Arrow Builders Inc
- Based in
- San Rafael
- On San Francisco permits
- Feb 2017 to Jun 2026
- Last 24 months
- 9 permits filed
55 permits since 2000: 41 completed, 3 in progress, 5 never finaled, 6 expired or cancelled.
Of the 5 never-finaled permits, 5 are 5 to 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 30, 2026 | In progress filed Jun 2026, not yet issued | 1148 Dolores St | interior only replace (e) gas log lighter with (n) direct vent fireplaceDetails
interior only replace (e) gas log lighter with (n) direct vent fireplace | $10,000 |
| Apr 17, 2026 | In progress filed Apr 2026, not yet issued | 3878 Clay St | (n) fixtures and fittings, appliances, finishes at (e) locations at kitchen & 2 bathrooms, non struct partions & steam shower, change to shower at guest bath (n) pocket doors added to (e) openning (n) sconic lightng and (n) outlets, reconfigure of outlet heights.Details
(n) fixtures and fittings, appliances, finishes at (e) locations at kitchen & 2 bathrooms, non struct partions & steam shower, change to shower at guest bath (n) pocket doors added to (e) openning (n) sconic lightng and (n) outlets, reconfigure of outlet heights. | $200,000 |
| Dec 1, 2025 | Completed final sign-off Dec 2025 | 294 Juanita Wy | remove existing windows, install new inserts same size, same location 18 total. no change to openings, headers, or framing. 3 windows are street facing.Details
remove existing windows, install new inserts same size, same location 18 total. no change to openings, headers, or framing. 3 windows are street facing. | $50,000 |
| Oct 17, 2025 | In progress issued Dec 2025 | 225 Locust St | interior remodel including new mud room at basement, remodel (e) kitchen and pantry on 1st flr, remodel (e) primary suite and new laundry at 2nd flr, new dubwaiter connecting basement, 1st, and 2nd flrs, modified window opening at rear of (e) 2nd flr.Details
interior remodel including new mud room at basement, remodel (e) kitchen and pantry on 1st flr, remodel (e) primary suite and new laundry at 2nd flr, new dubwaiter connecting basement, 1st, and 2nd flrs, modified window opening at rear of (e) 2nd flr. | $500,000 |
| Jul 9, 2025 | Completed final sign-off Jun 2026 | 2115 Broderick St | work include replacement in kind of exterior cladding patio doors and windows at the rear yard facade on both stories. work consists of replacement in kind of kitchen casework, appliances, and plumbing fixtures. electrical systems and light fixtures will be replaced in the kitchen, dining area andDetails
work include replacement in kind of exterior cladding patio doors and windows at the rear yard facade on both stories. work consists of replacement in kind of kitchen casework, appliances, and plumbing fixtures. electrical systems and light fixtures will be replaced in the kitchen, dining area and | $100,000 |
| Apr 24, 2025 | Completed final sign-off Mar 2026 | 2512 Pacific Av | remodel single family dwelling, first flr: demo e storage, new finishes, elec,water heater w heat pumps, 2nd flr: new window openings in north wall, demo e kitchen, new kitchen in new location,finishes replacement, new elec/plumbingDetails
remodel single family dwelling, first flr: demo e storage, new finishes, elec,water heater w heat pumps, 2nd flr: new window openings in north wall, demo e kitchen, new kitchen in new location,finishes replacement, new elec/plumbing | $75,000 |
| Apr 24, 2025 | Completed final sign-off Mar 2026 | 2715 Steiner St | interior remodel at 3 bathrooms, 1 new bathroom. replace 5 windows in kind and in place. all public facing windows to be woodDetails
interior remodel at 3 bathrooms, 1 new bathroom. replace 5 windows in kind and in place. all public facing windows to be wood | $44,357 |
| Jan 24, 2025 | Completed final sign-off Jun 2025 | 620 El Camino Del Mar | revision to 202407015607 and 202406063874. single pane glazed doors at dining room to be replaced with dbl pane glazed doors with a uvalue of .39. primary bath and closet interior door header to be raised and replaced. 3 fireplance framing to be replace, changes to skylightsDetails
revision to 202407015607 and 202406063874. single pane glazed doors at dining room to be replaced with dbl pane glazed doors with a uvalue of .39. primary bath and closet interior door header to be raised and replaced. 3 fireplance framing to be replace, changes to skylights | $1,800 |
