior stairs in rear. | $120,000 | |
| Jan 7, 2021 | Completed final sign-off Apr 2026 | 900 Chenery St | Barker-O'donoghue Master Bldrs | horizontal addition at 1st & 2nd floor of (e) 2 story house over basement. remodel basement and add guest suite. remodel existing house and add bathroom & master suite with balcony.Details
horizontal addition at 1st & 2nd floor of (e) 2 story house over basement. remodel basement and add guest suite. remodel existing house and add bathroom & master suite with balcony. | $750,000 |
| Nov 25, 2020 | Completed final sign-off Mar 2022 | 100 Turquoise Wy | Kotas Construction Inc | rev to pa202008262711: 1 (n) skylight. no facade changes, no work in public right of way, no changes to fixture count.Details
rev to pa202008262711: 1 (n) skylight. no facade changes, no work in public right of way, no changes to fixture count. | $3,000 |
| Nov 24, 2020 | Completed final sign-off Dec 2021 | 4430 24th St | H T H Construction | new stairs & landscape walls at the rear yard.Details
new stairs & landscape walls at the rear yard. | $90,000 |
| Aug 13, 2020 | Completed final sign-off Dec 2021 | 330 Roosevelt Wy | Bryce C B Construction Inc | increase height of flat roof at rear of house over 2nd flr kitchen. area of proposed change is not visible from neighor's rera yards or from streetDetails
increase height of flat roof at rear of house over 2nd flr kitchen. area of proposed change is not visible from neighor's rera yards or from street | $25,000 |
| Feb 20, 2020 | Never finaled issued Aug 2021, no final | 210 Beacon St | Rico's General Construction | vertical addition to an existing 3 story plus basement single family residence. modify roof slope to increase height of room below, interior remodel. no new additionsDetails
vertical addition to an existing 3 story plus basement single family residence. modify roof slope to increase height of room below, interior remodel. no new additions | $100,000 |
| Feb 19, 2020 | Completed final sign-off Apr 2021 | 477 Belvedere St | J K Construction Co | revision to 201711143984 s1. scope inlcludes modifications to rear yardDetails
revision to 201711143984 s1. scope inlcludes modifications to rear yard | $7,000 |
| Feb 19, 2020 | Completed final sign-off Dec 2020 | 844 Cabrillo St | C H Burnham Inc | rev to pa# 201907055181; scope of work includes eliminating grade beam & bearing wall at line 3 due to discovery of (e) beam, replace (e) footing w/new at lightwellDetails
rev to pa# 201907055181; scope of work includes eliminating grade beam & bearing wall at line 3 due to discovery of (e) beam, replace (e) footing w/new at lightwell | |
| Nov 26, 2019 | Completed final sign-off Jun 2020 | 150 Belvedere St | V Mash Construction | kitchen and extg full bath renovation. new cabinets, fixtures and tile. relocate 1 window and replace one exterior door and 3 windows. not visible to the street.Details
kitchen and extg full bath renovation. new cabinets, fixtures and tile. relocate 1 window and replace one exterior door and 3 windows. not visible to the street. | $75,000 |
| Nov 21, 2019 | Completed final sign-off Apr 2021 | 477 Belvedere St | J K Construction Co | revision to 201711143984 s1 scope of work includes replacing existing foundation with new foundation at gridline 4 north wall with temporty shoring detailsDetails
revision to 201711143984 s1 scope of work includes replacing existing foundation with new foundation at gridline 4 north wall with temporty shoring details | $20,000 |
| Nov 14, 2019 | Completed final sign-off Apr 2021 | 672 Moultrie St | Frederic Grasset Design-Build | alt to the facade and front stairs to include new windows, remove protruding bay window & new siding and railings.Details
