A J O Group Build Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2015 to Jan 2025
- Last 24 months
- 2 permits filed
148 permits since 2000: 125 completed, 14 never finaled, 9 expired or cancelled.
Of the 14 never-finaled permits, 14 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 148.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 29, 2025 | Completed final sign-off Feb 2025 | 700 Cabrillo St | to obtain final inspection for work approved under pa# 2018-0122-9191. all work is complete.Details
to obtain final inspection for work approved under pa# 2018-0122-9191. all work is complete. | |
| Jan 8, 2025 | Completed final sign-off Jul 2025 | 1400 Guerrero St | address nov# 202432401. repairs in kind of ground fllor north-east corner of building after car went into building. replace corner column, repair store front windows & door in kind.Details
address nov# 202432401. repairs in kind of ground fllor north-east corner of building after car went into building. replace corner column, repair store front windows & door in kind. | $15,000 |
| Oct 4, 2023 | Completed final sign-off Mar 2025 | 1415 Indiana St | structural repairs on the roof framing due to fire damage.replace damaged roof joists, roofing and steel beam in kindDetails
structural repairs on the roof framing due to fire damage.replace damaged roof joists, roofing and steel beam in kind | $15,000 |
| May 16, 2023 | Completed final sign-off Jun 2024 | 463 Duboce Av | replace rear yard stairs and add deck at 3rd floor. replace wood siding on entire rear with hardie plank.Details
replace rear yard stairs and add deck at 3rd floor. replace wood siding on entire rear with hardie plank. | $55,000 |
| Oct 14, 2022 | Completed final sign-off Dec 2022 | 412 Green St | replace deteriorated wood siding on 2 sections of east exterior wall facing adjacent building light well.Details
replace deteriorated wood siding on 2 sections of east exterior wall facing adjacent building light well. | $27,000 |
| Jul 26, 2022 | Completed final sign-off Oct 2022 | 72 Stanyan St | to comply with nov# 202293113. soil stabilization via geo-grouting along north property line foundation required for excavation work at adjacent property at 66-68 stanyan st under pa# 202205275167 & revision to pa# 202207259208.Details
to comply with nov# 202293113. soil stabilization via geo-grouting along north property line foundation required for excavation work at adjacent property at 66-68 stanyan st under pa# 202205275167 & revision to pa# 202207259208. | $5,000 |
| Jul 25, 2022 | Completed final sign-off Mar 2023 | 66 Stanyan St | revision to pa# 2022-0527-5167 change bathroom layout patio walls configuration and foundation along south property lineDetails
revision to pa# 2022-0527-5167 change bathroom layout patio walls configuration and foundation along south property line | $5,000 |
| Jul 25, 2022 | Completed final sign-off Sep 2022 | 1772 Golden Gate Av | revision pa# 202205275164: minor construction changesDetails
revision pa# 202205275164: minor construction changes | |
| Jun 17, 2022 | Completed final sign-off Jan 2023 | 2849 Fillmore St | completion of work approved under application # 202101273448. all work is completed.Details
completion of work approved under application # 202101273448. all work is completed. | |
| Jun 14, 2022 | Completed final sign-off Feb 2023 | 772 Elizabeth St | revision to pa# 2021-0625-3264: new steel beam, new steel frame, new foundation pit for future elevator new grade beam at interior stairsDetails
revision to pa# 2021-0625-3264: new steel beam, new steel frame, new foundation pit for future elevator new grade beam at interior stairs | $15,000 |
| Jun 1, 2022 | Completed final sign-off Dec 2024 | 338 Sanchez St | remove (e) rear deck and stair and replace with new. add new spiral stair.Details
