Speedy Building And Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2019 to Sep 2026
- Last 24 months
- 20 permits filed
48 permits since 2000: 29 completed, 13 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 3 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2026 | In progress issued Sep 2026 | 265 Avila St | repair walls inside and outside due to foundation and slab replacement @ rear of building.Details
repair walls inside and outside due to foundation and slab replacement @ rear of building. | $65,000 |
| Aug 25, 2026 | In progress issued Sep 2026 | 4634 03rd St | interior t. i. for legal aid org. reconfigure conference room, replace flooring throughout (including washroom (#106) and breakroom (105), install privacy portion wall for work areas, reception desk, install new high efficacy lighting throughout. no phone booths. 9/10/26 azDetails
interior t. i. for legal aid org. reconfigure conference room, replace flooring throughout (including washroom (#106) and breakroom (105), install privacy portion wall for work areas, reception desk, install new high efficacy lighting throughout. no phone booths. 9/10/26 az | $90,000 |
| Jul 9, 2026 | In progress issued Jul 2026 | 704 Arguello Bl | 704 arguello street only:kitchen and bath remodel finishes only. no structural. replacement of windows not visible. total 6 like for like.Details
704 arguello street only:kitchen and bath remodel finishes only. no structural. replacement of windows not visible. total 6 like for like. | $43,000 |
| Jul 6, 2026 | In progress issued Jul 2026 | 333 Bush St | unit 3901: shower pan replacement to nclude a faucet. no structual work.Details
unit 3901: shower pan replacement to nclude a faucet. no structual work. | $3,000 |
| Jun 25, 2026 | In progress issued Jul 2026 | 3763 Cesar Chavez St | front bldg - remodeling unit 3763 including reconfiguring the kitchen; converting the sunroom into a bedroom, replace existing transom & doors to the rear deck; remodeling the (e) bathroom and adding another @ 2nd floor.Details
front bldg - remodeling unit 3763 including reconfiguring the kitchen; converting the sunroom into a bedroom, replace existing transom & doors to the rear deck; remodeling the (e) bathroom and adding another @ 2nd floor. | $50,000 |
| Apr 10, 2026 | In progress issued Apr 2026 | 72 Waller St | unit remodel to include kitchen, bathroom and laundry. no structural work to be done. like for like construction.Details
unit remodel to include kitchen, bathroom and laundry. no structural work to be done. like for like construction. | $40,000 |
| Apr 10, 2026 | In progress issued Apr 2026 | 1101 Treat Av | recommencement and completion of work approved under pa# 202406104050Details
recommencement and completion of work approved under pa# 202406104050 | |
| Mar 26, 2026 | Completed final sign-off Apr 2026 | 4950 California St | to obtain final inspection for work approved under pa 202408088245 all work completedDetails
to obtain final inspection for work approved under pa 202408088245 all work completed | |
| Mar 26, 2026 | Expired or cancelled denied Mar 2026 | 1101 Treat Av | request to renew 202406104050Details
request to renew 202406104050 | |
| Mar 20, 2026 | In progress issued Apr 2026 | 2970 Mission St | recommencement and completion of work approved under pa#202105070015...Details
recommencement and completion of work approved under pa#202105070015... | $300,000 |
| Dec 22, 2025 | Completed final sign-off Apr 2026 | 2338 Mission St | tenant improvement, update walkin cooler, replace 3 comp. sinks, preap sink and counters, install espresso equipment, bread display, update upstairs office and storage, remove door openingDetails
tenant improvement, update walkin cooler, replace 3 comp. sinks, preap sink and counters, install espresso equipment, bread display, update upstairs office and storage, remove door opening | $85,000 |
| Dec 8, 2025 | Completed final sign-off Apr 2026 | 4150 Irving St | to obtain final inspection for work approved under pa #2019-0422-8601. all work is complete.Details
to obtain final inspection for work approved under pa #2019-0422-8601. all work is complete. | |
| Sep 16, 2025 | Completed final sign-off Nov 2025 | 2400 Washington St | patch and seal walls and paintDetails
patch and seal walls and paint | $1,000 |
| Jul 7, 2025 | Completed final sign-off Oct 2025 | 182 Douglass St | kitchen and bathroom remodel. no structural work. relocate laundry hookups.Details
kitchen and bathroom remodel. no structural work. relocate laundry hookups. | $30,000 |
| May 15, 2025 | Completed final sign-off May 2025 | 680 Capp St | replace 360 sq.ft of siding left side of the building, not visible from street.Details
replace 360 sq.ft of siding left side of the building, not visible from street. | $5,000 |
