Sure, Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Aug 2026
- Last 24 months
- 98 permits filed
1,395 permits since 2000: 1,252 completed, 25 in progress, 54 never finaled, 64 expired or cancelled.
Of the 54 never-finaled permits, 5 are 3 to 5 years old, 23 are 5 to 10 years old, 26 are over 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 1,395.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 25, 2026 | In progress issued Aug 2026 | 1827 Golden Gate Av | unit #9: 1 kitchen (70sf) and 1 bath (50 sft) | $39,000 |
| Aug 20, 2026 | In progress filed Aug 2026, not yet issued | 555 Broderick St | 2 new adus on 1st floor per state adu program, ordinance no.95-17, new fire sprinkler system to be installed throughout the entire 1st floor in compliance with 2025 nfpa13 and eg-05, new heat pump water heaters and heating systems for each adu. a manual fire alarm system in compliance w/2025 nfpa72 | $250,000 |
| Aug 17, 2026 | Completed final sign-off Sep 2026 | 2614 Gough St | repair exterior staircase: dryrot repair less than 50% and not visible to street. located on side of building. | $3,000 |
| Aug 17, 2026 | Completed final sign-off Sep 2026 | 1040 Cole St | repair exterior staircase: dryrot repair less than 50% and not visible to street. located on side of building. | $3,000 |
| Aug 17, 2026 | In progress issued Aug 2026 | 479 Paris St | add two bedrooms, media room & a full bath on 1st flr. intall new tankless water heater. no structural alterations. | $85,000 |
| Aug 4, 2026 | In progress issued Aug 2026 | 270 26th Av | unit 6: (1)kitchen (81sf) and (1) bathroom remodel (50sf). no wall moving, keeping same layout on everthing. update electrical wiring in the unit with new sub-panel. new updated light fixtures througout the unit. | $30,000 |
| Jul 31, 2026 | In progress issued Aug 2026 | 3133 Scott St | unit 3133, level 3: replace all windows in kind. new skylights and roof framing for additional support. interior non load bearing walls. remodel existing kitchen, remove e windows, install 1 new window side north elevation. new laundry area with stacked. remodel e split bath to full. | $60,000 |
| Jul 30, 2026 | In progress issued Jul 2026 | 5 Murray St | remove and reinstall (8) (e) windows due to leak. repair stucco afterword. approx 30sf of stucco to patch and match. minor dry rot repair. beneath one window on the inside of the wall in unit #209. all (e) windows are street facing windows. | $7,000 |
| Jul 28, 2026 | In progress issued Jul 2026 | 619 Frederick St | replace dry rotted deck pieces at therear deck, approx 10% structural wood are unaffected. this rear deck is located at the rear of the building. | $3,000 |
| Jul 10, 2026 | Completed final sign-off Jul 2026 | 3465 Sacramento St | dry rot repairs to deck, less than 50% repairs back of bldg. | $3,000 |
| Jul 2, 2026 | Completed final sign-off Jul 2026 | 50 Ramona Av | trench open drywall to run/update electrical wiring. patch drywall afterward. | $2,000 |
| Jun 30, 2026 | In progress issued Jun 2026 | 2800 Green St | restucco the non-street facing (rear side) at the back of the house (approx 600 sq ft) and minor dry rot repair on (e) non-street facing deck (approx 30 sq ft)<50%. | $15,000 |
| Jun 26, 2026 | Completed final sign-off Sep 2026 | 279 Shipley St | unit a: 1 bathroom remodel, 60 sf, update wiring for the bathroom, replace kitchen cabinets following existing cabinet layout plus new countertop, no change to any layout in the unit, (n) electric breaker panel in the unit. | $30,000 |
| Jun 25, 2026 | Completed final sign-off Aug 2026 | 52 Ramona Av | interior residential renovation: convert e closets into new bathroom and laundry closet | $10,000 |
| Jun 24, 2026 | Completed final sign-off Aug 2026 | 3133 Scott St | (1) kitchen and (1) bathroom remodel. replace cabinets, counter. sheetrock door opening to previous deck and install siding outside over (e) opening. led lighting. roof repair outside of 3133 scott st. no work street visible. no change to existing layout, no expansion of building envelope. | $30,000 |