alt to the facade and front stairs to include new windows, remove protruding bay window & new siding and railings. | $40,000 |
| Nov 12, 2019 | Completed final sign-off May 2020 | 140 Belvedere St | O'shea Co. Home Grown Construction | replace (e) brick footing with (n) concrete footing at south wall.Details
replace (e) brick footing with (n) concrete footing at south wall. | $15,000 |
| Oct 11, 2019 | Completed final sign-off Jul 2020 | 2235 Laguna St | Bjlgc Inc | structural repair and upgrade to e concrete slab and wood roof framing of an e 1 story storage building in rear yard. infill window openingsDetails
structural repair and upgrade to e concrete slab and wood roof framing of an e 1 story storage building in rear yard. infill window openings | $20,000 |
| Oct 10, 2019 | Completed final sign-off Apr 2020 | 513 Hickory St | Oak Leaf Construction | residential remodel of 3 story r-3 sfd. replace interior finishes, create new master bath, new stair, operable roof hatch to access a new roof deck, replace rear facade garage door with man doorDetails
residential remodel of 3 story r-3 sfd. replace interior finishes, create new master bath, new stair, operable roof hatch to access a new roof deck, replace rear facade garage door with man door | $500,000 |
| Oct 1, 2019 | Completed final sign-off Aug 2020 | 636 Belvedere St | Hakewill Construction Co. Inc. | interior alter to the (e) 2nd floor in 2-story dwelling, including remodeling the kitchens & bathroom & powder room, expansion into (e) lightwell to expand (e) powder room. new windows to match & rep (e) new deck on grade and landscape.Details
interior alter to the (e) 2nd floor in 2-story dwelling, including remodeling the kitchens & bathroom & powder room, expansion into (e) lightwell to expand (e) powder room. new windows to match & rep (e) new deck on grade and landscape. | $45,000 |
| Jul 11, 2019 | Completed final sign-off Jul 2020 | 333 Texas St | Saturn Construction Co | remove garage stair & rear patio stair. remodel (e) kitchen & bathroom, add 1 (n) bathroom, replace rear window/door with/bi-fold door. remove (e) fireplace.Details
remove garage stair & rear patio stair. remodel (e) kitchen & bathroom, add 1 (n) bathroom, replace rear window/door with/bi-fold door. remove (e) fireplace. | $180,000 |
| Aug 15, 2018 | Completed final sign-off Jan 2019 | 1425 Shotwell St | Jln Builders | new interior spiral stair to connect (e) ground level floor to 1st lev. add 1 bathroom & 1 bedroom on g/f. (n) concrete slab on g/f with new footings for sprial staircase and (n) load bearing wall. electrical & plumbing as required.Details
new interior spiral stair to connect (e) ground level floor to 1st lev. add 1 bathroom & 1 bedroom on g/f. (n) concrete slab on g/f with new footings for sprial staircase and (n) load bearing wall. electrical & plumbing as required. | $60,000 |
| Jun 25, 2018 | Completed final sign-off Jun 2019 | 325 Cornwall St | Cook Construction | revisionto 201805189603 submittal of structural drawings onlyDetails
revisionto 201805189603 submittal of structural drawings only | |
| May 29, 2018 | Completed final sign-off Mar 2021 | 2445 Franklin St | S H C I | replace (e) slab on grade in garage, playroom & office witn (n) footing in playroom & officeDetails
replace (e) slab on grade in garage, playroom & office witn (n) footing in playroom & office | $10,000 |
| May 29, 2018 | Completed final sign-off Dec 2018 | 655 04th Av | Hing Wah Construction Inc | replace (e) ftg witn (n) ftg along north property line wallDetails
replace (e) ftg witn (n) ftg along north property line wall | $10,000 |
| May 16, 2018 | Never finaled issued May 2018, no final | 145 Mallorca Wy | Cook Construction | supplemental structural work. revision to pa 2018-0327-4759Details
