Jln Builders
- Based in
- San Francisco
- On San Francisco permits
- Jun 2016 to Jul 2019
- Last 24 months
- 0 permits filed
27 permits since 2000: 26 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 10, 2019 | Completed final sign-off Sep 2019 | 1125 Monterey Bl | rev to pa# 201810264227; addition of stucco replacement in-kind.Details
rev to pa# 201810264227; addition of stucco replacement in-kind. | $10,000 |
| Apr 12, 2019 | Completed final sign-off Jul 2019 | 1207 Indiana St | unit #7 remodel kitchen, partial remodel in 2 bathrooms. bathroom scope is replacement of vanity. n/a for maherDetails
unit #7 remodel kitchen, partial remodel in 2 bathrooms. bathroom scope is replacement of vanity. n/a for maher | $48,000 |
| Feb 21, 2019 | Completed final sign-off Mar 2019 | 35 Clement St | revision to pa 201811055011. revision to incl ada push button electric openerDetails
revision to pa 201811055011. revision to incl ada push button electric opener | $3,500 |
| Dec 19, 2018 | Completed final sign-off Aug 2019 | 45 San Leandro Wy | repair waterproofing at balcony and above south facing basement windows. not visible from street.Details
repair waterproofing at balcony and above south facing basement windows. not visible from street. | $1,500 |
| Dec 14, 2018 | Completed final sign-off Aug 2019 | 760 Dolores St | correction permit in response to planning enforcement #2018012875enf to remove non-conforming interconnecting stair between basement unit #2 & 3- story unit #1 above. install basement kitchenette restoring last permitted use as shown on appln #200206280275Details
correction permit in response to planning enforcement #2018012875enf to remove non-conforming interconnecting stair between basement unit #2 & 3- story unit #1 above. install basement kitchenette restoring last permitted use as shown on appln #200206280275 | $20,000 |
| Nov 21, 2018 | Expired or cancelled cancelled Jan 2026 | 1125 Monterey Bl | replace (e) conc slab at garage, mech, storage add (n) ret wall or steps & fts. sistered to (e) as req'd by site conditions, install (n) perimeter & under slab drainage system & driveway trench drain & downsprouts connected to (n) catch basin with silt trap to (e) downslope waste lines, add 1/2"Details
replace (e) conc slab at garage, mech, storage add (n) ret wall or steps & fts. sistered to (e) as req'd by site conditions, install (n) perimeter & under slab drainage system & driveway trench drain & downsprouts connected to (n) catch basin with silt trap to (e) downslope waste lines, add 1/2" | $20,000 |
| Nov 5, 2018 | Completed final sign-off Mar 2019 | 35 Clement St | rework (e) space to accomodate interior design studio with private office and wet barDetails
rework (e) space to accomodate interior design studio with private office and wet bar | $5,000 |
| Oct 26, 2018 | Completed final sign-off Sep 2019 | 1125 Monterey Bl | lower level: finish basement,add 2 beds, 1 bath. maintain 1 car garge space, main level: remodel kitchen & bathroom add powder & master bath, general: enlarge (e) openings at rear of house, seismic upgrades, new elec, mech & plumbingDetails
lower level: finish basement,add 2 beds, 1 bath. maintain 1 car garge space, main level: remodel kitchen & bathroom add powder & master bath, general: enlarge (e) openings at rear of house, seismic upgrades, new elec, mech & plumbing | $285,000 |
| Aug 15, 2018 | Completed final sign-off Jan 2019 | 1425 Shotwell St | new interior spiral stair to connect (e) ground level floor to 1st lev. add 1 bathroom & 1 bedroom on g/f. (n) concrete slab on g/f with new footings for sprial staircase and (n) load bearing wall. electrical & plumbing as required.Details
new interior spiral stair to connect (e) ground level floor to 1st lev. add 1 bathroom & 1 bedroom on g/f. (n) concrete slab on g/f with new footings for sprial staircase and (n) load bearing wall. electrical & plumbing as required. | $60,000 |
| Jun 20, 2018 | Completed final sign-off Sep 2019 | 1125 Monterey Bl | kitchen remodeling. no change in wall & opening layout. add water outlet at refrigerator spaceDetails
kitchen remodeling. no change in wall & opening layout. add water outlet at refrigerator space | $20,000 |
| Mar 9, 2018 | Completed final sign-off Jan 2019 | 630 Wawona St | rev to app# 201702028508 s1 add a window to front facadeDetails
rev to app# 201702028508 s1 add a window to front facade | $500 |
| Mar 8, 2018 | Completed final sign-off Aug 2018 | 1331 45th Av | revision to app#201606069169. add skylight above kitchen sink.Details
revision to app#201606069169. add skylight above kitchen sink. | $250 |
| Feb 1, 2018 | Completed final sign-off Apr 2021 | 4254 24th St | interior renovations to (e) basement & 1st flr levels with bay additions @ front @ both (e) flr levels; new 2nd flr addition & new attic level addition. widen (e) garage door, reconfigure (e) front exterior steps.Details
interior renovations to (e) basement & 1st flr levels with bay additions @ front @ both (e) flr levels; new 2nd flr addition & new attic level addition. widen (e) garage door, reconfigure (e) front exterior steps. | $700,000 |
| Jan 26, 2018 | Completed final sign-off Feb 2018 | 624 Wawona St | repair replacing of exiting footting at property line. (4 feet)Details
repair replacing of exiting footting at property line. (4 feet) | $1,000 |
