C H Burnham Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2012 to Aug 2026
- Last 24 months
- 15 permits filed
148 permits since 2000: 120 completed, 10 in progress, 11 never finaled, 7 expired or cancelled.
Of the 11 never-finaled permits, 1 is 3 to 5 years old, 9 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 148.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 18, 2026 | In progress issued Sep 2026 | 1480 Willard St | remodel 1/f plan. in-fill addition at balcony. rebuild stairs to the 2/f to bring them into code compliance. add new bath & bar. new rear windows.Details
remodel 1/f plan. in-fill addition at balcony. rebuild stairs to the 2/f to bring them into code compliance. add new bath & bar. new rear windows. | $150,000 |
| Jul 29, 2026 | In progress issued Sep 2026 | 1045 Cole St | partial renovation to single family home including kitchen and powderroom. add new windows to rear. remove fireplace and chimney. replace in-kind roof deck guardrail, repair rear facade dry rot and roof decking.Details
partial renovation to single family home including kitchen and powderroom. add new windows to rear. remove fireplace and chimney. replace in-kind roof deck guardrail, repair rear facade dry rot and roof decking. | $110,000 |
| Jul 24, 2026 | In progress issued Aug 2026 | 1480 Willard St | remodel basement in single family home. add new bath & sauna. new glass doors & window.Details
remodel basement in single family home. add new bath & sauna. new glass doors & window. | $150,000 |
| May 18, 2026 | Completed final sign-off Jun 2026 | 411 Noriega St | revision to permit 202401315021, change proposed curd at rear room roof to 32" parapet to coordinate with approved structural design drawings. no work visible from street.Details
revision to permit 202401315021, change proposed curd at rear room roof to 32" parapet to coordinate with approved structural design drawings. no work visible from street. | $2,000 |
| May 6, 2026 | In progress issued May 2026 | 511 10th Av | revision to permit 202407025677. remove one skylight & one bathroom from third floor. relocate mudroom and laundry on ground floor. relocate water heater and hvac to garage. revise kitchen layout on second floor and remove west-facing kitchen window. revise window configuration at bedroom 3.Details
revision to permit 202407025677. remove one skylight & one bathroom from third floor. relocate mudroom and laundry on ground floor. relocate water heater and hvac to garage. revise kitchen layout on second floor and remove west-facing kitchen window. revise window configuration at bedroom 3. | $60,000 |
| Apr 29, 2026 | In progress issued Jun 2026 | 3880 Cesar Chavez St | revision to permit 202108045703, remove full bathroom from 1st floor proposed scope, convert to storage room with future bathroom rough-in plumbing.Details
revision to permit 202108045703, remove full bathroom from 1st floor proposed scope, convert to storage room with future bathroom rough-in plumbing. | |
| Nov 18, 2025 | Completed final sign-off Dec 2025 | 39 Atalaya Tr | recommencement and completion of work approved under pa# 202408239376Details
recommencement and completion of work approved under pa# 202408239376 | $10,000 |
| Jul 29, 2025 | Completed final sign-off Jun 2026 | 180 16th Av | revision to pa #202410233527 to respond to site condition to include new stair from 1st to 2nd floors and changing select windows facing rear yard replace in kind.Details
revision to pa #202410233527 to respond to site condition to include new stair from 1st to 2nd floors and changing select windows facing rear yard replace in kind. | $6,000 |
| Jul 16, 2025 | In progress issued Oct 2025 | 249 Santa Rosa Av | interior remodel and horizontal addition consisting of full interior remodel, horizontal addition at rear first and second level. landscape modification.Details
interior remodel and horizontal addition consisting of full interior remodel, horizontal addition at rear first and second level. landscape modification. | $190,000 |
| Jun 26, 2025 | Completed final sign-off Aug 2026 | 1225 17th Av | remodel new kitchenette & new window at 1st fl. remodel of kitchen & bathroom at 2nd fl. lighting & electrical upgrades. new boiler for radiant heat att 1st & 2nd fl. no new square footage, no horizontal or vertical additionDetails
remodel new kitchenette & new window at 1st fl. remodel of kitchen & bathroom at 2nd fl. lighting & electrical upgrades. new boiler for radiant heat att 1st & 2nd fl. no new square footage, no horizontal or vertical addition | $350,000 |
