Rico's General Construction
- Based in
- El Sobrante
- On San Francisco permits
- Apr 2011 to Aug 2026
- Last 24 months
- 6 permits filed
100 permits since 2000: 63 completed, 5 in progress, 17 never finaled, 15 expired or cancelled.
Of the 17 never-finaled permits, 14 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 14, 2026 | Completed final sign-off Aug 2026 | 609 Moultrie St | to obtain final inspection for work approved under pa# 202309136521. all work is complete.Details
to obtain final inspection for work approved under pa# 202309136521. all work is complete. | |
| Aug 10, 2026 | Completed final sign-off Oct 2026 | 2266 09th Av | this project will consist of the demoliton of the (e) rear decks currently in disrepair. to comply with nov#202426404 first floor stairs to ramain repair as nesesary.Details
this project will consist of the demoliton of the (e) rear decks currently in disrepair. to comply with nov#202426404 first floor stairs to ramain repair as nesesary. | $267 |
| Feb 9, 2026 | Completed final sign-off Feb 2026 | 1358 Dolores St | to obtain final inspection for work approved under pa #2021-0203-3863 and 2023-1106-0268. all work is complete.Details
to obtain final inspection for work approved under pa #2021-0203-3863 and 2023-1106-0268. all work is complete. | |
| Aug 13, 2025 | In progress issued Feb 2026 | 1006 Carolina St | reconfiguration of lower unit interior- 1/f and 2/f, reconfiguration of upper unit interior- 3/f. removal of (e) rear decks and addition of (n) cantilevered deck @ 3/f. front and rear facade alteration. addition of (n) exterior staris connecting (e) rear yard to ground flr. reroofing.Details
reconfiguration of lower unit interior- 1/f and 2/f, reconfiguration of upper unit interior- 3/f. removal of (e) rear decks and addition of (n) cantilevered deck @ 3/f. front and rear facade alteration. addition of (n) exterior staris connecting (e) rear yard to ground flr. reroofing. | $770,047 |
| Jul 11, 2025 | In progress issued Aug 2025 | 680 Connecticut St | interior remodel and roof deck set back on all sides, no changes to front facade. replace deck and stair with new stairs to back yard. increase 504 sqft. converting garage to habitable space.Details
interior remodel and roof deck set back on all sides, no changes to front facade. replace deck and stair with new stairs to back yard. increase 504 sqft. converting garage to habitable space. | $250,000 |
| May 14, 2025 | In progress issued Oct 2025 | 7 Bennington St | remodel & vertical expansion of an (e)single family dwelling structure,including a modification of a small portion of the ground fl,modification of the (e)2nd fl,addition of a new 3rd fl and a small roof deck,modification of front & rear facades,& addition of a small rear deckDetails
remodel & vertical expansion of an (e)single family dwelling structure,including a modification of a small portion of the ground fl,modification of the (e)2nd fl,addition of a new 3rd fl and a small roof deck,modification of front & rear facades,& addition of a small rear deck | $558,000 |
| Nov 6, 2023 | Expired or cancelled expired Feb 2026 | 1358 Dolores St | revision to 202102033863 upgrade (e) foundation based on observed site conditionDetails
revision to 202102033863 upgrade (e) foundation based on observed site condition | $20,000 |
| Sep 13, 2023 | Completed final sign-off Aug 2026 | 609 Moultrie St | revision to pa# 201709056831, eliminate basement from permit.Details
revision to pa# 201709056831, eliminate basement from permit. | |
| Feb 1, 2023 | Completed final sign-off Aug 2024 | 1554 Masonic Av | rev to pa# 2021-0211-4470: replacement of (e) foundations, landscape feature (not on previous structural set)Details
rev to pa# 2021-0211-4470: replacement of (e) foundations, landscape feature (not on previous structural set) | $10,000 |
| Nov 10, 2022 | Completed final sign-off Aug 2024 | 1554 Masonic Av | shoring for foundation excavation per permit 202102114470Details
shoring for foundation excavation per permit 202102114470 | $2,000 |
| Jul 13, 2022 | In progress issued May 2024 | 88 Castenada Av | renovation & vertical expansion. alteration to interior comprises of reconfiguration of interior stair. modification of ground fl and l2 floor plans & windows. exterior modifications include front & rear facades, exterior entry area landscaping, and addition of stair penthouse.Details
