Capitol Electric Const
- Based in
- San Francisco
- On San Francisco permits
- May 2001 to Oct 2026
- Last 24 months
- 12 permits filed
184 permits since 2000: 105 completed, 9 in progress, 49 never finaled, 21 expired or cancelled.
Of the 49 never-finaled permits, 12 are 3 to 5 years old, 9 are 5 to 10 years old, 28 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 184.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 1, 2026 | In progress issued Oct 2026 | 140 New Montgomery St | new lighting and associated circulating/control/power and signal devices and associated wiring ref pa# 202605261870Details
new lighting and associated circulating/control/power and signal devices and associated wiring ref pa# 202605261870 | $28,530 |
| Jul 16, 2026 | In progress issued Jul 2026 | 63 Bluxome St | revisoin 202412126716- title 24 to include lighting fixtures and associated circuiting/controls, power and signal devices and associated wiring, new replacement main switchboard and panel for new elevatorDetails
revisoin 202412126716- title 24 to include lighting fixtures and associated circuiting/controls, power and signal devices and associated wiring, new replacement main switchboard and panel for new elevator | $75,835 |
| Jun 26, 2026 | Completed final sign-off Jul 2026 | 201 Filbert St | to obtain final inspection for work approved under pa#202503132186. all work is complete.Details
to obtain final inspection for work approved under pa#202503132186. all work is complete. | |
| Mar 17, 2026 | Completed final sign-off May 2026 | 501 02nd St | suite 100: office tenanat retrofit-lighting fixtures and associated circuting/controls, power and signal devices and associated wiring. ref pa#202511200064Details
suite 100: office tenanat retrofit-lighting fixtures and associated circuting/controls, power and signal devices and associated wiring. ref pa#202511200064 | $37,585 |
| Dec 4, 2025 | Completed final sign-off Mar 2026 | 575 Market St | 25th floor - ste 2550: provide new lights and associated circuiting/controls for ti pa# 202510157452.Details
25th floor - ste 2550: provide new lights and associated circuiting/controls for ti pa# 202510157452. | $38,530 |
| Jul 10, 2025 | In progress issued Jul 2025 | 730 Polk St | 2/f- office: lighting fixtures and associated circuit/ controls ref 202504285312.Details
2/f- office: lighting fixtures and associated circuit/ controls ref 202504285312. | $4,530 |
| Jun 18, 2025 | Completed final sign-off Sep 2025 | 580 California St | suite 1400: office tenant retrofit: lighting fixtures and asscociated circuiting/controls, power and signal devices, and asscociated wiring in the new conference room. ref to ti.#2025-0506-5906Details
suite 1400: office tenant retrofit: lighting fixtures and asscociated circuiting/controls, power and signal devices, and asscociated wiring in the new conference room. ref to ti.#2025-0506-5906 | $28,530 |
| May 5, 2025 | In progress issued Sep 2025 | 121 Steuart St | replace existing electrical main service in (e) location. relocate fire pump feedDetails
replace existing electrical main service in (e) location. relocate fire pump feed | $50,000 |
| May 1, 2025 | Completed final sign-off Jun 2025 | 570 Pacific Av | ti retrofit light fixture and associated circuiting/controls. ref 2025-02-10-0003Details
ti retrofit light fixture and associated circuiting/controls. ref 2025-02-10-0003 | $28,530 |
| Mar 13, 2025 | Expired or cancelled expired Jun 2026 | 201 Filbert St | 1st floor: relocation of e fire smoke (manual fan and damper panel from lobby of bldg to adjacent fire annunciator roomDetails
1st floor: relocation of e fire smoke (manual fan and damper panel from lobby of bldg to adjacent fire annunciator room | $11,970 |
| Oct 31, 2024 | In progress issued Oct 2024 | 1 Sansome St | 9th fl: ref pa # 202408098305 retrofit light fixtures and associated circuiting/controls, power & signal devices ans associated wiringDetails
