George Soskin

License
C9223
Look the license up with the state
Listed as
architect, attorney, authorized agent-others, designer, engineer
Firm
Huntsman
Based in
San Francisco
On San Francisco permits
Sep 2013 to Mar 2023

656 permits since 2000 (architect on 631 permits, engineer on 12 permits, designer on 9 permits, authorized agent-others on 3 permits, attorney on 1 permit): 540 completed, 84 never finaled, 32 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

Showing the 100 most recent of 656.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Mar 2, 2023Completed
final sign-off Jul 2023
1 Embarcadero CenterPeacock Construction15/f: upgrade restrooms to full compliance & new finishes in elevator lobby & common area corridors.no change in occupancy area or use. mep,life safety & sprinklers deferred.
Details
Permit
202303022890
Status
complete
Filed
Mar 2, 2023
Permit issued
Mar 13, 2023
Final sign-off
Jul 31, 2023
Declared cost
$185,000
Address
1 Embarcadero Center

15/f: upgrade restrooms to full compliance & new finishes in elevator lobby & common area corridors.no change in occupancy area or use. mep,life safety & sprinklers deferred.

Open the permit page

$185,000
Dec 28, 2022Completed
final sign-off Mar 2025
1 California StBcci Construction Company, Swinerton Builders19th floor office t.i. to include new partitions, ceilings, finishes & mep.
Details
Permit
202212289252
Status
complete
Filed
Dec 28, 2022
Permit issued
Jan 17, 2023
Final sign-off
Mar 18, 2025
Declared cost
$345,000
Address
1 California St

19th floor office t.i. to include new partitions, ceilings, finishes & mep.

Open the permit page

$345,000
Dec 22, 2022Completed
final sign-off May 2024
1 Embarcadero CenterHathaway Dinwiddie Co.interior demo and abatement of existing unoccupied 25th & 26th floors including non-structural partitions, ceilings, lighting, plumbing and finishes. replace any removed fire-proofing with new to maintain existing fire ratings. no change in occupancy, use or area. ab-017.
Details
Permit
202212229027
Status
complete
Filed
Dec 22, 2022
Permit issued
Mar 29, 2023
Final sign-off
May 22, 2024
Declared cost
$215,000
Address
1 Embarcadero Center

interior demo and abatement of existing unoccupied 25th & 26th floors including non-structural partitions, ceilings, lighting, plumbing and finishes. replace any removed fire-proofing with new to maintain existing fire ratings. no change in occupancy, use or area. ab-017.

Open the permit page

$215,000
Dec 20, 2022Completed
final sign-off Feb 2025
555 California StNovo Construction Inc46/f - ste 4646: revision to pa 2022-0706-7839 to create new ti closet, 2 private offices, lighting finishes and power
Details
Permit
202212208718
Status
complete
Filed
Dec 20, 2022
Permit issued
Mar 17, 2023
Final sign-off
Feb 21, 2025
Address
555 California St

46/f - ste 4646: revision to pa 2022-0706-7839 to create new ti closet, 2 private offices, lighting finishes and power

Open the permit page

Dec 15, 2022Completed
final sign-off Aug 2023
1 Embarcadero CenterPeacock Construction20th floor: non-structural demo upgrade toilet rooms to full t-24 compliance. new finishes in elevator lobby and common corridor. no change in occupancy, use, or area. mep, life safty, & sprinkler defered.
Details
Permit
202212158424
Status
complete
Filed
Dec 15, 2022
Permit issued
Mar 8, 2023
Final sign-off
Aug 15, 2023
Declared cost
$157,000
Address
1 Embarcadero Center

20th floor: non-structural demo upgrade toilet rooms to full t-24 compliance. new finishes in elevator lobby and common corridor. no change in occupancy, use, or area. mep, life safty, & sprinkler defered.

Open the permit page

$157,000
Dec 15, 2022Completed
final sign-off Feb 2023
1 Embarcadero CenterHp Build16/f: approx 200 sq. ft. area, revision to (e) suite entry, demo of (e) wall partiiton, storefront, ceiling lights, new partition work, ceiling tilework, doors. no deferred work only trade permits.
Details
Permit
202212158361
Status
complete
Filed
Dec 15, 2022
Permit issued
Dec 22, 2022
Final sign-off
Feb 24, 2023
Declared cost
$80,000
Address
1 Embarcadero Center

16/f: approx 200 sq. ft. area, revision to (e) suite entry, demo of (e) wall partiiton, storefront, ceiling lights, new partition work, ceiling tilework, doors. no deferred work only trade permits.

Open the permit page

$80,000
Dec 15, 2022Completed
final sign-off Jul 2023
1 Embarcadero CenterGci, Incnon structural demo. upgrade toilet rooms to full t24 compliance. new finishes in elev lobbyand common corridor. no change in occupancy, use or area. mep, ls, sprinlkers deferred.
Details
Permit
202212158474
Status
complete
Filed
Dec 15, 2022
Permit issued
Jan 19, 2023
Final sign-off
Jul 17, 2023
Declared cost
$157,000
Address
1 Embarcadero Center

non structural demo. upgrade toilet rooms to full t24 compliance. new finishes in elev lobbyand common corridor. no change in occupancy, use or area. mep, ls, sprinlkers deferred.

Open the permit page

$157,000
Dec 13, 2022Completed
final sign-off Sep 2024
50 California StRichlen Constructionnon structural demo, new non structural partitoins, paint, new compliant toilet rooms, no change in occupancy use or area. life safety deferred.
Details
Permit
202212138199
Status
complete
Filed
Dec 13, 2022
Permit issued
Dec 19, 2022
Final sign-off
Sep 13, 2024
Declared cost
$16,000
Address
50 California St

non structural demo, new non structural partitoins, paint, new compliant toilet rooms, no change in occupancy use or area. life safety deferred.

Open the permit page

$16,000
Nov 14, 2022Completed
final sign-off Jul 2023
555 California StBcci Construction Company21/f: interior improvements, non structural partitions, ceiling grid, lighting and finishes.
Details
Permit
202211146410
Status
complete
Filed
Nov 14, 2022
Permit issued
Apr 20, 2023
Final sign-off
Jul 13, 2023
Declared cost
$287,600
Address
555 California St

21/f: interior improvements, non structural partitions, ceiling grid, lighting and finishes.

Open the permit page

$287,600
Oct 4, 2022Completed
final sign-off Feb 2025
535 Mission StM C S Construction Servicesnew non structural partitions, glass, doors, millwork and finishes. mep, l/s sprinklers deferred. no change in occupancy, use or area.
Details
Permit
202210043657
Status
complete
Filed
Oct 4, 2022
Permit issued
Nov 16, 2022
Final sign-off
Feb 27, 2025
Declared cost
$110,000
Address
535 Mission St

new non structural partitions, glass, doors, millwork and finishes. mep, l/s sprinklers deferred. no change in occupancy, use or area.

Open the permit page

$110,000
Sep 22, 2022Completed
final sign-off Mar 2023
3 Embarcadero CenterSource Planning And Construction Increvision to 202202168054. replace scope. delete mep
Details
Permit
202209222926
Status
complete
Filed
Sep 22, 2022
Permit issued
Oct 4, 2022
Final sign-off
Mar 1, 2023
Address
3 Embarcadero Center

revision to 202202168054. replace scope. delete mep

Open the permit page

Sep 22, 2022Completed
final sign-off Mar 2023
2 Embarcadero CenterSource Planning And Construction Inc16th fl - revision to pa 2021-0211-4453 reduce scope delete mep scope
Details
Permit
202209222959
Status
complete
Filed
Sep 22, 2022
Permit issued
Oct 4, 2022
Final sign-off
Mar 3, 2023
Address
2 Embarcadero Center

16th fl - revision to pa 2021-0211-4453 reduce scope delete mep scope

Open the permit page

Sep 8, 2022Completed
final sign-off Oct 2022
4 Embarcadero CenterM C S Construction Servicessuite 3410: deferred mechanical and electrical title 24 compliance. ref t.i. pa 202207128225.
Details
Permit
202209082084
Status
complete
Filed
Sep 8, 2022
Permit issued
Sep 8, 2022
Final sign-off
Oct 6, 2022
Declared cost
$25,000
Address
4 Embarcadero Center

suite 3410: deferred mechanical and electrical title 24 compliance. ref t.i. pa 202207128225.

