Kells Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2009 to Aug 2026
- Last 24 months
- 17 permits filed
87 permits since 2000: 80 completed, 5 in progress, 2 never finaled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 12, 2026 | In progress issued Sep 2026 | 135 Willard North St | to comply with nov #202652562, 2026513474, 201813241 item #3. install 2x4 sleepers underneath deck to promote proper drainage. work only in unit #6Details
to comply with nov #202652562, 2026513474, 201813241 item #3. install 2x4 sleepers underneath deck to promote proper drainage. work only in unit #6 | $1,000 |
| Aug 6, 2026 | In progress issued Aug 2026 | 1868 Vallejo St | unit#4: in kind kitchen remodel. (n) countertops, (n) cabinets & hookup, (n) appliances, 120 sf kitchen. remove drywall to prepare for electrical work ~1200sf.Details
unit#4: in kind kitchen remodel. (n) countertops, (n) cabinets & hookup, (n) appliances, 120 sf kitchen. remove drywall to prepare for electrical work ~1200sf. | $25,000 |
| Jul 29, 2026 | In progress filed Jul 2026, not yet issued | 563 02nd St | renewal of pa 9912819 (ref 202603238054) for inpsection of as-built conditions reviewd, approved and inspected. this permit covers m.e.p work constructed w/o approval, to complete core & shell work to an (e) restaurant & brewery. food service spaces are not part of this permit.Details
renewal of pa 9912819 (ref 202603238054) for inpsection of as-built conditions reviewd, approved and inspected. this permit covers m.e.p work constructed w/o approval, to complete core & shell work to an (e) restaurant & brewery. food service spaces are not part of this permit. | |
| Jul 14, 2026 | In progress issued Jul 2026 | 609 Burnett Av | apt#7: fire damage repair, replace all in kind (n) insulation, drywall & finishes, replace patio door sliders to match existing - 500 sf apt, not street facing.Details
apt#7: fire damage repair, replace all in kind (n) insulation, drywall & finishes, replace patio door sliders to match existing - 500 sf apt, not street facing. | $65,000 |
| Jun 17, 2026 | Completed final sign-off Aug 2026 | 2330 17th St | to comply w/ nov 202544849. replace e) damaged garage header & post in kind, replace 100 sf stucco, patch & repair in kind, install 3 new garage doors in kind. work not in public right of wayDetails
to comply w/ nov 202544849. replace e) damaged garage header & post in kind, replace 100 sf stucco, patch & repair in kind, install 3 new garage doors in kind. work not in public right of way | $30,000 |
| May 18, 2026 | Completed final sign-off Jun 2026 | 1899 California St | unit 10: kitchen remodel, replace kitchen cabinets, install new appliances, in kind, existing openings and connections.Details
unit 10: kitchen remodel, replace kitchen cabinets, install new appliances, in kind, existing openings and connections. | $12,500 |
| May 12, 2026 | In progress issued May 2026 | 135 Willard North St | dryrot repair: removing ~60sf stucco @ front facade & replacing damaged wood members. patch and repair stucco in kind. replace damaged wood siding on 3/f south facing wall.Details
dryrot repair: removing ~60sf stucco @ front facade & replacing damaged wood members. patch and repair stucco in kind. replace damaged wood siding on 3/f south facing wall. | $8,500 |
| Mar 23, 2026 | Completed final sign-off Aug 2026 | 563 02nd St | to obtain final inspection under pa# 9912819. all work is complete.Details
to obtain final inspection under pa# 9912819. all work is complete. | |
| Mar 10, 2026 | Completed final sign-off May 2026 | 1900 Vallejo St | unit #605: kitchen remodel, in kind. replace cabinets and counters.Details
unit #605: kitchen remodel, in kind. replace cabinets and counters. | $30,000 |