remove (e) rear deck and stair and replace with new. add new spiral stair. | $15,000 |
| May 27, 2022 | Completed final sign-off Sep 2022 | 1772 Golden Gate Av | comply with san francisco wood-frame seismic retrofit program (soft story), sfbc chapter 4d, 2019 ceac appendix a-4Details
comply with san francisco wood-frame seismic retrofit program (soft story), sfbc chapter 4d, 2019 ceac appendix a-4 | $60,000 |
| May 27, 2022 | Completed final sign-off Mar 2023 | 66 Stanyan St | ground floor remodel with new family room, bathroom & wet bar. voluntary seismic upgrade at ground floor.Details
ground floor remodel with new family room, bathroom & wet bar. voluntary seismic upgrade at ground floor. | $95,000 |
| Jan 19, 2022 | Completed final sign-off Aug 2022 | 17 Elsie St | replace drywall on entire bedroom to scope of work per pa 202111011529Details
replace drywall on entire bedroom to scope of work per pa 202111011529 | |
| Jan 6, 2022 | Completed final sign-off Aug 2022 | 17 Elsie St | add replacement of exterior siding on rear wall per pa#202111011529. approx. 30 sf.Details
add replacement of exterior siding on rear wall per pa#202111011529. approx. 30 sf. | |
| Jan 5, 2022 | Completed final sign-off May 2022 | 1483 Oak St | ground floor rear crwlspace replace post & beam with perimeter cont. footing enclosure. not habitable space 6'-6" c.h.Details
ground floor rear crwlspace replace post & beam with perimeter cont. footing enclosure. not habitable space 6'-6" c.h. | $50,000 |
| Jan 5, 2022 | Completed final sign-off May 2022 | 1017 Hyde St | comply with sf wood frame seismic retrofit program (soft story) sebc chapter 4d, per 2019 cebc appendix 4Details
comply with sf wood frame seismic retrofit program (soft story) sebc chapter 4d, per 2019 cebc appendix 4 | $90,000 |
| Dec 17, 2021 | Expired or cancelled cancelled Mar 2022 | 772 Elizabeth St | revision to pa 202112154483 install five new windows on side wall (not visible street)Details
revision to pa 202112154483 install five new windows on side wall (not visible street) | |
| Dec 15, 2021 | Expired or cancelled cancelled Mar 2022 | 772 Elizabeth St | revision to pa 2021-0625-3264 install new steel beam, replace concrete stairs on side yard & install 6 new windows on side walls (not visible from street)Details
revision to pa 2021-0625-3264 install new steel beam, replace concrete stairs on side yard & install 6 new windows on side walls (not visible from street) | $12,000 |
| Dec 13, 2021 | Completed final sign-off Apr 2022 | 338 Sanchez St | enclosed rear cantilever w./ new walls and foundations.Details
enclosed rear cantilever w./ new walls and foundations. | $15,000 |
| Dec 13, 2021 | Completed final sign-off Aug 2023 | 196 Urbano Dr | revision to 201912038552. revision to structural plans onlyDetails
revision to 201912038552. revision to structural plans only | |
| Nov 24, 2021 | Completed final sign-off Mar 2022 | 3947 18th St | comply with sf wood frame seismic retrofit program soft story sfbc ch 4d per 2019 cebc appendix a4Details
comply with sf wood frame seismic retrofit program soft story sfbc ch 4d per 2019 cebc appendix a4 | $85,000 |
| Nov 1, 2021 | Completed final sign-off Aug 2022 | 17 Elsie St | remodel (e) bathroom @ 2nd fl; add a hallway bathroom @ 2nd fl; replace (e) windows and door @ rear elevationDetails
remodel (e) bathroom @ 2nd fl; add a hallway bathroom @ 2nd fl; replace (e) windows and door @ rear elevation | $55,000 |
| Jun 25, 2021 | Completed final sign-off Feb 2023 | 772 Elizabeth St | g/f: structural upgrade. replace entire ground floor.Details
g/f: structural upgrade. replace entire ground floor. | $110,000 |
| Jun 23, 2021 | Completed final sign-off Oct 2021 | 20 Apparel Wy | warehouse voluntary minor structural upgrades. install 2 new steel columns with concrete foundation pads to reinforce deteriorated concrete columns.Details