| May 6, 2025 | Expired or cancelled cancelled Jan 2026 | 345 Santa Clara Av | basement: convert portion to living space w/ bath, laundry, and storage. rebuild interior stair to basement. level 1: renovation of rear living space and kitchen, (n) powder room. level 2: full renovation of (e) bathrooms. replacement windows and some (n) windows. reduce size of garage.Details
basement: convert portion to living space w/ bath, laundry, and storage. rebuild interior stair to basement. level 1: renovation of rear living space and kitchen, (n) powder room. level 2: full renovation of (e) bathrooms. replacement windows and some (n) windows. reduce size of garage. | |
| Nov 4, 2024 | In progress issued Dec 2025 | 511 10th Av | remove non historic exterior cladding; infill under (e) elevated 2 story wing facing rear yard; replace 7 exterior windows; replace windows w/(n) clad windows; 1st fl excavation increase ceiling ht; construct (n) bedrm & (n) bath; 2nd fl - kitchen remodel & (n) powder rm; 3rd fl - remodel 2 (e) bathDetails
remove non historic exterior cladding; infill under (e) elevated 2 story wing facing rear yard; replace 7 exterior windows; replace windows w/(n) clad windows; 1st fl excavation increase ceiling ht; construct (n) bedrm & (n) bath; 2nd fl - kitchen remodel & (n) powder rm; 3rd fl - remodel 2 (e) bath | $400,000 |
| Oct 28, 2024 | Completed final sign-off Nov 2025 | 25 Bennington St | replace 5 street facing windows in kind. replace 2 windws on (e) dormers in kind. marvin alum-clad with same operation.Details
replace 5 street facing windows in kind. replace 2 windws on (e) dormers in kind. marvin alum-clad with same operation. | $10,000 |
| Oct 23, 2024 | Completed final sign-off Jun 2026 | 180 16th Av | project proposes a horizontal addition at the ground flr and converting a portion of the garage to conditioned space. the scope of work incldues a new 2f deck aboe the new addition below.Details
project proposes a horizontal addition at the ground flr and converting a portion of the garage to conditioned space. the scope of work incldues a new 2f deck aboe the new addition below. | $163,000 |
| Oct 15, 2024 | In progress issued Oct 2024 | 782 Lakeview Av | revision to pa # 2022-1230-9538 for changes to s2.1 & s2.2 to be more consistent with approved architectural drawings.Details
revision to pa # 2022-1230-9538 for changes to s2.1 & s2.2 to be more consistent with approved architectural drawings. | $5,000 |
| Sep 4, 2024 | Completed final sign-off Mar 2025 | 106 Noe St | electric enlargement opening panel at the wall at back.Details
electric enlargement opening panel at the wall at back. | $2,000 |
| Aug 23, 2024 | Expired or cancelled expired Dec 2025 | 39 Atalaya Tr | rev 202405021269- lower florr in garage work room and adjacent hall to match (n) laundry and bath 3Details
rev 202405021269- lower florr in garage work room and adjacent hall to match (n) laundry and bath 3 | $5,000 |
| May 2, 2024 | Completed final sign-off Dec 2025 | 39 Atalaya Tr | remodel kitchen, pantry and powder at 2nd floor. convert a portion of ground floor unconditional space into conditioned area with new bath, laundry room & connecting stair. remodel 3rd floor baths. new windows at sides and rear. no change to front elevation.Details
remodel kitchen, pantry and powder at 2nd floor. convert a portion of ground floor unconditional space into conditioned area with new bath, laundry room & connecting stair. remodel 3rd floor baths. new windows at sides and rear. no change to front elevation. | $200,000 |
| Apr 8, 2024 | Completed final sign-off Aug 2024 | 2224 Ortega St | bathroom remodel: move no walls.Details
bathroom remodel: move no walls. | $40,000 |
| Jan 31, 2024 | Completed final sign-off Jun 2026 | 411 Noriega St | remodel (e) single family dwelling to include: remove all (e) exterior doors and windows. replace with new exterior doors and windows. re-frame roof at family room to repair water damage. new concrete landscape stairs and planters at front exterior.Details
remodel (e) single family dwelling to include: remove all (e) exterior doors and windows. replace with new exterior doors and windows. re-frame roof at family room to repair water damage. new concrete landscape stairs and planters at front exterior. | $150,000 |
| Oct 13, 2023 | Completed final sign-off Oct 2024 | 125 Villa Tr | remodel primary bathroom @ level 3; replace 5 doors facing rear yard. no structural workDetails
remodel primary bathroom @ level 3; replace 5 doors facing rear yard. no structural work | $20,000 |