| Jun 24, 2026 | Completed final sign-off Jul 2026 | 119 Ramsell St | remove 2 non structural walls and restore to prior layout 6 years ago. no work in other area. | $2,000 |
| Jun 8, 2026 | Completed final sign-off Aug 2026 | 52 Ramona Av | bathroom remodel, 70 sq ft. update wiring and plumbing as needed. repair leaking shower pan, no wall moving. | $60,000 |
| Jun 1, 2026 | In progress issued Jun 2026 | 1039 Scott St | unit 1039a:1 kitchen (approx 100sq ft) and 1 bath remodel (approx 40 sq ft) update electrical wiring throughout the unit with new sub-breaker panel and new led light fitures. no wall moving or change to the layout. | $65,000 |
| May 19, 2026 | Completed final sign-off Jul 2026 | 3230 Vicente St | unit 6: (1) 70 sq.ft kitchen and (1) 35 sq.ft bathroom remodel, no change to wall, follow (e) layout. update electrical to code. new led light fixtures. | $40,000 |
| May 13, 2026 | Completed final sign-off Aug 2026 | 2999 Pacific Av | unit #5: rebuild one shower pan and retile the shower area in one bathroom only. replace shower fixtures and one wall sconce. | $9,000 |
| May 8, 2026 | In progress issued Aug 2026 | 36 College Av | relocate (e) kitchen, bathroom, add 1 new bathroom & replace (e) sheetrock w/ new. all work on 2/f. | $120,000 |
| May 7, 2026 | Completed final sign-off May 2026 | 3658 17th St | dry rot repair per sb721 report at the rear wooden staircase, about 5%. not street visible. | $3,000 |
| May 6, 2026 | Completed final sign-off May 2026 | 1119 Dolores St | dry rot repairs at staircase in light well, less than 50%. to comply with sb 721 report. | $2,000 |
| Apr 28, 2026 | Completed final sign-off May 2026 | 632 San Bruno Av | common area: dryrot repairs at rear stairs, not street visible, approx 10% only deck boards, non structual. | $3,000 |
| Apr 3, 2026 | Completed final sign-off Apr 2026 | 1300 12th Av | spot dryrotted lumber replacement like to like no more than 50% the stair case. stair case is not visible to the street. | $5,000 |
| Mar 25, 2026 | Completed final sign-off Jun 2026 | 2010 Chestnut St | #310 (1) 60 sf kitchen & (1) 50 sf bathroom remodel. no wall moving; (n) led light fixtures throughout unit. bring wiring to code. no change to layout | $52,000 |
| Mar 25, 2026 | Completed final sign-off May 2026 | 3230 Vicente St | unit 2: 1 60 sf kitchen and 1 40 sf bathroom rmeodel. no change in layout. electrical and pumbing updates in unit. no wall demolishing. | $52,000 |
| Feb 10, 2026 | Completed final sign-off May 2026 | 1119 Dolores St | unit#3: (1) kitchen, (1) bathroom remodeling following (e) layout. no wall moving. no work on windows or doors. | $55,000 |
| Feb 3, 2026 | Completed final sign-off Mar 2026 | 2747 Judah St | demo tile at the enclosed lightwell and an repair water proofiong underlayment. install same floor over new underlayment afterward. work will remain all in-kind. | $6,000 |
| Feb 2, 2026 | Completed final sign-off Sep 2026 | 830 Mount Vernon Av | construct 2 bedroom, 2 full bath, family room, & install wetbar at g/f. remodel (e) kitchen, bathroom, and add new bath at 2/f. | $283,000 |
| Jan 22, 2026 | In progress issued Jan 2026 | 109 Liberty St | permit to demo leaning chimney per compliant and field inspector note | $10,000 |
| Jan 15, 2026 | Completed final sign-off May 2026 | 4191 17th St | add new bathroom at (e) walk-in closet. no wall moving & no structural work. remodel (e) kitchen and 1 (e) bathroom following same layout. no walls moving or strutcural work or changes. bring electrical & subpanel to code. | $78,000 |
| Jan 5, 2026 | In progress filed Jan 2026, not yet issued | 109 Liberty St | existing dbi permits that have been applied for pa #201910184989 & planning apps 2025-009415prl & 2019-017325prj/coa/pic fail to show the existing dangerous leaning chimney nor the leaning building that is in instant need for temporary safety here. | $23,660 |