renovation & vertical expansion. alteration to interior comprises of reconfiguration of interior stair. modification of ground fl and l2 floor plans & windows. exterior modifications include front & rear facades, exterior entry area landscaping, and addition of stair penthouse. | $550,000 |
| Jun 23, 2022 | In progress issued Jul 2025 | 945 Minnesota St | comply w/ complalint #202290991 for 945-947 minnesota - exceeding scope of work, re-frame damaged area of building @ back of the building. horizontal addition. complete remodel on all floors. new stair at rear. new roof deck.Details
comply w/ complalint #202290991 for 945-947 minnesota - exceeding scope of work, re-frame damaged area of building @ back of the building. horizontal addition. complete remodel on all floors. new stair at rear. new roof deck. | $20,000 |
| Jun 1, 2022 | Completed final sign-off Aug 2024 | 556 Somerset St | interior renovation of (e) residence. convert 270 sqft of ground floor garage area to habitable. replace (e) windows throughout. replace garage door. reroofing.Details
interior renovation of (e) residence. convert 270 sqft of ground floor garage area to habitable. replace (e) windows throughout. replace garage door. reroofing. | $300,000 |
| Mar 9, 2022 | Expired or cancelled expired Mar 2026 | 945 Minnesota St | to renew pa#201710252264 for final inspectionDetails
to renew pa#201710252264 for final inspection | |
| Aug 4, 2021 | Completed final sign-off Mar 2023 | 211 Nevada St | 2 story horizontal addition at rear of existing single family, includes kitchen over bedrooms.Details
2 story horizontal addition at rear of existing single family, includes kitchen over bedrooms. | $140,000 |
| Feb 26, 2021 | Expired or cancelled cancelled Jan 2026 | 98 Mullen Av | 950 sf 1-story vertical addition to an existing 1-story-over-garage. new int stair to be constructed from basement to lv 2, kitchen moved from lv 1 to lv 2, new bathrooms to be constructed on lv 1 and lv 2, structural repairs in basement, ext stair to be modified to enter through basement, existingDetails
950 sf 1-story vertical addition to an existing 1-story-over-garage. new int stair to be constructed from basement to lv 2, kitchen moved from lv 1 to lv 2, new bathrooms to be constructed on lv 1 and lv 2, structural repairs in basement, ext stair to be modified to enter through basement, existing | $200,000 |
| Feb 11, 2021 | Completed final sign-off Aug 2024 | 1554 Masonic Av | renovation and vertical & horizontal expansion. alteration to the existing main house consisting of minor modifications to the front facade windows, an update to the rear facade windows and doors, and reconfiguration of the existing interior stair. minor excavation on the ground floor. 3rdfl 480sqftDetails
renovation and vertical & horizontal expansion. alteration to the existing main house consisting of minor modifications to the front facade windows, an update to the rear facade windows and doors, and reconfiguration of the existing interior stair. minor excavation on the ground floor. 3rdfl 480sqft | $400,000 |
| Feb 3, 2021 | Expired or cancelled expired Feb 2026 | 1358 Dolores St | remodel 2/f & 3/f w/ light change on the 1/f to provide larger garage entrance. add (n) greenhouse on roof level. remodel facade on street level, materials & general envelope will be kept but one window will be added & all windows to be replaced. complete remodel backyard side facade. sprinkler 13rDetails
remodel 2/f & 3/f w/ light change on the 1/f to provide larger garage entrance. add (n) greenhouse on roof level. remodel facade on street level, materials & general envelope will be kept but one window will be added & all windows to be replaced. complete remodel backyard side facade. sprinkler 13r | $400,000 |
| Oct 10, 2020 | Completed final sign-off May 2022 | 1523 26th Av | remodel of 2-story home. excavation @ 1st fl (& portion of rear yard) to increase ceiling height over portion of fl; relocate 1st fl bath & laundry; replace interior stair w/ (n) stair; remodel kitchen, bath, & half bath on 2nd fl; replace windows on rear facade & in south lightwell. mep separateDetails
remodel of 2-story home. excavation @ 1st fl (& portion of rear yard) to increase ceiling height over portion of fl; relocate 1st fl bath & laundry; replace interior stair w/ (n) stair; remodel kitchen, bath, & half bath on 2nd fl; replace windows on rear facade & in south lightwell. mep separate | $250,000 |