warehouse voluntary minor structural upgrades. install 2 new steel columns with concrete foundation pads to reinforce deteriorated concrete columns. | $9,000 |
| Jun 4, 2021 | Completed final sign-off Aug 2021 | 3700 Cabrillo St | repair/replace in kind dry rot damaged elements (less than 50%) at building's light-well wood stairs.Details
repair/replace in kind dry rot damaged elements (less than 50%) at building's light-well wood stairs. | $7,500 |
| Apr 13, 2021 | Completed final sign-off Jun 2021 | 1250 48th Av | replace in kind some joists with dry- rot in the landings of the building central light (3x7)Details
replace in kind some joists with dry- rot in the landings of the building central light (3x7) | $1,000 |
| Apr 12, 2021 | Completed final sign-off Aug 2021 | 3700 Cabrillo St | commencement of work not strated under previously approved appilcation no(s): 201709158718; (soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4)Details
commencement of work not strated under previously approved appilcation no(s): 201709158718; (soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4) | $50,000 |
| Mar 15, 2021 | Completed final sign-off Oct 2021 | 778 Broadway | voluntary soft story retrofit. install 1 accessible bathroom. (residential portion of project)Details
voluntary soft story retrofit. install 1 accessible bathroom. (residential portion of project) | $48,800 |
| Mar 15, 2021 | Completed final sign-off Oct 2021 | 776 Broadway | voluntary soft story retrofit. install 1 accessible bathroom. commercial portion of project)Details
voluntary soft story retrofit. install 1 accessible bathroom. commercial portion of project) | $32,000 |
| Mar 1, 2021 | Completed final sign-off Sep 2021 | 1255 Taylor St | revision to pa# 201809140255 soft story retrofit per sfebc chater 4d:2016 cebc appensix a-4 (residential) n/a maherDetails
revision to pa# 201809140255 soft story retrofit per sfebc chater 4d:2016 cebc appensix a-4 (residential) n/a maher | |
| Mar 1, 2021 | Completed final sign-off Apr 2021 | 3340 18th St | revision to pa# 202011108667. connection changes to steel frame at grid line a.Details
revision to pa# 202011108667. connection changes to steel frame at grid line a. | |
| Mar 1, 2021 | Completed final sign-off Sep 2021 | 1255 Taylor St | revision to pa# 201809140256 soft story retrofit per sfebc chater 4d:2016 cebc appensix a-4 (commercial) n/a maherDetails
revision to pa# 201809140256 soft story retrofit per sfebc chater 4d:2016 cebc appensix a-4 (commercial) n/a maher | |
| Jan 27, 2021 | Expired or cancelled expired Jan 2023 | 2849 Fillmore St | open kitchen to living area. relocate (e) bathroom. coordinate closet with bathroom. vent kitchen & bathroom. fire rate garage under apartment. install lighting & outlets.Details
open kitchen to living area. relocate (e) bathroom. coordinate closet with bathroom. vent kitchen & bathroom. fire rate garage under apartment. install lighting & outlets. | $30,000 |
| Jan 20, 2021 | Completed final sign-off Aug 2022 | 883 Urbano Dr | new adu at ground level. lower the first floor to create an 8' floor to ceiling height for the proposed adu.Details
new adu at ground level. lower the first floor to create an 8' floor to ceiling height for the proposed adu. | $100,000 |
| Nov 12, 2020 | Never finaled filed Nov 2020, never issued | 31 Belmont Av | replace full brick founation, new g/f slab on grade, replace in-kind brick entry stairs,(n) interior stairs to g/f, add'l g/f space within building envelope:remodel 2/f & 3/f bathrooms, (n) 3/f laundry room,(n) new windows but no change to facade.Details
replace full brick founation, new g/f slab on grade, replace in-kind brick entry stairs,(n) interior stairs to g/f, add'l g/f space within building envelope:remodel 2/f & 3/f bathrooms, (n) 3/f laundry room,(n) new windows but no change to facade. | $110,000 |