supplemental structural work. revision to pa 2018-0327-4759 | $3,000 |
| Jan 4, 2018 | Never finaled issued May 2021, no final | 313 Castro St | Kanler Inc, Connemara Fine Trim Inc Dba Highland Bui | add 1 bedroom & 1 office on 3rd fl. revision to expired bpa# 201708225549 (vertical addition on the 3rd fl roof deck)Details
add 1 bedroom & 1 office on 3rd fl. revision to expired bpa# 201708225549 (vertical addition on the 3rd fl roof deck) | $55,000 |
| Aug 23, 2017 | Expired or cancelled cancelled Apr 2018 | 925 Kirkham St | replace (e) rear yard retaining wall with newDetails
replace (e) rear yard retaining wall with new | $5,000 | |
| Aug 8, 2017 | Completed final sign-off May 2019 | 584 Duncan St | Duffin Construction | remodel extg kitchen in units 584 and 586. replace in kind fixtures for 586 bathroom. replace rear windows. relocate gas fireplace, new skylights. replace in kind front facade windows.Details
remodel extg kitchen in units 584 and 586. replace in kind fixtures for 586 bathroom. replace rear windows. relocate gas fireplace, new skylights. replace in kind front facade windows. | $80,000 |
| May 18, 2017 | Completed final sign-off Oct 2019 | 2835 Van Ness Av | Sure, Inc. | renovation of 6 apartments: units 1,2 and 3 on 2nd floor and 7, 8 and 9 on the 4th floor. new kitchen cabinets. new plumbing fixtures. new washer/dryer and dishwashers in all renovated units. new lighting at existing j box locations. no change to mechanical. no exterior work. no fire alarm ofDetails
renovation of 6 apartments: units 1,2 and 3 on 2nd floor and 7, 8 and 9 on the 4th floor. new kitchen cabinets. new plumbing fixtures. new washer/dryer and dishwashers in all renovated units. new lighting at existing j box locations. no change to mechanical. no exterior work. no fire alarm of | $285,000 |
| May 5, 2017 | Completed final sign-off Mar 2018 | 1431 Grove St | Sandbank Construction, Inc | revision to pa #2015-1026-0722. revisions include changes to shear wall locations. n/a maherDetails
revision to pa #2015-1026-0722. revisions include changes to shear wall locations. n/a maher | |
| May 4, 2017 | Completed final sign-off Feb 2021 | 1055 Mason St | Halyard Inc | residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. maher na. commercial under pa 201705045650Details
residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. maher na. commercial under pa 201705045650 | $100,000 |
| May 4, 2017 | Completed final sign-off Oct 2017 | 319 Missouri St | Saturn Construction Co | (n) slab on grade & interior concrete footing & shear wall in garageDetails
(n) slab on grade & interior concrete footing & shear wall in garage | $25,000 |
| May 4, 2017 | Completed final sign-off Feb 2021 | 1101 Clay St | commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. maher na. residential is under pa 201705045652 accessibility upgrade to (e) bathroom.Details
commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. maher na. residential is under pa 201705045652 accessibility upgrade to (e) bathroom. | $25,000 | |
| Mar 29, 2017 | Completed final sign-off Jun 2018 | 169 Amber Dr | Saturn Construction Co | revision to pa 2017-0210-9133 structural updates to enlarge openingsDetails
revision to pa 2017-0210-9133 structural updates to enlarge openings | $50,000 |
| Mar 1, 2017 | Completed final sign-off Jun 2019 | 1712 Castro St | Hive Builds Inc. | board of appeals #16-161. (n) roof deck, (n) spiral stair access from 2nd fl & (n) sliding roof access skylight.Details
board of appeals #16-161. (n) roof deck, (n) spiral stair access from 2nd fl & (n) sliding roof access skylight. | |
| Feb 23, 2017 | Completed final sign-off Sep 2017 | 188 Haight St | Kilrea Construction Inc. | interior partition changes; master bedroom, mud/laundry, bath and wetbar renovation; plumbing, electrical and mechanical work; doors & windows envelope changesDetails