9th fl: ref pa # 202408098305 retrofit light fixtures and associated circuiting/controls, power & signal devices ans associated wiring | $28,530 |
| Oct 17, 2024 | Completed final sign-off May 2025 | 50 California St | 24th fl - provide new lights and associated circuiting/controls for restrooms. ref pa 202408078122Details
24th fl - provide new lights and associated circuiting/controls for restrooms. ref pa 202408078122 | $8,530 |
| Sep 26, 2024 | Completed final sign-off Oct 2024 | 301 Howard St | 14th/f electrical work for t.i. 202408158729: additional power & tele-dataDetails
14th/f electrical work for t.i. 202408158729: additional power & tele-data | $10,523 |
| Aug 15, 2024 | Completed final sign-off Aug 2025 | 600 Battery St | tenant office retrofit, light fixtures and associated circuits/controls, new power and circuit for roof heatersDetails
tenant office retrofit, light fixtures and associated circuits/controls, new power and circuit for roof heaters | $58,450 |
| Aug 15, 2024 | Completed final sign-off Oct 2024 | 301 Howard St | 14th fl ref pa # 2024-0530-3259 provide lighting & power for tiDetails
14th fl ref pa # 2024-0530-3259 provide lighting & power for ti | $21,533 |
| Mar 14, 2024 | In progress issued Mar 2024 | 201 California St | ste 600. provide lighting and power for t.i. ref to t.i pa# 202402286726Details
ste 600. provide lighting and power for t.i. ref to t.i pa# 202402286726 | $21,533 |
| Mar 11, 2024 | Completed final sign-off Jul 2025 | 201 Mission St | electrical generator tap can to be installed- ground floorDetails
electrical generator tap can to be installed- ground floor | $75,000 |
| Jan 5, 2024 | In progress issued Jan 2024 | 650 California St | ste 2750: office tenant retrofit: light fixtures and associated circuiting, controls, power and signal devices and associated wiring.Details
ste 2750: office tenant retrofit: light fixtures and associated circuiting, controls, power and signal devices and associated wiring. | $32,638 |
| Dec 7, 2023 | In progress issued Jan 2024 | 475 Brannan St | new feeder, 75kva transformer,panel board and branch circuits for (8) new electr veh chargers.Details
new feeder, 75kva transformer,panel board and branch circuits for (8) new electr veh chargers. | $12,638 |
| Nov 2, 2023 | In progress issued Nov 2023 | 555 California St | 51st fl: retrofit lighting fixtures and associated circuiting and controls.Details
51st fl: retrofit lighting fixtures and associated circuiting and controls. | $8,530 |
| Aug 16, 2023 | Completed final sign-off Sep 2023 | 150 California St | 11th fl - modification of (e) life safety system ref pa 2022-1222-8926. install 16 new speakers and 19 new strobes; install 1 new smoke detectorDetails
11th fl - modification of (e) life safety system ref pa 2022-1222-8926. install 16 new speakers and 19 new strobes; install 1 new smoke detector | $46,526 |
| Aug 15, 2023 | Completed final sign-off Jan 2024 | 1355 Market St | install level 3 ev charger in garageDetails
install level 3 ev charger in garage | $50,000 |
| Jun 28, 2023 | Expired or cancelled cancelled Jan 2026 | 386 Geary St | one-for-one replacement of (e) light fixtures in (e) restaurant, no new wiring/circuit/controls.Details
one-for-one replacement of (e) light fixtures in (e) restaurant, no new wiring/circuit/controls. | $16,500 |
| Apr 26, 2023 | Never finaled issued Apr 2023, no final | 1045 Sansome St | install new and replace exist signs and emergency lights in common path of egressDetails
install new and replace exist signs and emergency lights in common path of egress | $12,638 |
| Apr 21, 2023 | Completed final sign-off Sep 2023 | 33 New Montgomery St | 14th fl - ti work to inlcude new lighting & mechanical work @ 14th fl. ref pa 2023-0309-3307Details
14th fl - ti work to inlcude new lighting & mechanical work @ 14th fl. ref pa 2023-0309-3307 | $500,000 |
| Mar 28, 2023 | Completed final sign-off Oct 2023 | 345 Spear St | b1 lvl: 200a electrical feed from retail meter to car chargers, install 2-l3 ev chargers.Details
