126 permits since 2000 (engineer on 114 permits, designer on 11 permits, authorized agent-others on 1 permit): 71 completed, 35 in progress, 8 never finaled, 12 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 126.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 21, 2026 | In progress filed Sep 2026, not yet issued | 1215 Bay St | alteration of the space of one (e) parking space, storage room & partial laundry room for a new adu within (e) building envelope.Details
alteration of the space of one (e) parking space, storage room & partial laundry room for a new adu within (e) building envelope. | $70,000 | |
| Sep 18, 2026 | In progress issued Sep 2026 | 160 Richland Av | Superbuilt | increase opening in dining room, replace window at side and rear in kind, replace (e) water heater for lower floor unit.Details
increase opening in dining room, replace window at side and rear in kind, replace (e) water heater for lower floor unit. | $28,000 |
| Sep 1, 2026 | In progress issued Sep 2026 | 101 Quintara St | Barry O Mahony Construction | comply with nov#: 202544963. remove the retaining walls added without a building permit. restore the original grade per the soil report. add a new 6 ft fence with 24" high non-engineered wall at the east elevation.Details
comply with nov#: 202544963. remove the retaining walls added without a building permit. restore the original grade per the soil report. add a new 6 ft fence with 24" high non-engineered wall at the east elevation. | $20,000 |
| Aug 31, 2026 | In progress filed Aug 2026, not yet issued | 2180 29th Av | rebuild the front brick stairs and replace them with tile stairs. replace the front window and remove the brick chinmey, visible from street. move the front wall for new stairs orientation.Details
rebuild the front brick stairs and replace them with tile stairs. replace the front window and remove the brick chinmey, visible from street. move the front wall for new stairs orientation. | $50,000 | |
| Aug 31, 2026 | In progress filed Aug 2026, not yet issued | 731 Athens St | remodel the kitchen on the 2nd floor. add a new bedroom, an office, and a full bathroom and a wetbar on the ground floor. replace water heater and window on ground floor with a new door.Details
remodel the kitchen on the 2nd floor. add a new bedroom, an office, and a full bathroom and a wetbar on the ground floor. replace water heater and window on ground floor with a new door. | $120,000 | |
| Aug 31, 2026 | In progress filed Aug 2026, not yet issued | 1255 Shrader St | Urban Nest Inc | remodel existing kitchen and bathroom. add a full bathroom. replace the existing dry rot exterior wood beam in kind at the west elevation.Details
remodel existing kitchen and bathroom. add a full bathroom. replace the existing dry rot exterior wood beam in kind at the west elevation. | $100,000 |
| Aug 18, 2026 | In progress issued Sep 2026 | 489 Hazelwood Av | Andrei Smirnov | convert storage rooms and part of the garage into living spacesand add a new bedroom and bathroom and 2nd kitchen on first floorDetails
convert storage rooms and part of the garage into living spacesand add a new bedroom and bathroom and 2nd kitchen on first floor | $80,000 |
| Aug 10, 2026 | In progress issued Aug 2026 | 54 Douglass St | Edenavow Construction & Design | frame opening in wall.Details
frame opening in wall. | $5,000 |
| Jul 21, 2026 | In progress issued Aug 2026 | 2540 Chestnut St | to comply with nov:202544911 and repairs in both units due to fire damage. repair the damaged framing in kind and remodel the kitchen and bathroom in kind. replace damaged structural beams and struc. framing, replace damage windows in kind.Details
to comply with nov:202544911 and repairs in both units due to fire damage. repair the damaged framing in kind and remodel the kitchen and bathroom in kind. replace damaged structural beams and struc. framing, replace damage windows in kind. | $200,000 | |
| Jul 4, 2026 | In progress filed Jul 2026, not yet issued | 291 Richland Av | addition, excavate below (e) 1/f & (e) front setback to create (n) basement lvl, for (n) parking garage, (n) addition into (e) front setback at (n) basement lvl, create (n) driveway & landscaping, (n) curbcut, convert (e) non-habitable 1/f to habitable space, (n) fixtures, finishes & services-Details
addition, excavate below (e) 1/f & (e) front setback to create (n) basement lvl, for (n) parking garage, (n) addition into (e) front setback at (n) basement lvl, create (n) driveway & landscaping, (n) curbcut, convert (e) non-habitable 1/f to habitable space, (n) fixtures, finishes & services- | $250,000 | |
| Jun 25, 2026 | In progress issued Aug 2026 | 282 Eureka St | Perez Construction Llc. | kitchen renovation w/ (n) fixtures, finishes, cabinets, & appliances, modify interior openings @ kitchen, breakfast, entry, & family rooms @ 2nd fl. convert (e) closets @ 3rd fl to (n) main bath w/ (n) skylight. install (n) exterior doors & windows within (e) openings all flrs. repair/replace (e)...Details
kitchen renovation w/ (n) fixtures, finishes, cabinets, & appliances, modify interior openings @ kitchen, breakfast, entry, & family rooms @ 2nd fl. convert (e) closets @ 3rd fl to (n) main bath w/ (n) skylight. install (n) exterior doors & windows within (e) openings all flrs. repair/replace (e)... | $55,000 |
| Jun 23, 2026 | In progress filed Jun 2026, not yet issued | 290 Dolores St | voluntary strengthening in the crawl space. add plywood shear walls w/ concrete grade beams.Details
voluntary strengthening in the crawl space. add plywood shear walls w/ concrete grade beams. | $30,000 | |