| Dec 24, 2025 | Completed final sign-off Mar 2026 | 2010 Chestnut St | unit #303 - (1) kitchen, (1) bathroom remodel. no change to layout, no wall moving. update electrical in the unit with (n) in-unit sub-panel.keep (e) accessibility. | $39,000 |
| Dec 10, 2025 | In progress issued Dec 2025 | 271 09th St | replace window trim for 2 windows front of bldg. street visible. | $2,000 |
| Nov 17, 2025 | In progress issued Nov 2025 | 3759 Fillmore St | dryrot repair at exterior side staircase approx 15%, like for like repair. light well areas | $2,000 |
| Nov 14, 2025 | Completed final sign-off Jan 2026 | 2010 Chestnut St | unit # 105: kitchen remodel: countertop, no work on (e) cabinets. remodel 1-bathroom following (e) layout, like for like. replace (e) shower pan with (n). bring kitchen & bathroom electrical to code. | $39,000 |
| Nov 13, 2025 | Completed final sign-off Mar 2026 | 280 Andover St | 1-kitchen and 1-bathroom remodel following (e) layout. no wall moving, bring plumbing and electrical in kitchen and bathroom to code. (n) kitchen appliances, cabinet, countertop, sink and faucet. like for like. | $35,000 |
| Oct 29, 2025 | Completed final sign-off Nov 2025 | 411 Dolores St | common area: minor dry rot repair on guard railing on roof level approx 2%, replace rusted bolt supporting the stair treads, all work above are non street facing. | $2,000 |
| Oct 29, 2025 | In progress issued Oct 2025 | 364 Page St | minor dry rot repair at the rear wooden staircase approx 5% and non street facing | $2,500 |
| Oct 8, 2025 | Completed final sign-off Jan 2026 | 665 10th Av | remodel 1 bathroom and 1 half bath. no change to layout or walls. new bathroom fan and electrical work in bathrooms. like for like remodel. | $35,000 |
| Sep 22, 2025 | In progress issued Sep 2026 | 2645 Ocean Av | ti of a medical imaging office. in suite 101: non bearing partition walls for entrance foyer, control room, gantry room, storage & voluntary structural strengthening. in ste 105: non-bearing partition walls for reception & waiting area, office, stress lab, accessible bathroom. | $150,000 |
| Sep 19, 2025 | Completed final sign-off Feb 2026 | 515 46th Av | 1/f: new bathroom, new family room. 2/f: new bathroom, kitchen renovation. | $80,000 |
| Sep 15, 2025 | Completed final sign-off Sep 2025 | 675 Monterey Bl | dryer vent repair w/permit to comply with nov #202540997 item #2 with solid ducting. | $300 |
| Sep 15, 2025 | Completed final sign-off Sep 2025 | 1045 Post St | repair dryer ducting with solid duting to compy with nov #202537912 item #4. | $300 |
| Sep 10, 2025 | Completed final sign-off Dec 2025 | 632 San Bruno Av | apt #3 - kitchen remodel (150 sf) remodel and (1) bathroom (40sf) remodel. no change to layout; update wiring to code within the unit with new electric sub breaker panel. no structural change or wall moving. no wall removal | $60,000 |
| Sep 10, 2025 | Completed final sign-off Nov 2025 | 125 Bay St | #5 - kitchen (100 sf) and (1) bahtroom (40 sf) remodel; update wiring to code with (n) electric sub panel in unit; no wall moving or structural changes | $60,000 |
| Sep 9, 2025 | In progress issued Sep 2025 | 109 Liberty St | proposed exploratory demolition | $3,000 |
| Aug 28, 2025 | Completed final sign-off Apr 2026 | 1351 Broadway | lower unit: convert e) water closet to a new bathroom, remodel e) bath & e) kitchen in-kind. repair water damage | $50,000 |
| Aug 27, 2025 | Completed final sign-off Oct 2025 | 281 Shipley St | 1 bathroom remodel with same layout. relace kitchen countertop. no work on existing kitchen cab9inet. replace electrical breaker panel inside the unit. | $12,000 |
| Aug 13, 2025 | Completed final sign-off Aug 2025 | 374 Connecticut St | per field inspector, revised scope of work on building permit #s:202505237143 and 202507181179. remove all work on attic level. no insulation and no sheetrock will be installed. | |