b1 lvl: 200a electrical feed from retail meter to car chargers, install 2-l3 ev chargers. | $30,000 |
| Mar 9, 2023 | Never finaled issued Mar 2023, no final | 150 California St | 20/f ste# 2000: modification of existing life safety system, ref pa# 202210134259, install new 2-speakers and 8-strobes, install new 3-fire smoke dampers, 3-addressible output module and 1-duct mounting plate, relocation of existing speakers and strobes.Details
20/f ste# 2000: modification of existing life safety system, ref pa# 202210134259, install new 2-speakers and 8-strobes, install new 3-fire smoke dampers, 3-addressible output module and 1-duct mounting plate, relocation of existing speakers and strobes. | $16,500 |
| Feb 16, 2023 | Never finaled issued Feb 2023, no final | 475 Brannan St | provide lighting & power for t.i. ref bpa#202211186828Details
provide lighting & power for t.i. ref bpa#202211186828 | $14,533 |
| Dec 8, 2022 | Never finaled issued Dec 2022, no final | 555 California St | garage level b3 - provide (2) 65 kw level 3 ev charger, provide 100a circuit from panel ev b3. fire alarm/sprinklers under sep permits.Details
garage level b3 - provide (2) 65 kw level 3 ev charger, provide 100a circuit from panel ev b3. fire alarm/sprinklers under sep permits. | $14,725 |
| Oct 14, 2022 | Completed final sign-off Jan 2023 | 221 Main St | provide power and lighting for spec suite 1240 refe 202206025455Details
provide power and lighting for spec suite 1240 refe 202206025455 | $8,530 |
| Aug 4, 2022 | Never finaled issued Aug 2022, no final | 201 California St | provide lighting (title 24 compliance) for tenant improvement in suite 640. ref pa# 2022-0208-7565. maher n/a.Details
provide lighting (title 24 compliance) for tenant improvement in suite 640. ref pa# 2022-0208-7565. maher n/a. | $11,533 |
| Aug 4, 2022 | Never finaled issued Aug 2022, no final | 201 California St | provide lighting title compliance for common area on 12th fl. ref pa# 2021-1215-4443Details
provide lighting title compliance for common area on 12th fl. ref pa# 2021-1215-4443 | $8,530 |
| Aug 4, 2022 | Never finaled issued Aug 2022, no final | 201 California St | provide lighting (title 24 compliance) for tenant improvement in suite 1350. ref pa# 2022-0208-7550. maher n/a.Details
provide lighting (title 24 compliance) for tenant improvement in suite 1350. ref pa# 2022-0208-7550. maher n/a. | $11,533 |
| Aug 4, 2022 | Never finaled issued Aug 2022, no final | 201 California St | provide lighting (title 24 compliance) for tenant improvement in suite 600. ref pa# 202202087563. maher n/a.Details
provide lighting (title 24 compliance) for tenant improvement in suite 600. ref pa# 202202087563. maher n/a. | $11,533 |
| Aug 4, 2022 | Never finaled issued Aug 2022, no final | 201 California St | provide lighting & title 24 compliance for common area on 13th fl. ref pa# 2021-1215-4469Details
provide lighting & title 24 compliance for common area on 13th fl. ref pa# 2021-1215-4469 | $8,530 |
| Aug 4, 2022 | Never finaled issued Aug 2022, no final | 201 California St | provide lighting title 24 compliance for common area on 6th fl. ref pa# 2021-1215-4446Details
provide lighting title 24 compliance for common area on 6th fl. ref pa# 2021-1215-4446 | $8,530 |
| Aug 4, 2022 | Never finaled issued Aug 2022, no final | 201 California St | provide lighting (title 24 compliance) for tenant improvement in suite 1200. ref pa# 2022-0218-8280. maher n/a.Details
provide lighting (title 24 compliance) for tenant improvement in suite 1200. ref pa# 2022-0218-8280. maher n/a. | $11,533 |
| Mar 9, 2022 | Completed final sign-off Dec 2022 | 150 California St | 10th floor:modification of extg life safety system. install 16 new speakers and 22 new strobes.install 1 new dual sync module. ref pa#202201145998.Details
10th floor:modification of extg life safety system. install 16 new speakers and 22 new strobes.install 1 new dual sync module. ref pa#202201145998. | $16,500 |