| May 6, 2025 | In progress issued May 2025 | 4950 California St | to comply with nov 202536163 #3,4,5,6,8,9,10,11,13,15,16,17,&18 - repair: (3) treads & risers, siding & door to boiler room, garage ceilings, interior egress multiple walls. unit #2 - to comply with nov 202536161 #2,3,4,5,6,&7 - repair ceiling . unit #6 - to comply with nov 202535707 #2,3,4,5,&6.Details
to comply with nov 202536163 #3,4,5,6,8,9,10,11,13,15,16,17,&18 - repair: (3) treads & risers, siding & door to boiler room, garage ceilings, interior egress multiple walls. unit #2 - to comply with nov 202536161 #2,3,4,5,6,&7 - repair ceiling . unit #6 - to comply with nov 202535707 #2,3,4,5,&6. | $3,000 |
| Apr 22, 2025 | Completed final sign-off May 2025 | 301 Dorado Tr | unit 303: replace tiles due to water leak.pp20250418724 for unit 303 (lower) to replace tub and shower valve only.Details
unit 303: replace tiles due to water leak.pp20250418724 for unit 303 (lower) to replace tub and shower valve only. | $600 |
| Apr 22, 2025 | Completed final sign-off Jun 2025 | 2609 Lake St | to comply with nov 202536160 (for siding only). to reair siding as needed in kind. approx 300 sq ft.Details
to comply with nov 202536160 (for siding only). to reair siding as needed in kind. approx 300 sq ft. | $3,000 |
| Mar 31, 2025 | In progress issued Apr 2025 | 4950 California St | repair stucco entry way, no structural work. 10 sfDetails
repair stucco entry way, no structural work. 10 sf | $3,000 |
| Feb 7, 2025 | Completed final sign-off Aug 2025 | 4027 Mission St | kitchen and bath remodel. no structural work for both units. roof repair less than 300 sqft. to r/r e) vent stacksDetails
kitchen and bath remodel. no structural work for both units. roof repair less than 300 sqft. to r/r e) vent stacks | $30,000 |
| Aug 8, 2024 | Expired or cancelled expired Apr 2026 | 4950 California St | unit 3: remodel to include kitchen and bath. no structural workDetails
unit 3: remodel to include kitchen and bath. no structural work | $20,000 |
| Jun 24, 2024 | In progress issued Jun 2024 | 1656 Anza St | repair areas of building were trim is dryrotted, clean up areas of paint as per complaint# 20312271. no structural work & to comply with nov# 20424436 (street facing). all work in kind.Details
repair areas of building were trim is dryrotted, clean up areas of paint as per complaint# 20312271. no structural work & to comply with nov# 20424436 (street facing). all work in kind. | $6,000 |
| Jun 10, 2024 | In progress issued Jun 2024 | 1101 Treat Av | unit remodel to include kitchen and bathroom no structural work finishes only.Details
unit remodel to include kitchen and bathroom no structural work finishes only. | $60,000 |
| Apr 16, 2024 | Completed final sign-off Feb 2025 | 2609 Lake St | unit 1: remodel kitchen and bathroom. no structural work.Details
unit 1: remodel kitchen and bathroom. no structural work. | $20,000 |
| Mar 26, 2024 | Completed final sign-off Apr 2024 | 1353 Bush St | remove 4 kitchenets in units 101, 119, 201, 219. to comply w/ complaint #202308395.Details
remove 4 kitchenets in units 101, 119, 201, 219. to comply w/ complaint #202308395. | $1,500 |
| Jan 30, 2024 | Completed final sign-off Aug 2024 | 4950 California St | unit 10: to comply with complaint #202288741. survey broken window in unit 10 on 3rd fl.Details
unit 10: to comply with complaint #202288741. survey broken window in unit 10 on 3rd fl. | $500 |
| Jan 30, 2024 | Completed final sign-off Apr 2024 | 2 Parker Av | to comply with complaint #202310015 fire proof ground floor walls and ceilings to include any penetrationDetails
to comply with complaint #202310015 fire proof ground floor walls and ceilings to include any penetration | $2,000 |
| Jan 11, 2024 | Completed final sign-off May 2024 | 577 14th Av | unit 4 kitchen and bathroom remodel in kind. cabinet, sink, faucets.Details
unit 4 kitchen and bathroom remodel in kind. cabinet, sink, faucets. | $1,000 |
| Jan 11, 2024 | Completed final sign-off May 2024 | 577 14th Av | unit(s) 1 and 2; kitchen remodel in kind. cabinet(s), sink(s), faucet(s)Details
unit(s) 1 and 2; kitchen remodel in kind. cabinet(s), sink(s), faucet(s) | $2,000 |
| Nov 21, 2023 | Completed final sign-off Dec 2023 | 1504 Church St | reroofing.Details
reroofing. | $12,500 |
| Nov 21, 2023 | Completed final sign-off Dec 2023 | 1504 Church St | sheathing replacement for reroof under pa 202311211245.Details
sheathing replacement for reroof under pa 202311211245. | $2,000 |
| Aug 10, 2023 | Completed final sign-off Sep 2023 | 200 Maynard St | garage repair. replace siding (320 sq ft) in kind no changes primer and paint. to comply nov 202309354.Details
garage repair. replace siding (320 sq ft) in kind no changes primer and paint. to comply nov 202309354. | $3,000 |
| Mar 24, 2023 | Completed final sign-off Apr 2023 | 266 Bay Shore Bl | to comply with nov 201937940 and nov 201917594. remove unauthorized structure on reay yard. remove unauthorized roof/canopy on rear yard. repair (e) roof.Details
to comply with nov 201937940 and nov 201917594. remove unauthorized structure on reay yard. remove unauthorized roof/canopy on rear yard. repair (e) roof. | $7,000 |