| Jun 12, 2026 | In progress issued Jun 2026 | 3806 Clay St | D K Construction | revision to bpa 202410082572 to add laundry sink, new interior stair guardrail on (e) stair, new attic skylights, new attic powder room, and a shifted door location in attic.Details
revision to bpa 202410082572 to add laundry sink, new interior stair guardrail on (e) stair, new attic skylights, new attic powder room, and a shifted door location in attic. | $20,000 |
| May 22, 2026 | Completed final sign-off Aug 2026 | 875 Shotwell St | Dore Const. Of Calif. Inc. | converting an overhang into storage shed. two windows and a door. 3 recypticals, one light switch and relocate a hose bib.Details
converting an overhang into storage shed. two windows and a door. 3 recypticals, one light switch and relocate a hose bib. | $15,000 |
| May 4, 2026 | Expired or cancelled withdrawn Jun 2026 | 530 Dewey Bl | revision to bpa 202512292882: replace windows withing the same opening in kind. remove and replace (e) french door to (n) 60" x80" sliding door @ balcony on 2nd floor. replace stucco w/ new sheetrock. roof replace. new stucco outside. add 30in to balcony deck.Details
revision to bpa 202512292882: replace windows withing the same opening in kind. remove and replace (e) french door to (n) 60" x80" sliding door @ balcony on 2nd floor. replace stucco w/ new sheetrock. roof replace. new stucco outside. add 30in to balcony deck. | $56,000 | |
| May 1, 2026 | In progress filed May 2026, not yet issued | 2901 16th St | voluntary structural strenghtening on the commercial ground floor w/ 2 moment frames. replace (e) sidewalk floor w/ 2 moment frames. replace (e) sidewalk over (e) basement w/ new concrete slab. disable access upgrades compliance per d.a checklist.Details
voluntary structural strenghtening on the commercial ground floor w/ 2 moment frames. replace (e) sidewalk floor w/ 2 moment frames. replace (e) sidewalk over (e) basement w/ new concrete slab. disable access upgrades compliance per d.a checklist. | $180,000 | |
| Apr 21, 2026 | In progress issued May 2026 | 712 Tennessee St | Sft Construction Corp | comply with nov#201993791. do mandatory soft story retrofit on the ground floor per 2025 ebc, chapter a.4. add plywood shear walls and simpson panels with concrete grade beams.Details
comply with nov#201993791. do mandatory soft story retrofit on the ground floor per 2025 ebc, chapter a.4. add plywood shear walls and simpson panels with concrete grade beams. | $100,000 |
| Apr 3, 2026 | In progress issued Apr 2026 | 2059 Mission St | Dv Gomez Construction Inc | struct. rev. to pa 2025-0417-4674 per field conditions including slightly reconfigured shear walls on 2nd & 3rd floors, diaphragm to wall connection, new ret. wall at prev. approved removal conven. stair, smrf to wood connection, r/r glass & aluminum store fronts in kind for 4 commercial spaces.Details
struct. rev. to pa 2025-0417-4674 per field conditions including slightly reconfigured shear walls on 2nd & 3rd floors, diaphragm to wall connection, new ret. wall at prev. approved removal conven. stair, smrf to wood connection, r/r glass & aluminum store fronts in kind for 4 commercial spaces. | $50,000 |
| Apr 2, 2026 | Completed final sign-off Sep 2026 | 1405 Van Ness Av | De Brus Construction Inc | replace existing metal egress stairs in kind. in the lightwell @ the south side of the building, visible from the street, due to significant corrosionDetails
replace existing metal egress stairs in kind. in the lightwell @ the south side of the building, visible from the street, due to significant corrosion | $75,000 |
| Mar 24, 2026 | In progress issued Jun 2026 | 2952 Folsom St | revise approved adu pa# 201910083942. revise adus# 1 & @ adn add adu# 3. addition of adu pursuant to planning code section 207.1.Details
revise approved adu pa# 201910083942. revise adus# 1 & @ adn add adu# 3. addition of adu pursuant to planning code section 207.1. | $100,000 | |
| Mar 23, 2026 | In progress issued Sep 2026 | 424 Pacheco St | One Inch To The Left, Inc. Dba Rarefield | rebulid side deck. side deck will be clad in stucco to match (e). (n) railing will be metal with vertical picket. demolish lower solid sections only of (e) arched entryway. remain (e) arches. replace rear deck with spiral spiral stairs and smaller deck.Details
rebulid side deck. side deck will be clad in stucco to match (e). (n) railing will be metal with vertical picket. demolish lower solid sections only of (e) arched entryway. remain (e) arches. replace rear deck with spiral spiral stairs and smaller deck. | $32,000 |
| Mar 10, 2026 | Completed final sign-off Mar 2026 | 216 Frederick St | revision to 202411205423 in order to document change from 9'11" garage door opening to 10'4" per drawing.Details
revision to 202411205423 in order to document change from 9'11" garage door opening to 10'4" per drawing. | ||
| Feb 24, 2026 | Completed final sign-off Jun 2026 | 171 Caselli Av | add a full bathroom in the laundry room on the ground fl.Details
add a full bathroom in the laundry room on the ground fl. | $20,000 | |
| Feb 24, 2026 | Completed final sign-off Jun 2026 | 1036 Jackson St | Seismic Retrofitters Inc. | mandatory soft story retrofit on the ground fl per 2025 sfebc. add plywood shear walls on the ground fl.Details
mandatory soft story retrofit on the ground fl per 2025 sfebc. add plywood shear walls on the ground fl. | $100,000 |
| Feb 24, 2026 | In progress issued Mar 2026 | 2516 Bryant St | Mission Home Remodeling Inc | revision to pa 202512222407 do voluntary strengthening in the kitchen area by adding plywood shear wall. kitchen remodel under separate pa 202601073348Details