| Oct 10, 2023 | In progress issued May 2024 | 3880 Cesar Chavez St | revision to pa# 202108045703. revise primary bath layout. reduce rear yard deck (no fire wall), remove deck stairs, reduce landscape patio at rear. revise kitchen layout. revise 1st fl bathroom layout. revise location of rear-facing windows. no work visible from st.Details
revision to pa# 202108045703. revise primary bath layout. reduce rear yard deck (no fire wall), remove deck stairs, reduce landscape patio at rear. revise kitchen layout. revise 1st fl bathroom layout. revise location of rear-facing windows. no work visible from st. | |
| Jul 12, 2023 | Completed final sign-off Aug 2024 | 844 Page St | rear bldg/ revision to 202206297404: 1st fl-construct new laundry room, remove powder rm, modify 1st fl bedroom from original. 2nd fl: modify bathroom from originalDetails
rear bldg/ revision to 202206297404: 1st fl-construct new laundry room, remove powder rm, modify 1st fl bedroom from original. 2nd fl: modify bathroom from original | |
| May 18, 2023 | Completed final sign-off Jun 2023 | 184 Aptos Av | rev to pa# 202212218900, to add a closet to 2nd flr foyer & open shelving behind it at office.Details
rev to pa# 202212218900, to add a closet to 2nd flr foyer & open shelving behind it at office. | $1,000 |
| Mar 20, 2023 | Completed final sign-off Apr 2023 | 760 Church St | to obtain final inspection for work approved under permit 201304154490. all work is complete.Details
to obtain final inspection for work approved under permit 201304154490. all work is complete. | |
| Mar 9, 2023 | Completed final sign-off Aug 2024 | 844 Page St | new 241sf roof deck on existing single-family home located within the required rear yard. roof deck to have open railings. construct new single exit deck access stair. no new bldg envelope increase proposed.Details
new 241sf roof deck on existing single-family home located within the required rear yard. roof deck to have open railings. construct new single exit deck access stair. no new bldg envelope increase proposed. | $100,000 |
| Mar 7, 2023 | Completed final sign-off Aug 2023 | 111 Noe St | revision to pa#202301059726. clarifying scope at extg deck to be replaced in kind. clarifying dry rot repair to include storage space. less than 50%. reinforcment of dropped ceiling in kitchen and dry rot repair as needed.Details
revision to pa#202301059726. clarifying scope at extg deck to be replaced in kind. clarifying dry rot repair to include storage space. less than 50%. reinforcment of dropped ceiling in kitchen and dry rot repair as needed. | |
| Jan 5, 2023 | Completed final sign-off Aug 2023 | 111 Noe St | unit a: remodel bathroom, kitchen, and bedroom closet. replace 8 windows in rear and exterior rear door. repair dry rot at ceiling membrane under (e) roof deck less than 50%Details
unit a: remodel bathroom, kitchen, and bedroom closet. replace 8 windows in rear and exterior rear door. repair dry rot at ceiling membrane under (e) roof deck less than 50% | $20,000 |
| Dec 30, 2022 | In progress issued Jul 2024 | 782 Lakeview Av | 1) vertical addition of 1120sf to (e) 1-story house with basement. 2) interior remodel of (e) house, add laundry, office, mudroom and stairs to addition.Details
1) vertical addition of 1120sf to (e) 1-story house with basement. 2) interior remodel of (e) house, add laundry, office, mudroom and stairs to addition. | $400,000 |
| Dec 21, 2022 | Completed final sign-off Jun 2023 | 184 Aptos Av | 3/flr: remodel 2 bathrooms, add laundry closet. replace 9 metal windows with wood windows, replace gravity furnace w/ new electric heat pump hvac. replace knob and tube electrical throughout.Details
3/flr: remodel 2 bathrooms, add laundry closet. replace 9 metal windows with wood windows, replace gravity furnace w/ new electric heat pump hvac. replace knob and tube electrical throughout. | $250,000 |
| Dec 14, 2022 | Completed final sign-off Jul 2024 | 3400 Clay St | remodel (e) kitchen/dining rooms to create open floor plan kitchen & family room. remodel (e) powder room.Details
remodel (e) kitchen/dining rooms to create open floor plan kitchen & family room. remodel (e) powder room. | $68,000 |
| Nov 14, 2022 | Completed final sign-off Apr 2023 | 760 Church St | partial bathroom remodel in kind and shower panDetails
partial bathroom remodel in kind and shower pan | $5,000 |
| Sep 8, 2022 | Completed final sign-off Dec 2022 | 1620 Broadway | unit 6: rev to pa 202106142341. revise scope to include 5 new replacement windows at sides and rear (not visible from street) only second floor roof safety rail. omit third flr roof. review roof curb detail and rail designDetails