interior partition changes; master bedroom, mud/laundry, bath and wetbar renovation; plumbing, electrical and mechanical work; doors & windows envelope changes | $50,000 |
| Jan 17, 2017 | Completed final sign-off Oct 2017 | 504 02nd Av | Planart Construction Corp | interior remodel with four new windows and one exterior door at rear facade includes: new kitchen, new powder room, division of upper level to include 2 bedrooms & 1 new bathrooms. installation of 2 new skylights. removal of extg walls on main floor & new beams to replace.Details
interior remodel with four new windows and one exterior door at rear facade includes: new kitchen, new powder room, division of upper level to include 2 bedrooms & 1 new bathrooms. installation of 2 new skylights. removal of extg walls on main floor & new beams to replace. | $65,000 |
| Jan 9, 2017 | Completed final sign-off Mar 2017 | 714 Duncan St | Itu Construction | remove (e) bearing wall between living room & rear bedroom on the 2nd floor.Details
remove (e) bearing wall between living room & rear bedroom on the 2nd floor. | $10,000 |
| Dec 21, 2016 | Completed final sign-off Mar 2017 | 3 Lupine Av | revision to pa#201609076953, modifications to structural details only.Details
revision to pa#201609076953, modifications to structural details only. | ||
| Dec 16, 2016 | Completed final sign-off Apr 2018 | 115 Mountain Spring Av | Johnstone - Mc Auliffe Const. Inc. | rev. to pa#201607192752 to remove (e) walls in 2/f, new roof structure and skylight over an (e) sunroom, new roofing and insulation over new structural roof sheathing, new exterior doors & window & assoc. minor exterior upgrades, new conditioned sq.ft. within (e) envelope for (n) laundry room.Details
rev. to pa#201607192752 to remove (e) walls in 2/f, new roof structure and skylight over an (e) sunroom, new roofing and insulation over new structural roof sheathing, new exterior doors & window & assoc. minor exterior upgrades, new conditioned sq.ft. within (e) envelope for (n) laundry room. | $350,000 |
| Nov 23, 2016 | Completed final sign-off Feb 2018 | 1330 Union St | Sure, Inc. | renovate 4 apartments, 5a at 1st floor, unit 12 at 2nd floor, #16 and 21 at 3rd floor. new cabinets, plmg, lighting. no mechanical, no exterior work, no fire alarm or sprinkler. n/a for maher.Details
renovate 4 apartments, 5a at 1st floor, unit 12 at 2nd floor, #16 and 21 at 3rd floor. new cabinets, plmg, lighting. no mechanical, no exterior work, no fire alarm or sprinkler. n/a for maher. | $300,000 |
| Nov 22, 2016 | Completed final sign-off Jan 2018 | 2953 Broderick St | C H Burnham Inc | remodel extg ground floor powder room, laundry area and garden room to create theatre, guest bedroom and bathroom. no work visible from street.Details
remodel extg ground floor powder room, laundry area and garden room to create theatre, guest bedroom and bathroom. no work visible from street. | $30,000 |
| Nov 15, 2016 | Completed final sign-off Nov 2017 | 2719 Franklin St | Hing Wah Construction Inc | revision to 201605096898. use pipe lines and removal of posts in garageDetails
revision to 201605096898. use pipe lines and removal of posts in garage | |
| Nov 1, 2016 | Completed final sign-off Jun 2017 | 4624 18th St | Allied Teamwork Construction Co | 2/f:infill (e) lightwell for new bathroom, lighting & plumbing for new bath.Details
2/f:infill (e) lightwell for new bathroom, lighting & plumbing for new bath. | $25,000 |