Open the permit page

$25,000
Aug 23, 2022Expired or cancelled
cancelled Jan 2026
101 02nd St2/f: non-structural demo. new non-structural partitions, door/frame/hardware, millwork, finishes. no change in occupancy, use or area. mep included in the set. life safety and sprinklers under separate permit.
Details
Permit
202208231073
Status
cancelled
Filed
Aug 23, 2022
Declared cost
$211,514
Address
101 02nd St

2/f: non-structural demo. new non-structural partitions, door/frame/hardware, millwork, finishes. no change in occupancy, use or area. mep included in the set. life safety and sprinklers under separate permit.

Open the permit page

$211,514
Aug 2, 2022Completed
final sign-off Dec 2022
1 Embarcadero CenterM C S Construction Services15/f: non-struc demo and isntall new non-structural partitions, glazing, dfh, millwork, finishes. no changes in occupany, use or area, mep, sprinklers & fire safety deferred. maher n/a.
Details
Permit
202208029710
Status
complete
Filed
Aug 2, 2022
Permit issued
Aug 16, 2022
Final sign-off
Dec 28, 2022
Declared cost
$149,610
Address
1 Embarcadero Center

15/f: non-struc demo and isntall new non-structural partitions, glazing, dfh, millwork, finishes. no changes in occupany, use or area, mep, sprinklers & fire safety deferred. maher n/a.

Open the permit page

$149,610
Jul 6, 2022Completed
final sign-off Mar 2023
301 Howard StBcci Construction Company2nd floor. rev to pa 2022-0506-3752 remove two way comm and mushroom button at elevator lobby - remove card readers from elevator lobbies
Details
Permit
202207067837
Status
complete
Filed
Jul 6, 2022
Permit issued
Jul 6, 2022
Final sign-off
Mar 1, 2023
Declared cost
$11,500
Address
301 Howard St

2nd floor. rev to pa 2022-0506-3752 remove two way comm and mushroom button at elevator lobby - remove card readers from elevator lobbies

Open the permit page

$11,500
Jul 6, 2022Completed
final sign-off Feb 2025
555 California StNovo Construction Inc46/f ste 4646: ti consist of new non structural partitions, glazing, doors, lighting, finishes, and power. mechanical and electrical.
Details
Permit
202207067839
Status
complete
Filed
Jul 6, 2022
Permit issued
Jul 20, 2022
Final sign-off
Feb 21, 2025
Declared cost
$1,010,000
Address
555 California St

46/f ste 4646: ti consist of new non structural partitions, glazing, doors, lighting, finishes, and power. mechanical and electrical.

Open the permit page

$1,010,000
Jun 22, 2022Completed
final sign-off Sep 2022
555 California StBcci Construction Company43rd floor demo of selective partitions, ceilings, millwork, doors/frames and finishes. new paritions, door, paint and lighting. mep deferred.
Details
Permit
202206226892
Status
complete
Filed
Jun 22, 2022
Permit issued
Jun 23, 2022
Final sign-off
Sep 20, 2022
Declared cost
$125,000
Address
555 California St

43rd floor demo of selective partitions, ceilings, millwork, doors/frames and finishes. new paritions, door, paint and lighting. mep deferred.

Open the permit page

$125,000
Jun 15, 2022Completed
final sign-off Jun 2023
3 Embarcadero CenterPeacock Construction3rd fl: partial fl t.i., new non-load bearing partitions, ceilings & floor finishes. infill deck. 4th fl: modify (e) shower room into all gender restroom. new mep.
Details
Permit
202206156376
Status
complete
Filed
Jun 15, 2022
Permit issued
Jul 8, 2022
Final sign-off
Jun 29, 2023
Declared cost
$1,025,089
Address
3 Embarcadero Center

3rd fl: partial fl t.i., new non-load bearing partitions, ceilings & floor finishes. infill deck. 4th fl: modify (e) shower room into all gender restroom. new mep.

Open the permit page

$1,025,089
Jun 15, 2022Completed
final sign-off Jul 2023
3 Embarcadero CenterPeacock Construction2nd floor:partial floor t.i. new non-load bearing partitions, ceilings and floors. new showerroom and new mep incl fsd's.
Details
Permit
202206156401
Status
complete
Filed
Jun 15, 2022
Permit issued
Jul 12, 2022
Final sign-off
Jul 11, 2023
Declared cost
$856,324
Address
3 Embarcadero Center

2nd floor:partial floor t.i. new non-load bearing partitions, ceilings and floors. new showerroom and new mep incl fsd's.

Open the permit page

$856,324
Jun 2, 2022Completed
final sign-off Feb 2024
50 California StRichlen Constructiondemo of non struc partitions, millwk, power/data, plumbing, ceiling systems incl abatement of haz materials. removal of (e) interconnect stair and slab infill. build back of accessible restrooms and mep to warm sheel condition space will remain unoccupied. add 11 fsds & 127 upright sprinkler heads.
Details
Permit
202206025434
Status
complete
Filed
Jun 2, 2022
Permit issued
Jun 6, 2022
Final sign-off
Feb 8, 2024
Declared cost
$160,000
Address
50 California St

demo of non struc partitions, millwk, power/data, plumbing, ceiling systems incl abatement of haz materials. removal of (e) interconnect stair and slab infill. build back of accessible restrooms and mep to warm sheel condition space will remain unoccupied. add 11 fsds & 127 upright sprinkler heads.

Open the permit page

$160,000
May 12, 2022Never finaled
issued May 2022, no final
1 Maritime PzGci, Inc7th fl: fire only to obtain assembly permit stamps.
Details
Permit
202205124131
Status
issued
Filed
May 12, 2022
Permit issued
May 19, 2022
Address
1 Maritime Pz

7th fl: fire only to obtain assembly permit stamps.

Open the permit page

May 12, 2022Never finaled
issued May 2022, no final
1 Maritime PzGci, Inc6th fl: fire only to obtain assembly permit stamps.
Details
Permit
202205124133
Status
issued
Filed
May 12, 2022
Permit issued
May 19, 2022
Address
1 Maritime Pz

6th fl: fire only to obtain assembly permit stamps.

Open the permit page

Apr 26, 2022Completed
final sign-off Sep 2023
50 California StRichlen Construction6/f: demo of (e) non-structural partioins, millwork , power/data, plumbing and celing systems including rmeoval of hazadous matz on unoccupied full floor. build back of multi-occupant restrooms and mep systems to warm shell condition.future ti sep permit. ab-017. maher n/a.
Details
Permit
202204262977
Status
complete
Filed
Apr 26, 2022
Permit issued
Jun 6, 2022
Final sign-off
Sep 8, 2023
Declared cost
$160,000
Address
50 California St

6/f: demo of (e) non-structural partioins, millwork , power/data, plumbing and celing systems including rmeoval of hazadous matz on unoccupied full floor. build back of multi-occupant restrooms and mep systems to warm shell condition.future ti sep permit. ab-017. maher n/a.

Open the permit page

$160,000
Mar 2, 2022Completed
final sign-off Jun 2022
555 California StBcci Construction Company28th fl: t.i. new non-structural partitions, ceilings & mep. arch & mep for pa# 202201276810.
Details
Permit
202203029073
Status
complete
Filed
Mar 2, 2022
Permit issued
Mar 18, 2022
Final sign-off
Jun 13, 2022
Declared cost
$500,000
Address
555 California St

28th fl: t.i. new non-structural partitions, ceilings & mep. arch & mep for pa# 202201276810.