revision to pa 202512222407 do voluntary strengthening in the kitchen area by adding plywood shear wall. kitchen remodel under separate pa 202601073348 | $10,000 |
| Feb 19, 2026 | In progress issued Feb 2026 | 1824 Green St | revision to pa # 2025-1028-8331: install simpson panels side by side. document existing holdowns.Details
revision to pa # 2025-1028-8331: install simpson panels side by side. document existing holdowns. | ||
| Feb 19, 2026 | In progress issued Feb 2026 | 720 Waller St | Barcci Builders Inc | revision to pa #2025-0819-3380: replace an existing translucent fiberglass roof located in the kitchen with a conventional wood framed roof with 2 skylights.Details
revision to pa #2025-0819-3380: replace an existing translucent fiberglass roof located in the kitchen with a conventional wood framed roof with 2 skylights. | $15,000 |
| Feb 11, 2026 | In progress issued May 2026 | 124 Saturn St | Hawthorne Construction | work includes addressing remaining items in nov 202294956. kitchen and bathroom remodel to existing family home also window replacementDetails
work includes addressing remaining items in nov 202294956. kitchen and bathroom remodel to existing family home also window replacement | $150,000 |
| Feb 4, 2026 | Completed final sign-off Apr 2026 | 3943 26th St | Ideal Builders | move and widen the door opening to 4'6" between the living room and hallwayDetails
move and widen the door opening to 4'6" between the living room and hallway | $6,000 |
| Feb 3, 2026 | In progress issued Feb 2026 | 731 Duboce Av | revision to permit#2024-0731-7628. close existing window in the sunroom. revise post location in basement. document (e) condition and as-built per engineer at basement and 1st floorDetails
revision to permit#2024-0731-7628. close existing window in the sunroom. revise post location in basement. document (e) condition and as-built per engineer at basement and 1st floor | $1,000 | |
| Jan 6, 2026 | Completed final sign-off Jun 2026 | 1266 York St | Deep Elm Construction Llc | revision to pa #2025-0429-5472 & 2025-0819-3359. replace retaining wall at front of the property. add new trash enclosure and mailbox. unit 1266: add new closets, relocate (e) bedroom to front of the property. omit (n) grade beam at rear.Details
revision to pa #2025-0429-5472 & 2025-0819-3359. replace retaining wall at front of the property. add new trash enclosure and mailbox. unit 1266: add new closets, relocate (e) bedroom to front of the property. omit (n) grade beam at rear. | $5,000 |
| Nov 19, 2025 | Completed final sign-off Sep 2026 | 670 Joost Av | Seismic Retrofitters Inc. | move the existing foundation wall in the garage approx 7ft further to have additional room for parking in garage on the ground floor.Details
move the existing foundation wall in the garage approx 7ft further to have additional room for parking in garage on the ground floor. | $60,000 |
| Nov 18, 2025 | Completed final sign-off Aug 2026 | 12 Marsilly St | M & L Construction | demo the (e) deck and (e) stair and add a new 2nd flr deck w/ exterior stairs in the backyard. no firewall construction.Details
demo the (e) deck and (e) stair and add a new 2nd flr deck w/ exterior stairs in the backyard. no firewall construction. | $25,000 |
| Oct 28, 2025 | Completed final sign-off Mar 2026 | 112 Galewood Cr | M & L Construction | structural repair to the existing 2nd/floor balcony in the rear. sister existing balcony joists with new joists due to dry-rotDetails
structural repair to the existing 2nd/floor balcony in the rear. sister existing balcony joists with new joists due to dry-rot | $20,000 |
| Sep 30, 2025 | Completed final sign-off Aug 2026 | 590 30th St | Darc Ventures Inc Dba Spl Construction S | add a full bath in the garage on the gr floor. replace water heater with tankless water heater.Details
add a full bath in the garage on the gr floor. replace water heater with tankless water heater. | $25,000 |
| Sep 30, 2025 | In progress issued Oct 2025 | 3639 16th St | Universe Alliance Inc Dba Universe Cons | dry rot repair on the south (rear) and west elevations of the building. replace dry rotted studs, posts and beams in kind. revision to pa # 2023-0620-0418Details
dry rot repair on the south (rear) and west elevations of the building. replace dry rotted studs, posts and beams in kind. revision to pa # 2023-0620-0418 | $60,000 |
| Aug 19, 2025 | In progress issued Sep 2025 | 720 Waller St | Barcci Builders Inc | remodel kitchen, bathroom, dressing area of the house. remove wall between bedroom & kitchen, replace w/ parallel to the side walls. kitchen reconfiguration w/ new appliances. wall between living room & dining room to be opened & beam install. replace skylight w. new, add 2 skylight.Details
remodel kitchen, bathroom, dressing area of the house. remove wall between bedroom & kitchen, replace w/ parallel to the side walls. kitchen reconfiguration w/ new appliances. wall between living room & dining room to be opened & beam install. replace skylight w. new, add 2 skylight. | $85,000 |
| May 16, 2025 | Completed final sign-off Aug 2026 | 241 Harkness Av | comply with nov#: 202172715 & 202432295, fill in underneath the 2nd story in the rear. add new habitable space on the ground floor and remodel the existing bathroom.Details
comply with nov#: 202172715 & 202432295, fill in underneath the 2nd story in the rear. add new habitable space on the ground floor and remodel the existing bathroom. | $100,000 | |
| May 15, 2025 | Completed final sign-off Jun 2026 | 1794 Page St | Mission Home Remodeling Inc | exterior siding & trim/ front porch addition. demo stucco, mansards, stairs construct wood porch & stair. new french door & 2 windows. install siding and historic trim. new windowsDetails