| Feb 27, 2020 | Completed final sign-off Oct 2023 | 2231 Steiner St | permit submission remedy for planning enforcement case #201801692/enf. (e) unauthorize unit to be added as an adu. compliance of code modification to ceiling & fire safety of (n) adu unit. ordinance #162-16Details
permit submission remedy for planning enforcement case #201801692/enf. (e) unauthorize unit to be added as an adu. compliance of code modification to ceiling & fire safety of (n) adu unit. ordinance #162-16 | $20,000 |
| Feb 27, 2020 | Completed final sign-off Oct 2023 | 2231 Steiner St | renovation work @ 2nd & 3rd fl @ (2)(e) residential units. work to include (n) living space @ 2nd fl & (n) master bathroom & expanded kitchen space @ 3rd flDetails
renovation work @ 2nd & 3rd fl @ (2)(e) residential units. work to include (n) living space @ 2nd fl & (n) master bathroom & expanded kitchen space @ 3rd fl | $125,000 |
| Feb 20, 2020 | Never finaled issued Aug 2021, no final | 210 Beacon St | vertical addition to an existing 3 story plus basement single family residence. modify roof slope to increase height of room below, interior remodel. no new additionsDetails
vertical addition to an existing 3 story plus basement single family residence. modify roof slope to increase height of room below, interior remodel. no new additions | $100,000 |
| Nov 27, 2019 | Never finaled issued Nov 2019, no final | 2567 Union St | street spaceDetails
street space | |
| Nov 27, 2019 | Never finaled issued Nov 2019, no final | 2559 Union St | street spaceDetails
street space | |
| Nov 27, 2019 | Never finaled issued Nov 2019, no final | 248 Prospect Av | street spaceDetails
street space | |
| Nov 25, 2019 | Completed final sign-off Jan 2020 | 2567 Union St | to obtain final inspection for work approved under pa# 201308063602, 201612235819, 201710030252. all work is completeDetails
to obtain final inspection for work approved under pa# 201308063602, 201612235819, 201710030252. all work is complete | |
| Oct 3, 2019 | Expired or cancelled revoked Oct 2022 | 945 Minnesota St | replace damaged front stair entry doors, all windows. modify width of center windows @ front bay. wood windows w/ ogee lugs @ front & exposed north facade. all other windows shall be wd.marvin integrity. replace all clapboard to rustic siding to match (e). create (n) deck @ rear 3rd fl roof level -Details
replace damaged front stair entry doors, all windows. modify width of center windows @ front bay. wood windows w/ ogee lugs @ front & exposed north facade. all other windows shall be wd.marvin integrity. replace all clapboard to rustic siding to match (e). create (n) deck @ rear 3rd fl roof level - | $10,000 |
| Sep 10, 2019 | Completed final sign-off Jan 2021 | 248 Prospect Av | reconfigure rear yard deck within (e) envelope.Details
reconfigure rear yard deck within (e) envelope. | $10,000 |
| Jul 10, 2019 | Expired or cancelled withdrawn Sep 2019 | 2567 Union St | modify roof profile. no change or impact to structural or mechanical. ref pa# 201711224744.Details
modify roof profile. no change or impact to structural or mechanical. ref pa# 201711224744. | $5,000 |
| Apr 4, 2019 | Never finaled issued Apr 2019, no final | 242 Prospect Av | street spaceDetails
street space | |
| Apr 4, 2019 | Never finaled issued Apr 2019, no final | 248 Prospect Av | street spaceDetails
street space | |
| Apr 4, 2019 | Never finaled issued Apr 2019, no final | 2567 Union St | street spaceDetails
street space | |
| Apr 4, 2019 | Never finaled issued Apr 2019, no final | 2559 Union St | street spaceDetails
street space | |
| Nov 30, 2018 | Completed final sign-off Mar 2019 | 1030 Fell St | replace 6 front windows in unit #4 in kind. aluminum wood clad, double hung.Details
replace 6 front windows in unit #4 in kind. aluminum wood clad, double hung. | $6,000 |
| Nov 9, 2018 | Completed final sign-off Nov 2019 | 935 North Point St | rectifying s.f. planning department complaint #2018008154 enf. add 1 hour fire rated wall at common stair. add stair to connect 2nd and 3rd floor unit one. add bathrom @ 2nd floor. revert back to a 2 unit bldg.Details
rectifying s.f. planning department complaint #2018008154 enf. add 1 hour fire rated wall at common stair. add stair to connect 2nd and 3rd floor unit one. add bathrom @ 2nd floor. revert back to a 2 unit bldg. | $10,000 |