Open the permit page

$500,000
Jun 16, 2021Completed
final sign-off Nov 2021
3 Embarcadero Center5th fl - demo of select non structural walls. build back of ceiling height walls. new door & card readers. relocation of exit sign. install of new hi/lo drinking fountain
Details
Permit
202106162565
Status
complete
Filed
Jun 16, 2021
Permit issued
Jun 16, 2021
Final sign-off
Nov 16, 2021
Declared cost
$10,000
Address
3 Embarcadero Center

5th fl - demo of select non structural walls. build back of ceiling height walls. new door & card readers. relocation of exit sign. install of new hi/lo drinking fountain

Open the permit page

$10,000
Jun 14, 2021Completed
final sign-off Feb 2022
275 Battery StHathaway Dinwiddie Co.ref pa 202012020023 & 202103166609. electrical upgrades, lighting, life safety, mechanical upgrades ( to 10th flr public spaces, ste 1000 & 1050. fire alarm and sprinkler under separate permits.
Details
Permit
202106142346
Status
complete
Filed
Jun 14, 2021
Permit issued
Jun 16, 2021
Final sign-off
Feb 11, 2022
Declared cost
$535,000
Address
275 Battery St

ref pa 202012020023 & 202103166609. electrical upgrades, lighting, life safety, mechanical upgrades ( to 10th flr public spaces, ste 1000 & 1050. fire alarm and sprinkler under separate permits.

Open the permit page

$535,000
Apr 21, 2021Completed
final sign-off Nov 2021
1 Embarcadero CenterM C S Construction Servicesnew non-structural partitions, new door and hardware, new lighting and ceilings, new wall and floor finishes, new millwork and furniture, new upgraded restrooms for ada compliance
Details
Permit
202104219049
Status
complete
Filed
Apr 21, 2021
Permit issued
May 24, 2021
Final sign-off
Nov 4, 2021
Declared cost
$285,000
Address
1 Embarcadero Center

new non-structural partitions, new door and hardware, new lighting and ceilings, new wall and floor finishes, new millwork and furniture, new upgraded restrooms for ada compliance

Open the permit page

$285,000
Apr 15, 2021Completed
final sign-off Jun 2021
405 Howard StSc Builders, Inc3rd fl: revision to pa# 202009265173. reduction of scope. remove 4 private offices, modify some door hardware to panic hardware. delete/relocated some outlets.
Details
Permit
202104158679
Status
complete
Filed
Apr 15, 2021
Permit issued
May 18, 2021
Final sign-off
Jun 24, 2021
Address
405 Howard St

3rd fl: revision to pa# 202009265173. reduction of scope. remove 4 private offices, modify some door hardware to panic hardware. delete/relocated some outlets.

Open the permit page

Apr 7, 2021Completed
final sign-off Oct 2021
555 California StBcci Construction Company1st fl, concourse level: non structural demolition. new non structural partitions, doors, glazing, lighting and finishes. no change in occupancy, use, or area. life safety and sprinklers under separate permit.
Details
Permit
202104078093
Status
complete
Filed
Apr 7, 2021
Permit issued
Jun 7, 2021
Final sign-off
Oct 6, 2021
Declared cost
$43,050
Address
555 California St

1st fl, concourse level: non structural demolition. new non structural partitions, doors, glazing, lighting and finishes. no change in occupancy, use, or area. life safety and sprinklers under separate permit.

Open the permit page

$43,050
Apr 1, 2021Completed
final sign-off Oct 2021
1 Maritime PzGci, Inc13/f: revision to pa 201901099946. accessible restroom to be provided by tenant architect approved under pa 201911187518.
Details
Permit
202104017708
Status
complete
Filed
Apr 1, 2021
Permit issued
Jun 21, 2021
Final sign-off
Oct 5, 2021
Address
1 Maritime Pz

13/f: revision to pa 201901099946. accessible restroom to be provided by tenant architect approved under pa 201911187518.

Open the permit page

Feb 11, 2021Completed
final sign-off Mar 2023
1 Embarcadero CenterSource Planning And Construction Inc7th fl: non-structural demo. (n) non-structutal partitions, finishes, plumbing. no change in area, occupancy or use. mep, l/s, fire sprinklers under separate permit.
Details
Permit
202102114449
Status
complete
Filed
Feb 11, 2021
Permit issued
Jan 19, 2022
Final sign-off
Mar 3, 2023
Declared cost
$157,000
Address
1 Embarcadero Center

7th fl: non-structural demo. (n) non-structutal partitions, finishes, plumbing. no change in area, occupancy or use. mep, l/s, fire sprinklers under separate permit.

Open the permit page

$157,000
Feb 11, 2021Completed
final sign-off Mar 2023
2 Embarcadero CenterSource Planning And Construction Inc16th fl: non-structural demo. (n) non-structutal partitions, finishes, plumbing, fixtures & accessories. no change in area, occupancy or use. mep, l/s, fire sprinklers under separate permit.
Details
Permit
202102114453
Status
complete
Filed
Feb 11, 2021
Permit issued
Jan 19, 2022
Final sign-off
Mar 3, 2023
Declared cost
$157,000
Address
2 Embarcadero Center

16th fl: non-structural demo. (n) non-structutal partitions, finishes, plumbing, fixtures & accessories. no change in area, occupancy or use. mep, l/s, fire sprinklers under separate permit.

Open the permit page

$157,000
Feb 8, 2021Expired or cancelled
withdrawn Jul 2024
291 Geary St2/f: renovation of 2/f office space. minor demo of non-load partitions and finishes. new non-load partitions millwork and finishes. new led lights and new power outlets. no structural work. sprinkler under separate permit.
Details
Permit
202102084239
Status
withdrawn
Filed
Feb 8, 2021
Declared cost
$209,500
Address
291 Geary St

2/f: renovation of 2/f office space. minor demo of non-load partitions and finishes. new non-load partitions millwork and finishes. new led lights and new power outlets. no structural work. sprinkler under separate permit.

Open the permit page

$209,500
Dec 29, 2020Completed
final sign-off Jun 2021
444 Battery StGci, Increv to pa# 201908269776. (aka 9 maritime plaza) increased scope of work. selective demolition of non-structural partitions & doors. construction of new non-structural partitions & doors. fire rating of elevator lobby has been reduced.
Details
Permit
202012291868
Status
complete
Filed
Dec 29, 2020
Permit issued
Mar 23, 2021
Final sign-off
Jun 9, 2021
Address
444 Battery St

rev to pa# 201908269776. (aka 9 maritime plaza) increased scope of work. selective demolition of non-structural partitions & doors. construction of new non-structural partitions & doors. fire rating of elevator lobby has been reduced.

Open the permit page

Dec 9, 2020Completed
final sign-off Jun 2021
1 Daniel Burnham CtRossi Builders Inc.4/f: suite 400 - demo and construction of non-structural partitions, ceilings, lighting, electrical, millwork and finishes incl restroom upgrades. fire alarm and fire sprinkler deferred.
Details
Permit
202012090631
Status
complete
Filed
Dec 9, 2020
Permit issued
Apr 21, 2021
Final sign-off
Jun 21, 2021
Declared cost
$430,611
Address
1 Daniel Burnham Ct

4/f: suite 400 - demo and construction of non-structural partitions, ceilings, lighting, electrical, millwork and finishes incl restroom upgrades. fire alarm and fire sprinkler deferred.

Open the permit page

$430,611
Dec 2, 2020Completed
final sign-off Mar 2021
225 Bush StGci, Incfl 20th, 21st, 22nd: demo non-structural doors, millwork, ceiling, grid, lighting, flooring & equipment.
Details
Permit
202012020073
Status
complete
Filed
Dec 2, 2020
Permit issued
Dec 22, 2020
Final sign-off
Mar 8, 2021
Declared cost
$100,000
Address
225 Bush St

fl 20th, 21st, 22nd: demo non-structural doors, millwork, ceiling, grid, lighting, flooring & equipment.

Open the permit page

$100,000
Nov 12, 2020Completed
final sign-off Mar 2021
275 Battery StHathaway Dinwiddie Co.mechanical and electrical deferred submittal for pa# 201912139469, 3rd fl tenant improvement.
Details
Permit
202011128784
Status
complete
Filed
Nov 12, 2020
Permit issued
Jan 14, 2021
Final sign-off
Mar 4, 2021
Declared cost
$35,000
Address
275 Battery St

mechanical and electrical deferred submittal for pa# 201912139469, 3rd fl tenant improvement.