unit 6: rev to pa 202106142341. revise scope to include 5 new replacement windows at sides and rear (not visible from street) only second floor roof safety rail. omit third flr roof. review roof curb detail and rail design | |
| Jun 29, 2022 | Completed final sign-off Aug 2024 | 844 Page St | rear building: new internal stair to connect (e) conditioned 1/ to 2/f. interior remodel 1/f: construction of (2) bedroos, convert (e) door to eero windows.construction (n) powder room. construction (n) media room. interior remodel, 2/f: convert (e) bedroom to living room, convert (e) bed to (n)ofceDetails
rear building: new internal stair to connect (e) conditioned 1/ to 2/f. interior remodel 1/f: construction of (2) bedroos, convert (e) door to eero windows.construction (n) powder room. construction (n) media room. interior remodel, 2/f: convert (e) bedroom to living room, convert (e) bed to (n)ofce | $275,000 |
| Jun 21, 2022 | Completed final sign-off Apr 2023 | 760 Church St | revision to 202203079364. (e) post at garage to be removed, 2 posts. reinforce beams, sister w/ (e) beams. replace (e) beam.Details
revision to 202203079364. (e) post at garage to be removed, 2 posts. reinforce beams, sister w/ (e) beams. replace (e) beam. | $5,000 |
| Jun 16, 2022 | Completed final sign-off Apr 2023 | 48 Westgate Dr | interior remodel of existing kitchen and dining room.Details
interior remodel of existing kitchen and dining room. | $50,000 |
| May 26, 2022 | Completed final sign-off Feb 2023 | 760 Church St | repair dryrot discovered on rear deck less than 50%. replace siding on rear facade due to dry rot.Details
repair dryrot discovered on rear deck less than 50%. replace siding on rear facade due to dry rot. | $10,000 |
| Mar 7, 2022 | Completed final sign-off Apr 2023 | 760 Church St | unit 2 new spiral staircase, kitchen remodel; unit 1 kitchen remodel without drawingDetails
unit 2 new spiral staircase, kitchen remodel; unit 1 kitchen remodel without drawing | $50,000 |
| Feb 28, 2022 | Completed final sign-off Apr 2023 | 760 Church St | unit#1: in kind, remodel bathroom and kitchen. move no walls- in kind. replace siding on south side of unit #1 in kind.Details
unit#1: in kind, remodel bathroom and kitchen. move no walls- in kind. replace siding on south side of unit #1 in kind. | $30,000 |
| Feb 15, 2022 | Completed final sign-off Dec 2025 | 25 Bennington St | remove 1-story rear addition & replace w/ 3-story addition. excavate @ rear garage to create 1st fl living space. relocate (e) 2nd fl kitchen & bathroom, add 2 dommers, 2 bedrooms, 1 bath, skylight, & balcony @ 3rd fl. build ((n) interior stair. add spiral stair & patio @ rearDetails
remove 1-story rear addition & replace w/ 3-story addition. excavate @ rear garage to create 1st fl living space. relocate (e) 2nd fl kitchen & bathroom, add 2 dommers, 2 bedrooms, 1 bath, skylight, & balcony @ 3rd fl. build ((n) interior stair. add spiral stair & patio @ rear | $550,000 |
| Oct 4, 2021 | Completed final sign-off Dec 2022 | 1620 Broadway | apt 6: remodel (e) kitchen, replace cabinets, fixtures and finishes. insall recessed lighting. install new laundry cabinet.Details
apt 6: remodel (e) kitchen, replace cabinets, fixtures and finishes. insall recessed lighting. install new laundry cabinet. | $20,000 |
| Sep 30, 2021 | Completed final sign-off Jan 2023 | 1258 43rd Av | revision to 202008262715, clouded at delta 4 arch, delta 2 structural. new lightwell with 2 new dual glazed windows, layout changes to new master bath, new bath 1, and new bath 2.Details
revision to 202008262715, clouded at delta 4 arch, delta 2 structural. new lightwell with 2 new dual glazed windows, layout changes to new master bath, new bath 1, and new bath 2. | $1,000 |
| Sep 22, 2021 | Completed final sign-off Apr 2023 | 760 Church St | unit #2: new office. new door to rear yard.Details
unit #2: new office. new door to rear yard. | $15,000 |
| Sep 22, 2021 | Completed final sign-off Apr 2023 | 760 Church St | unit 3 and affected floors below; field revision to increase headspace at stair at unit 3 to roof; and add in new bedroom in support of roof with the removal of wall bearing approved drawing permit no. 202102044061.Details
unit 3 and affected floors below; field revision to increase headspace at stair at unit 3 to roof; and add in new bedroom in support of roof with the removal of wall bearing approved drawing permit no. 202102044061. | $10,000 |
| Sep 10, 2021 | Completed final sign-off Jun 2024 | 483 28th St | remodel e (2) kitchens and (2) baths. remove load bearing wall. add (2) washers and (2) dryers.Details