exterior siding & trim/ front porch addition. demo stucco, mansards, stairs construct wood porch & stair. new french door & 2 windows. install siding and historic trim. new windows | $200,000 |
| Apr 18, 2025 | Completed final sign-off Sep 2025 | 2559 Union St | Ventana 76 | front bldg: remove the load bearing wall in the kitchen and add new post and beam. structural work only kitchen remodel is under a separate pa 2024-1105-4455Details
front bldg: remove the load bearing wall in the kitchen and add new post and beam. structural work only kitchen remodel is under a separate pa 2024-1105-4455 | $15,000 |
| Apr 9, 2025 | In progress issued Apr 2025 | 233 Parker Av | Mcmahon Construction | to comply with nov# 202428823: do repairs in units 203, 204, 303, 304, & 400 due to fire damage. repairs kitchen and bathrooms in-kind.Details
to comply with nov# 202428823: do repairs in units 203, 204, 303, 304, & 400 due to fire damage. repairs kitchen and bathrooms in-kind. | $250,000 |
| Mar 19, 2025 | Completed final sign-off Jul 2025 | 1451 Shotwell St | Hawke Construction | this is a revision to pa#: 202207118156 due to field conditions sister the (e) beam with steel channel.Details
this is a revision to pa#: 202207118156 due to field conditions sister the (e) beam with steel channel. | $5,000 |
| Mar 14, 2025 | Completed final sign-off Dec 2025 | 192 Laidley St | De Brus Construction Inc | replace the (e) collapsed stone retaining wall in the backyard with new reinforced concrete retaining, adding new wood guardrails. replace existing fence and gate in-kind, less than 6-ft in height.Details
replace the (e) collapsed stone retaining wall in the backyard with new reinforced concrete retaining, adding new wood guardrails. replace existing fence and gate in-kind, less than 6-ft in height. | $70,000 |
| Feb 26, 2025 | Expired or cancelled withdrawn Feb 2026 | 1949 Lyon St | revision to (e) 202406134427 to comply with nov 202422836 and do demo for safety and hazard mitigation due to fire damage demolishing the 2nd and 3rd stories due to significant fire damageDetails
revision to (e) 202406134427 to comply with nov 202422836 and do demo for safety and hazard mitigation due to fire damage demolishing the 2nd and 3rd stories due to significant fire damage | $10,000 | |
| Feb 12, 2025 | Completed final sign-off Apr 2025 | 24 Rausch St | Kells Construction Inc. | comply with nov 202428673 do structural repairs on existing fire egress stairs in the backyard. no firewall construction. no configuration change level of landings to remainDetails
comply with nov 202428673 do structural repairs on existing fire egress stairs in the backyard. no firewall construction. no configuration change level of landings to remain | $20,000 |
| Feb 11, 2025 | Completed final sign-off Feb 2026 | 2990 Baker St | tenant improvement: resize (e) bar, new bathrooms, new kitchen, new finishes & lighting, enlarge windows. replace front door with code complaint doorDetails
tenant improvement: resize (e) bar, new bathrooms, new kitchen, new finishes & lighting, enlarge windows. replace front door with code complaint door | $180,000 | |
| Jan 30, 2025 | Completed final sign-off Jul 2025 | 595 09th Av | Red Rock Hill Construction Llc | kitchen remodel under pa # 2024-1209-6382. new plan configuration in the kitchen. replace the property line window with a larger window, not visible from the street. (n) washer & dryer.Details
kitchen remodel under pa # 2024-1209-6382. new plan configuration in the kitchen. replace the property line window with a larger window, not visible from the street. (n) washer & dryer. | $25,000 |
| Jan 14, 2025 | Completed final sign-off May 2025 | 135 15th Av | Barrett Karber Built Llc | revision to (e) permit# 202409050135. relocate garage seperation wall, move it 3ft on plan to increase garage size from 600 sq ft to 625 sq ftDetails
revision to (e) permit# 202409050135. relocate garage seperation wall, move it 3ft on plan to increase garage size from 600 sq ft to 625 sq ft | $10,000 |
| Dec 19, 2024 | In progress filed Dec 2024, not yet issued | 65 Oakwood St | revision (e) permit#2024-0220-6128. revise layout on the ground floor to match the adu floor plans approved under permit#2023-0511-7579. move the shear walls and grade beams to mtch new layout. structural work under this permit.Details
revision (e) permit#2024-0220-6128. revise layout on the ground floor to match the adu floor plans approved under permit#2023-0511-7579. move the shear walls and grade beams to mtch new layout. structural work under this permit. | $10,000 | |
| Oct 23, 2024 | In progress issued Apr 2025 | 145 Julian Av | nov 202421747- structural repairs due top significant fire damage. architectural repairs will be under seperate permit. remove (e) garage in rear yard that was added with out a building permit. rebiuld fire egress stairs to match original approved design per pa 810617Details
nov 202421747- structural repairs due top significant fire damage. architectural repairs will be under seperate permit. remove (e) garage in rear yard that was added with out a building permit. rebiuld fire egress stairs to match original approved design per pa 810617 | $100,000 | |
| Sep 20, 2024 | Completed final sign-off Aug 2025 | 572 Anderson St | Edri Construction Inc *See Notes* | remodel (e) hallway bathroom. reconfigure (e) laundry & add 1/2 bath. replace part of exterior siding and window trims like for like. remove all gas lines from dwellingDetails