| Nov 10, 2020 | Completed final sign-off Apr 2021 | 3340 18th St | voluntary structural upgrade. install new steel frame at front wall.Details
voluntary structural upgrade. install new steel frame at front wall. | $30,000 |
| Oct 2, 2020 | Completed final sign-off Feb 2021 | 1235 Waller St | rev to 201712277461 to replace entire previous set. to comly with san francisco wood-frame seismic retrofit program (soft story), sfbc ch4d, 2016 cebc apendex a-4.Details
rev to 201712277461 to replace entire previous set. to comly with san francisco wood-frame seismic retrofit program (soft story), sfbc ch4d, 2016 cebc apendex a-4. | |
| Oct 2, 2020 | Completed final sign-off Dec 2020 | 3048 California St | rev to pa201708296319: seismic retrofit (replace (e) brick foudnation w/ concrete foundation at shear wall locations).Details
rev to pa201708296319: seismic retrofit (replace (e) brick foudnation w/ concrete foundation at shear wall locations). | $20,000 |
| Sep 30, 2020 | Completed final sign-off Oct 2021 | 118 Santa Ysabel Av | construct new rear deck.Details
construct new rear deck. | $15,000 |
| Aug 20, 2020 | Completed final sign-off Dec 2020 | 715 47th Av | minor fire damage repairs including finishes and electrical wiring replacement at gr fl 2 rear rooms as well as replacement of floor finishes and painting as necessaryDetails
minor fire damage repairs including finishes and electrical wiring replacement at gr fl 2 rear rooms as well as replacement of floor finishes and painting as necessary | $25,000 |
| Aug 10, 2020 | Completed final sign-off Aug 2022 | 1615 Powell St | rev to pa201708316575: soft story retrofit - changes to sheer connections in logitudinal direction.Details
rev to pa201708316575: soft story retrofit - changes to sheer connections in logitudinal direction. | |
| Jul 10, 2020 | Completed final sign-off Aug 2020 | 2828 Webster St | repair dry rot damaged framing @ rear east(rear)wall 2nd & 3rd fl. 2nd fl courtyard east balcony. refinish to match existing. work @ rear of bldgDetails
repair dry rot damaged framing @ rear east(rear)wall 2nd & 3rd fl. 2nd fl courtyard east balcony. refinish to match existing. work @ rear of bldg | $11,000 |
| May 19, 2020 | Completed final sign-off Mar 2021 | 2412 Larkin St | enlarge (e) garage door. widen interior access to parking area inside garage. replace (e) front stair, lower run in-kind, with code-complying treads & risers. replace (e) front railing, in-kind w/ (e) front wall raised for guardrail height. add handrails to both sides. resurface stair.Details
enlarge (e) garage door. widen interior access to parking area inside garage. replace (e) front stair, lower run in-kind, with code-complying treads & risers. replace (e) front railing, in-kind w/ (e) front wall raised for guardrail height. add handrails to both sides. resurface stair. | $86,000 |
| Jan 29, 2020 | Completed final sign-off Jul 2020 | 45 Grattan St | ground floor: add bathroom. replace 3 windows and add 1 window. no work visible from the street.Details
ground floor: add bathroom. replace 3 windows and add 1 window. no work visible from the street. | $25,000 |
| Jan 3, 2020 | Never finaled issued Jan 2020, no final | 196 Urbano Dr | street spaceDetails
street space | |
| Jan 3, 2020 | Never finaled issued Jan 2020, no final | 250 21st Av | street spaceDetails
street space | |
| Dec 11, 2019 | Completed final sign-off Mar 2020 | 1250 48th Av | rev to pa# 201811014711; changes to steel frame at grid line aDetails
rev to pa# 201811014711; changes to steel frame at grid line a | |
| Dec 11, 2019 | Completed final sign-off May 2020 | 45 Grattan St | ground floor voluntary seismic/structural upgrad with replacement of about 70% of foundations and constructions of new shear wallsDetails