remodel e (2) kitchens and (2) baths. remove load bearing wall. add (2) washers and (2) dryers. | $95,000 |
| Aug 17, 2021 | Completed final sign-off Mar 2022 | 111 Noe St | kitchen and bath remodel in kind.lights per cec 150.0k.Details
kitchen and bath remodel in kind.lights per cec 150.0k. | $30,000 |
| Aug 4, 2021 | Never finaled issued Sep 2022, no final | 3880 Cesar Chavez St | alter site to revise site pa#201703312927-s. reduction of approved 4-story 23'-3" horizontal addition to smaller 3-story 2'-8" horizontal addition with 16'-0" 2nd fl deck and stair to grade in rear yd (18'-8" total proposed horizontal addition). no change to street facade aside from restoration workDetails
alter site to revise site pa#201703312927-s. reduction of approved 4-story 23'-3" horizontal addition to smaller 3-story 2'-8" horizontal addition with 16'-0" 2nd fl deck and stair to grade in rear yd (18'-8" total proposed horizontal addition). no change to street facade aside from restoration work | |
| Jul 30, 2021 | Completed final sign-off Mar 2023 | 5333 California St | interior remodel of 1st fl unit 5333 to include relocated kitchen, master bath, bathroomDetails
interior remodel of 1st fl unit 5333 to include relocated kitchen, master bath, bathroom | $115,000 |
| Jun 14, 2021 | Completed final sign-off Dec 2022 | 1620 Broadway | 3rd flr #6 - replace 5 (e) winoows at side & rear of unit 6 (non visible from st). replace (e) safety rail at non-occupied 3rd fl roof. add safety rail @ 4th fl roof. add skylight at unit 6 kitchen. no roof deck existing or proposed.Details
3rd flr #6 - replace 5 (e) winoows at side & rear of unit 6 (non visible from st). replace (e) safety rail at non-occupied 3rd fl roof. add safety rail @ 4th fl roof. add skylight at unit 6 kitchen. no roof deck existing or proposed. | $30,000 |
| Feb 4, 2021 | Completed final sign-off Feb 2023 | 760 Church St | remodel kitchen, wall to be removed between living room and dining room. new bedroom. new bathroom at master bedroom.Details
remodel kitchen, wall to be removed between living room and dining room. new bedroom. new bathroom at master bedroom. | $135,000 |
| Jan 28, 2021 | Completed final sign-off May 2023 | 369 Missouri St | create new master suite by raising roof and adding a vertical addition at the rear. new connecting stair from second floor to third floor. new skylight over stair.Details
create new master suite by raising roof and adding a vertical addition at the rear. new connecting stair from second floor to third floor. new skylight over stair. | $200,000 |
| Dec 29, 2020 | Never finaled issued Feb 2021, no final | 11 Surrey St | revision to pa #202008222416 - foundation replacement beneath breakfast room to replace posts and piers with continuous footing. extension of curb detail across front of mechanical roomDetails
revision to pa #202008222416 - foundation replacement beneath breakfast room to replace posts and piers with continuous footing. extension of curb detail across front of mechanical room | $3,000 |
| Aug 26, 2020 | Completed final sign-off Jan 2023 | 1258 43rd Av | remodel includes a (n) master suite (m. bed, bath, closet), (n) office, (n) storage area and (n) laundry at lower level. at main level, remodel includes 2 (n) bathrooms, and renovated kitchen / dining area.Details
remodel includes a (n) master suite (m. bed, bath, closet), (n) office, (n) storage area and (n) laundry at lower level. at main level, remodel includes 2 (n) bathrooms, and renovated kitchen / dining area. | $380,000 |
| Aug 22, 2020 | Completed final sign-off Jun 2023 | 11 Surrey St | interior remodel of (e) 2-story residence with 267 unconditioned crawl space; remodel bath, add skylight, (n) window, family rm, remodel living rm/kitchen/breakfast rm. move doors in 2 bedrooms. convert crawl space into conditioned space w/ laundry/bath/mech room. new deck/stairs and wall.Details
interior remodel of (e) 2-story residence with 267 unconditioned crawl space; remodel bath, add skylight, (n) window, family rm, remodel living rm/kitchen/breakfast rm. move doors in 2 bedrooms. convert crawl space into conditioned space w/ laundry/bath/mech room. new deck/stairs and wall. | $100,000 |
| Jun 4, 2020 | Completed final sign-off Mar 2022 | 21 Paramount Tr | new windows at (e) openings same size same location, marvin alum clad wood, at second floor front (north) facade. max u-factor 0.32 or better; no other workDetails
new windows at (e) openings same size same location, marvin alum clad wood, at second floor front (north) facade. max u-factor 0.32 or better; no other work | $5,200 |