| Dec 3, 2025 | Completed final sign-off Mar 2026 | 860 Arguello Bl | unit #205: demolish everything to the studs. all new electrical with new electric baseboard heaters. insulation, drywall, and new finishes throughout (~450sf living, 35sf bath). in kind remodel of entire apartment unit including cabinets as well as bathroom remodel in kind.Details
unit #205: demolish everything to the studs. all new electrical with new electric baseboard heaters. insulation, drywall, and new finishes throughout (~450sf living, 35sf bath). in kind remodel of entire apartment unit including cabinets as well as bathroom remodel in kind. | $60,000 |
| Oct 9, 2025 | Completed final sign-off Jan 2026 | 3301 Broderick St | to comply w/ nov 202535649. reinforce a total of 56 cornice corbel connections by installing hardware & fasteners to provide a continueous & positive conncection btw the corbel & parapet framingDetails
to comply w/ nov 202535649. reinforce a total of 56 cornice corbel connections by installing hardware & fasteners to provide a continueous & positive conncection btw the corbel & parapet framing | $15,000 |
| Aug 13, 2025 | Completed final sign-off Oct 2025 | 1696 Grove St | reframing front bedroom closet from 24" to 30" door within unit 1696Details
reframing front bedroom closet from 24" to 30" door within unit 1696 | |
| Aug 5, 2025 | Completed final sign-off Dec 2025 | 2040 Jefferson St | unit #201: remodel kitchen and bath. remove plaster from damaged walls and replaster. new electrical throughout. minor plumbing repairs. 75 square feet kitchen; 35 square feet bathroom.Details
unit #201: remodel kitchen and bath. remove plaster from damaged walls and replaster. new electrical throughout. minor plumbing repairs. 75 square feet kitchen; 35 square feet bathroom. | $45,000 |
| Jul 1, 2025 | Completed final sign-off Aug 2025 | 1827 Quintara St | remove and replace 20 sq ft of stucco to match like for like.Details
remove and replace 20 sq ft of stucco to match like for like. | $4,800 |
| Jun 2, 2025 | Completed final sign-off Nov 2025 | 1696 Grove St | kitchen & one bathroom remodel in kind. all new eletric & plumbing. new drywall throughout unit with 5/8" type x sheet rock. (repair in kind) 900 sfDetails
kitchen & one bathroom remodel in kind. all new eletric & plumbing. new drywall throughout unit with 5/8" type x sheet rock. (repair in kind) 900 sf | $105,000 |
| May 27, 2025 | Completed final sign-off Aug 2025 | 2040 Jefferson St | unit #305: all (n) electrical and plumbing. (n) drywall throughout-repair in kind. kitchen remodel and bathroom remodel. (n) flooring. area is 458 sqft. work is only in unit 305.Details
unit #305: all (n) electrical and plumbing. (n) drywall throughout-repair in kind. kitchen remodel and bathroom remodel. (n) flooring. area is 458 sqft. work is only in unit 305. | $58,000 |
| Feb 12, 2025 | Completed final sign-off Apr 2025 | 24 Rausch St | comply with nov 202428673 do structural repairs on existing fire egress stairs in the backyard. no firewall construction. no configuration change level of landings to remainDetails
comply with nov 202428673 do structural repairs on existing fire egress stairs in the backyard. no firewall construction. no configuration change level of landings to remain | $20,000 |
| Aug 23, 2024 | Completed final sign-off Sep 2024 | 2960 Divisadero St | resurfacing an (e) 400sqft roof deck with new trex material and replace rotten plywood on walls (150 sqft) with new material to match.Details
resurfacing an (e) 400sqft roof deck with new trex material and replace rotten plywood on walls (150 sqft) with new material to match. | $15,000 |
| Aug 8, 2024 | Completed final sign-off Mar 2025 | 2040 Jefferson St | dry rot repairs in lightwell, approx. 1000 sf. in kind replacement of 48 windows. (marvin fiberglass), no changes to opening size or operation. u = .30 max.Details
dry rot repairs in lightwell, approx. 1000 sf. in kind replacement of 48 windows. (marvin fiberglass), no changes to opening size or operation. u = .30 max. | $180,000 |