| Mar 24, 2023 | Completed final sign-off Jun 2023 | 1722 Irving St | commercial unit. new interior partitions, new kitchenette, & subpanel, no structural work. meps under separate permits.Details
commercial unit. new interior partitions, new kitchenette, & subpanel, no structural work. meps under separate permits. | $42,000 |
| Dec 30, 2022 | Completed final sign-off Feb 2024 | 1846 San Jose Av | to comply with accessible business entrance program ord 51-16. replace door hardware, and threshold. install automatic door opener. ref abe 202002041670.Details
to comply with accessible business entrance program ord 51-16. replace door hardware, and threshold. install automatic door opener. ref abe 202002041670. | $5,000 |
| Dec 29, 2022 | In progress issued Jun 2024 | 4832 Mission St | comply with the accessible business entrance program per ordinance #51-16: abe 202208243050. mandatory disability access improvement.Details
comply with the accessible business entrance program per ordinance #51-16: abe 202208243050. mandatory disability access improvement. | $5,000 |
| Dec 29, 2022 | Completed final sign-off Oct 2023 | 4977 Mission St | to comply with accessible business entrance (abe) ord. 51-16. mandatory disability access improvement. main door hardware replacement, threshold replacement. abe # 202205190912Details
to comply with accessible business entrance (abe) ord. 51-16. mandatory disability access improvement. main door hardware replacement, threshold replacement. abe # 202205190912 | $5,000 |
| Dec 28, 2022 | Completed final sign-off Oct 2024 | 121 States St | construction of a deck at rear of property. reconfiguration of interior nonstructural walls. relocation of hvac and hw heaters. legalization of non-permitted bathroom. no work in public right of way. no work to front of building.Details
construction of a deck at rear of property. reconfiguration of interior nonstructural walls. relocation of hvac and hw heaters. legalization of non-permitted bathroom. no work in public right of way. no work to front of building. | $25,000 |
| Dec 12, 2022 | Completed final sign-off Apr 2023 | 1456 Vallejo St | apt# 102: remodel bath and kitchen no structural work to include plumbing and electricalDetails
apt# 102: remodel bath and kitchen no structural work to include plumbing and electrical | $10,000 |
| Dec 12, 2022 | Completed final sign-off Apr 2023 | 1462 Vallejo St | apt# 302: remodel bath and kitchen no structural work to include plumbing and electricalDetails
apt# 302: remodel bath and kitchen no structural work to include plumbing and electrical | $10,000 |
| Oct 24, 2022 | Completed final sign-off Aug 2024 | 581 Ivy St | relocate kitchen and bedrooms. remodel 1st floor bath. add full bath to 2nd floor. add washer and dryer. install (2) new sliding doors from bedrooms to exterior alley. replace roof. replace foundation. seismic upgrade. upgrade roof for future roof deck filed under separate permit pa# 202210245010.Details
relocate kitchen and bedrooms. remodel 1st floor bath. add full bath to 2nd floor. add washer and dryer. install (2) new sliding doors from bedrooms to exterior alley. replace roof. replace foundation. seismic upgrade. upgrade roof for future roof deck filed under separate permit pa# 202210245010. | $100,000 |
| Oct 24, 2022 | Completed final sign-off Aug 2024 | 581 Ivy St | new 360 sq.ft. roof deck. add stair from 2nd floor to (n) roof deck.Details
new 360 sq.ft. roof deck. add stair from 2nd floor to (n) roof deck. | $50,000 |
| Jul 15, 2022 | Completed final sign-off Aug 2022 | 292 Crescent Av | replace 2 windows : wood in front of propertyDetails
replace 2 windows : wood in front of property | $1,200 |
| Apr 8, 2022 | Never finaled issued Sep 2022, no final | 3646 Baker St | addition of new rooftop deck.Details
addition of new rooftop deck. | $30,000 |
| Feb 17, 2022 | Completed final sign-off Jun 2022 | 791 25th Av | (1) bathroom remodel. cosmetic only. no structural work. replace toilet, sink, tile and flooring in-kind.Details
(1) bathroom remodel. cosmetic only. no structural work. replace toilet, sink, tile and flooring in-kind. | $6,000 |
| Dec 16, 2021 | Expired or cancelled cancelled Apr 2022 | 1616 Ocean Av | revision to 202106212891. upgrade (e) bath to ada all gender. upgrade (e) service counter to ada service counter.Details
revision to 202106212891. upgrade (e) bath to ada all gender. upgrade (e) service counter to ada service counter. | $12,000 |
| Oct 29, 2019 | Never finaled issued Jun 2022, no final | 2908 California St | mandatory soft story retrofit per plans per sfebc chapter 4d engineering criteria.Details
mandatory soft story retrofit per plans per sfebc chapter 4d engineering criteria. | $80,000 |
| Oct 29, 2019 | Never finaled issued Jun 2022, no final | 1152 Jackson St | mandatory soft story retrofit per plans.Details
mandatory soft story retrofit per plans. | $80,000 |