| Feb 25, 2022 | Completed final sign-off Mar 2022 | 150 California St | 3rd fl: modification of existing life safety system to 3rd floor ti work in reference to ti permit 202106172696. install new (6) speakers and (10) strobes. relocation of an (e) smoke detector to new idf room.Details
3rd fl: modification of existing life safety system to 3rd floor ti work in reference to ti permit 202106172696. install new (6) speakers and (10) strobes. relocation of an (e) smoke detector to new idf room. | $16,500 |
| Jan 28, 2022 | Never finaled issued Jan 2022, no final | 150 California St | suite 200: as-built rev to pa202201075586: install 5 wall strobes & 6 ceiling speaker. remove scope of work where says "relocate of an existing smoke detector to a new idf room."Details
suite 200: as-built rev to pa202201075586: install 5 wall strobes & 6 ceiling speaker. remove scope of work where says "relocate of an existing smoke detector to a new idf room." | |
| Jan 7, 2022 | Completed final sign-off Feb 2022 | 150 California St | suite #200: install (5) wall strobes and (6) ceilling speakers to pa# 2021-0916-8520Details
suite #200: install (5) wall strobes and (6) ceilling speakers to pa# 2021-0916-8520 | $2,500 |
| Nov 4, 2021 | Completed final sign-off Dec 2021 | 50 California St | provide power and lighting for restrooms and vistibule area on 11th and 12th fl 202012161094Details
provide power and lighting for restrooms and vistibule area on 11th and 12th fl 202012161094 | $8,530 |
| Oct 7, 2021 | Completed final sign-off Dec 2021 | 1 Maritime Pz | provide lighting/power to office restroom. t.i. permit #2021/0611/2217Details
provide lighting/power to office restroom. t.i. permit #2021/0611/2217 | $7,536 |
| Jun 24, 2021 | Never finaled issued Jun 2021, no final | 150 California St | 1st fl: install (1) new duct smoke detector and relay module for activation of new fire smoke damper to pa 202101213050Details
1st fl: install (1) new duct smoke detector and relay module for activation of new fire smoke damper to pa 202101213050 | $2,500 |
| Dec 21, 2020 | Expired or cancelled withdrawn Dec 2022 | 343 Sansome St | provide (2) sets of three relay modules for primary recall, alternate ewcall and fireman's hat: (1) set in passenger elevator machine room level 17 penthouse; (1) set in freight elevator machine room lower level basement 1. tie in new initiating device to existing slc circuits ( loop 61 & 71).Details
provide (2) sets of three relay modules for primary recall, alternate ewcall and fireman's hat: (1) set in passenger elevator machine room level 17 penthouse; (1) set in freight elevator machine room lower level basement 1. tie in new initiating device to existing slc circuits ( loop 61 & 71). | $6,275 |
| Dec 17, 2020 | Completed final sign-off May 2021 | 150 California St | 7th fl, ste 700: install (12) new ceiling speaker and (12) new wall strobes (1) smoke detector. ref to ti permit # 2020.1001.5031Details
7th fl, ste 700: install (12) new ceiling speaker and (12) new wall strobes (1) smoke detector. ref to ti permit # 2020.1001.5031 | $10,485 |
| Dec 17, 2020 | Never finaled issued Feb 2021, no final | 150 California St | install (3) hardwired switches, (7) new ceiling speakers. relocate existing magnetic door holder and associated smoke detector. remove preaction system equipment. ref. to permit 2020-1002-5731.Details
install (3) hardwired switches, (7) new ceiling speakers. relocate existing magnetic door holder and associated smoke detector. remove preaction system equipment. ref. to permit 2020-1002-5731. | $11,875 |
| Sep 12, 2020 | Completed final sign-off Jan 2021 | 100 Pine St | 1st floor: provide power & lighting for ti #2018-1010-2762.Details
1st floor: provide power & lighting for ti #2018-1010-2762. | $11,830 |
| Sep 12, 2020 | Completed final sign-off Feb 2023 | 425 Market St | provide power & lighting to ti pa #202002053576.Details
provide power & lighting to ti pa #202002053576. | $15,000 |