| Mar 3, 2020 | Completed final sign-off Nov 2020 | 11 Bennington St | rev to pa# 201906062724; replace existing rear yard fenceDetails
rev to pa# 201906062724; replace existing rear yard fence | $5,000 |
| Feb 19, 2020 | Completed final sign-off Dec 2020 | 844 Cabrillo St | rev to pa# 201907055181; scope of work includes eliminating grade beam & bearing wall at line 3 due to discovery of (e) beam, replace (e) footing w/new at lightwellDetails
rev to pa# 201907055181; scope of work includes eliminating grade beam & bearing wall at line 3 due to discovery of (e) beam, replace (e) footing w/new at lightwell | |
| Dec 17, 2019 | Completed final sign-off Mar 2022 | 21 Paramount Tr | reconfiguration of interior walls & exterior entry, 1 new bath, 2 new bedroom, 1 new interior communication stair, and 2 new rear windows, 2 new skylights, replacement of 1 existing skylight. remodel existing kitchen and bathDetails
reconfiguration of interior walls & exterior entry, 1 new bath, 2 new bedroom, 1 new interior communication stair, and 2 new rear windows, 2 new skylights, replacement of 1 existing skylight. remodel existing kitchen and bath | $325,000 |
| Dec 12, 2019 | Completed final sign-off Aug 2022 | 2359 39th Av | interior renovation of existing single family semi-detached house. new conditioned space on ground floor, reconfiguration of partitions on 2nd floor. all work occurs in existing envelopeDetails
interior renovation of existing single family semi-detached house. new conditioned space on ground floor, reconfiguration of partitions on 2nd floor. all work occurs in existing envelope | $115,000 |
| Oct 11, 2019 | Completed final sign-off Feb 2020 | 156 Texas St | front bldg: roof deck and siding repair: remove and replace in kind. less than 50%Details
front bldg: roof deck and siding repair: remove and replace in kind. less than 50% | $20,000 |
| Sep 24, 2019 | Never finaled issued Sep 2019, no final | 569 Valencia St | street spaceDetails
street space | |
| Sep 24, 2019 | Never finaled issued Sep 2019, no final | 11 Bennington St | street spaceDetails
street space | |
| Sep 3, 2019 | Completed final sign-off Jun 2020 | 258 Judson Av | revision to 201907115591 small changes to foundationDetails
revision to 201907115591 small changes to foundation | $10,000 |
| Jul 23, 2019 | Completed final sign-off Nov 2019 | 569 Valencia St | mechanical and electrical deferred submittal for pa 2019-0510-0326 (interior tenant improvement for retail)Details
mechanical and electrical deferred submittal for pa 2019-0510-0326 (interior tenant improvement for retail) | $25,000 |
| Jul 11, 2019 | Completed final sign-off Jun 2020 | 258 Judson Av | interior remodel & unconditioned space conversion.Details
interior remodel & unconditioned space conversion. | $200,000 |
| Jul 5, 2019 | Completed final sign-off Dec 2020 | 844 Cabrillo St | renovation to (e) 1/f including (n) master bedrm, (n) closet, (n) bath; modification to (e) interior stairs; window/door changes at rear on 1/f; replacement of 2/f fireplace; minor interior modification at 2/f; 2 lightwell to be replaced in kind; cosmetic upgrades to (e) common hallDetails
renovation to (e) 1/f including (n) master bedrm, (n) closet, (n) bath; modification to (e) interior stairs; window/door changes at rear on 1/f; replacement of 2/f fireplace; minor interior modification at 2/f; 2 lightwell to be replaced in kind; cosmetic upgrades to (e) common hall | $100,000 |
| Jun 17, 2019 | Completed final sign-off Apr 2021 | 425 01st St | revision to pa 201709127764. relocate wine fridge, changes to electrical plans - new light specificationsDetails
revision to pa 201709127764. relocate wine fridge, changes to electrical plans - new light specifications | $40,000 |
| Jun 6, 2019 | Completed final sign-off Nov 2020 | 11 Bennington St | replace perimeter fence, add concrete slab patio in backyard, add concrete slab to front, add ev charging station to garage, replace e door @den, replace e windows @front of house, modify ext facing sliding doors and windows @kitchen, dining. update/revise details for rear deck. revis 201706098947Details
replace perimeter fence, add concrete slab patio in backyard, add concrete slab to front, add ev charging station to garage, replace e door @den, replace e windows @front of house, modify ext facing sliding doors and windows @kitchen, dining. update/revise details for rear deck. revis 201706098947 | $40,000 |
| May 10, 2019 | Never finaled issued May 2019, no final | 569 Valencia St | retail ti, interior workDetails