remodel (e) hallway bathroom. reconfigure (e) laundry & add 1/2 bath. replace part of exterior siding and window trims like for like. remove all gas lines from dwelling | $70,000 |
| Sep 10, 2024 | Completed final sign-off Aug 2025 | 546 Elizabeth St | Russ Murphy Construction | interior remodel: alteration of structural wall. modify and upgrade (e) kitchen. upgrade (e) kitchen & bathroom. add (n) fixtures, finishes & service throughoutDetails
interior remodel: alteration of structural wall. modify and upgrade (e) kitchen. upgrade (e) kitchen & bathroom. add (n) fixtures, finishes & service throughout | $152,596 |
| Jul 9, 2024 | In progress issued Aug 2024 | 1346 04th Av | Smart Energy Upgrade Co | interior remodel, upgrade kitchen and bathroom. add new powder room 1st flr and new bathroom 2nd flr. replace structural posts in basement.Details
interior remodel, upgrade kitchen and bathroom. add new powder room 1st flr and new bathroom 2nd flr. replace structural posts in basement. | $120,000 |
| Jul 3, 2024 | Expired or cancelled expired May 2026 | 1256 Stanyan St | Juan M Labarena | fill in underneath the pop-out @ the rear in the crawl space. less than loft in height. add storage in the crawl space. replace concrete slab and foundation in kindDetails
fill in underneath the pop-out @ the rear in the crawl space. less than loft in height. add storage in the crawl space. replace concrete slab and foundation in kind | $35,000 |
| Jun 24, 2024 | Expired or cancelled suspend Sep 2024 | 1950 15th St | comply with a portion of violation 202421131 document (e) metal railing in the roof terrace @ east side as a fence and replace (e) fence w/(n) metal railing at the north sideDetails
comply with a portion of violation 202421131 document (e) metal railing in the roof terrace @ east side as a fence and replace (e) fence w/(n) metal railing at the north side | $5,000 | |
| Jun 13, 2024 | In progress issued Jun 2024 | 1949 Lyon St | limited demo for safety and hazard mitigation due to fire damage at the subject property. demolish a portion of the collapsed roof assembly and demolishing a portion of the damaged 4th floor stud walls. subsequent permit required to reconstruct 4th flr and roofDetails
limited demo for safety and hazard mitigation due to fire damage at the subject property. demolish a portion of the collapsed roof assembly and demolishing a portion of the damaged 4th floor stud walls. subsequent permit required to reconstruct 4th flr and roof | ||
| May 9, 2024 | In progress issued Dec 2024 | 719 Clementina St | Zeus Construction Corp. | remodel (e) live-work unit in 2-unit live-work condo bldg- remove (e) structure & portion of work space @ rear of 1st flr and create rear yard/courtyard -add (n) bathroom & interior framing @ 1st flr-(n) rowder rm, (n) laundry closet, & (n) kitchen in (n) location @ 2nd flr.(n) glazing units @ rearDetails
remodel (e) live-work unit in 2-unit live-work condo bldg- remove (e) structure & portion of work space @ rear of 1st flr and create rear yard/courtyard -add (n) bathroom & interior framing @ 1st flr-(n) rowder rm, (n) laundry closet, & (n) kitchen in (n) location @ 2nd flr.(n) glazing units @ rear | $250,000 |
| Apr 17, 2024 | Completed final sign-off Jan 2025 | 931 14th St | remodel (e) kitchen. (n) plan configuration, remove non-load bearing walls. add new posts and beam voluntarily for redundancy.Details
remodel (e) kitchen. (n) plan configuration, remove non-load bearing walls. add new posts and beam voluntarily for redundancy. | $40,000 | |
| Apr 7, 2024 | In progress issued Oct 2024 | 1466 15th Av | Am Construction Inc | partial conversion of(e)unconditioned 1st fl to(n)conditioned area.(n)conditioned areas include 1b,1ba,a music & family room and wetbar.103 sf addition to (e)garage & 106 sf rear addition to conditioned space.demolition of(e) stairs in the lgihtway.interior remodel of upper level.Details
partial conversion of(e)unconditioned 1st fl to(n)conditioned area.(n)conditioned areas include 1b,1ba,a music & family room and wetbar.103 sf addition to (e)garage & 106 sf rear addition to conditioned space.demolition of(e) stairs in the lgihtway.interior remodel of upper level. | $200,000 |
| Mar 18, 2024 | Completed final sign-off Jun 2025 | 560 Hill St | A2z Remodeling Inc., Ideal Builders | remove a load bearing wall on 2nd fl and add new posts & beams. add new plywood shear walls in garage.Details
remove a load bearing wall on 2nd fl and add new posts & beams. add new plywood shear walls in garage. | $30,000 |
| Jan 26, 2024 | Completed final sign-off Sep 2024 | 124 Saturn St | Edenavow Construction & Design | 552 sq ft remodel to basement level. add new bath, bedroom, and laundry room. demo attic bathroom and exterior walkway to unconditioned attic. no work to front facade. (partially comply with nov# 202294956 - attic portion)Details
552 sq ft remodel to basement level. add new bath, bedroom, and laundry room. demo attic bathroom and exterior walkway to unconditioned attic. no work to front facade. (partially comply with nov# 202294956 - attic portion) | $150,000 |
| Jan 9, 2024 | Completed final sign-off May 2025 | 4027 23rd St | Cameron Builders Sf | interior remodel of kitchen and bath add bath. removal of wall between kitchen and dining.Details
interior remodel of kitchen and bath add bath. removal of wall between kitchen and dining. | $150,000 |
| Dec 4, 2023 | Completed final sign-off May 2024 | 1448 Hayes St | Seismic Retrofitters Inc. | voluntary strengthening on the ground floor per 2022 sfebc appendix a3. add new simpson panels with concrete grade beams and plywood shear walls.Details