| Oct 27, 2016 | Completed final sign-off May 2018 | 226 Edgewood Av | Eastwood Development Incorporated | renovation of (e), 3 story sfd - interior renovation of kitchen, dining, living, family room, stairs, guest bedroom and master suite. exterior balcony and roof overhang demo and deck extension over existing roof. no extension beyond (e) roof line. exterior window; door replacementDetails
renovation of (e), 3 story sfd - interior renovation of kitchen, dining, living, family room, stairs, guest bedroom and master suite. exterior balcony and roof overhang demo and deck extension over existing roof. no extension beyond (e) roof line. exterior window; door replacement | $350,000 |
| Oct 7, 2016 | Completed final sign-off Apr 2021 | 122 Avila St | San Francisco Investment Development | relocating interior stairs, add new bathroom, remodel existing bath, remove post in garage. new skylight. sprinkler under seperate permit. ** maher: n/a **Details
relocating interior stairs, add new bathroom, remodel existing bath, remove post in garage. new skylight. sprinkler under seperate permit. ** maher: n/a ** | $50,000 |
| Sep 26, 2016 | Completed final sign-off Oct 2016 | 1442 42nd Av | Dcs Plumbing Llc | create (n) one story (5' high) rear deck within buildable area. comply with nov#201637632Details
create (n) one story (5' high) rear deck within buildable area. comply with nov#201637632 | $10,000 |
| Sep 8, 2016 | Completed final sign-off Feb 2017 | 49 Eagle St | Barry M Nadell Construction Inc, Travis General Contractors | (n) exterior retaining wall for (n) outside storage area.Details
(n) exterior retaining wall for (n) outside storage area. | $5,000 |
| Sep 6, 2016 | Completed final sign-off Jun 2023 | 1600 Fell St | Adobe Soil & Structures, Sandbank Construction, Inc | soft story seismic retrofit per sf mandatory soft story program. design criteria 2016 - cebc app a4Details
soft story seismic retrofit per sf mandatory soft story program. design criteria 2016 - cebc app a4 | $75,000 |
| Sep 6, 2016 | Completed final sign-off Dec 2023 | 120 Gardenside Dr | Sandbank Construction, Inc | soft story seismic retrofit per sf mandatory soft story program. design criteria 2022 - cebc app a4Details
soft story seismic retrofit per sf mandatory soft story program. design criteria 2022 - cebc app a4 | $50,000 |
| Sep 6, 2016 | Completed final sign-off Mar 2017 | 145 Mallorca Wy | Cook Construction | revision to ref pa 201605117155 - foundation details maher naDetails
revision to ref pa 201605117155 - foundation details maher na | |
| Sep 6, 2016 | Completed final sign-off Nov 2022 | 2740 Greenwich St | Adobe Soil & Structures, Sandbank Construction, Inc | soft story seismic retrofit per sf mandatory soft story program. design criteria 2012 - iebc app a4Details
soft story seismic retrofit per sf mandatory soft story program. design criteria 2012 - iebc app a4 | $75,000 |
| Sep 2, 2016 | Completed final sign-off Mar 2017 | 476 Eureka St | Miguel A Padilla Construction | remodel of condminium kitchen. demolition of non-load bearing wall. install new cabinetry appliances and new french doors in extg opening. replacement of 2 windows and reinforcement of extg wall.Details
remodel of condminium kitchen. demolition of non-load bearing wall. install new cabinetry appliances and new french doors in extg opening. replacement of 2 windows and reinforcement of extg wall. | $20,000 |
| Jul 14, 2016 | Completed final sign-off Dec 2023 | 417 Mississippi St | Current Construction | vertical & horizontal additional, building back into yard, new front & rear facades, new decks, new interior walls, electrical & plumbing. current 3 bed, 2 bath. change to 5 bed, 4.5 bath.Details
vertical & horizontal additional, building back into yard, new front & rear facades, new decks, new interior walls, electrical & plumbing. current 3 bed, 2 bath. change to 5 bed, 4.5 bath. | $975,000 |