| Oct 26, 2018 | Never finaled issued Nov 2018, no final | 447 Bush St | 2nd fl combining 2 guest rooms int0 1 accessible suite, add 1 guest rm in former lounge space to maintain guest room total work includes 2 new baths, rmodel e bath into accesible one. mep fire spr, t24 separately. both units remain residentialDetails
2nd fl combining 2 guest rooms int0 1 accessible suite, add 1 guest rm in former lounge space to maintain guest room total work includes 2 new baths, rmodel e bath into accesible one. mep fire spr, t24 separately. both units remain residential | $140,000 |
| Oct 22, 2018 | Completed final sign-off Nov 2022 | 1582 Dolores St | (n) roof deck on 2nd storyDetails
(n) roof deck on 2nd story | $10,000 |
| Oct 16, 2018 | Completed final sign-off Nov 2022 | 1580 Dolores St | interior ti of all 3 flrs. work incl (n) stair openings, kitchen and bathroom relocation, (n) mster suite.Details
interior ti of all 3 flrs. work incl (n) stair openings, kitchen and bathroom relocation, (n) mster suite. | |
| Sep 20, 2018 | Completed final sign-off Dec 2019 | 1906 Mission St | to finilaze work done under expired pa# 201407171469.Details
to finilaze work done under expired pa# 201407171469. | |
| Aug 29, 2018 | Completed final sign-off Dec 2019 | 1906 Mission St | to obtain a final inspection for work approved under permit #201410179182. all work is complete.Details
to obtain a final inspection for work approved under permit #201410179182. all work is complete. | |
| Aug 2, 2018 | Never finaled issued Aug 2018, no final | 2567 Union St | street spaceDetails
street space | |
| Aug 2, 2018 | Never finaled issued Aug 2018, no final | 1030 Fell St | street spaceDetails
street space | |
| Aug 2, 2018 | Never finaled issued Aug 2018, no final | 2559 Union St | street spaceDetails
street space | |
| Aug 2, 2018 | Never finaled issued Aug 2018, no final | 1580 Dolores St | demo: removal of inishes, doors, trim, drywall 7 insulation for structure. exploratory. approx 300sf. maher n/a.Details
demo: removal of inishes, doors, trim, drywall 7 insulation for structure. exploratory. approx 300sf. maher n/a. | $2,000 |
| May 14, 2018 | Completed final sign-off Mar 2019 | 1030 Fell St | remodel one bathroom and kitchen in unit #4. comply with nov # 201853445. no change in walls and openings layout. n/a maherDetails
remodel one bathroom and kitchen in unit #4. comply with nov # 201853445. no change in walls and openings layout. n/a maher | $15,000 |
| Dec 11, 2017 | Completed final sign-off Apr 2018 | 129 17th Av | revision to pa#201709137945, per correction issued 12/8/2017; full kitchen, bathroom & laundry remodel, no structural workDetails
revision to pa#201709137945, per correction issued 12/8/2017; full kitchen, bathroom & laundry remodel, no structural work | $45,000 |
| Nov 22, 2017 | Completed final sign-off Jan 2020 | 2567 Union St | revision to 201308063602. remove window leading to (e) power and proposed elevator shaft. add 1 window @ front facade. add 5 wood windows, 1 door and alter 4 wood windows along west elevation. convert office to bedroom at 1/f. new roof deck.Details
revision to 201308063602. remove window leading to (e) power and proposed elevator shaft. add 1 window @ front facade. add 5 wood windows, 1 door and alter 4 wood windows along west elevation. convert office to bedroom at 1/f. new roof deck. | $6,000 |
| Oct 12, 2017 | Completed final sign-off Jan 2018 | 2585 Union St | to obtain final inspection for work approved under pa #2015-0818-4638Details
to obtain final inspection for work approved under pa #2015-0818-4638 | |
| Oct 12, 2017 | Completed final sign-off Jan 2018 | 2559 Union St | to obtain final inspection for work approved under pa #2016-06-23-0689 and 2015-08-14-4636. all work is complete. maher naDetails
to obtain final inspection for work approved under pa #2016-06-23-0689 and 2015-08-14-4636. all work is complete. maher na | |
| Oct 3, 2017 | Completed final sign-off Dec 2019 | 2567 Union St | replace right side(pathway) shingle in kind. repair/salvage no dry rotted shingles. not visible from street.Details
replace right side(pathway) shingle in kind. repair/salvage no dry rotted shingles. not visible from street. | $1,500 |
| Sep 13, 2017 | Completed final sign-off Apr 2018 | 129 17th Av | new kitchen cabinets, appliances and finishesDetails