ground floor voluntary seismic/structural upgrad with replacement of about 70% of foundations and constructions of new shear walls | $65,000 |
| Nov 7, 2019 | Never finaled issued Dec 2020, no final | 342 Duncan St | replace slab & brick foundation, restore as level floor new interior stairs, misc related inerior finishesDetails
replace slab & brick foundation, restore as level floor new interior stairs, misc related inerior finishes | $36,000 |
| Nov 5, 2019 | Completed final sign-off Aug 2020 | 250 21st Av | revision to app#201812037353. residential addition. changes to foundation plan due to differing extg conditions.Details
revision to app#201812037353. residential addition. changes to foundation plan due to differing extg conditions. | $10,000 |
| Nov 5, 2019 | Completed final sign-off Mar 2020 | 250 21st Av | revision to app#201906274613 for soft story seismic upgrade. minor changes to foundation plan and to differing extg conditions.Details
revision to app#201906274613 for soft story seismic upgrade. minor changes to foundation plan and to differing extg conditions. | $5,000 |
| Sep 23, 2019 | Completed final sign-off Oct 2020 | 227 15th Av | to obtain final inspection for work approved under pa# 201409307732. all work is complete.Details
to obtain final inspection for work approved under pa# 201409307732. all work is complete. | |
| Sep 11, 2019 | Completed final sign-off Sep 2021 | 2164 Market St | residentialsoft story retrofit per sfbc chapter 4d engineering criteria 2016 cebc appx a4.commerical # 201909111337Details
residentialsoft story retrofit per sfbc chapter 4d engineering criteria 2016 cebc appx a4.commerical # 201909111337 | $150,000 |
| Sep 11, 2019 | Completed final sign-off Oct 2021 | 2164 Market St | commercial soft story retrofit per sfbc chapter 4d engineering criteria 2016 cebc appx a4. new power door, puch button installation & new ada ramp residential pa# 201909111338Details
commercial soft story retrofit per sfbc chapter 4d engineering criteria 2016 cebc appx a4. new power door, puch button installation & new ada ramp residential pa# 201909111338 | $30,000 |
| Sep 3, 2019 | Completed final sign-off Oct 2019 | 950 Harrison St | unit #220: replace in-kind two joists damaged by fire in unit 220. repair floor & clg. "a pre-construction meeting with the district building inspection is required for this project. call 4155586570 to schedule a pre-construction meeting."Details
unit #220: replace in-kind two joists damaged by fire in unit 220. repair floor & clg. "a pre-construction meeting with the district building inspection is required for this project. call 4155586570 to schedule a pre-construction meeting." | $1,500 |
| Aug 21, 2019 | Never finaled issued Oct 2019, no final | 3700 Cabrillo St | revision to pa 2017-0915-8718 shearwall types and lengths @ grid line (left side of building)Details
revision to pa 2017-0915-8718 shearwall types and lengths @ grid line (left side of building) | |
| Jul 18, 2019 | Never finaled issued Jul 2019, no final | 640 Lombard St | street spaceDetails
street space | |
| Jun 27, 2019 | Completed final sign-off Mar 2020 | 250 21st Av | voluntary seismic upgrade. legalization & upgrade of unit under separate pa #201812037353Details
voluntary seismic upgrade. legalization & upgrade of unit under separate pa #201812037353 | $20,000 |
| Jun 20, 2019 | Completed final sign-off Oct 2019 | 2849 Fillmore St | revision to pa # 201903074657 minor structural changes.Details
revision to pa # 201903074657 minor structural changes. | |
| Jun 20, 2019 | Expired or cancelled cancelled Jan 2026 | 2849 Fillmore St | revision to pa 2019-0307-4657 minor structural changesDetails
revision to pa 2019-0307-4657 minor structural changes | |
| May 23, 2019 | Expired or cancelled cancelled Jan 2026 | 1269 Vallejo St | replace (e) roof deck flooring and waterproofing with new modified bitumen granulated app waterproofing (reroof) and wood decking material.Details