| Feb 3, 2020 | Never finaled issued Feb 2020, no final | 1563 Mission St | as-built permit for errcs replace yag antenna and bda. reprogram new frequencies. ref pa #201703242250.Details
as-built permit for errcs replace yag antenna and bda. reprogram new frequencies. ref pa #201703242250. | $20,000 |
| Dec 13, 2019 | Completed final sign-off Aug 2020 | 345 Montgomery St | errc coverage - emergency responder radio covereage systemDetails
errc coverage - emergency responder radio covereage system | $69,713 |
| Nov 19, 2019 | Completed final sign-off Oct 2026 | 100 Pine St | installation of emergency responder radio coverage system. **maher n/a**Details
installation of emergency responder radio coverage system. **maher n/a** | $50,000 |
| Oct 31, 2019 | Completed final sign-off Nov 2019 | 150 California St | 8th fl - install 2 new speakers and relocate 3 speakers and 5 strobes. ref pa 201905080066Details
8th fl - install 2 new speakers and relocate 3 speakers and 5 strobes. ref pa 201905080066 | $9,785 |
| Oct 29, 2019 | Never finaled issued Nov 2019, no final | 100 Pine St | construction of 2 hr rated shaft enclosure to house 2 way communication emergency radio conduit through 2nd & 8th floor elevator lobbies. no structural work to be included in scope, no increase in area. no increase in occupancy or useDetails
construction of 2 hr rated shaft enclosure to house 2 way communication emergency radio conduit through 2nd & 8th floor elevator lobbies. no structural work to be included in scope, no increase in area. no increase in occupancy or use | $50,000 |
| Jul 26, 2019 | Completed final sign-off Feb 2020 | 100 Pine St | provide lighting for the ti on 28th fl. ref ti #201907246771.Details
provide lighting for the ti on 28th fl. ref ti #201907246771. | $11,725 |
| Feb 22, 2019 | Completed final sign-off Jul 2019 | 150 California St | f/a for ste 200: install 11 strobes and 13 speakers. ref ti #201811024829.Details
f/a for ste 200: install 11 strobes and 13 speakers. ref ti #201811024829. | $18,773 |
| Aug 23, 2018 | Completed final sign-off Oct 2018 | 180 Howard St | ground 02: remove and replace 8 hologen downlights w/ led downlightsDetails
ground 02: remove and replace 8 hologen downlights w/ led downlights | $2,578 |
| Jul 5, 2018 | Never finaled issued Jul 2018, no final | 875 Howard St | 3rd fl: replace existing fluorescent lights with new led lights in same location.Details
3rd fl: replace existing fluorescent lights with new led lights in same location. | $3,493 |
| Jul 5, 2018 | Completed final sign-off Jul 2018 | 150 California St | suite 400 fire alarm: install 2 new speaker, 2 strobes; relocate 5 strobes, 2 speaker strobe. ref ti #201804267420.Details
suite 400 fire alarm: install 2 new speaker, 2 strobes; relocate 5 strobes, 2 speaker strobe. ref ti #201804267420. | $10,500 |
| Jul 5, 2018 | Never finaled issued Jul 2018, no final | 1 Front St | suite 1900: replace existing 2x4 fluorescent light with led liner light. replace existing 4" recessed light with led recessed light. all lights are replaced in existing location.Details
suite 1900: replace existing 2x4 fluorescent light with led liner light. replace existing 4" recessed light with led recessed light. all lights are replaced in existing location. | $2,850 |
| Jun 15, 2018 | Never finaled issued Jun 2018, no final | 150 California St | title 24. suites 610 & 650. installation of new led lightsDetails
title 24. suites 610 & 650. installation of new led lights | $2,973 |
| May 10, 2018 | Completed final sign-off Nov 2018 | 150 California St | fa ste #900: modification of existing l/s system by installing (10) new speakers and (10) strobes. 1 smoke detector outside of lobby doors ref 201803012543 maher naDetails
fa ste #900: modification of existing l/s system by installing (10) new speakers and (10) strobes. 1 smoke detector outside of lobby doors ref 201803012543 maher na | $12,630 |
| Sep 27, 2017 | Completed final sign-off Nov 2017 | 430 California St | 18/f- install new dimmable led light fixture. t.i. pa#201706270419. n/a ordinance #155-13Details