new kitchen cabinets, appliances and finishes | $5,000 |
| Sep 11, 2017 | Completed final sign-off Mar 2018 | 245 11th St | title 24 for 2017-0131-8272. maher n/aDetails
title 24 for 2017-0131-8272. maher n/a | |
| Sep 5, 2017 | Completed final sign-off Aug 2026 | 609 Moultrie St | to erect a three story type v-b single family dwelling w/ one basement.Details
to erect a three story type v-b single family dwelling w/ one basement. | $250,000 |
| May 23, 2017 | Completed final sign-off Jun 2017 | 2225 Steiner St | minor encroachment - 2 new planters as requested by dpw inspectorDetails
minor encroachment - 2 new planters as requested by dpw inspector | |
| May 3, 2017 | Never finaled issued May 2017, no final | 1906 Mission St | to obtain a final inspection for work approved under pa#201410179182. all work is complete.Details
to obtain a final inspection for work approved under pa#201410179182. all work is complete. | |
| Apr 24, 2017 | Completed final sign-off Jun 2017 | 2225 Steiner St | revision to app#201703151543. remove from scope of work 3 window at lightwell on north side of building infilled with one hour rating.Details
revision to app#201703151543. remove from scope of work 3 window at lightwell on north side of building infilled with one hour rating. | |
| Apr 20, 2017 | Completed final sign-off Jan 2021 | 248 Prospect Av | excavate for basement level remodel, 1st floor remodel, 2nd story (n) 700 ft vertical addition with (n) kitchen, (n) bath & (n) great room. reepair rear deck & stairs not to exceed 50% in kind as required.Details
excavate for basement level remodel, 1st floor remodel, 2nd story (n) 700 ft vertical addition with (n) kitchen, (n) bath & (n) great room. reepair rear deck & stairs not to exceed 50% in kind as required. | $200,000 |
| Mar 15, 2017 | Completed final sign-off Jun 2017 | 2225 Steiner St | as built revisions to 201406259480 - changes as per plans, relocation of powder room, new window schedule , relocation of mechanical room for all 3 units, relocation of washer/dryer room.Details
as built revisions to 201406259480 - changes as per plans, relocation of powder room, new window schedule , relocation of mechanical room for all 3 units, relocation of washer/dryer room. | |
| Feb 8, 2017 | Completed final sign-off Feb 2017 | 15 Dolores St | replace 6 fire-damaged windows on front facade, in-kind.n/a maherDetails
replace 6 fire-damaged windows on front facade, in-kind.n/a maher | $1,000 |
| Jan 31, 2017 | Completed final sign-off Mar 2018 | 245 11th St | base building improvements, new elevator lobby on 1st and 3rd fl, modifications to entrance on kissling, new vertical platform lift, replacement of steel windows w/ alum at 2nd fl on kissling, replacement of exterior lighting. mep, title 24 , fire sprinkler work permitted separatelyDetails
base building improvements, new elevator lobby on 1st and 3rd fl, modifications to entrance on kissling, new vertical platform lift, replacement of steel windows w/ alum at 2nd fl on kissling, replacement of exterior lighting. mep, title 24 , fire sprinkler work permitted separately | $50,000 |
| Dec 23, 2016 | Expired or cancelled expired Jan 2020 | 2567 Union St | new shed dormer on west side of sable roof below ht limit maher naDetails
new shed dormer on west side of sable roof below ht limit maher na | $5,000 |
| Sep 15, 2016 | Expired or cancelled cancelled Jan 2026 | 2225 Steiner St | Details
| $1,500 |
| Aug 23, 2016 | Expired or cancelled expired Sep 2019 | 2239 Webster St | revision to pa 2015-0818-4633 - structural revision only. addition of (n) moment frame & shearwall into the seismic scheme. replace (e) foundation & upgrade shearwallsDetails
revision to pa 2015-0818-4633 - structural revision only. addition of (n) moment frame & shearwall into the seismic scheme. replace (e) foundation & upgrade shearwalls | $85,000 |
| Aug 11, 2016 | Completed final sign-off Nov 2016 | 303 Sacramento St | 3/f- title 24 lighting calcs. for work under t.i. pa#201605197877. n/a ordinance #155-13Details
3/f- title 24 lighting calcs. for work under t.i. pa#201605197877. n/a ordinance #155-13 | |
| Jun 29, 2016 | Completed final sign-off Nov 2016 | 447 Bush St | title 24 documentation & calcs in ref pa 2016 0315 2009 maher naDetails
title 24 documentation & calcs in ref pa 2016 0315 2009 maher na | |