| May 9, 2024 | Completed final sign-off May 2024 | 1519 Oak St | replacing (5) existing vinyl windows in lightwell. (n) overflow drain on (e) deck. same size, same locations, max u-factor 0.30.Details
replacing (5) existing vinyl windows in lightwell. (n) overflow drain on (e) deck. same size, same locations, max u-factor 0.30. | $3,000 |
| May 9, 2024 | Completed final sign-off Mar 2026 | 830 Bush St | replace section of roof parapet "in kind" retrofit. street facing building facade to remain as existing.Details
replace section of roof parapet "in kind" retrofit. street facing building facade to remain as existing. | $60,000 |
| Mar 27, 2024 | Completed final sign-off Apr 2024 | 1899 California St | remove existing deck boards on (e) roof deck to allow roofers to complete their re-roofing work. replace deck boards in kind over re-roof. deck is facing rear facade of bldg. deck is approx. 180 sqft.Details
remove existing deck boards on (e) roof deck to allow roofers to complete their re-roofing work. replace deck boards in kind over re-roof. deck is facing rear facade of bldg. deck is approx. 180 sqft. | $11,000 |
| Mar 26, 2024 | Completed final sign-off May 2024 | 1519 Oak St | dryrot repair in existing lightwell, 450 ft2. replacing 2 existing vinyl windows, no change to opening size or operation. to comply with nov#: 202419758. items 3 and 5.Details
dryrot repair in existing lightwell, 450 ft2. replacing 2 existing vinyl windows, no change to opening size or operation. to comply with nov#: 202419758. items 3 and 5. | $70,000 |
| Feb 1, 2024 | Completed final sign-off Apr 2024 | 1651 Larkin St | unit# 5 in-kind replacement of cabinets, countertops & appliances in the kitchen. in-kind replacement of tub, vanity & toilet. kitchen is 10 x 12, bath 5 x 8. upgrade electrical panel. no wall changes, no (n) plumbing fixturesDetails
unit# 5 in-kind replacement of cabinets, countertops & appliances in the kitchen. in-kind replacement of tub, vanity & toilet. kitchen is 10 x 12, bath 5 x 8. upgrade electrical panel. no wall changes, no (n) plumbing fixtures | $32,000 |
| Jan 26, 2024 | Completed final sign-off Feb 2024 | 1200 17th Av | unit#: 302, admistrative revision to approved pa#: 202312112310, per inspector john lau's request to add unit 302Details
unit#: 302, admistrative revision to approved pa#: 202312112310, per inspector john lau's request to add unit 302 | |
| Dec 11, 2023 | Completed final sign-off Feb 2024 | 1200 17th Av | one kitchen and one bath remodel. upgrade electrical panel.Details
one kitchen and one bath remodel. upgrade electrical panel. | $32,000 |
| Oct 18, 2023 | Completed final sign-off Dec 2024 | 418 Arguello Bl | underpin foundation to accommodate excavation @ 416 arguello.Details
underpin foundation to accommodate excavation @ 416 arguello. | $20,000 |
| Oct 18, 2023 | Completed final sign-off May 2024 | 412 Arguello Bl | underpin foundation to accommodate excavation @ 416 arguello.Details
underpin foundation to accommodate excavation @ 416 arguello. | $25,000 |
| Oct 17, 2023 | Completed final sign-off Nov 2023 | 1627 Clay St | dry rot repair on building facade under address # and underneath windows. dry rot reapir of basement floor from water damage, approx 8 sheets of plywood. remodel 36 sf (6 x 6) bathroom in kind.Details
dry rot repair on building facade under address # and underneath windows. dry rot reapir of basement floor from water damage, approx 8 sheets of plywood. remodel 36 sf (6 x 6) bathroom in kind. | $35,000 |
| Aug 21, 2023 | Completed final sign-off Sep 2023 | 685 Mcallister St | unit 108: remove existing cabinets and countertops and appliances and replace with newDetails
unit 108: remove existing cabinets and countertops and appliances and replace with new | $8,000 |