| Jul 21, 2025 | Completed final sign-off Aug 2025 | 763 09th Av | replace approx 300sf of hardi siding over (e0 siding at the rear side of the building. none of the work is visible to the street. | $6,000 |
| Jul 21, 2025 | Completed final sign-off Oct 2025 | 4424 Fulton St | unit 6: full kitchen& bathroom remodel. no walls moving. update wiring to code. new light fixtures, new in-unit subpanel. new walk-in shower with showerpan. no change to layout. | $47,000 |
| Jul 18, 2025 | Completed final sign-off Aug 2025 | 374 Connecticut St | revise pa 202505237143 to remove from the previously approved scope the installation of insulation in the attic. revise pa 202507100507 to revise the description of work to explicitly include replacing the kitchen countertops only while keeping existing cabinets. | $2,500 |
| Jul 10, 2025 | Completed final sign-off Nov 2025 | 701 Pine St | unit 7: (1) kitchen (1) bath remodel. no wall moving. no change to layout. update electrical. led fixtures and sub-panel in the unit. replace (e) bathtub w/walk-in shower. | $40,000 |
| Jul 10, 2025 | Completed final sign-off Oct 2025 | 140 Dolores St | unit #204: (n) kitchen countertop over (e) kitchen cabinets. full (1) bathroom remodel following same (e) layout. update electrical in the unit and update the sub-panel in the unit. | $50,000 |
| Jul 10, 2025 | Completed final sign-off Aug 2025 | 374 Connecticut St | replace dry rotted window frame back of house. replace 2 bathroom vanities. install faux recessed light led in kitchen entry area and in the small dining area at the kitchen. | $7,000 |
| Jul 9, 2025 | Completed final sign-off Oct 2025 | 537 Russia Av | remodel (e) kitchen, bathroom at 2/f. construct 1 bedroom, one bathroom, family room, & wetbar at g/f. | $168,000 |
| Jun 24, 2025 | Completed final sign-off Oct 2025 | 2855 Polk St | #302: convert existing studio unit to one bedroom unit. no structural work. no exterior work. | $15,000 |
| Jun 12, 2025 | Completed final sign-off Sep 2025 | 3720 Fillmore St | unit#204:interior remodel of one 64sf kitchen & one 60sf bath. no change to layout. replace(4) non-street facing windows. install(n) walk-in shower over old tub.no structural change. update electrical with (n) subpanel. (n) led fixtures and bring wiring to code. no exterior work. otc per scope. | $50,000 |
| Jun 10, 2025 | Completed final sign-off Jul 2025 | 2845 Washington St | replace the siding w/ hardi siding in the back side of the building due to leak. no structural changes. same footprint. | $50,000 |
| Jun 9, 2025 | Completed final sign-off Jul 2025 | 361 West Portal Av | no construction comply with 2022-012459enf legalize awning under awning amnest program (tsing's) | $2,000 |
| Jun 9, 2025 | Completed final sign-off Oct 2025 | 335 Jones St | comply with nov202430228: legalize removal of alum storefront.replace withas-built storefront storage rooms and staircase.repair damaged wall w/ exposed wiring at mezzanin.legalize condensor unit on roof. | $10,000 |
| Jun 9, 2025 | Expired or cancelled cancelled Jul 2025 | 361 West Portal Av | no construction legalize sign umder awning sing amnesty program (tsing's) | $800 |
| May 23, 2025 | Completed final sign-off Aug 2025 | 374 Connecticut St | rear deck dry rot repair approx 10%. install insulation in the attic and cover the insulation with sheetrocks. | $8,000 |
| May 20, 2025 | Completed final sign-off Aug 2025 | 1935 Clay St | unit #304: interior only renovation of (e) 64sf kitchen an 60sf bath. no structural changes. no wall relocation. scope includes replacement of fixtures. cabinet, and appliances in (e) locations. no mechanical, plumbing or electrical relocation. cosmetic updates only. | $48,000 |
| May 20, 2025 | Completed final sign-off Aug 2025 | 995 Pine St | unit #405: replace kitchen counter top. remodel (1) bathroom w/ new walk-in shower. new light fixtures in the unit and wiring update. | $30,000 |