| May 19, 2016 | Completed final sign-off Nov 2016 | 303 Sacramento St | t.i. at 3rd floor office space: work includes new partitions, doors, interior window, millwork, lighting, electrical, plumbing, new toilet rooms, and new finishes. mep, title 24, &fire sprinkler work to be permitted seperate. n/a for maher.Details
t.i. at 3rd floor office space: work includes new partitions, doors, interior window, millwork, lighting, electrical, plumbing, new toilet rooms, and new finishes. mep, title 24, &fire sprinkler work to be permitted seperate. n/a for maher. | $145,000 |
| Apr 29, 2016 | Completed final sign-off Nov 2016 | 447 Bush St | public health dept review only - ref approved pa 2016-0315-2009. other departments approval under pa 2016-0315-2009.Details
public health dept review only - ref approved pa 2016-0315-2009. other departments approval under pa 2016-0315-2009. | |
| Apr 12, 2016 | Completed final sign-off Feb 2017 | 15 Dolores St | unit 2: remove non-bearing walls on 3rd floor per plan. add two skylights on 3rd floor per plan. fire damange repair to comply with nov#201576701. n/a maher ordinanceDetails
unit 2: remove non-bearing walls on 3rd floor per plan. add two skylights on 3rd floor per plan. fire damange repair to comply with nov#201576701. n/a maher ordinance | $10,000 |
| Apr 7, 2016 | Completed final sign-off Aug 2016 | 30 Athens St | bathroom addition on 1st floor.Details
bathroom addition on 1st floor. | $25,000 |
| Apr 7, 2016 | Completed final sign-off Jun 2017 | 2225 Steiner St | temporary shoring for new patio area at rear. n/a for maher. piers will be dug in more than 8' soil.Details
temporary shoring for new patio area at rear. n/a for maher. piers will be dug in more than 8' soil. | $4,000 |
| Apr 1, 2016 | Never finaled issued Apr 2016, no final | 2239 Webster St | demolition: remove moldings, drywall insulation, doors appliances. got 2 units to studs, removal of sheetrock on non bearing walls only.Details
demolition: remove moldings, drywall insulation, doors appliances. got 2 units to studs, removal of sheetrock on non bearing walls only. | $4,000 |
| Mar 15, 2016 | Never finaled issued Apr 2016, no final | 447 Bush St | new hotel bar in first floor space. work includes new walls, ceiling, door s, millwork and finishes. mep, alarm, title 24 calcs and fire sprinkler work to be permitted separately. maher naDetails
new hotel bar in first floor space. work includes new walls, ceiling, door s, millwork and finishes. mep, alarm, title 24 calcs and fire sprinkler work to be permitted separately. maher na | $140,000 |
| Oct 22, 2015 | Completed final sign-off Aug 2016 | 462 27th St | soft story program seismic retrofit 2012 iebc a.4Details
soft story program seismic retrofit 2012 iebc a.4 | $20,000 |
| Aug 18, 2015 | Completed final sign-off Sep 2019 | 2239 Webster St | restore base of 2nd floor bay window, lower (e) sloped driveway & install new garage door, replace (e) front stair railing, remove a portion of bldg at rear of property, and interior remodel of existing 2 units, maher n/aDetails
restore base of 2nd floor bay window, lower (e) sloped driveway & install new garage door, replace (e) front stair railing, remove a portion of bldg at rear of property, and interior remodel of existing 2 units, maher n/a | $280,000 |
| Jul 21, 2015 | Completed final sign-off Feb 2016 | 1906 Mission St | to legalize 3 additional guest rooms bringing the current 28 guest rooms to a total. 31 guestrooms with 1 of the new guestroom to have cooking.Details
to legalize 3 additional guest rooms bringing the current 28 guest rooms to a total. 31 guestrooms with 1 of the new guestroom to have cooking. | |
| Jun 25, 2015 | Expired or cancelled cancelled Jul 2017 | 2225 Steiner St | commencement of work not started under previously approved pa# 201110197184Details
commencement of work not started under previously approved pa# 201110197184 | $20,000 |
| Jun 18, 2015 | Completed final sign-off Jun 2017 | 2225 Steiner St | revision to app#201406259480. modification due to extg conditions. additional/underpinning on north and south walls. moment frame re-calculations. n/a for maherDetails
revision to app#201406259480. modification due to extg conditions. additional/underpinning on north and south walls. moment frame re-calculations. n/a for maher | $60,000 |