retail ti, interior work | $80,000 |
| Apr 25, 2019 | Completed final sign-off Nov 2020 | 11 Bennington St | revision to 201706098947 remove and replace foundation on south side of property line 1 b to eDetails
revision to 201706098947 remove and replace foundation on south side of property line 1 b to e | $1,500 |
| Mar 7, 2019 | Completed final sign-off Nov 2020 | 11 Bennington St | revision to pa 201706098947. revision to foundation planDetails
revision to pa 201706098947. revision to foundation plan | $8,000 |
| Feb 6, 2019 | Completed final sign-off Jan 2020 | 1219 06th Av | remodel upper unit (1,606 sq ft.) living, dinning, kitchen, master bedroom, (n) walk in closet, bedroom 1.Details
remodel upper unit (1,606 sq ft.) living, dinning, kitchen, master bedroom, (n) walk in closet, bedroom 1. | $280,000 |
| Jan 15, 2019 | Never finaled issued Feb 2019, no final | 420 Hazelwood Av | revision to (e) pa 201810123125. remove stairs from (e) deck, (n) rail, (n) low gate at deck, (n) window in officeDetails
revision to (e) pa 201810123125. remove stairs from (e) deck, (n) rail, (n) low gate at deck, (n) window in office | $5,000 |
| Dec 13, 2018 | Completed final sign-off May 2019 | 49 Seacliff Av | remodel three bathrooms no change to existing layout. remodel in kind, no structural work. comply with cec 152(k)5Details
remodel three bathrooms no change to existing layout. remodel in kind, no structural work. comply with cec 152(k)5 | $50,000 |
| Dec 11, 2018 | Never finaled issued Dec 2018, no final | 420 Hazelwood Av | install temporary shoring system to support extg s.f.d. during extension and remodeling of 1st floor level & to support soils as shown on sh 2.0 to allow construction of new lightwell at 420 hazelwood ave.Details
install temporary shoring system to support extg s.f.d. during extension and remodeling of 1st floor level & to support soils as shown on sh 2.0 to allow construction of new lightwell at 420 hazelwood ave. | $50,000 |
| Nov 26, 2018 | Completed final sign-off Aug 2019 | 4540 20th St | add interior spiral stairs in living room to connect to garage level. add walk in clost on 1st fl master bedroom. no exterior work.remove wetbar.Details
add interior spiral stairs in living room to connect to garage level. add walk in clost on 1st fl master bedroom. no exterior work.remove wetbar. | $6,500 |
| Oct 22, 2018 | Never finaled issued Oct 2018, no final | 420 Hazelwood Av | kitchen remodel, no relocation of walls, 120 sq ftDetails
kitchen remodel, no relocation of walls, 120 sq ft | $25,000 |
| Oct 12, 2018 | Completed final sign-off Jul 2020 | 420 Hazelwood Av | rooms down renovation to add family room & guest bedroom in (e) ground floor garage space. addition of new windows to service ground level rooms. new interior stair from garage to main level to replace existing non code compliant stair. main level interior renovation at kitchenDetails
rooms down renovation to add family room & guest bedroom in (e) ground floor garage space. addition of new windows to service ground level rooms. new interior stair from garage to main level to replace existing non code compliant stair. main level interior renovation at kitchen | $250,000 |
| Aug 7, 2018 | Completed final sign-off Nov 2018 | 1895 Pacific Av | remodel bathroom - move no wallsDetails
remodel bathroom - move no walls | $15,000 |
| Jul 12, 2018 | Completed final sign-off Nov 2018 | 2866 Jackson St | new laundry roomDetails
new laundry room | $5,000 |
| Jul 12, 2018 | Completed final sign-off Feb 2019 | 5001 Diamond Heights Bl | kitchen renovation; new hardwood flooring, replace gas fireplaceDetails
kitchen renovation; new hardwood flooring, replace gas fireplace | $80,000 |
| May 14, 2018 | Completed final sign-off Oct 2018 | 950 Columbus Av | remodel two bathrooms no walls will be moved, replace 1(x) tub, 1(x) shower surround, 2(x) vanitiesDetails
remodel two bathrooms no walls will be moved, replace 1(x) tub, 1(x) shower surround, 2(x) vanities | $30,000 |
| Apr 16, 2018 | Completed final sign-off May 2018 | 3880 23rd St | dry rot repairs to front of house. replace existing trim in kind, wood siding, at 2nd fl bay window.Details
dry rot repairs to front of house. replace existing trim in kind, wood siding, at 2nd fl bay window. | $5,000 |
| Apr 4, 2018 | Never finaled issued Apr 2018, no final | 2727 Jackson St | remove and replace siding to repair leaks. all work at side and rear of house, not visible from street. maher naDetails
remove and replace siding to repair leaks. all work at side and rear of house, not visible from street. maher na | $20,000 |