replace (e) roof deck flooring and waterproofing with new modified bitumen granulated app waterproofing (reroof) and wood decking material. | $28,000 |
| Apr 12, 2019 | Never finaled issued Jul 2020, no final | 1718 Hyde St | two adu @ grd flr per ord# 162-16 - convert (e) storage & mechnical rm into habitable space. remove interior stair and add (n) exterior stair. adu.1- 3 bed, 2 bath, kitchen & living rm. adu.2- 1 bed, 1 bath, kitchen, dining rm & living rm. (n) elect.Details
two adu @ grd flr per ord# 162-16 - convert (e) storage & mechnical rm into habitable space. remove interior stair and add (n) exterior stair. adu.1- 3 bed, 2 bath, kitchen & living rm. adu.2- 1 bed, 1 bath, kitchen, dining rm & living rm. (n) elect. | $280,000 |
| Apr 11, 2019 | Completed final sign-off May 2019 | 2560 Polk St | revision to 201706280527 minor structural changesDetails
revision to 201706280527 minor structural changes | |
| Apr 9, 2019 | Completed final sign-off Jan 2023 | 1406 Pacific Av | commercial. compliance with soft story retrofit program cebc 2016 appendix a-4 & sfebc chapter 4d. maher n/a.Details
commercial. compliance with soft story retrofit program cebc 2016 appendix a-4 & sfebc chapter 4d. maher n/a. | $10,000 |
| Apr 9, 2019 | Completed final sign-off Jan 2023 | 1406 Pacific Av | residential. compliance with soft story retrofit program cebc 2016 appendix a-4 & sfebc chapter 4d. maher n/a.Details
residential. compliance with soft story retrofit program cebc 2016 appendix a-4 & sfebc chapter 4d. maher n/a. | $20,000 |
| Apr 4, 2019 | Completed final sign-off Jul 2019 | 1101 Valencia St | revision to app#201809130126. upgrade of structural systems based on extg conditions found.Details
revision to app#201809130126. upgrade of structural systems based on extg conditions found. | |
| Mar 19, 2019 | Completed final sign-off Apr 2021 | 1061 Filbert St | remodel units #1, 3 & 4, repair sunroom wall on 1st fl unit #4. new lighting & electrical in remodel area. remodel kitchen & bathrooms. remove old water heater in unit #3 & #6.Details
remodel units #1, 3 & 4, repair sunroom wall on 1st fl unit #4. new lighting & electrical in remodel area. remodel kitchen & bathrooms. remove old water heater in unit #3 & #6. | $150,000 |
| Mar 12, 2019 | Completed final sign-off Oct 2022 | 852 Greenwich St | conversion of partial basement to two adu units per ordinance no. 162-16.Details
conversion of partial basement to two adu units per ordinance no. 162-16. | $52,000 |
| Mar 11, 2019 | Completed final sign-off Nov 2019 | 3146 Divisadero St | revision to pa # 2017-0413-3893. replace wood shearwall at grid b with steel frame.Details
revision to pa # 2017-0413-3893. replace wood shearwall at grid b with steel frame. | |
| Mar 8, 2019 | Completed final sign-off Aug 2019 | 2853 Sacramento St | rev to pa201811297059 - change of lateral framing system.Details
rev to pa201811297059 - change of lateral framing system. | $10,000 |
| Mar 7, 2019 | Never finaled issued Mar 2019, no final | 1504 Florida St | remodel kitchen and one bathroom. no change in wall layout & opening.Details
remodel kitchen and one bathroom. no change in wall layout & opening. | $40,000 |
| Mar 7, 2019 | Never finaled issued Mar 2019, no final | 1502 Florida St | remodel kitchen and one bathroom. no change in wall layout & opening.Details
remodel kitchen and one bathroom. no change in wall layout & opening. | $40,000 |
| Mar 7, 2019 | Completed final sign-off Oct 2019 | 2849 Fillmore St | revision to pa #201801249413. soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.Details
revision to pa #201801249413. soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | |
| Mar 7, 2019 | Never finaled issued Mar 2019, no final | 1508 Florida St | remodel kitchen and one bathroom. no change in wall layout & opening.Details
remodel kitchen and one bathroom. no change in wall layout & opening. | $40,000 |
| Mar 7, 2019 | Never finaled issued Mar 2019, no final | 1506 Florida St | remodel kitchen and one bathroom. no change in wall layout & opening.Details
remodel kitchen and one bathroom. no change in wall layout & opening. | $40,000 |
| Mar 1, 2019 | Completed final sign-off Aug 2023 | 196 Urbano Dr | conversion of (e) basement space to living space by way of excavation. converted space to include (n) family room, bathroom, study. remodel (e) 1st flr kitchen.Details
conversion of (e) basement space to living space by way of excavation. converted space to include (n) family room, bathroom, study. remodel (e) 1st flr kitchen. | $164,000 |
| Feb 7, 2019 | Completed final sign-off Mar 2019 | 3007 Cesar Chavez St | soil stabilization with permiation grouting at north east corner of property.Details
soil stabilization with permiation grouting at north east corner of property. | $4,000 |
| Dec 31, 2018 | Completed final sign-off May 2019 | 144 Downey St | voluntary streghthening at the garage and storage areas at the ground fl.Details
voluntary streghthening at the garage and storage areas at the ground fl. | $45,000 |
| Dec 20, 2018 | Completed final sign-off Feb 2020 | 1411 Diamond St | reconfigure rear deck stairs and landscaping.Details
reconfigure rear deck stairs and landscaping. | $10,000 |
| Dec 19, 2018 | Completed final sign-off Feb 2019 | 333 Presidio Av | comply w/ san francisco wood-frame seismic retrofit soft-story program, sfbc chapter 4d per 2016 cebc appendix a-4Details
comply w/ san francisco wood-frame seismic retrofit soft-story program, sfbc chapter 4d per 2016 cebc appendix a-4 | $45,000 |
| Dec 14, 2018 | Completed final sign-off Aug 2020 | 150 Anzavista Av | voluntary structural upgrade per ab-094 per 2016 cebc appx a4Details
voluntary structural upgrade per ab-094 per 2016 cebc appx a4 | $50,000 |
| Dec 5, 2018 | Never finaled issued Jan 2019, no final | 981 Valencia St | altered site to pa #2018-0531-0658 s. new railing on unoccupied roof.Details
altered site to pa #2018-0531-0658 s. new railing on unoccupied roof. | $10,000 |
| Nov 29, 2018 | Completed final sign-off Aug 2019 | 2853 Sacramento St | voluntary structural upgrade of front section of ground floor at garageDetails
voluntary structural upgrade of front section of ground floor at garage | $20,000 |
| Nov 16, 2018 | Expired or cancelled cancelled Dec 2018 | 981 Valencia St | rev to pa# 201805310658; to change scope of work to "new non-occupied roof & repair (e) rear stairs (less than 50%)". maher n/a.Details
rev to pa# 201805310658; to change scope of work to "new non-occupied roof & repair (e) rear stairs (less than 50%)". maher n/a. | |
| Nov 1, 2018 | Completed final sign-off May 2020 | 1250 48th Av | comply w/ san francisco wood-frame seismic retrofit program ( soft story ), sfbc chapter 4d, per 2016 cebc appendix a-4Details
comply w/ san francisco wood-frame seismic retrofit program ( soft story ), sfbc chapter 4d, per 2016 cebc appendix a-4 | $40,000 |
| Oct 31, 2018 | Completed final sign-off Mar 2019 | 850 Greenwich St | volunteer seismic retrofit program (soft story), sfbc chapter 4d per 2016 cebc appendix a-4Details
volunteer seismic retrofit program (soft story), sfbc chapter 4d per 2016 cebc appendix a-4 | $80,000 |
| Oct 10, 2018 | Completed final sign-off Nov 2018 | 711 Guerrero St | revision to pa 201708255898. relocate 3 new shear wallsDetails
revision to pa 201708255898. relocate 3 new shear walls | |
| Oct 10, 2018 | Completed final sign-off Mar 2019 | 1502 Florida St | voluntary structural seismic upgrade as per sf ab-094, sfbc chapter 4d, per 2016 cebc appendix a4Details