| Mar 3, 2015 | Completed final sign-off Nov 2016 | 447 Bush St | relocation of hotel reception desk to 1st fl to include new lobby space, breakfast area, storage room, and remodel of toilet rooms. mep and fire sprinklers permitted separately. n/a for maher ordinance.Details
relocation of hotel reception desk to 1st fl to include new lobby space, breakfast area, storage room, and remodel of toilet rooms. mep and fire sprinklers permitted separately. n/a for maher ordinance. | $40,000 |
| Feb 11, 2015 | Completed final sign-off Jun 2017 | 2225 Steiner St | remove sheetrocks and insulation of electrical and plumbing fixtures, and finishes for whole interiors of the building. separate permit for all remodelling.Details
remove sheetrocks and insulation of electrical and plumbing fixtures, and finishes for whole interiors of the building. separate permit for all remodelling. | $2,000 |
| Oct 17, 2014 | Expired or cancelled expired Jan 2017 | 1906 Mission St | new electrical service, work includes new concrete pad/slab to support new electrical equipment (new pg&e transformer and electrical service board) and new fence and gate at property line along 15th st.Details
new electrical service, work includes new concrete pad/slab to support new electrical equipment (new pg&e transformer and electrical service board) and new fence and gate at property line along 15th st. | $20,000 |
| Aug 21, 2014 | Completed final sign-off Oct 2014 | 1906 Mission St | construct accessible toilet room, install new lighting and electrical.Details
construct accessible toilet room, install new lighting and electrical. | $50,000 |
| Jul 17, 2014 | Expired or cancelled expired Jan 2017 | 1906 Mission St | new laundry room and storage spaces at 1/f, with new exterior ramp to provide disabled access. mep. & sprinklers permitted seperately.Details
new laundry room and storage spaces at 1/f, with new exterior ramp to provide disabled access. mep. & sprinklers permitted seperately. | $33,000 |
| Jun 10, 2014 | Completed final sign-off Oct 2015 | 1906 Mission St | revision appl. 201312063565. structural modification. additional foundation at center and south wall in kind.Details
revision appl. 201312063565. structural modification. additional foundation at center and south wall in kind. | $20,000 |
| Dec 6, 2013 | Completed final sign-off Oct 2015 | 1906 Mission St | mandatory seismic upgrade to extg "soft story" construction. new accessible ramps to be added at entries to the 1st retail spaces. cost of construction - exclude moment frame & its foundation work cost.Details
mandatory seismic upgrade to extg "soft story" construction. new accessible ramps to be added at entries to the 1st retail spaces. cost of construction - exclude moment frame & its foundation work cost. | $64,000 |
| Dec 6, 2013 | Completed final sign-off Oct 2015 | 1906 Mission St | 2nd and 3rd floor:remodel of shower rooms on both floors, new bathroom at manager apt on 2n fl. remodel of reception area on 2nd fl., new windows at bldg facade both floors, mep ls and sprinklers on separate permits. jjcDetails
2nd and 3rd floor:remodel of shower rooms on both floors, new bathroom at manager apt on 2n fl. remodel of reception area on 2nd fl., new windows at bldg facade both floors, mep ls and sprinklers on separate permits. jjc | $100,000 |
| Oct 11, 2013 | Completed final sign-off Feb 2014 | 85 Marcela Av | kitchen remodel and new bathroom on first floorDetails
kitchen remodel and new bathroom on first floor | $35,000 |
| Aug 6, 2013 | Expired or cancelled expired Jan 2020 | 2567 Union St | interior remodel within (e) bldg envelope, new 3rd story addition, 1 bathroom and one bath on 3rd story, horizontal extension to the rear, new garage in the front of the propertyDetails
interior remodel within (e) bldg envelope, new 3rd story addition, 1 bathroom and one bath on 3rd story, horizontal extension to the rear, new garage in the front of the property | $150,000 |
| Jun 27, 2013 | Completed final sign-off Dec 2013 | 1234 Page St | ground floor lower unit - new drywall throughout unit, studs repairs in kind for dryrot damage, plbg upgrade on bathroom & kitchen, electrical upgrade throuhout unit, replace widnows (4) & doors (6) in kind, new moldings, new cabinets & countertop.Details
ground floor lower unit - new drywall throughout unit, studs repairs in kind for dryrot damage, plbg upgrade on bathroom & kitchen, electrical upgrade throuhout unit, replace widnows (4) & doors (6) in kind, new moldings, new cabinets & countertop. | $30,000 |