| Jan 12, 2018 | Completed final sign-off Jan 2019 | 630 Wawona St | enclosure of lightwell infill along the east facade to enlarge an existing bathroom, main level. ref bpa#201702028508Details
enclosure of lightwell infill along the east facade to enlarge an existing bathroom, main level. ref bpa#201702028508 | $2,500 |
| Jan 8, 2018 | Completed final sign-off Mar 2018 | 170 Commonwealth Av | bathroom refresh of finsihes, (e) fixtures to remain in (e) locations. no alteration of wall, window and door.Details
bathroom refresh of finsihes, (e) fixtures to remain in (e) locations. no alteration of wall, window and door. | $15,000 |
| Nov 3, 2017 | Completed final sign-off Feb 2018 | 2302 Divisadero St | scope of work at interior stairway at 2nd floor: refinish (e)treads & risers, new paint & tile & sheet rock, update electrical fixtures in same location. new sheet rock shall be no less than 5/8" type x gyp board.Details
scope of work at interior stairway at 2nd floor: refinish (e)treads & risers, new paint & tile & sheet rock, update electrical fixtures in same location. new sheet rock shall be no less than 5/8" type x gyp board. | $10,000 |
| Aug 2, 2017 | Completed final sign-off Nov 2017 | 338 Holladay Av | interior renovation to extg kitchen. scope to include new cabinets, appliances, fixtures and finishes. patch flooring as required. plumbing and electrical work as required. n/a for maher.Details
interior renovation to extg kitchen. scope to include new cabinets, appliances, fixtures and finishes. patch flooring as required. plumbing and electrical work as required. n/a for maher. | $20,000 |
| May 18, 2017 | Completed final sign-off Dec 2017 | 570 Precita Av | revision to structural permit 2017-0118-7382 to add shotcreteDetails
revision to structural permit 2017-0118-7382 to add shotcrete | |
| Feb 2, 2017 | Completed final sign-off Dec 2018 | 630 Wawona St | lower level: remodel & upgrade of bedroom, reconfigure foyer & enclosure of (e) open stairwell. main level: reconfigure kitchen, powder room, office, bathroom & (2) bedrooms. upper level: demo (e) stair & build (n) stair, remodel master suite & bathroom, demo (e) roof to replace w/ (n) roof.Details
lower level: remodel & upgrade of bedroom, reconfigure foyer & enclosure of (e) open stairwell. main level: reconfigure kitchen, powder room, office, bathroom & (2) bedrooms. upper level: demo (e) stair & build (n) stair, remodel master suite & bathroom, demo (e) roof to replace w/ (n) roof. | $600,000 |
| Jan 18, 2017 | Completed final sign-off Dec 2017 | 570 Precita Av | original application pa #2016-0602-8983 (r1) needs new structural drawings because original structural drwg's were never reviewed.Details
original application pa #2016-0602-8983 (r1) needs new structural drawings because original structural drwg's were never reviewed. | |
| Jan 9, 2017 | Completed final sign-off Dec 2017 | 570 Precita Av | new foundation at 1st floor including new concrete walls, new slab and new footings. remodel bath at 1st floor. ref app#201606028983 & #201701187382. for whole building. structural review. rp 01/12/17Details
new foundation at 1st floor including new concrete walls, new slab and new footings. remodel bath at 1st floor. ref app#201606028983 & #201701187382. for whole building. structural review. rp 01/12/17 | $50,000 |
| Jul 27, 2016 | Completed final sign-off Jan 2017 | 277 Bradford St | replace 6 windows in-kind. front and back of house. glazing, u=0.40Details
replace 6 windows in-kind. front and back of house. glazing, u=0.40 | $5,000 |
| Jun 24, 2016 | Completed final sign-off Dec 2016 | 3770 Cesar Chavez St | interior renovation to 2nd level includes remodel of (e) kitchen and bathroom. cabinetry at living room and new gas fireplace to replace (e) wood burining fireplace.Details
interior renovation to 2nd level includes remodel of (e) kitchen and bathroom. cabinetry at living room and new gas fireplace to replace (e) wood burining fireplace. | $100,000 |
| Jun 16, 2016 | Completed final sign-off Jan 2017 | 277 Bradford St | remove (e) wall between kitchen and liv rm. renovate (e) kitchen, remove portion of wall between interior stair and liv rm. renovate/enlarge (e) bath. add 1 closet at ea bdrm. plumb/elec sep permit. interior work only, only struct at bsmt and 1st flDetails
remove (e) wall between kitchen and liv rm. renovate (e) kitchen, remove portion of wall between interior stair and liv rm. renovate/enlarge (e) bath. add 1 closet at ea bdrm. plumb/elec sep permit. interior work only, only struct at bsmt and 1st fl | $85,000 |
| Jun 6, 2016 | Completed final sign-off Aug 2018 | 1331 45th Av | the scope of work is to add an addition to the top floor and to fill in below an (e) rear room. the existing deck will be demolished and replaced with a smaller new deckDetails
the scope of work is to add an addition to the top floor and to fill in below an (e) rear room. the existing deck will be demolished and replaced with a smaller new deck | $250,000 |
| Jun 2, 2016 | Completed final sign-off Dec 2017 | 570 Precita Av | interior remodel & reconfiguration of 2nd flr including remodeled kitchen, bath, bedrooms, living & dining. new 3rd floor roof dormer, new bath & w.c. new rear windows & door. new water heater & heating unit.Details
interior remodel & reconfiguration of 2nd flr including remodeled kitchen, bath, bedrooms, living & dining. new 3rd floor roof dormer, new bath & w.c. new rear windows & door. new water heater & heating unit. | $200,500 |