| May 12, 2025 | Completed final sign-off May 2025 | 1405 Funston Av | voluntary installation of epoxy set anchor bolts along (e) foundation sill plates for improved lateral resistance. no structural alterations or framing modifications or change in occupancy. all work limited to hardware attachment at (e) conditions5/8" diameter x10" at 4' o.c. w/ epoxy | $9,000 |
| Apr 29, 2025 | Completed final sign-off Aug 2025 | 2341 Chestnut St | unit #202 - (1) 90 sqft kitchen remodel. no wall moving. bring electrical in kitchen up to code. install (n) exhaust fan in the bathroom.(replace in kind) | $30,000 |
| Apr 29, 2025 | Completed final sign-off Aug 2025 | 520 Divisadero St | unit #1: (1)70sf kitchen and (1) 30sf bathroom remodel. no wall moving, update electrical in the unit w/ new electric subpanel. (n) led light fixtures throughout the unit. (n) walk-in shower over (e) bathtub. | $50,000 |
| Apr 14, 2025 | Completed final sign-off May 2025 | 250 Ramsell St | revision to 202411014226: add an electric fire place at living rm at 2nd fl | $1,000 |
| Apr 11, 2025 | Completed final sign-off Jul 2025 | 2855 Polk St | replace concrete slab. add new butteress wall behind existing rear wall. | $30,000 |
| Apr 9, 2025 | Completed final sign-off Aug 2025 | 2341 Chestnut St | unit #102: (1) kitchen remodel approx 50 sf. replace cabinet. (n) countertop. update electrical in kitchen. no change to layout. (n) appliance in the unit and replace the laundry machines. | $40,000 |
| Apr 7, 2025 | Completed final sign-off Jun 2025 | 3230 Vicente St | unit #5 (1) 60 sf kitchen and (1) 40 sf bathroom remodel. no change to layout. bring electrical to code with new subpanel and (n) led light fixtures. (n) walk in shower over (e) bathtub. replace (e) kitchen and bathroom fixtures, no wall demolition or construction. | $52,000 |
| Apr 3, 2025 | In progress issued Apr 2025 | 1300 Monterey Bl | revision to bpa: 202502261090 - to reduce from: 2 baths, 1 powder and 1 kitchen" to 1 kitchen and 1 bath, update subpanel and wiring in 1kitchen and 1 bath. | $50,000 |
| Mar 20, 2025 | Completed final sign-off Apr 2025 | 109 Brazil Av | replace approx. 40 sf of leaking stucco due to leaks. stucco is street facing, but new stucco will match w/existing stucco and texture. | $4,000 |
| Mar 13, 2025 | Completed final sign-off May 2025 | 125 Bay St | unit #3: (1) 90 sf kitchen & (1) 50 sf bath remodel, no chbage to layout, (n) shower over existing bath tub, (n) led fixtures througout the unit (n) sub-panel in the unit | $27,000 |
| Mar 3, 2025 | Completed final sign-off Aug 2025 | 2845 Washington St | unit #5: (1) bathroom remodel in kind. update electric wiring, fixtures in the bathroom only. (n) walk-in shower over (e) bathtub. | $14,000 |
| Feb 26, 2025 | In progress issued Feb 2025 | 1300 Monterey Bl | remodel in kind 2 bath & 1 powder room. remodel in kind 1 kitchen. update wiring in 2 bath 1 powder and kitchen. no changes to floor layout. no changes to wall layout. no structural work. | $85,000 |
| Feb 7, 2025 | Completed final sign-off Mar 2025 | 4424 Fulton St | add laundry hook up at 4th fl kitchen area per inspector request | $4,000 |
| Feb 3, 2025 | Completed final sign-off May 2025 | 486 Castro St | bathroom remodel. no work in kitchen. update wiring in the unit. led light fixtures throughout the unit. | $35,000 |
| Jan 31, 2025 | Completed final sign-off Mar 2025 | 915 Minnesota St | replace approx half of kitchen cabinets only approx 9' wide. no plumbing work. | $9,000 |
| Jan 27, 2025 | Completed final sign-off May 2025 | 2855 Polk St | unit #103: (1) kitchen 80sf (1) 40sf bathroom remodel. no change to layout. update wiring in the unit & new sub-panel in the unit. new led light fixtures throughout the unit. | $58,000 |
| Jan 14, 2025 | Completed final sign-off Jan 2025 | 3990 18th St | to obtain final inspection for work approved under 20137111551. all work is complete | |