18/f- install new dimmable led light fixture. t.i. pa#201706270419. n/a ordinance #155-13 | $9,548 |
| Apr 21, 2017 | Never finaled issued Apr 2017, no final | 201 California St | partial scope office tenant retrofit, lighting, lighting controls. ref pa 2017-0302-0544. maher naDetails
partial scope office tenant retrofit, lighting, lighting controls. ref pa 2017-0302-0544. maher na | $4,500 |
| Apr 14, 2017 | Completed final sign-off Jul 2017 | 150 California St | install one new relay module to release elevator lobby door locks.Details
install one new relay module to release elevator lobby door locks. | $3,500 |
| Feb 24, 2017 | Completed final sign-off Aug 2017 | 260 Townsend St | 1st,3rd,5th floors: t-24. install new light fixtures. maher na ref 201609026675Details
1st,3rd,5th floors: t-24. install new light fixtures. maher na ref 201609026675 | $2,980 |
| Jul 29, 2016 | Never finaled issued Dec 2016, no final | 150 California St | 10th floor: this project involves addition of selected power outlets for new tenant equipment. no change to lighting fixtures or controls. no change to partitions or (e) for the tenant space. maher naDetails
10th floor: this project involves addition of selected power outlets for new tenant equipment. no change to lighting fixtures or controls. no change to partitions or (e) for the tenant space. maher na | $18,000 |
| Jun 24, 2016 | Never finaled issued Jun 2016, no final | 201 Mission St | 6th flr: lighting upgrades, title 24 compliance per 201509036056; maher n/aDetails
6th flr: lighting upgrades, title 24 compliance per 201509036056; maher n/a | |
| Jun 24, 2016 | Completed final sign-off Dec 2016 | 201 Mission St | 23rd flr, ste 2350: lighting upgrades, title 24 compliance, ref. 201509036062; maher n/aDetails
23rd flr, ste 2350: lighting upgrades, title 24 compliance, ref. 201509036062; maher n/a | |
| Feb 22, 2016 | Never finaled issued Feb 2016, no final | 201 Mission St | title 24. lighting upgrades. branch circuit upgrades. ref pa 2015-0903-6061Details
title 24. lighting upgrades. branch circuit upgrades. ref pa 2015-0903-6061 | |
| Jan 25, 2016 | Completed final sign-off May 2016 | 201 Mission St | ste 540, spower tenant improvement, update lighting & power for title 24 upgrades. ref pa 2015-1105-1880; n/a maher ord # 155-13Details
ste 540, spower tenant improvement, update lighting & power for title 24 upgrades. ref pa 2015-1105-1880; n/a maher ord # 155-13 | |
| Jan 8, 2016 | Completed final sign-off Feb 2016 | 274 Brannan St | 6th floor: title 24 compliance. ref app#201410310410. n/a for maherDetails
6th floor: title 24 compliance. ref app#201410310410. n/a for maher | |
| Jan 7, 2016 | Completed final sign-off Feb 2016 | 274 Brannan St | title 24 compliance to t.i. pa#201506017595. n/a ordinance #155-13Details
title 24 compliance to t.i. pa#201506017595. n/a ordinance #155-13 | |
| Dec 22, 2015 | Completed final sign-off May 2016 | 201 Mission St | title 24, lighting upgrade. ref pa 2015-0528-7386- emergency lighting - work in restrooms- lobby and corridor-Details
title 24, lighting upgrade. ref pa 2015-0528-7386- emergency lighting - work in restrooms- lobby and corridor- | |
| Dec 22, 2015 | Completed final sign-off May 2016 | 201 Mission St | 23rd floor: corridor lighting upgrade. n/a for maherDetails
23rd floor: corridor lighting upgrade. n/a for maher | |
| Dec 22, 2015 | Completed final sign-off May 2016 | 201 Mission St | corridor lighting upgrade, restroom lighting upgrade, title 24 lighting upgrade. ref pa 2015-0528-7384Details
corridor lighting upgrade, restroom lighting upgrade, title 24 lighting upgrade. ref pa 2015-0528-7384 | |
| Dec 22, 2015 | Completed final sign-off May 2016 | 201 Mission St | 6th floor: corridor, restroom and elevator lighting upgrade. n/a for maherDetails
6th floor: corridor, restroom and elevator lighting upgrade. n/a for maher | |
| Dec 9, 2015 | Never finaled issued Dec 2015, no final | 301 Howard St | lighting controls title 24. ref pa 2015-1009-9309 maher naDetails