| Jan 21, 2025 | Completed final sign-off Feb 2026 | 2715 Steiner St | new lighting at dining room. replace 6 windows in-kind and in-place.Details
new lighting at dining room. replace 6 windows in-kind and in-place. | $8,000 |
| Jul 1, 2024 | Completed final sign-off Jun 2025 | 620 El Camino Del Mar | door replacement in kind to higher energy performance doors. 3 double swing doors, 1 is street facing e openingsDetails
door replacement in kind to higher energy performance doors. 3 double swing doors, 1 is street facing e openings | $8,750 |
| Jun 6, 2024 | Completed final sign-off Jun 2025 | 620 El Camino Del Mar | renovation of primary bedroom suite. add pocket door. enlarge closet. replace fireplace and lighting. add skylights.Details
renovation of primary bedroom suite. add pocket door. enlarge closet. replace fireplace and lighting. add skylights. | $43,000 |
| May 22, 2024 | Completed final sign-off Sep 2024 | 1579 Funston Av | revision to pa# 202401234458 revised structural detailsDetails
revision to pa# 202401234458 revised structural details | |
| Jan 25, 2024 | Completed final sign-off Sep 2024 | 1579 Funston Av | new deck in the rear. meeting section 130 & 134 of sf planning code. new exterior lightsDetails
new deck in the rear. meeting section 130 & 134 of sf planning code. new exterior lights | $25,000 |
| Jan 23, 2024 | Completed final sign-off Sep 2024 | 1579 Funston Av | the project is a renovation of an extg kitchen and 2nd floor bathroom. the work includes new metal windows and doors on the 1st floor rear facade, and replacement of the basement potting shed exterior door. kitchen remodel including new elect. appliances, casework, and finishes. a bathroomDetails
the project is a renovation of an extg kitchen and 2nd floor bathroom. the work includes new metal windows and doors on the 1st floor rear facade, and replacement of the basement potting shed exterior door. kitchen remodel including new elect. appliances, casework, and finishes. a bathroom | $225,000 |
| Dec 20, 2023 | Completed final sign-off Jun 2025 | 620 El Camino Del Mar | window replacement only to highter energy performance, replace windows throuhout in kind w/wood clad windows w/true divided lites (tdl) -(9) street facingDetails
window replacement only to highter energy performance, replace windows throuhout in kind w/wood clad windows w/true divided lites (tdl) -(9) street facing | $47,500 |
| Dec 11, 2023 | Expired or cancelled cancelled Jan 2025 | 3676 21st St | proposed project is a 3 story elevator. elevator will extend from the garage (1st fl) to the 3rd floor. the elevator is to be located in the garage on the 1st floor and infill a portion of the existing lightwell on the 2nd and 3rd floors.Details
proposed project is a 3 story elevator. elevator will extend from the garage (1st fl) to the 3rd floor. the elevator is to be located in the garage on the 1st floor and infill a portion of the existing lightwell on the 2nd and 3rd floors. | $90,000 |
| Aug 31, 2023 | Completed final sign-off May 2024 | 7 Russian Hill Pl | replace bathroom finishes and fixtures in kind remove and replace gas furnace and gas tankless hot water heater in same location. remove fireplace no change to chimney or chimney enclosure all interior update electric outlets to be grounded.Details
replace bathroom finishes and fixtures in kind remove and replace gas furnace and gas tankless hot water heater in same location. remove fireplace no change to chimney or chimney enclosure all interior update electric outlets to be grounded. | $25,000 |
| Jun 30, 2023 | Completed final sign-off May 2024 | 7 Russian Hill Pl | remove replace flooring, plumging fixtures, kitchen counters in kind, decorative lighting, paint interiors onlyDetails
remove replace flooring, plumging fixtures, kitchen counters in kind, decorative lighting, paint interiors only | $100,000 |
| May 15, 2023 | Completed final sign-off Jun 2023 | 2715 Steiner St | to obtain final inspection for work approved under pa# 201902203324, 201906183738, and 201909060870. all work is complete.Details
to obtain final inspection for work approved under pa# 201902203324, 201906183738, and 201909060870. all work is complete. | |
| Mar 17, 2023 | Completed final sign-off Apr 2023 | 268 Pixley St | revision to permit 202105281273. reduction in scope: no work at rear facade. replacement of only 3 windows at front facade (instead of all of them). new entry door and new garage door at same size/location. 3/f: removal of non-bearing wall for new bedroom layout.Details