| Jan 6, 2025 | Completed final sign-off Mar 2025 | 2010 Chestnut St | unit 407. (1) 40 sf bathroom remodel with same layout. (n) bathroom plumbing fixtures. update electrical in the unit. no changes to unit layout. replace kitchen faucet and sink. | $30,000 |
| Jan 3, 2025 | Expired or cancelled cancelled May 2026 | 36 College Av | 1 kitchen 100sqft and 1 bathroom remodel on upper floor.update electrical in the house, no underground plumbing work. (n) led lights fixtures throught. no wall moving. | $30,000 |
| Dec 26, 2024 | Completed final sign-off May 2025 | 2855 Polk St | unit 104: 1 kitchen (80 sf) & 1 bathroom (40 sf) remodel. no change to layout, update wiring in uint & new sub panel. new led light fixtures thru out unit | $40,000 |
| Nov 8, 2024 | Completed final sign-off Mar 2025 | 2614 Van Ness Av | (1) 80 sf kitchen, (1) 50 sf bathroom remodel. no change to layout. update wiring in unit. (n) light fixtures througout the unit. in kind | $48,000 |
| Nov 7, 2024 | Completed final sign-off Mar 2025 | 4424 Fulton St | correction for nov# 202430173 item #2: unit 6: replace (2) windows in the unit. one street facing. one rear facing. material will be same as exisitng. vinyl no window framing work will be done or resizing. unit 8: bathroom remodel- in kind. no kitchen remodel at this time. | $45,000 |
| Nov 7, 2024 | Completed final sign-off Mar 2025 | 995 Pine St | unit #502: (1) 50sf bath remodel. (1) 70sf kitchen remodel. update wiring in the unit w/ (n) breaker panel. (n) light fixtures throughout the unit. in kind remodel | $48,000 |
| Nov 5, 2024 | Completed final sign-off Mar 2025 | 125 Bay St | patch wall with rated sheetrock after updating wiring ans subpanel inside unit 1 and 4. new switches and outlets. | $28,000 |
| Nov 5, 2024 | Completed final sign-off Jan 2025 | 2625 Sacramento St | unit #2: (1) 50sf bathroom remodel. no layout change. replace kitchen countertop but kitchen cabinet to remain. update wiring inside the unit w/ (n) sub breaker panel. replace (4) non-st facing windows w/ vinyl windows. no framing work. | $30,000 |
| Nov 1, 2024 | Completed final sign-off May 2025 | 250 Ramsell St | remodel kitchen and a bathroom on 2nd floor. add a mudroom, 2 bedroom, and a full bath on the 1st floor. | $90,000 |
| Nov 1, 2024 | Completed final sign-off Jul 2025 | 106 Jules Av | 1) remodel (e) kitchen, bath room. add one new bath room and replace partial (e) shet rock w/new at 2nd flr. 2) construct two bed room. two full bath bath room, media room and install kitchenette at ground flr. 3) construct (n) staircase at rear of building. | $261,722 |
| Oct 9, 2024 | Completed final sign-off Jan 2025 | 109 Brazil Av | apt 1: remodeling 1 kitchen & 1 bathroom. no moving of walls, no layout changes. update wiring in the unit with new subbreaker panel, new led light fixtures in the unit. | $45,000 |
| Oct 9, 2024 | Completed final sign-off Dec 2024 | 2040 Broadway | unit 203- 45sf bathroom remodel no change to layout new shower pan no work in any other area inside of the condo. no wall removal | $15,000 |
| Oct 3, 2024 | Completed final sign-off Feb 2025 | 488 Castro St | bathroom remodel: update wiring to code (n) led lights fixtures throught the unit. (no work in kitchen) | $35,000 |
| Oct 3, 2024 | Completed final sign-off Nov 2024 | 1119 Dolores St | dryrot repair to the wooden staircase less than 50% none of the work is visible from the street. | $3,000 |
| Sep 20, 2024 | In progress issued Sep 2024 | 1300 Monterey Bl | revision to 2023-0831-5699: to replace all stucco due to water damage with same texture as existing per the field inspector. | $30,000 |
| Sep 16, 2024 | Completed final sign-off Nov 2024 | 2010 Chestnut St | unit 309: (1) 50 sf bathroom remodeling keep (e) layout, update wiring inside the unit, (n) led light fixtures, (n) in unit sub breker panel | $35,000 |