lighting controls title 24. ref pa 2015-1009-9309 maher na | $40,000 |
| Dec 9, 2015 | Never finaled issued Dec 2015, no final | 301 Howard St | lighting controls title 24. ref pa 2015-1009-9309Details
lighting controls title 24. ref pa 2015-1009-9309 | $25,000 |
| Dec 9, 2015 | Never finaled issued Jan 2016, no final | 301 Howard St | suite 840: lighting, lighting controls title 24. ref pa 2015-0624-9732. maher naDetails
suite 840: lighting, lighting controls title 24. ref pa 2015-0624-9732. maher na | $17,000 |
| Dec 9, 2015 | Completed final sign-off Feb 2016 | 45 Fremont St | 28th floor: install 70 type fl dimmable led recessed 2'x2' lights and controls. ref app#201412224277Details
28th floor: install 70 type fl dimmable led recessed 2'x2' lights and controls. ref app#201412224277 | $28,750 |
| Dec 9, 2015 | Never finaled issued Dec 2015, no final | 301 Howard St | lighting, lighting controls title 24. ref bldg pa 2015-0505-5351. maher naDetails
lighting, lighting controls title 24. ref bldg pa 2015-0505-5351. maher na | $103,001 |
| Mar 26, 2015 | Completed final sign-off Apr 2015 | 150 California St | 19th fl: install 1 smoke detector, 5 strobes, 2 speakers & 2 door holders; relocate 3 speakers and 2 strobes. t.i. pa# 2015-0109-5292. n/a ordinance #155-13.Details
19th fl: install 1 smoke detector, 5 strobes, 2 speakers & 2 door holders; relocate 3 speakers and 2 strobes. t.i. pa# 2015-0109-5292. n/a ordinance #155-13. | $7,000 |
| Mar 26, 2015 | Completed final sign-off Apr 2015 | 150 California St | 13th fl: install 9 new strobes and 5 new speakers; relocate 4 existing speakers. t.i. pa# 201501165911. n/a ordinance #155-13Details
13th fl: install 9 new strobes and 5 new speakers; relocate 4 existing speakers. t.i. pa# 201501165911. n/a ordinance #155-13 | $6,537 |
| Mar 26, 2015 | Completed final sign-off Sep 2015 | 150 California St | install 9 strobes, 6 speakers. relocate 2 speakers.t.i. pa# 201501165911. n/a ordinance #155-13Details
install 9 strobes, 6 speakers. relocate 2 speakers.t.i. pa# 201501165911. n/a ordinance #155-13 | $6,722 |
| Jul 17, 2014 | Completed final sign-off Nov 2014 | 150 California St | ste #800 and 850: installation of 9 new ceiling speakers and 7 new strobes. relocation of 6 existing strobes/speaker-strobes.t.i. under seperate permit 201406279692. maher n/aDetails
ste #800 and 850: installation of 9 new ceiling speakers and 7 new strobes. relocation of 6 existing strobes/speaker-strobes.t.i. under seperate permit 201406279692. maher n/a | $15,497 |
| Jun 23, 2014 | Never finaled issued Jun 2014, no final | 555 California St | g/f - remove 188 extg incandescent/ fluorescent down lights and replace with 188 led downlights in same location using extg wiring. title 24 drawings. work in ground floor lobby.n/a for the maher ordinance #155-13Details
g/f - remove 188 extg incandescent/ fluorescent down lights and replace with 188 led downlights in same location using extg wiring. title 24 drawings. work in ground floor lobby.n/a for the maher ordinance #155-13 | $167,500 |
| Jun 19, 2013 | Never finaled issued Jul 2013, no final | 345 Spear St | 7th flr: revision to 201301087434 evacuation placard and exit signage upgrades,Details
7th flr: revision to 201301087434 evacuation placard and exit signage upgrades, | |
| Dec 19, 2012 | Completed final sign-off Jan 2013 | 555 California St | install 39 temporary lights and 1 digital time clock. emergency lighting requires a separate circuit.Details
install 39 temporary lights and 1 digital time clock. emergency lighting requires a separate circuit. | $11,350 |
| Jul 12, 2012 | Completed final sign-off Aug 2012 | 123 Mission St | install 3-ceiling mounted speakers, 4-ceiling mounted speaker/strobes and relocate 5-existing speaker/strobes.Details
install 3-ceiling mounted speakers, 4-ceiling mounted speaker/strobes and relocate 5-existing speaker/strobes. | $7,380 |