| Jul 13, 2016 | Completed final sign-off Dec 2016 | 263 Mullen Av | Handy Construction Team Inc | renovation of 1st floor unit. remodel bathroom kitchen & living room.Details
renovation of 1st floor unit. remodel bathroom kitchen & living room. | $50,000 |
| Jul 6, 2016 | Expired or cancelled withdrawn Dec 2023 | 825 De Haro St | remodel w/ rear & 2-story addition. basement:(n)kitchen,storage,mech,bath, art studio & gym. 1st fl:(n)garage,1/2 bath. 2nd fl: (n)bedrm/bath suites, (2)decks,den,laundry,closet,bath. 3rd fl: (n)master suite, music/lving rm, deck & (2)offices. 4th fl: (n)kitchn,living,dining rm, pantry, closet,1/2baDetails
remodel w/ rear & 2-story addition. basement:(n)kitchen,storage,mech,bath, art studio & gym. 1st fl:(n)garage,1/2 bath. 2nd fl: (n)bedrm/bath suites, (2)decks,den,laundry,closet,bath. 3rd fl: (n)master suite, music/lving rm, deck & (2)offices. 4th fl: (n)kitchn,living,dining rm, pantry, closet,1/2ba | $1,250,000 | |
| Jun 23, 2016 | Completed final sign-off Apr 2017 | 141 San Pablo Av | Dennis Webb Construction | permit revision to 2016-0126-8025 & 2015-0911-6671 structural details modificationDetails
permit revision to 2016-0126-8025 & 2015-0911-6671 structural details modification | $2,000 |
| Jun 23, 2016 | Completed final sign-off Oct 2016 | 3320 Octavia St | Sure, Inc. | #5 & #9 - permit revision pa 2016-0328-3180, revisions include modifications to structural framing details. maher naDetails
#5 & #9 - permit revision pa 2016-0328-3180, revisions include modifications to structural framing details. maher na | |
| Jun 23, 2016 | Expired or cancelled expired Sep 2026 | 227 Laguna St | Leeward Construction Co. | permit revision to pa 2014-0121-6670, structural detail modificationsDetails
permit revision to pa 2014-0121-6670, structural detail modifications | |
| Jun 16, 2016 | Completed final sign-off Feb 2018 | 925 Kirkham St | M Group Construction | revision to ref pa 2016 0126 7964: modifications to structural designs of rear retaining wallDetails
revision to ref pa 2016 0126 7964: modifications to structural designs of rear retaining wall | |
| May 9, 2016 | Completed final sign-off May 2019 | 1985 Fulton St | Sandbank Construction, Inc | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. n/a maherDetails
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. n/a maher | $125,000 |
| Apr 7, 2016 | Completed final sign-off Oct 2016 | 3420 Market St | S4s Construction Inc | revision to app#2015-1026-0718. discovery of extg moment frames, modification to structural details.Details
revision to app#2015-1026-0718. discovery of extg moment frames, modification to structural details. | |
| Mar 30, 2016 | Never finaled issued Apr 2016, no final | 43 Everson St | Saturn Construction Co | (n) foundation & interior remodel 1/f: (n) home gym, sauna, lounge/wet bar, 1.5 baths, exercise area & stairs. 2/f: (n) bedroom, 1-1/2 baths, closets & media room. existing 3/f to remain.Details
(n) foundation & interior remodel 1/f: (n) home gym, sauna, lounge/wet bar, 1.5 baths, exercise area & stairs. 2/f: (n) bedroom, 1-1/2 baths, closets & media room. existing 3/f to remain. | $195,000 |
| Mar 28, 2016 | Completed final sign-off Oct 2016 | 3320 Octavia St | Sure, Inc. | #5 & #9- remodel 2 apts. demo of structural walls, new kitchen cabinets, plumbing fixtures, lighting, electrical. no change to mechanical, no exterior work. no fire alarm or sprinkler.Details
#5 & #9- remodel 2 apts. demo of structural walls, new kitchen cabinets, plumbing fixtures, lighting, electrical. no change to mechanical, no exterior work. no fire alarm or sprinkler. | $100,000 |
| Feb 11, 2016 | Completed final sign-off Mar 2016 | 360 Lily St | B Park Construction & Painting Co. | remove 4' pocket door and open wall approx 10' long, lower bathroom and hallway ceiling, install 6" duct pipe to outside wall for kitchen hood, install bath fan, add 7 down lights.Details