Open the permit page

$35,000
Nov 6, 2020Completed
final sign-off Aug 2022
101 Mission StGci, Inc11/f: restroom accessibility upgrades on the 11/f: mens and womens
Details
Permit
202011068441
Status
complete
Filed
Nov 6, 2020
Permit issued
Jan 21, 2021
Final sign-off
Aug 29, 2022
Declared cost
$30,000
Address
101 Mission St

11/f: restroom accessibility upgrades on the 11/f: mens and womens

Open the permit page

$30,000
Nov 6, 2020Never finaled
issued Jan 2021, no final
101 Mission StGci, Inc10/f: restroom accessibility upgrades on the 10/f: mens and womens
Details
Permit
202011068439
Status
issued
Filed
Nov 6, 2020
Permit issued
Jan 21, 2021
Declared cost
$30,000
Address
101 Mission St

10/f: restroom accessibility upgrades on the 10/f: mens and womens

Open the permit page

$30,000
Oct 29, 2020Completed
final sign-off Apr 2022
555 California StBcci Construction Company4th,7th, & 10th flr demolition only of non-structural partitions, doors,glazing,millwork,ceiling,lighting & finishes. no change in occupancy, use, or area. mep, life safety & sprinklers under separate permit. ab-017.
Details
Permit
202010297765
Status
complete
Filed
Oct 29, 2020
Permit issued
Nov 30, 2020
Final sign-off
Apr 11, 2022
Declared cost
$467,280
Address
555 California St

4th,7th, & 10th flr demolition only of non-structural partitions, doors,glazing,millwork,ceiling,lighting & finishes. no change in occupancy, use, or area. mep, life safety & sprinklers under separate permit. ab-017.

Open the permit page

$467,280
Oct 19, 2020Completed
final sign-off Jun 2022
75 Hawthorne StField Construction Inc.8th floor: ti includes non-structural demo, construction of non-structural partitions, doors, interior glazing, ceiling, light fixtures, millwork, and finishes. no cahnge in occupancy, use, or area. lifesafety & sprinklers under separate permit.
Details
Permit
202010196846
Status
complete
Filed
Oct 19, 2020
Permit issued
Feb 4, 2021
Final sign-off
Jun 8, 2022
Declared cost
$635,855
Address
75 Hawthorne St

8th floor: ti includes non-structural demo, construction of non-structural partitions, doors, interior glazing, ceiling, light fixtures, millwork, and finishes. no cahnge in occupancy, use, or area. lifesafety & sprinklers under separate permit.

Open the permit page

$635,855
Oct 7, 2020Completed
final sign-off Apr 2021
100 Potrero AvBcci Construction Companyrevision to pa 201908199109. revised areas clouded with delta 7. addition of casework, sink and equipment. no change in occupancy, area or use.
Details
Permit
202010076115
Status
complete
Filed
Oct 7, 2020
Permit issued
Mar 23, 2021
Final sign-off
Apr 16, 2021
Declared cost
$8,810
Address
100 Potrero Av

revision to pa 201908199109. revised areas clouded with delta 7. addition of casework, sink and equipment. no change in occupancy, area or use.

Open the permit page

$8,810
Oct 6, 2020Completed
final sign-off Jan 2021
2 Embarcadero CenterSource Planning And Construction Increvision to pa #2020 0722 0710. existing tile & grid to be remained, existing lights to be relamped, existing signs & strobes to remain. new havc grilles
Details
Permit
202010066028
Status
complete
Filed
Oct 6, 2020
Permit issued
Nov 4, 2020
Final sign-off
Jan 19, 2021
Address
2 Embarcadero Center

revision to pa #2020 0722 0710. existing tile & grid to be remained, existing lights to be relamped, existing signs & strobes to remain. new havc grilles

Open the permit page

Oct 1, 2020Completed
final sign-off Aug 2021
1 California StG Swanson Constr. Inc.barrier removal only at 21st fl. toilet rooms, remove, replace relocate accessories, all plumb fixtures to remain no mep sprinkler or life safety as all (e) equipment and devices to remain. n/a maher
Details
Permit
202010015688
Status
complete
Filed
Oct 1, 2020
Permit issued
Feb 1, 2021
Final sign-off
Aug 16, 2021
Declared cost
$29,685
Address
1 California St

barrier removal only at 21st fl. toilet rooms, remove, replace relocate accessories, all plumb fixtures to remain no mep sprinkler or life safety as all (e) equipment and devices to remain. n/a maher

Open the permit page

$29,685
Oct 1, 2020Completed
final sign-off Aug 2021
150 California StTeam Commercial Construction Inc.ground floor - new non struct partitions, ceiling & lighting, millwork and finishes, no change in occuancy area or use, mep, life safety, sprinklers under sep permit
Details
Permit
202010015683
Status
complete
Filed
Oct 1, 2020
Permit issued
Dec 28, 2020
Final sign-off
Aug 16, 2021
Declared cost
$30,750
Address
150 California St

ground floor - new non struct partitions, ceiling & lighting, millwork and finishes, no change in occuancy area or use, mep, life safety, sprinklers under sep permit

Open the permit page

$30,750
Sep 26, 2020Completed
final sign-off Jun 2021
405 Howard StSc Builders, Inc3/f: t.i.:new non-structural partitions, doors, glazing, millwork, finishes. no change in occupancy, use or area. life safety & sprinklers under sep permit.
Details
Permit
202009265173
Status
complete
Filed
Sep 26, 2020
Permit issued
Feb 1, 2021
Final sign-off
Jun 24, 2021
Declared cost
$383,125
Address
405 Howard St

3/f: t.i.:new non-structural partitions, doors, glazing, millwork, finishes. no change in occupancy, use or area. life safety & sprinklers under sep permit.

Open the permit page

$383,125
Aug 22, 2020Completed
final sign-off Sep 2022
600 Montgomery StHathaway Dinwiddie Co.revision to bpa# 201907105505- demo of non-structural partitions (ceiling to remain); fireproofing deferred submittal; framing associated with temporary opening slabbtw floor 49-50 for hoistway; and electrical riser for vertical power to enable tomporary power during construction. no exterior work.
Details
Permit
202008222384
Status
complete
Filed
Aug 22, 2020
Permit issued
Oct 13, 2020
Final sign-off
Sep 16, 2022
Declared cost
$100,000
Address
600 Montgomery St

revision to bpa# 201907105505- demo of non-structural partitions (ceiling to remain); fireproofing deferred submittal; framing associated with temporary opening slabbtw floor 49-50 for hoistway; and electrical riser for vertical power to enable tomporary power during construction. no exterior work.

Open the permit page

$100,000
Aug 13, 2020Never finaled
issued Jul 2021, no final
3 Embarcadero CenterSkyline Constructionnew communicating stairs between 20th & 21st floor.
Details
Permit
202008131714
Status
issued
Filed
Aug 13, 2020
Permit issued
Jul 21, 2021
Declared cost
$250,000
Address
3 Embarcadero Center

new communicating stairs between 20th & 21st floor.

Open the permit page

$250,000
Jul 6, 2020Completed
final sign-off Mar 2021
301 Howard StSkyline Construction18th floor: t.i. of an extg full floor tenant suite. scope of work include: non-structural demolition, new non-structural partitions, lighting, millwork and finishes. toilet room upgrades. no change in occupancy, use or area.
Details
Permit
202007069647
Status
complete
Filed
Jul 6, 2020
Permit issued
Jul 9, 2020
Final sign-off
Mar 25, 2021
Declared cost
$964,862
Address
301 Howard St

18th floor: t.i. of an extg full floor tenant suite. scope of work include: non-structural demolition, new non-structural partitions, lighting, millwork and finishes. toilet room upgrades. no change in occupancy, use or area.

Open the permit page

$964,862
Jul 1, 2020Completed
final sign-off Sep 2020
150 California StTeam Commercial Construction Inc.revision to pa #2019-0508-0066: addition of 1 office, electrical, lighting. addition of av monitos, card readers, cameras and power for furniture.
Details
Permit
202007019486
Status
complete
Filed
Jul 1, 2020
Permit issued
Aug 21, 2020
Final sign-off
Sep 30, 2020
Declared cost
$41,000
Address
150 California St

revision to pa #2019-0508-0066: addition of 1 office, electrical, lighting. addition of av monitos, card readers, cameras and power for furniture.