voluntary strengthening on the ground floor per 2022 sfebc appendix a3. add new simpson panels with concrete grade beams and plywood shear walls. | $50,000 |
| Oct 18, 2023 | Completed final sign-off Jun 2025 | 3819 23rd St | Sft Construction Corp | revision to pa# 202207279420: reconfigure basement foundation wall to job around entry stair. reconfigure proposed master bath on 2nd fl & change proposed window type. reconfigure proposed stair from 2nd to 3rd fl. remove 1 proposed bathroom & 1 proposed dormer window on 3rd fl. several dimensional.Details
revision to pa# 202207279420: reconfigure basement foundation wall to job around entry stair. reconfigure proposed master bath on 2nd fl & change proposed window type. reconfigure proposed stair from 2nd to 3rd fl. remove 1 proposed bathroom & 1 proposed dormer window on 3rd fl. several dimensional. | |
| Oct 11, 2023 | Completed final sign-off Dec 2023 | 360 Coleridge St | Jari Construction Inc | revision '1' to (e) pa# 202306129835: replace (2) 10 ft portions of the brick foundation with new concrete foundation next to garage door.Details
revision '1' to (e) pa# 202306129835: replace (2) 10 ft portions of the brick foundation with new concrete foundation next to garage door. | $5,000 |
| Oct 4, 2023 | Completed final sign-off Mar 2025 | 1415 Indiana St | De Brus Construction Inc, A J O Group Build Inc | structural repairs on the roof framing due to fire damage.replace damaged roof joists, roofing and steel beam in kindDetails
structural repairs on the roof framing due to fire damage.replace damaged roof joists, roofing and steel beam in kind | $15,000 |
| Oct 3, 2023 | Completed final sign-off Apr 2024 | 970 Greenwich St | Seismic Retrofitters Inc. | structural repair only. replace (e) post and damaged floor sheathing in kind.Details
structural repair only. replace (e) post and damaged floor sheathing in kind. | $10,000 |
| Sep 26, 2023 | Completed final sign-off May 2024 | 4 Windsor Pl | Tombay Construction | revision 1 to (e) bpa# 202208100232: remove holdowns and revise shear wall length. (mandatory soft story retrofit per 2019 sfebc appendix a.4)Details
revision 1 to (e) bpa# 202208100232: remove holdowns and revise shear wall length. (mandatory soft story retrofit per 2019 sfebc appendix a.4) | |
| Sep 11, 2023 | Completed final sign-off Mar 2025 | 2264 Filbert St | Seismic Retrofitters Inc. | replacing concrete foundation with new foundation @ 3 sides and underneath existing post. add new stud wall in the backyard underneath porch for seismic strengthening. add plywood shear walls on perimetr walls. replace existing framing in-kind in unit 2264 in the dining roomDetails
replacing concrete foundation with new foundation @ 3 sides and underneath existing post. add new stud wall in the backyard underneath porch for seismic strengthening. add plywood shear walls on perimetr walls. replace existing framing in-kind in unit 2264 in the dining room | $120,000 |
| Aug 31, 2023 | Completed final sign-off Aug 2026 | 1338 28th Av | Paul O'driscoll Inc | exterior addition & interior revovation. 2 story rear addition comprised of bedrm w/ windows & stair to 2nd story. renovate kitchen, bathrm, (n) interior stairwell & ground flr space. (n) skylight.Details
exterior addition & interior revovation. 2 story rear addition comprised of bedrm w/ windows & stair to 2nd story. renovate kitchen, bathrm, (n) interior stairwell & ground flr space. (n) skylight. | $300,000 |
| Aug 1, 2023 | Never finaled filed Aug 2023, never issued | 1715 Lyon St | add (3_) new skylights in the kitchen of top unit. 5'-6'from the property line.Details
add (3_) new skylights in the kitchen of top unit. 5'-6'from the property line. | $10,000 | |
| Jun 12, 2023 | Never finaled issued Aug 2023, no final | 26 Naylor St | Seismic Retrofitters Inc. | replace the deteriorated concrete foundation with new reinforced concrete foundation at the rear wall. add a new laundry room on the ground floor. no work on the upper floors.Details
replace the deteriorated concrete foundation with new reinforced concrete foundation at the rear wall. add a new laundry room on the ground floor. no work on the upper floors. | $30,000 |
| Apr 4, 2023 | Completed final sign-off Nov 2023 | 1905 Union St | M C S Construction Services | revision to pa# 202211176757, adding opening into wall- needed structural plans & calculations,Details
revision to pa# 202211176757, adding opening into wall- needed structural plans & calculations, | |
| Mar 24, 2023 | Expired or cancelled cancelled Jan 2026 | 3441 Mission St | comply with accessible business entrance ordinance 51-16 for business entrances on mission street abe 201807061037Details
comply with accessible business entrance ordinance 51-16 for business entrances on mission street abe 201807061037 | $2,500 | |
| Mar 24, 2023 | Expired or cancelled cancelled Jan 2026 | 3437 Mission St | comply with accessible business entrance ordinance 51-16 for business entrances on mission street abe 201807061036Details
comply with accessible business entrance ordinance 51-16 for business entrances on mission street abe 201807061036 | $5,000 | |
| Feb 9, 2023 | Completed final sign-off Mar 2024 | 311 Mangels Av | De Brus Construction Inc | complywith building violation 202286387 and planning violation case no 2022001640enf. legalize new deck added without a permit. reduce it's size and move the stairs. add 2 new retaining walls.Details
complywith building violation 202286387 and planning violation case no 2022001640enf. legalize new deck added without a permit. reduce it's size and move the stairs. add 2 new retaining walls. | $80,000 |