revision to permit 202105281273. reduction in scope: no work at rear facade. replacement of only 3 windows at front facade (instead of all of them). new entry door and new garage door at same size/location. 3/f: removal of non-bearing wall for new bedroom layout. | |
| Feb 10, 2023 | Completed final sign-off Sep 2023 | 30 Walnut St | revision to pa #202206277136. window replacement at 3rd floor and recessed floor at 2nd floor kitchen hall.Details
revision to pa #202206277136. window replacement at 3rd floor and recessed floor at 2nd floor kitchen hall. | $10,000 |
| Sep 1, 2022 | Expired or cancelled withdrawn Nov 2022 | 108 Villa Tr | new deck on (e) non-conforming garage roof. new parapets and 73' infill of side yard for new outdoor area. new balcony on south facade overlapping rear yard setback. in-kind of the type window replacement. interior includes new fixtures & finishes. no change to conditioned spaceDetails
new deck on (e) non-conforming garage roof. new parapets and 73' infill of side yard for new outdoor area. new balcony on south facade overlapping rear yard setback. in-kind of the type window replacement. interior includes new fixtures & finishes. no change to conditioned space | $600,000 |
| Jun 27, 2022 | Completed final sign-off Sep 2023 | 30 Walnut St | 2/f: remodel kitchen, powder room. 3/f: remodel master bath, (e) spare bedroom/bathroom, new laundry closet, new window at stair. 4/f: new window at stair.Details
2/f: remodel kitchen, powder room. 3/f: remodel master bath, (e) spare bedroom/bathroom, new laundry closet, new window at stair. 4/f: new window at stair. | $50,000 |
| May 17, 2022 | Completed final sign-off May 2023 | 3577 Pacific Av | resurfacing of (e) exterior roof deck, stair and walkway. replace (e) guardrails skylight. new and resurfaced built in planter boxes new low level sedum plantings on existing adjacent roof areas, matching (e) height roof curbs. no envelope changes.Details
resurfacing of (e) exterior roof deck, stair and walkway. replace (e) guardrails skylight. new and resurfaced built in planter boxes new low level sedum plantings on existing adjacent roof areas, matching (e) height roof curbs. no envelope changes. | $165,000 |
| Mar 28, 2022 | Completed final sign-off Jun 2022 | 2254 Union St | increase value of work per building inspector. this is in reference to existing permit 202111172603. additional dry rot repair required.Details
increase value of work per building inspector. this is in reference to existing permit 202111172603. additional dry rot repair required. | $10,000 |
| Feb 3, 2022 | Expired or cancelled cancelled Jan 2026 | 2254 Union St | additional dryrot at facade, rebuild in kind upper balconies. same details as lower balcony cover by permit 202111177603Details
additional dryrot at facade, rebuild in kind upper balconies. same details as lower balcony cover by permit 202111177603 | $7,500 |
| Jan 20, 2022 | Completed final sign-off Oct 2022 | 2117 Broderick St | rev to pa201911268280: refinish of basement storage area following structural improvements, includig new convenience electrical, lighting and full replace of in-kind of (e) bathroom.Details
rev to pa201911268280: refinish of basement storage area following structural improvements, includig new convenience electrical, lighting and full replace of in-kind of (e) bathroom. | $20,000 |
| Nov 17, 2021 | Completed final sign-off Jun 2022 | 2254 Union St | reconstruct front balcony in kindDetails
reconstruct front balcony in kind | $5,000 |
| Aug 20, 2021 | Completed final sign-off Feb 2022 | 2258 Union St | small balcony is pulling away from building. along with stucco. this presents a safaety hazard for pedestrians. scope of work is to remove balcony and then review framing structural requirements with a structural engineer.Details
small balcony is pulling away from building. along with stucco. this presents a safaety hazard for pedestrians. scope of work is to remove balcony and then review framing structural requirements with a structural engineer. | $2,000 |
| Jul 13, 2021 | Completed final sign-off Oct 2022 | 2117 Broderick St | revision to 202106233058, revision to foundation and framing plans to address inadequate (e) structure. revision to demolition calcs.Details
revision to 202106233058, revision to foundation and framing plans to address inadequate (e) structure. revision to demolition calcs. | |