Open the permit page

$41,000
Mar 16, 2020Completed
final sign-off Jan 2021
1 Embarcadero CenterGci, Inc35/f: demo of (e) non structural partitions. new interior improvements (partitions non-structural, dfh, lighting, finishes, new furniture systems power & data) meps deferred
Details
Permit
202003167121
Status
complete
Filed
Mar 16, 2020
Permit issued
Mar 16, 2020
Final sign-off
Jan 8, 2021
Declared cost
$25,000
Address
1 Embarcadero Center

35/f: demo of (e) non structural partitions. new interior improvements (partitions non-structural, dfh, lighting, finishes, new furniture systems power & data) meps deferred

Open the permit page

$25,000
Mar 12, 2020Expired or cancelled
cancelled Jan 2026
4 Embarcadero Centerone new demising wall. no change in occupancy use or area. mep, ls, sprinklers under sep permit
Details
Permit
202003126843
Status
cancelled
Filed
Mar 12, 2020
Declared cost
$20,000
Address
4 Embarcadero Center

one new demising wall. no change in occupancy use or area. mep, ls, sprinklers under sep permit

Open the permit page

$20,000
Feb 27, 2020Completed
final sign-off Dec 2020
50 California StRichlen Construction25th floor: upgrade toilet room for accessibility. barrier removal only. no change in occupancy, use or area.
Details
Permit
202002275546
Status
complete
Filed
Feb 27, 2020
Permit issued
Mar 4, 2020
Final sign-off
Dec 7, 2020
Declared cost
$32,365
Address
50 California St

25th floor: upgrade toilet room for accessibility. barrier removal only. no change in occupancy, use or area.

Open the permit page

$32,365
Feb 7, 2020Never finaled
issued Feb 2020, no final
101 Mission StGci, Inc2nd fl, suite 200: revision to pa #201910114239. addition of millwork island and light fixtures in breakroom & addition of private officec to existing unoccupied speculative office suite.
Details
Permit
202002073826
Status
issued
Filed
Feb 7, 2020
Permit issued
Feb 10, 2020
Declared cost
$15,532
Address
101 Mission St

2nd fl, suite 200: revision to pa #201910114239. addition of millwork island and light fixtures in breakroom & addition of private officec to existing unoccupied speculative office suite.

Open the permit page

$15,532
Jan 16, 2020Completed
final sign-off Jun 2020
275 Battery StHathaway Dinwiddie Co.2nd fl - mep drawings to support tenant improvement permit ap 2019-1121-7789 & permit revision 2020-0116-2010
Details
Permit
202001162012
Status
complete
Filed
Jan 16, 2020
Permit issued
Feb 3, 2020
Final sign-off
Jun 1, 2020
Declared cost
$450,000
Address
275 Battery St

2nd fl - mep drawings to support tenant improvement permit ap 2019-1121-7789 & permit revision 2020-0116-2010

Open the permit page

$450,000
Jan 16, 2020Completed
final sign-off Jun 2020
275 Battery StHathaway Dinwiddie Co.2nd fl - revision to pa 2019-1121-7889 relocation of it room. move backgrounds match mep drawings. no change in occupancy, use or area. mep, sprinklers, life safety under separate permit
Details
Permit
202001162010
Status
complete
Filed
Jan 16, 2020
Permit issued
Feb 3, 2020
Final sign-off
Jun 1, 2020
Declared cost
$50,000
Address
275 Battery St

2nd fl - revision to pa 2019-1121-7889 relocation of it room. move backgrounds match mep drawings. no change in occupancy, use or area. mep, sprinklers, life safety under separate permit

Open the permit page

$50,000
Jan 13, 2020Completed
final sign-off May 2021
4 Embarcadero CenterSource Planning And Construction Inc39th fl, ste 3950 - ti include the modification to the exterior opening to comply with ada code and the addition of a guardrail at the existing parapet. (life safety work will be design build under separate permit. bldg fully sprinklered
Details
Permit
202001131732
Status
complete
Filed
Jan 13, 2020
Permit issued
Dec 1, 2020
Final sign-off
May 19, 2021
Declared cost
$100,000
Address
4 Embarcadero Center

39th fl, ste 3950 - ti include the modification to the exterior opening to comply with ada code and the addition of a guardrail at the existing parapet. (life safety work will be design build under separate permit. bldg fully sprinklered

Open the permit page

$100,000
Jan 2, 2020Completed
final sign-off Jul 2020
275 Battery StHathaway Dinwiddie Co.rev to pa# 201904228576; revision to handrail, track lighting n/a maher
Details
Permit
202001021140
Status
complete
Filed
Jan 2, 2020
Permit issued
Jan 13, 2020
Final sign-off
Jul 23, 2020
Address
275 Battery St

rev to pa# 201904228576; revision to handrail, track lighting n/a maher

Open the permit page

Dec 20, 2019Completed
final sign-off Jun 2020
2 Embarcadero CenterM C S Construction Services16/f: new non structural partitons, ceiling, lighting, finishes elec. no change in area occupancy use. mep, ls, sprklr sep permit. maher n/a.
Details
Permit
201912200104
Status
complete
Filed
Dec 20, 2019
Permit issued
Jan 8, 2020
Final sign-off
Jun 2, 2020
Declared cost
$281,260
Address
2 Embarcadero Center

16/f: new non structural partitons, ceiling, lighting, finishes elec. no change in area occupancy use. mep, ls, sprklr sep permit. maher n/a.

Open the permit page

$281,260
Dec 19, 2019Completed
final sign-off Aug 2020
1 California StR.M.R. Construction Company22nd fl, ste 2250 - interior ti of offices and related space. interior non-rated partitions, finishes, millwork, electrical plumbing and mechanical systems
Details
Permit
201912190095
Status
complete
Filed
Dec 19, 2019
Permit issued
Jan 28, 2020
Final sign-off
Aug 25, 2020
Declared cost
$450,000
Address
1 California St

22nd fl, ste 2250 - interior ti of offices and related space. interior non-rated partitions, finishes, millwork, electrical plumbing and mechanical systems

Open the permit page

$450,000
Dec 17, 2019Completed
final sign-off Dec 2020
50 California StRichlen Construction33rd fl: demo of e non-struc partitions, power/data, millwork, plumbing & ceiling systems including removal of hazardous materials on an unoccupied full fl. space will remain unoccupied. any future buildouts will be under a sep permit. per ab-017. no change to use, occupancy, or sf. maher na
Details
Permit
201912179723
Status
complete
Filed
Dec 17, 2019
Permit issued
Dec 19, 2019
Final sign-off
Dec 7, 2020
Declared cost
$114,120
Address
50 California St

33rd fl: demo of e non-struc partitions, power/data, millwork, plumbing & ceiling systems including removal of hazardous materials on an unoccupied full fl. space will remain unoccupied. any future buildouts will be under a sep permit. per ab-017. no change to use, occupancy, or sf. maher na

Open the permit page

$114,120
Dec 13, 2019Completed
final sign-off Mar 2021
275 Battery StHathaway Dinwiddie Co.suite 300. tenant improvement to (e) space. demo non-structural partitions. construct (n) non-structural partitions. new power, data, glazing, millwork and finishes
Details
Permit
201912139469
Status
complete
Filed
Dec 13, 2019
Permit issued
Dec 24, 2019
Final sign-off
Mar 3, 2021
Declared cost
$385,000
Address
275 Battery St

suite 300. tenant improvement to (e) space. demo non-structural partitions. construct (n) non-structural partitions. new power, data, glazing, millwork and finishes

Open the permit page

$385,000
Nov 27, 2019Completed
final sign-off Oct 2020
100 Pine St3rd fl - selective demo of partitions, ceiling, light fixtures and finishes. construction of new partitions, ceiling, lighting & finishes. no change in occupancy or use. this project is to be design-build mep, life safety & sprinklers to be filed under separate permit
Details
Permit
201911278310
Status
complete
Filed
Nov 27, 2019
Permit issued
Dec 17, 2019
Final sign-off
Oct 1, 2020
Declared cost
$143,448
Address
100 Pine St

3rd fl - selective demo of partitions, ceiling, light fixtures and finishes. construction of new partitions, ceiling, lighting & finishes. no change in occupancy or use. this project is to be design-build mep, life safety & sprinklers to be filed under separate permit

Open the permit page

$143,448
Nov 22, 2019Completed
final sign-off Sep 2020
575 Market StM C S Construction Servicessuite #2050: new non-structural demo & construction - partitions, ceiling lights, millwork, & finishes. no change in occupancy, use, or area. mep. life safety, & sprinklers under separate permit.
Details
Permit
201911227959
Status
complete
Filed
Nov 22, 2019
Permit issued
Dec 23, 2019
Final sign-off
Sep 10, 2020
Declared cost
$117,101
Address
575 Market St

suite #2050: new non-structural demo & construction - partitions, ceiling lights, millwork, & finishes. no change in occupancy, use, or area. mep. life safety, & sprinklers under separate permit.