| Mar 8, 2018 | Completed final sign-off Oct 2018 | 1683 32nd Av | new pair of 32" french door at laoundry, bathroom remodel in kind, new 22'0" x 9'-0" rear patio, lower the closet ceiling by 3" at 2nd fl. replace front windows in kind (same size and location) with wood (casement)Details
new pair of 32" french door at laoundry, bathroom remodel in kind, new 22'0" x 9'-0" rear patio, lower the closet ceiling by 3" at 2nd fl. replace front windows in kind (same size and location) with wood (casement) | $5,000 |
| Jan 26, 2018 | Completed final sign-off Apr 2018 | 2729 Jackson St | bathroom remodel. no structural work. no wall/layout modifications.Details
bathroom remodel. no structural work. no wall/layout modifications. | $10,000 |
| Jan 16, 2018 | Completed final sign-off Apr 2018 | 369 Missouri St | bathroom remodel - no walls will be moved.Details
bathroom remodel - no walls will be moved. | $20,000 |
| Dec 11, 2017 | Completed final sign-off Jan 2018 | 1235 Sanchez St | revision to pa#201408194190 sidewalk encrochment permit originally approved by dpw request dbi reviewDetails
revision to pa#201408194190 sidewalk encrochment permit originally approved by dpw request dbi review | |
| Sep 19, 2017 | Completed final sign-off Nov 2018 | 18 Roanoke St | revision to app#201510018589 and 201707111588 to alter location of 2 walls on 1st floor onlyDetails
revision to app#201510018589 and 201707111588 to alter location of 2 walls on 1st floor only | $4,000 |
| Sep 19, 2017 | Completed final sign-off Nov 2017 | 1683 32nd Av | remodel bathroom - move no wallsDetails
remodel bathroom - move no walls | $15,000 |
| Sep 15, 2017 | Completed final sign-off Jun 2018 | 2727 Jackson St | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. n/a for maherDetails
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. n/a for maher | $50,000 |
| Aug 9, 2017 | Completed final sign-off Feb 2018 | 165 Farnum St | add new drain pipe at gr fl per plans. gr fl rms prev apprvd under 201708094391Details
add new drain pipe at gr fl per plans. gr fl rms prev apprvd under 201708094391 | $3,600 |
| Jul 13, 2017 | Never finaled issued Jan 2018, no final | 605 Waller St | revision to app#201609026787. revisions include modifications to post base details in 4/55.1Details
revision to app#201609026787. revisions include modifications to post base details in 4/55.1 | |
| Jul 11, 2017 | Completed final sign-off Nov 2018 | 18 Roanoke St | revision to 201510018589 to omit 2nd fl renovations, add new interior stair to 1st fl, convert 1st fl to conditioned space with 2 bdrms and bath in addition to work under orig permitDetails
revision to 201510018589 to omit 2nd fl renovations, add new interior stair to 1st fl, convert 1st fl to conditioned space with 2 bdrms and bath in addition to work under orig permit | |
| Jun 9, 2017 | Completed final sign-off Nov 2020 | 11 Bennington St | vertical rear addition to (e) 2 storysingle family house. interior renovations and addition. facade modification. replace front porch and entry stairDetails
vertical rear addition to (e) 2 storysingle family house. interior renovations and addition. facade modification. replace front porch and entry stair | $345,000 |
| May 22, 2017 | Completed final sign-off Aug 2017 | 2043 Bush St | leak repair, remove and replace deck waterproofing and siding. work not visable from street.Details
leak repair, remove and replace deck waterproofing and siding. work not visable from street. | $20,000 |
| May 15, 2017 | Completed final sign-off Jan 2018 | 1235 Sanchez St | increase valuation per correction notice: pa# 201408194190Details
increase valuation per correction notice: pa# 201408194190 | $340,000 |
| May 3, 2017 | Completed final sign-off Dec 2017 | 3400 Clay St | interior alteration: remove raised floor in the lower level, new fixtures & fittings in the third level & fourth level bathroom, wet bar in the lower level.Details
interior alteration: remove raised floor in the lower level, new fixtures & fittings in the third level & fourth level bathroom, wet bar in the lower level. | $10,000 |
| Mar 13, 2017 | Completed final sign-off Apr 2017 | 17 25th North Av | leak repairs to chimney on northeast corner of residence. repairs in kind.Details
leak repairs to chimney on northeast corner of residence. repairs in kind. | $3,000 |
| Mar 8, 2017 | Completed final sign-off Jan 2018 | 1235 Sanchez St | compliance with nov 201764551: additional demo due to dry rotDetails
compliance with nov 201764551: additional demo due to dry rot |