| Jun 23, 2021 | Completed final sign-off Oct 2022 | 2117 Broderick St | revision to 201911268280, revision to foundation and framing plans to accomodate e conditions unknown before start of constructionDetails
revision to 201911268280, revision to foundation and framing plans to accomodate e conditions unknown before start of construction | |
| Mar 24, 2021 | Never finaled filed Mar 2021, never issued | 1717 Baker St | rebuild wood deck at rear yard in kind, with addition of steps down to rear yard. new gabled roof at extg study room. replace windows at west and south walls of study.Details
rebuild wood deck at rear yard in kind, with addition of steps down to rear yard. new gabled roof at extg study room. replace windows at west and south walls of study. | $43,000 |
| Feb 23, 2021 | Never finaled filed Feb 2021, never issued | 1717 Baker St | (n) access hatch at garage. remodel 3 bathrooms. replace roof & floor at laundry/powder. rebuild stairs at laundry. remodel kitchen. remove 1 window at north facade. replace windows and 1 door. add 2 windows at south. replace 9 windows on front.Details
(n) access hatch at garage. remodel 3 bathrooms. replace roof & floor at laundry/powder. rebuild stairs at laundry. remodel kitchen. remove 1 window at north facade. replace windows and 1 door. add 2 windows at south. replace 9 windows on front. | $213,000 |
| Dec 14, 2020 | Completed final sign-off Jun 2022 | 1177 California St | unit 715: kitchen & bathroom remodel: addition of washer/dryer. remodel of (e) bedroom. interior & non-structural work only.Details
unit 715: kitchen & bathroom remodel: addition of washer/dryer. remodel of (e) bedroom. interior & non-structural work only. | $46,000 |
| Sep 12, 2020 | Completed final sign-off Feb 2021 | 1711 Baker St | revision to pa #2019-0213-2849: reframe/resheath 1st floor above tradesman's path & breakfast room. reframe/resheath 2nd floor low roof above tradesman's path & floor at master bath. reframe/resheath roof above master bath & perimeter walls at master bath.Details
revision to pa #2019-0213-2849: reframe/resheath 1st floor above tradesman's path & breakfast room. reframe/resheath 2nd floor low roof above tradesman's path & floor at master bath. reframe/resheath roof above master bath & perimeter walls at master bath. | $275,000 |
| Aug 14, 2020 | Completed final sign-off Jan 2022 | 2280 Vallejo St | interior basement/studio remodel w/in existing building, includes limited structural workDetails
interior basement/studio remodel w/in existing building, includes limited structural work | $32,512 |
| Feb 10, 2020 | Completed final sign-off Feb 2021 | 1711 Baker St | conversion of extg storage space behind garage space on lower level to new 2nd unit under density. no work visible from baker street.Details
conversion of extg storage space behind garage space on lower level to new 2nd unit under density. no work visible from baker street. | $40,000 |
| Feb 10, 2020 | Completed final sign-off Feb 2021 | 1711 Baker St | revision to pa #201902132849, 201906133360, 201907085349. structural: replace shearwall, beam, pot at 1st fl, revise interior wall at rear of garage. energy: replace furnace w/(n) radiant heat system. minor window changes at side & rear elevations.Details
revision to pa #201902132849, 201906133360, 201907085349. structural: replace shearwall, beam, pot at 1st fl, revise interior wall at rear of garage. energy: replace furnace w/(n) radiant heat system. minor window changes at side & rear elevations. | $20,000 |
| Nov 26, 2019 | Completed final sign-off Oct 2022 | 2117 Broderick St | interior remodel of (e) kitchen, bathrooms master bedroom, facade alteration of side & rear facades (not visible from the street) to add new windows & doorsDetails
interior remodel of (e) kitchen, bathrooms master bedroom, facade alteration of side & rear facades (not visible from the street) to add new windows & doors | $285,000 |
| Sep 6, 2019 | Expired or cancelled expired Jun 2023 | 2715 Steiner St | revision to pa# 201902203324 & 201906183738. including bathroom remodel and replacement of existing foundation and shear wall.Details
revision to pa# 201902203324 & 201906183738. including bathroom remodel and replacement of existing foundation and shear wall. | $20,000 |
| Aug 8, 2019 | Completed final sign-off Feb 2021 | 1711 Baker St | enlarge (e) deck. construction ew 1 houre fire rated wall adjacent to side property line.Details