Open the permit page

$117,101
Nov 22, 2019Completed
final sign-off Sep 2020
575 Market StM C S Construction Servicessuite #2500: new non-structural demo & construction - partitions, ceiling lights, millwork, & finishes. no change in occupancy, use, or area. mep. life safety, & sprinklers under separate permit.
Details
Permit
201911227967
Status
complete
Filed
Nov 22, 2019
Permit issued
Dec 23, 2019
Final sign-off
Sep 10, 2020
Declared cost
$387,537
Address
575 Market St

suite #2500: new non-structural demo & construction - partitions, ceiling lights, millwork, & finishes. no change in occupancy, use, or area. mep. life safety, & sprinklers under separate permit.

Open the permit page

$387,537
Nov 22, 2019Completed
final sign-off Sep 2020
575 Market StM C S Construction Servicessuite #2550: new non-structural demo & construction - partitions, ceiling lights, millwork, & finishes. no change in occupancy, use, or area. mep. life safety, & sprinklers under separate permit.
Details
Permit
201911227966
Status
complete
Filed
Nov 22, 2019
Permit issued
Dec 23, 2019
Final sign-off
Sep 10, 2020
Declared cost
$258,141
Address
575 Market St

suite #2550: new non-structural demo & construction - partitions, ceiling lights, millwork, & finishes. no change in occupancy, use, or area. mep. life safety, & sprinklers under separate permit.

Open the permit page

$258,141
Nov 21, 2019Completed
final sign-off Jun 2020
275 Battery StHathaway Dinwiddie Co.2nd fl - ti to existing office space, demo of non-structural partitions, construction of new non-structural partitions, new lighting, elec
Details
Permit
201911217889
Status
complete
Filed
Nov 21, 2019
Permit issued
Dec 2, 2019
Final sign-off
Jun 1, 2020
Declared cost
$534,276
Address
275 Battery St

2nd fl - ti to existing office space, demo of non-structural partitions, construction of new non-structural partitions, new lighting, elec

Open the permit page

$534,276
Nov 21, 2019Completed
final sign-off Dec 2020
275 Battery StHathaway Dinwiddie Co.accessible upgrades to e restroom multi tenant corridor upgrades, non structural partitions
Details
Permit
201911217898
Status
complete
Filed
Nov 21, 2019
Permit issued
Jan 13, 2020
Final sign-off
Dec 29, 2020
Declared cost
$122,000
Address
275 Battery St

accessible upgrades to e restroom multi tenant corridor upgrades, non structural partitions

Open the permit page

$122,000
Nov 20, 2019Completed
final sign-off Aug 2020
275 Battery StGci, Inc29th fl: demolition of (e) structural partitions, and millwork, construction of new non structural partitions, lighting and finishes, there will be no change in occpuancy and no change in floor area, electrical, life safety, fire sprinkler work to be submitted/completed under separate permit(s)
Details
Permit
201911207718
Status
complete
Filed
Nov 20, 2019
Permit issued
Dec 9, 2019
Final sign-off
Aug 13, 2020
Declared cost
$3,363
Address
275 Battery St

29th fl: demolition of (e) structural partitions, and millwork, construction of new non structural partitions, lighting and finishes, there will be no change in occpuancy and no change in floor area, electrical, life safety, fire sprinkler work to be submitted/completed under separate permit(s)

Open the permit page

$3,363
Nov 20, 2019Completed
final sign-off Sep 2020
4 Embarcadero CenterBcci Construction Company4th floor: revision to pa# 2019-0606-2703: ceiling height furring, tile, & paint. no change in occupancy, use, or area. mep, sprinklers, & life safety under separate permit.
Details
Permit
201911207722
Status
complete
Filed
Nov 20, 2019
Permit issued
Nov 25, 2019
Final sign-off
Sep 2, 2020
Declared cost
$5,000
Address
4 Embarcadero Center

4th floor: revision to pa# 2019-0606-2703: ceiling height furring, tile, & paint. no change in occupancy, use, or area. mep, sprinklers, & life safety under separate permit.

Open the permit page

$5,000
Nov 20, 2019Completed
final sign-off Sep 2020
4 Embarcadero CenterBcci Construction Company2nd floor: revision to pa# 2019-0522-1464: ceiling height furring, tile, & paint. no change in occupancy, use, or area. mep, sprinklers, & life safety under separate permit.
Details
Permit
201911207719
Status
complete
Filed
Nov 20, 2019
Permit issued
Nov 25, 2019
Final sign-off
Sep 2, 2020
Declared cost
$5,000
Address
4 Embarcadero Center

2nd floor: revision to pa# 2019-0522-1464: ceiling height furring, tile, & paint. no change in occupancy, use, or area. mep, sprinklers, & life safety under separate permit.

Open the permit page

$5,000
Nov 20, 2019Completed
final sign-off Sep 2020
4 Embarcadero CenterBcci Construction Company3rd floor: revision to pa# 2019-0528-1822: ceiling height furring, tile, & paint. no change in occupancy, use, or area. mep, sprinklers, & life safety under separate permit.
Details
Permit
201911207720
Status
complete
Filed
Nov 20, 2019
Permit issued
Nov 25, 2019
Final sign-off
Sep 2, 2020
Declared cost
$5,000
Address
4 Embarcadero Center

3rd floor: revision to pa# 2019-0528-1822: ceiling height furring, tile, & paint. no change in occupancy, use, or area. mep, sprinklers, & life safety under separate permit.

Open the permit page

$5,000
Nov 4, 2019Completed
final sign-off Apr 2021
555 California StBcci Construction Companythis project on the 30th fl consist of selective demo of (e) non-structural partitions, doors/frames, millwork, ceiling grid & tile, lighting, power & finishes. no change in occupancy & floor area. life safety is design build and under separate permit. demo per ab-017. maher na ref pa201909192166.
Details
Permit
201911046304
Status
complete
Filed
Nov 4, 2019
Permit issued
Nov 8, 2019
Final sign-off
Apr 28, 2021
Declared cost
$181,720
Address
555 California St

this project on the 30th fl consist of selective demo of (e) non-structural partitions, doors/frames, millwork, ceiling grid & tile, lighting, power & finishes. no change in occupancy & floor area. life safety is design build and under separate permit. demo per ab-017. maher na ref pa201909192166.