remove 4' pocket door and open wall approx 10' long, lower bathroom and hallway ceiling, install 6" duct pipe to outside wall for kitchen hood, install bath fan, add 7 down lights. | $9,500 |
| Feb 11, 2016 | Completed final sign-off May 2016 | 385 Justin Dr | Elliott Build Remodel Llc | remove an extg bearing wall between kitchen and dining room. n/a for maherDetails
remove an extg bearing wall between kitchen and dining room. n/a for maher | $5,000 |
| Feb 5, 2016 | Completed final sign-off Feb 2017 | 2138 Jones St | revision to 201308225004 revise approved 2 story unit @ basement & 1st floor to (2) 1 story units, delete approved interior stairway. reconfigure basement plan to great room, bedroom, bath, study, media room. reconfigure 1st floor to great room, (2) bedrooms and bath.Details
revision to 201308225004 revise approved 2 story unit @ basement & 1st floor to (2) 1 story units, delete approved interior stairway. reconfigure basement plan to great room, bedroom, bath, study, media room. reconfigure 1st floor to great room, (2) bedrooms and bath. | $10,000 | |
| Jan 26, 2016 | Completed final sign-off Jun 2020 | 275 Grattan St | Sandbank Construction, Inc | soft story seismic retrofit in accordance with sf mandatory soft story program. removal of (e) posts on 1st floor. new foundation & slab on grade. 2012 iebc appendix a-4. (structural work only).Details
soft story seismic retrofit in accordance with sf mandatory soft story program. removal of (e) posts on 1st floor. new foundation & slab on grade. 2012 iebc appendix a-4. (structural work only). | $75,000 |
| Jan 19, 2016 | Completed final sign-off Aug 2016 | 3658 18th St | Hing Wah Construction Inc | 1/f: move entry to multipurpose room from garage to hall, reconfigure bath #1, relocate laundry; 2/f: add 3 windows, move fireplace at great room; 3/f: add 3 windows & move fireplace @ great room, move wall @ kitchen, reconfigure bath #1, reconfigure closets @ bedrm 1,2,3.Details
1/f: move entry to multipurpose room from garage to hall, reconfigure bath #1, relocate laundry; 2/f: add 3 windows, move fireplace at great room; 3/f: add 3 windows & move fireplace @ great room, move wall @ kitchen, reconfigure bath #1, reconfigure closets @ bedrm 1,2,3. | $24,000 |
| Jan 8, 2016 | Completed final sign-off Nov 2017 | 2127 33rd Av | San Francisco Design & Constr. | vertical addition to create third floor including master suite, home office & roof deck, remodel of existing home interior, new windows, in-fill at existing tunnel entrance.Details
vertical addition to create third floor including master suite, home office & roof deck, remodel of existing home interior, new windows, in-fill at existing tunnel entrance. | $400,000 |
| Dec 29, 2015 | Completed final sign-off Aug 2016 | 51 Clipper St | Spryscapes Const Inc. | replace (e) rear deck.Details
replace (e) rear deck. | $15,000 |
| Dec 10, 2015 | Completed final sign-off Apr 2018 | 1914 Mission St | Grizzly Builders Inc. | mandatory soft story retrofit per soft story mandate chapter 34b of the s.f. bldg code using 2012 iebc appendix a-4 (residential)Details
mandatory soft story retrofit per soft story mandate chapter 34b of the s.f. bldg code using 2012 iebc appendix a-4 (residential) | $75,000 |
| Dec 10, 2015 | Completed final sign-off Mar 2018 | 1912 Mission St | Grizzly Builders Inc. | mandatory soft story retrofit per soft story mandate chapter 34b of the s.f. bldg code using 2012 iebc appendix a-4. (commercial)Details
mandatory soft story retrofit per soft story mandate chapter 34b of the s.f. bldg code using 2012 iebc appendix a-4. (commercial) | $25,000 |