| Jun 26, 2012 | Completed final sign-off Jul 2012 | 345 Spear St | submission of as build drawings, per fire plan check. ref. permit #2011-1117-9168 -review and stamp fa sequence of operation - review and stamp firefighter override control panel - provide specialinspection report stamped by qualified engineersDetails
submission of as build drawings, per fire plan check. ref. permit #2011-1117-9168 -review and stamp fa sequence of operation - review and stamp firefighter override control panel - provide specialinspection report stamped by qualified engineers | |
| May 17, 2012 | Never finaled issued May 2012, no final | 123 Mission St | 26th floor-install new & relocate life safety devices tie into (e) power supply. devices include: 10 speakers, 26 strobes & 2 smoke detectorsDetails
26th floor-install new & relocate life safety devices tie into (e) power supply. devices include: 10 speakers, 26 strobes & 2 smoke detectors | $11,325 |
| Apr 24, 2012 | Completed final sign-off Jun 2012 | 345 Spear St | minor fire alarm (t.i) device installation due to adding offices in open space. install six new speaker/strobes.Details
minor fire alarm (t.i) device installation due to adding offices in open space. install six new speaker/strobes. | $3,570 |
| Apr 6, 2012 | Completed final sign-off Aug 2012 | 123 Mission St | 11th floor: install new life safety devices for t.i. work located on 11th floor. install 17 speakers, 23 ceiling speaker/strobe, 3 ceiling strobe, 2 wall strobe, 9 smoke detector, and 2 control modules.Details
11th floor: install new life safety devices for t.i. work located on 11th floor. install 17 speakers, 23 ceiling speaker/strobe, 3 ceiling strobe, 2 wall strobe, 9 smoke detector, and 2 control modules. | $15,870 |
| Mar 29, 2012 | Completed final sign-off May 2012 | 2 Harrison St | 3rd floor: install new speaker/strobes (13); new strobes (3); duct smoke detector (1); control relay (1); 1 new booster power supplyDetails
3rd floor: install new speaker/strobes (13); new strobes (3); duct smoke detector (1); control relay (1); 1 new booster power supply | $12,000 |
| Mar 1, 2012 | Completed final sign-off Mar 2012 | 123 Mission St | 4th/5th/6th floors-install audible visual notification devices to tie into (e) system. smoke detectors, control modules, detectors for fire/smoke damper & fan control on 3 floors. refer arch pa's #2011-1228-1406, 2011-1228-1407, 2011-1228-1383Details
4th/5th/6th floors-install audible visual notification devices to tie into (e) system. smoke detectors, control modules, detectors for fire/smoke damper & fan control on 3 floors. refer arch pa's #2011-1228-1406, 2011-1228-1407, 2011-1228-1383 | $25,437 |
| Feb 24, 2012 | Completed final sign-off Apr 2012 | 1 Embarcadero Center | 20th floor-install 12 speakers, 14 strobes, 1 duct smoke detector, 1 pad-3 power supply. all new life safety devices connect onto (e) life safety systemDetails
20th floor-install 12 speakers, 14 strobes, 1 duct smoke detector, 1 pad-3 power supply. all new life safety devices connect onto (e) life safety system | $13,964 |
| Dec 13, 2011 | Completed final sign-off Jan 2012 | 275 Battery St | install one strobe, one smoke duct detector and relocate one strobe and 3 speakers.Details
install one strobe, one smoke duct detector and relocate one strobe and 3 speakers. | $3,250 |
| Nov 18, 2011 | Completed final sign-off Jun 2012 | 1 Embarcadero Center | install new life safety devices included 20 speakers, 9 strobes, 1 smoke detectorDetails
install new life safety devices included 20 speakers, 9 strobes, 1 smoke detector | $15,000 |
| Nov 17, 2011 | Completed final sign-off May 2012 | 345 Spear St | fire alarm t/i on 6th fl: 94 speaker/strobes, 19 smoke detectors, 20 strobes, 23 duct detectors, 15 speakers, 14 control relays, 9 sd, 12 monitor modules & 6 fans/hoods.Details
fire alarm t/i on 6th fl: 94 speaker/strobes, 19 smoke detectors, 20 strobes, 23 duct detectors, 15 speakers, 14 control relays, 9 sd, 12 monitor modules & 6 fans/hoods. | $65,000 |