enlarge (e) deck. construction ew 1 houre fire rated wall adjacent to side property line. | $15,000 |
| Jul 8, 2019 | Completed final sign-off Feb 2021 | 1711 Baker St | revision to pa 2019-0613-3360 and 2019-0213-2849 simplification of retaining wall configurationDetails
revision to pa 2019-0613-3360 and 2019-0213-2849 simplification of retaining wall configuration | |
| Jul 8, 2019 | Completed final sign-off Feb 2021 | 1711 Baker St | temporary shoring permit, deferred submittal. pa# 201906133360Details
temporary shoring permit, deferred submittal. pa# 201906133360 | |
| Jun 25, 2019 | Completed final sign-off Jun 2020 | 2715 Steiner St | replace (e) window for french doors.Details
replace (e) window for french doors. | $5,000 |
| Jun 18, 2019 | Expired or cancelled expired Jun 2023 | 2715 Steiner St | reconfiguration of stair to garage. relocation of (e) powder room. new dry bar in living room. relocation of (e) laundry room to upgrade existing fireplace flueDetails
reconfiguration of stair to garage. relocation of (e) powder room. new dry bar in living room. relocation of (e) laundry room to upgrade existing fireplace flue | $75,000 |
| Jun 13, 2019 | Completed final sign-off Feb 2021 | 1711 Baker St | revision to app#201902132849. partial foundation replacement. replace extg wood deck with new landing and stair to rear yardDetails
revision to app#201902132849. partial foundation replacement. replace extg wood deck with new landing and stair to rear yard | |
| May 21, 2019 | Completed final sign-off Mar 2020 | 3577 Pacific Av | kitchen: partial remodel work to include nw plmg, lgtg, finish, & cabinetry, refinishing. main level bath: remodel extg bath. add 1 powder room. work to include demolition & nw construction. nw plmg, lgtg, finishes & millwork & cabinetry. master bath: remodel extg bath work to include demolitionDetails
kitchen: partial remodel work to include nw plmg, lgtg, finish, & cabinetry, refinishing. main level bath: remodel extg bath. add 1 powder room. work to include demolition & nw construction. nw plmg, lgtg, finishes & millwork & cabinetry. master bath: remodel extg bath work to include demolition | $50,000 |
| Feb 20, 2019 | Expired or cancelled expired Jun 2023 | 2715 Steiner St | kitchen remodel and removal of existing fireplaceDetails
kitchen remodel and removal of existing fireplace | $88,403 |
| Feb 13, 2019 | Completed final sign-off Feb 2021 | 1711 Baker St | main floor: remodel kitchen, breakfast, powder, laundry, office . upper level: remodel master bath and kids bath. other: replace footing at tradesman's path at south property line and replace deck and stair same size as extg deck.Details
main floor: remodel kitchen, breakfast, powder, laundry, office . upper level: remodel master bath and kids bath. other: replace footing at tradesman's path at south property line and replace deck and stair same size as extg deck. | $275,000 |
| Jan 17, 2018 | Never finaled issued Jan 2018, no final | 1913 Sacramento St | revision to 201708144774 - shoring plansDetails
revision to 201708144774 - shoring plans | |
| Aug 14, 2017 | Completed final sign-off Feb 2019 | 1913 Sacramento St | the project scope is the remodel of an extg 2 story building. total of 3 bedrooms and 2 1/2 baths.Details
the project scope is the remodel of an extg 2 story building. total of 3 bedrooms and 2 1/2 baths. | $421,000 |
| Jul 12, 2017 | Completed final sign-off Oct 2020 | 2280 Vallejo St | construct new retaining wallls w/ associated shade arbor structure at rear yard portion of propertyDetails
construct new retaining wallls w/ associated shade arbor structure at rear yard portion of property | $150,000 |
| May 25, 2017 | Completed final sign-off Oct 2017 | 2064 Jackson St | interior remodel of an existing bathroom, pantry & kitchen on the 3rd floor. there is no exterior work.Details
interior remodel of an existing bathroom, pantry & kitchen on the 3rd floor. there is no exterior work. | $130,000 |
| Feb 2, 2017 | Never finaled issued Jul 2020, no final | 863 Carolina St | demolish 1-story single family dwelling bldgDetails
demolish 1-story single family dwelling bldg | $20,000 |
| Feb 2, 2017 | Never finaled issued Jul 2020, no final | 863 Carolina St | to erect 3-story/1-basement, type v-b, 2-family dwellings.Details
to erect 3-story/1-basement, type v-b, 2-family dwellings. | $325,000 |