Open the permit page

$181,720
Nov 1, 2019Completed
final sign-off Oct 2021
2 Embarcadero CenterM C S Construction Services4th floor: non-structural demo, new non-structural partitions, doors, frames, hardware, lighting, millwork, finishes. no change in occupancy or area,or use. mep, life safty, sprinklers under seperate permit. n/a for maher
Details
Permit
201911016189
Status
complete
Filed
Nov 1, 2019
Permit issued
Mar 24, 2021
Final sign-off
Oct 13, 2021
Declared cost
$251,084
Address
2 Embarcadero Center

4th floor: non-structural demo, new non-structural partitions, doors, frames, hardware, lighting, millwork, finishes. no change in occupancy or area,or use. mep, life safty, sprinklers under seperate permit. n/a for maher

Open the permit page

$251,084
Oct 29, 2019Never finaled
issued Nov 2019, no final
100 Pine StCapitol Electric Constconstruction of 2 hr rated shaft enclosure to house 2 way communication emergency radio conduit through 2nd & 8th floor elevator lobbies. no structural work to be included in scope, no increase in area. no increase in occupancy or use
Details
Permit
201910295803
Status
issued
Filed
Oct 29, 2019
Permit issued
Nov 7, 2019
Declared cost
$50,000
Address
100 Pine St

construction of 2 hr rated shaft enclosure to house 2 way communication emergency radio conduit through 2nd & 8th floor elevator lobbies. no structural work to be included in scope, no increase in area. no increase in occupancy or use

Open the permit page

$50,000
Oct 25, 2019Completed
final sign-off Nov 2020
50 Beale StField Construction Inc.addition of ventilation fan to existing as meter room in basement
Details
Permit
201910255585
Status
complete
Filed
Oct 25, 2019
Permit issued
Nov 14, 2019
Final sign-off
Nov 10, 2020
Declared cost
$50,000
Address
50 Beale St

addition of ventilation fan to existing as meter room in basement

Open the permit page

$50,000
Oct 25, 2019Completed
final sign-off Nov 2020
50 Beale StField Construction Inc.mechanical alterations to e basement gas room. work includes new mech louvers at gr level facade/glazing.
Details
Permit
201910255586
Status
complete
Filed
Oct 25, 2019
Permit issued
Nov 14, 2019
Final sign-off
Nov 10, 2020
Declared cost
$5,000
Address
50 Beale St

mechanical alterations to e basement gas room. work includes new mech louvers at gr level facade/glazing.

Open the permit page

$5,000
Oct 17, 2019Completed
final sign-off May 2021
100 Pine StTeam Commercial Construction Inc.suite 3035: demo of (e) non-structural partitions, lights, millwork and finishes in (e) tenant space n/a maher per ab-017. restroom demo excluded from this permit.
Details
Permit
201910174768
Status
complete
Filed
Oct 17, 2019
Permit issued
Oct 24, 2019
Final sign-off
May 19, 2021
Declared cost
$23,103
Address
100 Pine St

suite 3035: demo of (e) non-structural partitions, lights, millwork and finishes in (e) tenant space n/a maher per ab-017. restroom demo excluded from this permit.

Open the permit page

$23,103
Oct 15, 2019Completed
final sign-off Jun 2020
600 Montgomery StHathaway Dinwiddie Co.17/f: accessibility upgrade to (e) mulit accomodation restrooms on 17th fl, finish upgrades to common area corridor
Details
Permit
201910154447
Status
complete
Filed
Oct 15, 2019
Permit issued
Oct 29, 2019
Final sign-off
Jun 24, 2020
Declared cost
$105,300
Address
600 Montgomery St

17/f: accessibility upgrade to (e) mulit accomodation restrooms on 17th fl, finish upgrades to common area corridor

Open the permit page

$105,300
Sep 30, 2019Completed
final sign-off Feb 2020
1 California StR.M.R. Construction Company22/f - ste 2250: interior t.i. of office and related spaces. install non-rated partition, finishes, millwork, electrical, plumbing and mehcanical systems. fire sprinklers and l/s sep permits. maher n/a.
Details
Permit
201909303021
Status
complete
Filed
Sep 30, 2019
Permit issued
Oct 8, 2019
Final sign-off
Feb 13, 2020
Declared cost
$587,500
Address
1 California St

22/f - ste 2250: interior t.i. of office and related spaces. install non-rated partition, finishes, millwork, electrical, plumbing and mehcanical systems. fire sprinklers and l/s sep permits. maher n/a.

Open the permit page

$587,500
Sep 6, 2019Completed
final sign-off Aug 2020
1 Embarcadero Centersuite 1310: non-structural demo. (n) non-structural partitions, doors, finishes. no change in occup, use or area. mep, life safety & sprinklers under sep permit. maher na
Details
Permit
201909060861
Status
complete
Filed
Sep 6, 2019
Permit issued
Sep 11, 2019
Final sign-off
Aug 11, 2020
Declared cost
$13,891
Address
1 Embarcadero Center

suite 1310: non-structural demo. (n) non-structural partitions, doors, finishes. no change in occup, use or area. mep, life safety & sprinklers under sep permit. maher na

Open the permit page

$13,891
Aug 26, 2019Completed
final sign-off May 2020
100 Potrero AvBcci Construction Companynon-structural demo. (n) non-structural partitions, ceiling and lights, electrical, millwork and finishes. no change in occupancy, use or area. mep, sprinklerand life safety under separate permit.
Details
Permit
201908269778
Status
complete
Filed
Aug 26, 2019
Permit issued
Sep 12, 2019
Final sign-off
May 22, 2020
Declared cost
$969,253
Address
100 Potrero Av

non-structural demo. (n) non-structural partitions, ceiling and lights, electrical, millwork and finishes. no change in occupancy, use or area. mep, sprinklerand life safety under separate permit.

Open the permit page

$969,253
Aug 26, 2019Completed
final sign-off Sep 2019
1 Maritime PzGci, Inc11th fl: revision to pa #201907186317. (n) gyp bd, (n) ceiling & lights per ab-017 & pa #201807305831. no change in occupancy, use or area. mep, life safety & sprinklers under separate permit. maher na.
Details
Permit
201908269780
Status
complete
Filed
Aug 26, 2019
Permit issued
Sep 6, 2019
Final sign-off
Sep 25, 2019
Address
1 Maritime Pz

11th fl: revision to pa #201907186317. (n) gyp bd, (n) ceiling & lights per ab-017 & pa #201807305831. no change in occupancy, use or area. mep, life safety & sprinklers under separate permit. maher na.

Open the permit page

Aug 26, 2019Completed
final sign-off Jun 2021
444 Battery StGci, Inc(aka 9 maritime plaza) 1st fl - (n) structural demo, (n) walls, doors, (e) ceiling & lighting to remain. no change in occupany use or area, mep, life safety & sprinklers under separate permit. maher na. work is at elevator lobby.
Details
Permit
201908269776
Status
complete
Filed
Aug 26, 2019
Permit issued
Sep 6, 2019
Final sign-off
Jun 10, 2021
Declared cost
$8,528
Address
444 Battery St

(aka 9 maritime plaza) 1st fl - (n) structural demo, (n) walls, doors, (e) ceiling & lighting to remain. no change in occupany use or area, mep, life safety & sprinklers under separate permit. maher na. work is at elevator lobby.

Open the permit page

$8,528
Aug 23, 2019Completed
final sign-off Dec 2019
505 Sansome StSkyline Construction11th flr - demo all (e) partitions, doors, millwork, ceiling grid, ceiling hard lid, flooring & equip. removal all ele from floor outlets and demod walls. remove mecj duct back to main loop. no struct
Details
Permit
201908239681
Status
complete
Filed
Aug 23, 2019
Permit issued
Sep 6, 2019
Final sign-off
Dec 2, 2019
Declared cost
$300,000
Address
505 Sansome St

11th flr - demo all (e) partitions, doors, millwork, ceiling grid, ceiling hard lid, flooring & equip. removal all ele from floor outlets and demod walls. remove mecj duct back to main loop. no struct

Open the permit page

$300,000
Aug 23, 2019Completed
final sign-off Dec 2019
600 Montgomery StSkyline Construction17th flr - demo all (e) partitions, doors, millwork, ceiling grid, ceiling hard lid, flooring & equip. removal all ele from floor outlets and demo walls. remove mech duct back to main loop. no struct. ab-017.
Details
Permit
201908239684
Status
complete
Filed
Aug 23, 2019
Permit issued
Sep 6, 2019
Final sign-off
Dec 2, 2019
Declared cost
$300,000
Address
600 Montgomery St

17th flr - demo all (e) partitions, doors, millwork, ceiling grid, ceiling hard lid, flooring & equip. removal all ele from floor outlets and demo walls. remove mech duct back to main loop. no struct. ab-017.