| Feb 7, 2023 | Completed final sign-off Mar 2024 | 2914 Franklin St | revision to pa 2023-0124-0625. add a wetbar in the new office; remove a load bearing wall, add new posts and beam; replace (e) 2 windows with 1 window in the rear wallDetails
revision to pa 2023-0124-0625. add a wetbar in the new office; remove a load bearing wall, add new posts and beam; replace (e) 2 windows with 1 window in the rear wall | $5,000 | |
| Jan 24, 2023 | Completed final sign-off May 2024 | 1928 Jackson St | Capomastro Group:Acalifornia Corp. | add a new bathroom on the ground floor; add a new 2-ft by 4-ft floor hatch to crawl space and divide the crawl space into 2 storage units. no new habitable sapce under this permitDetails
add a new bathroom on the ground floor; add a new 2-ft by 4-ft floor hatch to crawl space and divide the crawl space into 2 storage units. no new habitable sapce under this permit | $25,000 |
| Jan 9, 2023 | Completed final sign-off Jul 2023 | 560 26th Av | De Brus Construction Inc | madatory soft story retrofit per 2022 sfebc app a4, add 2 steel moment frames with concrete foundation and add plywood shear walls.Details
madatory soft story retrofit per 2022 sfebc app a4, add 2 steel moment frames with concrete foundation and add plywood shear walls. | $100,000 |
| Jan 6, 2023 | Completed final sign-off Jan 2025 | 2727 Clay St | remove e interior fireplace chmney breast from all 4 stories and above roofline, add n supporting structure as necessary, remove e closet from unit# 3. no other work.Details
remove e interior fireplace chmney breast from all 4 stories and above roofline, add n supporting structure as necessary, remove e closet from unit# 3. no other work. | $4,000 | |
| Jan 4, 2023 | Completed final sign-off Mar 2024 | 9 Jade Pl | Excelsior Building Group | revision to 202207067817. ground floor: expand ground floor bathroom and laundry room, install pocket door. 1st & 2nd fl: remove non-bearing walls. 2nd fl: relocate non-bearing wall of bathroom, replace master bedroom w/ 36"door. install windows at ground floor and 1st floor. windows aluminumDetails
revision to 202207067817. ground floor: expand ground floor bathroom and laundry room, install pocket door. 1st & 2nd fl: remove non-bearing walls. 2nd fl: relocate non-bearing wall of bathroom, replace master bedroom w/ 36"door. install windows at ground floor and 1st floor. windows aluminum | $10,000 |
| Dec 28, 2022 | In progress issued Jul 2024 | 236 Diamond St | Gnetzer General Contractor | expand footprint of rear portion of building. remodel exterior stair and deck. remove wall at level 3 kitchen. remodel level 2 kitchen. add level 1 bathroom.Details
expand footprint of rear portion of building. remodel exterior stair and deck. remove wall at level 3 kitchen. remodel level 2 kitchen. add level 1 bathroom. | $95,000 |
| Dec 15, 2022 | Completed final sign-off Jul 2023 | 527 03rd Av | Maksim Korzhenkov | rev to pa# 2022-0204-7350: remove(e) rotted entry porch and replace size match (e) (n) front elevation window and door remove all front siding, replace with stucco, repair decoration detail; revision to str include: single beam revision on 2nd fl, and foundation replacement to garage strcutureDetails
rev to pa# 2022-0204-7350: remove(e) rotted entry porch and replace size match (e) (n) front elevation window and door remove all front siding, replace with stucco, repair decoration detail; revision to str include: single beam revision on 2nd fl, and foundation replacement to garage strcuture | $2,500 |
| Nov 14, 2022 | In progress issued Dec 2024 | 850 Elizabeth St | Velic Construction Inc | remove partition,joint two rooms on 2nd fl,modify roof on 3rd fl for better head room, add a master closet and master bath.modify garage level,lower slab to meet hight requirements in habitable area.Details
remove partition,joint two rooms on 2nd fl,modify roof on 3rd fl for better head room, add a master closet and master bath.modify garage level,lower slab to meet hight requirements in habitable area. | $150,000 |
| Nov 10, 2022 | Completed final sign-off Apr 2023 | 2595 43rd Av | Sft Construction Corp | soft story retrofit per sfebc chapter 4d engineering criteria cebc appendix a-4. add new plywood shear walls to comply with nov 201812931Details
soft story retrofit per sfebc chapter 4d engineering criteria cebc appendix a-4. add new plywood shear walls to comply with nov 201812931 | $90,000 |
| Nov 10, 2022 | Completed final sign-off Jan 2024 | 330 Peru Av | Robert H. Evans, Gen Cont | do foundation repair on the ground floor. replace deteriorated concrete at the north-west corner. add concrete cap at the back wall.Details
do foundation repair on the ground floor. replace deteriorated concrete at the north-west corner. add concrete cap at the back wall. | $15,000 |
| Nov 10, 2022 | Completed final sign-off Apr 2023 | 1872 Church St | Jari Construction Inc | voluntary strengthening on the ground floor; add plywood shear walls on (e) perimeter walls; add new 3 ft high plywood stud wall underneath upper floor in the back; add simpson panelDetails
voluntary strengthening on the ground floor; add plywood shear walls on (e) perimeter walls; add new 3 ft high plywood stud wall underneath upper floor in the back; add simpson panel | $25,000 |
| Nov 9, 2022 | Completed final sign-off Sep 2023 | 777 Rhode Island St | seismic upgrade at the garage level. install ordinary steel moment frame and plywood shearwalls with holdowns.Details
seismic upgrade at the garage level. install ordinary steel moment frame and plywood shearwalls with holdowns. | $25,000 | |