| Jun 20, 2013 | Completed final sign-off Dec 2013 | 1234 Page St | comply with complaint #201308591-patching & painting new hardwood floorDetails
comply with complaint #201308591-patching & painting new hardwood floor | $9,000 |
| Jun 3, 2013 | Completed final sign-off Aug 2013 | 447 Bush St | to comply with ordinance 029-13. installation of grab bars. 1 full bathroom and 4 half bath on all 4 floors. 2 on each floor.Details
to comply with ordinance 029-13. installation of grab bars. 1 full bathroom and 4 half bath on all 4 floors. 2 on each floor. | $3,000 |
| Jan 22, 2013 | Expired or cancelled cancelled Jan 2026 | 2620 Sacramento St | replace garage door with single garage door by removing center post.Details
replace garage door with single garage door by removing center post. | $7,000 |
| Dec 5, 2012 | Completed final sign-off Dec 2012 | 2672 Sacramento St | to obtain final inspection for work approved under pa#2011-04-26-4829. all work is complete.Details
to obtain final inspection for work approved under pa#2011-04-26-4829. all work is complete. | |
| Aug 6, 2012 | Expired or cancelled expired Sep 2014 | 2620 Sacramento St | existing siding removal & new siding installation, redwood hard boards, visible from street.Details
existing siding removal & new siding installation, redwood hard boards, visible from street. | $20,000 |
| Jun 21, 2012 | Completed final sign-off Dec 2012 | 2672 Sacramento St | to comply with correction notice to pay additional fees on pa # 201104254754. increase cost by $100,000.00 to bring total construction cost to $350,000.00 per inspector's request.Details
to comply with correction notice to pay additional fees on pa # 201104254754. increase cost by $100,000.00 to bring total construction cost to $350,000.00 per inspector's request. | $100,000 |
| Jun 15, 2012 | Completed final sign-off Nov 2012 | 201 Raccoon Dr | first floor master bathroom remodel; moving tub, sink, adding bigger closet, moving toilet, changing bathroom layout as stated on plans (page 6).Details
first floor master bathroom remodel; moving tub, sink, adding bigger closet, moving toilet, changing bathroom layout as stated on plans (page 6). | $40,000 |
| Feb 24, 2012 | Completed final sign-off Dec 2012 | 2672 Sacramento St | install 44 ft length of excavation shoring at right (east property line) install24 ft of shoring at left (west property line). install 24 ft length in rear yard area ref 201104254754Details
install 44 ft length of excavation shoring at right (east property line) install24 ft of shoring at left (west property line). install 24 ft length in rear yard area ref 201104254754 | $35,000 |
| Sep 15, 2011 | Never finaled issued Sep 2011, no final | 401 Gough St | voluntary seismic upgrade - install steel moment frames for soft story retrofit only per plans-ab094.Details
voluntary seismic upgrade - install steel moment frames for soft story retrofit only per plans-ab094. | $150,000 |
| Jun 30, 2011 | Completed final sign-off Jun 2012 | 2635 Broderick St | develop ground floor space under (e) deck to new bedroom. 2nd floor deck to be replaced with new deck.Details
develop ground floor space under (e) deck to new bedroom. 2nd floor deck to be replaced with new deck. | $55,000 |
| Jun 23, 2011 | Completed final sign-off Nov 2011 | 166 Arguello Bl | demo 2 extg bathrooms,lower portion of extg conditioned space and garage floor. add new stairs,2 new bathrooms, plumbing, electrical work. new exterior doors and windows, plumbing, electrical heat under sep. trade permit. replace garage door.Details
demo 2 extg bathrooms,lower portion of extg conditioned space and garage floor. add new stairs,2 new bathrooms, plumbing, electrical work. new exterior doors and windows, plumbing, electrical heat under sep. trade permit. replace garage door. | $100,000 |
| Apr 25, 2011 | Completed final sign-off Dec 2012 | 2672 Sacramento St | relocate unit at 1st floor to basement. combine 1st & 2nd flr into one unit. fill in light wells at east 9 west excavote rear yard and provide one level addition and roof deck with patio. remodel kitchens and bathrooms.Details
relocate unit at 1st floor to basement. combine 1st & 2nd flr into one unit. fill in light wells at east 9 west excavote rear yard and provide one level addition and roof deck with patio. remodel kitchens and bathrooms. | $250,000 |