Open the permit page

$300,000
Aug 23, 2019Completed
final sign-off Dec 2019
505 Sansome StSkyline Construction19th flr - demo all (e) partitions, doors, millwork, ceiling grid, ceiling hard lid, flooring & equip. removal all ele from floor outlets and demod walls. remove mecj duct back to main loop. no struct
Details
Permit
201908239683
Status
complete
Filed
Aug 23, 2019
Permit issued
Sep 6, 2019
Final sign-off
Dec 2, 2019
Declared cost
$300,000
Address
505 Sansome St

19th flr - demo all (e) partitions, doors, millwork, ceiling grid, ceiling hard lid, flooring & equip. removal all ele from floor outlets and demod walls. remove mecj duct back to main loop. no struct

Open the permit page

$300,000
Aug 21, 2019Completed
final sign-off Aug 2020
505 Sansome StSkyline Constructioninterior tenant improvement of e lobby and conference room. demo non structural finishes, flooring, lighting, new non structural partitions, glazing, doors, power data, finishes, millwork, ceiling assembly and lighting
Details
Permit
201908219430
Status
complete
Filed
Aug 21, 2019
Permit issued
Jan 13, 2020
Final sign-off
Aug 12, 2020
Declared cost
$364,982
Address
505 Sansome St

interior tenant improvement of e lobby and conference room. demo non structural finishes, flooring, lighting, new non structural partitions, glazing, doors, power data, finishes, millwork, ceiling assembly and lighting

Open the permit page

$364,982
Aug 19, 2019Completed
final sign-off May 2020
100 Potrero AvBcci Construction Company3rd fl - non struct demo, (n) non-structural partitions, ceiling, lights, elec, millwork finishes. no change in occupancy, use or area. mep, life safety & sprinklers under a separate permit
Details
Permit
201908199109
Status
complete
Filed
Aug 19, 2019
Permit issued
Sep 12, 2019
Final sign-off
May 22, 2020
Declared cost
$1,267,080
Address
100 Potrero Av

3rd fl - non struct demo, (n) non-structural partitions, ceiling, lights, elec, millwork finishes. no change in occupancy, use or area. mep, life safety & sprinklers under a separate permit

Open the permit page

$1,267,080
Aug 19, 2019Completed
final sign-off May 2020
100 Potrero AvBcci Construction Company2nd fl - non struct demo, (n) non-structural partitions, ceiling, lights, elec, millwork finishes. no change in occupancy, use or area. mep, life safety & sprinklers under a separate permit
Details
Permit
201908199110
Status
complete
Filed
Aug 19, 2019
Permit issued
Sep 12, 2019
Final sign-off
May 22, 2020
Declared cost
$1,574,436
Address
100 Potrero Av

2nd fl - non struct demo, (n) non-structural partitions, ceiling, lights, elec, millwork finishes. no change in occupancy, use or area. mep, life safety & sprinklers under a separate permit

Open the permit page

$1,574,436
Aug 15, 2019Completed
final sign-off Mar 2021
291 Geary StU S Prime Contractor Incbrick wall opening on 4th fl, and one ada accessible bathroom.
Details
Permit
201908158947
Status
complete
Filed
Aug 15, 2019
Permit issued
Aug 26, 2019
Final sign-off
Mar 29, 2021
Declared cost
$5,000
Address
291 Geary St

brick wall opening on 4th fl, and one ada accessible bathroom.

Open the permit page

$5,000
Aug 14, 2019Completed
final sign-off May 2020
100 Potrero AvBcci Construction Companynon structural demo, new non struct partitions, ceiling and lights, finishes,millwork, power data. no change in occupancy, use, area. mep, life safety, sprinklers sep permit
Details
Permit
201908148715
Status
complete
Filed
Aug 14, 2019
Permit issued
Sep 12, 2019
Final sign-off
May 22, 2020
Declared cost
$1,009,750
Address
100 Potrero Av

non structural demo, new non struct partitions, ceiling and lights, finishes,millwork, power data. no change in occupancy, use, area. mep, life safety, sprinklers sep permit

Open the permit page

$1,009,750
Aug 13, 2019Completed
final sign-off Feb 2020
1 Embarcadero Center2nd fl - non-structural, demo (n), non-structural partitions, electrical outlets. no change in occupancy use or area. mep, life safety, srpinklers under separate permit
Details
Permit
201908138606
Status
complete
Filed
Aug 13, 2019
Permit issued
Aug 20, 2019
Final sign-off
Feb 10, 2020
Declared cost
$6,004
Address
1 Embarcadero Center

2nd fl - non-structural, demo (n), non-structural partitions, electrical outlets. no change in occupancy use or area. mep, life safety, srpinklers under separate permit

Open the permit page

$6,004
Aug 5, 2019Completed
final sign-off Feb 2020
1 Embarcadero CenterM C S Construction Services7th floor:non structural demo new non struc partitions, millwork, finishes. no change in occupancy, use, or area. mep sprinkler, lf, sep permit
Details
Permit
201908057827
Status
complete
Filed
Aug 5, 2019
Permit issued
Aug 8, 2019
Final sign-off
Feb 7, 2020
Declared cost
$64,944
Address
1 Embarcadero Center

7th floor:non structural demo new non struc partitions, millwork, finishes. no change in occupancy, use, or area. mep sprinkler, lf, sep permit

Open the permit page

$64,944
Aug 5, 2019Completed
final sign-off Nov 2019
1 Embarcadero CenterM C S Construction Services7th floor: non structural demo. relocate of toilets accessories and accessible stalls. no change in occupany, use or area. mep,sprinkler, life safety sep permit barrier removal only
Details
Permit
201908057826
Status
complete
Filed
Aug 5, 2019
Permit issued
Aug 8, 2019
Final sign-off
Nov 5, 2019
Declared cost
$21,906
Address
1 Embarcadero Center

7th floor: non structural demo. relocate of toilets accessories and accessible stalls. no change in occupany, use or area. mep,sprinkler, life safety sep permit barrier removal only

Open the permit page

$21,906
Jul 30, 2019Completed
final sign-off Sep 2020
1 California StR.M.R. Construction Companydemo of (e) stair between 30 & 31 , infill slab at 31st fl. no change in occupancy, use or area, life safety & sprinklers & mep under sep permit
Details
Permit
201907307281
Status
complete
Filed
Jul 30, 2019
Permit issued
Feb 21, 2020
Final sign-off
Sep 17, 2020
Declared cost
$190,000
Address
1 California St

demo of (e) stair between 30 & 31 , infill slab at 31st fl. no change in occupancy, use or area, life safety & sprinklers & mep under sep permit

Open the permit page

$190,000
Jul 26, 2019Never finaled
issued Sep 2019, no final
505 Sansome StSkyline Construction1/f demolish all (e) partitions, doors, millwork, ceiling grid, lighting, flooring, and equipment remove all equipment from fl. outlets & demollised walls,equipment from floor outlets and demolished loops remove mech duct work back to main loop mezzanine structural member to be demolished n/a maher
Details
Permit
201907267048
Status
issued
Filed
Jul 26, 2019
Permit issued
Sep 13, 2019
Declared cost
$124,000
Address
505 Sansome St

1/f demolish all (e) partitions, doors, millwork, ceiling grid, lighting, flooring, and equipment remove all equipment from fl. outlets & demollised walls,equipment from floor outlets and demolished loops remove mech duct work back to main loop mezzanine structural member to be demolished n/a maher

Open the permit page

$124,000
Jul 26, 2019Completed
final sign-off Jun 2020
275 Battery StHathaway Dinwiddie Co.suite #440 -ti to (e) space. demo non structural partitions. construction of non structural partitions, lights, power, data, glazing, millwork and new finishes.
Details
Permit
201907267124
Status
complete
Filed
Jul 26, 2019
Permit issued
Jul 31, 2019
Final sign-off
Jun 1, 2020
Declared cost
$285,000
Address
275 Battery St

suite #440 -ti to (e) space. demo non structural partitions. construction of non structural partitions, lights, power, data, glazing, millwork and new finishes.

Open the permit page

$285,000
Jul 24, 2019Completed
final sign-off Jun 2020
600 Montgomery StHathaway Dinwiddie Co.ti on 29th fl to existing office space. non-structural partitions doors, data/power finighses, ceiling, lighting.
Details
Permit
201907246828
Status
complete
Filed
Jul 24, 2019
Permit issued
Aug 5, 2019
Final sign-off
Jun 13, 2020
Declared cost
$482,274
Address
600 Montgomery St

ti on 29th fl to existing office space. non-structural partitions doors, data/power finighses, ceiling, lighting.

Open the permit page

$482,274