| Oct 11, 2022 | Never finaled issued Nov 2022, no final | 270 Staples Av | Jari Construction Inc | add a full bathroom at ground floor. replace (e) tub in-kind and lower concrete slab ~ 12" to achieve 8ft ceiling height. add plywood shear walls. replace water heater with tankless water heater.Details
add a full bathroom at ground floor. replace (e) tub in-kind and lower concrete slab ~ 12" to achieve 8ft ceiling height. add plywood shear walls. replace water heater with tankless water heater. | $120,000 |
| Jul 27, 2022 | Never finaled issued Feb 2023, no final | 2644 Larkin St | De Brus Construction Inc, Qse Construction | expand existing basement garage and remodel 1st fl including lower floor level; create new stair from 1st fl to garage; remodel (e) bathroom, convert storage to living area. no work at 2nd & 3rd flDetails
expand existing basement garage and remodel 1st fl including lower floor level; create new stair from 1st fl to garage; remodel (e) bathroom, convert storage to living area. no work at 2nd & 3rd fl | $105,000 |
| Jul 6, 2022 | Completed final sign-off Mar 2024 | 9 Jade Pl | Excelsior Building Group, Gbi Construction Llc | 1 kitchen & 2 baths remodel. expand ground floor bathroom & add laundry. remove/ replace windows for entire bldg. voluntary seismic upgrade.Details
1 kitchen & 2 baths remodel. expand ground floor bathroom & add laundry. remove/ replace windows for entire bldg. voluntary seismic upgrade. | $50,000 |
| Jun 29, 2022 | Completed final sign-off Jan 2024 | 2367 37th Av | Bay Remodels | renovation of bathrooms, kitchen, and adding/removing interior partitions to open up interior space. removal and addition of interior stairs, and new skylight. new doors and windows on rear of building. infill lightwell against a blank wall.Details
renovation of bathrooms, kitchen, and adding/removing interior partitions to open up interior space. removal and addition of interior stairs, and new skylight. new doors and windows on rear of building. infill lightwell against a blank wall. | $150,000 |
| Nov 18, 2021 | Never finaled issued Jun 2023, no final | 151 21st Av | Ventana 76 | 1st flr remodel of 582 sq ft in garage to create a fam rm, bath, and exercise rm. 2nd flr expand rear deck 5'-6" into yard, infill 82 sq ft for connecting stairway to 1st flr. 3rd flr expand (e) bedrm 192 sq ft to create (n) master bedroom w/ensuite bath.Details
1st flr remodel of 582 sq ft in garage to create a fam rm, bath, and exercise rm. 2nd flr expand rear deck 5'-6" into yard, infill 82 sq ft for connecting stairway to 1st flr. 3rd flr expand (e) bedrm 192 sq ft to create (n) master bedroom w/ensuite bath. | $130,500 |
| Oct 12, 2021 | Expired or cancelled withdrawn Mar 2025 | 241 Harkness Av | remodel existing kitchen and bath room. add new bath on upper floor. convert lower level into living space, 930 sf. add new bedroom, family room and 2 full baths. infill under cantilevered upper floor at back and add new windowsDetails
remodel existing kitchen and bath room. add new bath on upper floor. convert lower level into living space, 930 sf. add new bedroom, family room and 2 full baths. infill under cantilevered upper floor at back and add new windows | $150,000 | |
| Sep 22, 2021 | Completed final sign-off Apr 2022 | 705 09th Av | replace (e) fire egress stairs in-kind due to dry-rot damage. no firewall construction. stairs are required for 2nd means of egress.Details
replace (e) fire egress stairs in-kind due to dry-rot damage. no firewall construction. stairs are required for 2nd means of egress. | $20,000 | |
| Sep 1, 2021 | In progress issued Aug 2024 | 339 Campbell Av | add accessory dwelling unit to (e) single family dwelling: (n) framing,fixtures, finishes & services to convert (e) non-habitable ground floor interior space into habitbable space, to be a (n) adu - associated upgrades to fire-separation between units, at common areas & at property-linesDetails
add accessory dwelling unit to (e) single family dwelling: (n) framing,fixtures, finishes & services to convert (e) non-habitable ground floor interior space into habitbable space, to be a (n) adu - associated upgrades to fire-separation between units, at common areas & at property-lines | $142,000 | |
| Aug 30, 2021 | Completed final sign-off Jul 2024 | 818 Arguello Bl | De Brus Construction Inc | remodel (e) kitchen and bathroom. add 1 full bath and one half bath. add washer and dryer inside the unit. add new heated floorDetails
remodel (e) kitchen and bathroom. add 1 full bath and one half bath. add washer and dryer inside the unit. add new heated floor | $90,000 |
| Jan 22, 2021 | Completed final sign-off Apr 2022 | 712 Wisconsin St | Lynch Construction Inc, Construction Concierge Inc., Jason Tunnell Construction | the proposed remodel is an interior remodel, with no changes to exterior walls or windows. remodel work will include the following - kitchen remodel, with new simpson strongwall shear element; addition of powder room, bathroom & laundry room remodelDetails
the proposed remodel is an interior remodel, with no changes to exterior walls or windows. remodel work will include the following - kitchen remodel, with new simpson strongwall shear element; addition of powder room, bathroom & laundry room remodel | $60,000 |
| Sep 15, 2020 | Completed final sign-off Jan 2021 | 225 Cortland Av | Seismic Retrofitters Inc. | voluntary strengthening at the storages in the basement. no architectural work.Details
voluntary strengthening at the storages in the basement. no architectural work. | $30,000 |
| Feb 25, 2019 | Completed final sign-off Dec 2023 | 1300 Powell St | mandatory soft story retrofit per 2016 sfebc appendix a4Details
mandatory soft story retrofit per 2016 sfebc appendix a4 | $75,000 |