Bay Remodels
- Based in
- Pcifica
- On San Francisco permits
- Jun 2018 to Sep 2025
- Last 24 months
- 2 permits filed
17 permits since 2000: 9 completed, 3 in progress, 5 never finaled.
Of the 5 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 24, 2025 | Completed final sign-off Jul 2026 | 728 26th Av | revision to pa# 2020-0131-3274: remove guard rail fall protection at parapet (not street visible). install aresstor anchor system per ansi/asse z 359.1 in middle of roof and attach to steel ridge beam.Details
revision to pa# 2020-0131-3274: remove guard rail fall protection at parapet (not street visible). install aresstor anchor system per ansi/asse z 359.1 in middle of roof and attach to steel ridge beam. | $500 |
| Feb 6, 2025 | In progress issued Feb 2025 | 728 26th Av | rev pa 202001313274: change beam from wood to steel. replace discovered undersized floor framing (one room only).Details
rev pa 202001313274: change beam from wood to steel. replace discovered undersized floor framing (one room only). | |
| Apr 4, 2024 | In progress issued Jul 2024 | 116 San Aleso Av | voluntary structural strengthening with minor alterations. remove kitchen wall & remodel kitchenDetails
voluntary structural strengthening with minor alterations. remove kitchen wall & remodel kitchen | $30,000 |
| May 16, 2023 | In progress issued Apr 2024 | 116 San Aleso Av | new hvac heat pump and ac to replace existing, new ducting. install all new windows - entire house. remove and replace stucco - entire house. all windows will be wood. ac condenseroutside south-east of the building 7 heat pump wwater heater in the garage. max u-fact 0.30Details
new hvac heat pump and ac to replace existing, new ducting. install all new windows - entire house. remove and replace stucco - entire house. all windows will be wood. ac condenseroutside south-east of the building 7 heat pump wwater heater in the garage. max u-fact 0.30 | $60,000 |
| Aug 18, 2022 | Never finaled issued Aug 2022, no final | 116 San Aleso Av | renovation like for like: scope of work - drywall, electrical system/lighting fixture upgrades. change of (e) plumbing fixtures to new. kitchen renoavtion (new cabinetry), 3 bathrooms (new finishes).Details
renovation like for like: scope of work - drywall, electrical system/lighting fixture upgrades. change of (e) plumbing fixtures to new. kitchen renoavtion (new cabinetry), 3 bathrooms (new finishes). | $300,000 |
| Jun 29, 2022 | Completed final sign-off Jan 2024 | 2367 37th Av | renovation of bathrooms, kitchen, and adding/removing interior partitions to open up interior space. removal and addition of interior stairs, and new skylight. new doors and windows on rear of building. infill lightwell against a blank wall.Details
renovation of bathrooms, kitchen, and adding/removing interior partitions to open up interior space. removal and addition of interior stairs, and new skylight. new doors and windows on rear of building. infill lightwell against a blank wall. | $150,000 |
| May 9, 2022 | Never finaled issued May 2022, no final | 78 Stanyan Bl | to obtain final inspection for work approved under pa # 202012231678. all work is complete.Details
to obtain final inspection for work approved under pa # 202012231678. all work is complete. | |
| Apr 1, 2021 | Completed final sign-off Dec 2021 | 224 Scott St | kitchen and 2 bath remdel in kind remove and replace in same locaton for each room in kitchen, regrigerator is being relocated a side facing window is being relacd and reduced by 13.05 height(e) dimenions w -21-5/8 x h60 proposed -w21 5/8 x h47- 1/2Details
kitchen and 2 bath remdel in kind remove and replace in same locaton for each room in kitchen, regrigerator is being relocated a side facing window is being relacd and reduced by 13.05 height(e) dimenions w -21-5/8 x h60 proposed -w21 5/8 x h47- 1/2 | $43,000 |
| Dec 23, 2020 | Completed final sign-off Jul 2022 | 78 Stanyan St | remodel (e) kitchen & two (e) bathrooms. remove walls for new plan configuration. add washer & dryer in the unit.Details
remodel (e) kitchen & two (e) bathrooms. remove walls for new plan configuration. add washer & dryer in the unit. | $85,000 |
| Jan 31, 2020 | Never finaled issued Feb 2022, no final | 728 26th Av | horizontal addition. expand (e) 3/fl-add 1 bedroom & 1 bath. structural strengtening at floors/foundation below. (n)skylights at (e) roof, finishes & trim as needed due to structural work.Details
horizontal addition. expand (e) 3/fl-add 1 bedroom & 1 bath. structural strengtening at floors/foundation below. (n)skylights at (e) roof, finishes & trim as needed due to structural work. | $225,000 |
| Mar 27, 2019 | Never finaled issued Mar 2019, no final | 432 Hugo St | street spaceDetails
street space | |
| Dec 10, 2018 | Completed final sign-off Jan 2019 | 500 Ortega St | remodel master bathroom, all locations plumbing (e). replace rile, vanity, counter, floor, sink, toilet.Details
remodel master bathroom, all locations plumbing (e). replace rile, vanity, counter, floor, sink, toilet. | $10,000 |
| Nov 30, 2018 | Never finaled issued Nov 2018, no final | 432 Hugo St | eliminate 1 footing and adding beam to 2nd floor framing revision to 201810314613Details
eliminate 1 footing and adding beam to 2nd floor framing revision to 201810314613 | |
| Oct 31, 2018 | Completed final sign-off Jun 2019 | 432 Hugo St | remodel (e) kitchen & bathroom at unit 432, remove spiral stair to lower level, replace with (n) stairway. create master bedroom at existing lower level.Details
remodel (e) kitchen & bathroom at unit 432, remove spiral stair to lower level, replace with (n) stairway. create master bedroom at existing lower level. | $100,000 |
| Jul 3, 2018 | Completed final sign-off Jul 2018 | 165 Ripley St | revision to previously approved permit #201806111502. partial bearing wall removal new beam installed.Details
revision to previously approved permit #201806111502. partial bearing wall removal new beam installed. | $2,000 |
| Jun 22, 2018 | Completed final sign-off Oct 2018 | 2999 California St | unit #65: kitchen and bathroom remodel, remove 4 walls and add 3 new wallsDetails
unit #65: kitchen and bathroom remodel, remove 4 walls and add 3 new walls | $10,000 |
| Jun 11, 2018 | Completed final sign-off Sep 2018 | 165 Ripley St | remodel 1 kitchen & remodel 1 bathroom. k: new exhaust fan, r/r cabinets, countertop,sink ,new can lights. b: new tilet, new sink, new tilet, new can lights. no change in walls, openings or layout.Details
remodel 1 kitchen & remodel 1 bathroom. k: new exhaust fan, r/r cabinets, countertop,sink ,new can lights. b: new tilet, new sink, new tilet, new can lights. no change in walls, openings or layout. | $25,000 |