voluntary structural seismic upgrade as per sf ab-094, sfbc chapter 4d, per 2016 cebc appendix a4 | $80,000 |
| Oct 9, 2018 | Completed final sign-off Nov 2018 | 3372 22nd St | rear stairs not visible from the street. replacing all dry rotted wood members in-kind. additional permits and/or plans may be required at the field bldg. inspectors discretionDetails
rear stairs not visible from the street. replacing all dry rotted wood members in-kind. additional permits and/or plans may be required at the field bldg. inspectors discretion | $5,000 |
| Sep 14, 2018 | Completed final sign-off Sep 2021 | 1255 Taylor St | residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial soft story under pa 2018-0914-0256Details
residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial soft story under pa 2018-0914-0256 | $76,388 |
| Sep 14, 2018 | Completed final sign-off Sep 2021 | 1255 Taylor St | commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 2018-0914-0255 includes ada upgrades at commercial tenant space for path of travelDetails
commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 2018-0914-0255 includes ada upgrades at commercial tenant space for path of travel | $38,194 |
| Sep 14, 2018 | Completed final sign-off Jul 2020 | 5901 Geary Bl | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4(commercial)Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4(commercial) | $10,000 |
| Sep 14, 2018 | Completed final sign-off Jul 2020 | 5907 Geary Bl | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4(residential)Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4(residential) | $20,000 |
| Sep 13, 2018 | Completed final sign-off Mar 2020 | 67 Brosnan St | comply with san francisco wood-frame seismic retrofit program (soft story), sfbc chapter 4d, per 2016 cebc appendix a4Details
comply with san francisco wood-frame seismic retrofit program (soft story), sfbc chapter 4d, per 2016 cebc appendix a4 | $20,000 |
| Sep 13, 2018 | Completed final sign-off Jul 2019 | 1101 Valencia St | residential - comply with sf wood frame seismic retrofit program soft story sfbc ch 4d, per 2016 cebc app a4. commercial soft story under pa 201809130129Details
residential - comply with sf wood frame seismic retrofit program soft story sfbc ch 4d, per 2016 cebc app a4. commercial soft story under pa 201809130129 | $52,800 |
| Sep 13, 2018 | Completed final sign-off Jul 2019 | 1109 Valencia St | commercial - comply with sf wood frame seismic retrofit program soft story sfbc ch 4d per 2016 cebc app a4. residential soft story under pa 201809130126// front door of commercial space being enlarged for ada compliance- vifDetails
commercial - comply with sf wood frame seismic retrofit program soft story sfbc ch 4d per 2016 cebc app a4. residential soft story under pa 201809130126// front door of commercial space being enlarged for ada compliance- vif | $37,809 |
| Sep 5, 2018 | Completed final sign-off Nov 2020 | 1900 Divisadero St | residential- comply with san francisco wood-frame seismic retrofit program (soft story), sfbc chapter 4d,per 2016 cebc appendix a-4Details
residential- comply with san francisco wood-frame seismic retrofit program (soft story), sfbc chapter 4d,per 2016 cebc appendix a-4 | $90,000 |
| Sep 5, 2018 | Completed final sign-off Nov 2020 | 1900 Divisadero St | commercial- comply with san francisco wood-frame seismic retrofit program (soft story), sfbc chapter 4d,per 2016 cebc appendix a-4Details
commercial- comply with san francisco wood-frame seismic retrofit program (soft story), sfbc chapter 4d,per 2016 cebc appendix a-4 | $17,100 |
| Aug 24, 2018 | Completed final sign-off Aug 2018 | 724 16th Av | to obtain final inspection for work approved under pa 2015-1007-9121. all work is completeDetails
to obtain final inspection for work approved under pa 2015-1007-9121. all work is complete |