| Aug 11, 2023 | Completed final sign-off Oct 2023 | 4828 Mission St | to obtain final inspection for work approved under bpa# 201803234535. all work is complete.Details
to obtain final inspection for work approved under bpa# 201803234535. all work is complete. | |
| Aug 9, 2023 | Never finaled issued Aug 2023, no final | 132 Henry St | replacing less than 50% stairs in kind. demoing existing steps and stucco, reframing. front exterior.Details
replacing less than 50% stairs in kind. demoing existing steps and stucco, reframing. front exterior. | $18,000 |
| Jul 19, 2023 | Completed final sign-off Aug 2023 | 685 Mcallister St | unit #202: remodel e bath in unit 202Details
unit #202: remodel e bath in unit 202 | $14,000 |
| May 24, 2023 | Completed final sign-off Aug 2023 | 1651 Larkin St | unit# 10: replace kitchen cabinets and appliances. remodel bathroom.Details
unit# 10: replace kitchen cabinets and appliances. remodel bathroom. | $20,000 |
| Apr 21, 2023 | Completed final sign-off May 2023 | 35 Brosnan St | in-kind repair to deck and stairs. exterior egress stairs and landings at rear of bldg - less than 50%Details
in-kind repair to deck and stairs. exterior egress stairs and landings at rear of bldg - less than 50% | $8,000 |
| Apr 13, 2023 | Completed final sign-off May 2023 | 548 Steiner St | dry rot repair at first floor lightwell to address nov 202304871 & 202306389Details
dry rot repair at first floor lightwell to address nov 202304871 & 202306389 | $10,000 |
| Jan 25, 2023 | Completed final sign-off Apr 2023 | 2654 Gough St | unit 305: replace kitchen and bathroom in kind. new floors throughout. upgrade electrical panel. 3 fuse panel to circuit breaker panel.Details
unit 305: replace kitchen and bathroom in kind. new floors throughout. upgrade electrical panel. 3 fuse panel to circuit breaker panel. | $32,000 |
| Dec 1, 2022 | Completed final sign-off Feb 2023 | 100 Capra Wy | unit #302: one kitchen remodel. replace countertops and backsplash and add a dishwasher. no replacement appliances. no new cabinetry.Details
unit #302: one kitchen remodel. replace countertops and backsplash and add a dishwasher. no replacement appliances. no new cabinetry. | $5,000 |
| Nov 18, 2022 | Completed final sign-off Feb 2023 | 473 Sanchez St | repairing less than 50% of decks and stairs, in kind. (rear stairs)Details
repairing less than 50% of decks and stairs, in kind. (rear stairs) | $6,500 |
| Oct 20, 2022 | Completed final sign-off Oct 2022 | 2346 17th St | replace kitchen cabinets and counter (in kind)Details
replace kitchen cabinets and counter (in kind) | $6,500 |
| Oct 4, 2022 | Completed final sign-off Feb 2023 | 1651 Larkin St | unit 11 :replace kitchen cabines, appliances, remodel bathroom.Details
unit 11 :replace kitchen cabines, appliances, remodel bathroom. | $20,000 |
| Sep 19, 2022 | Completed final sign-off Feb 2023 | 475 Sanchez St | replace kitchen cabinets in kind- new appliances installation. electric and plumbing upgradesDetails
replace kitchen cabinets in kind- new appliances installation. electric and plumbing upgrades | $2,500 |
| Sep 13, 2022 | Completed final sign-off Oct 2022 | 2330 17th St | repair less than 50% exterior stairs in kind (front) (2 locations)Details
repair less than 50% exterior stairs in kind (front) (2 locations) | $2,500 |
| Sep 12, 2022 | Completed final sign-off Oct 2022 | 4828 Mission St | to comply with nov 202183470: replacing front 2 windows in kind. windows to either wood aluminum clad or architectual grade aluminum.Details
to comply with nov 202183470: replacing front 2 windows in kind. windows to either wood aluminum clad or architectual grade aluminum. | $2,500 |
| Sep 6, 2022 | Completed final sign-off Mar 2023 | 889 Capp St | remove all plaster of the walls, new wiring , plumbing, drywall. install new cabinets and fixtures in kitchen. repair/patch all finishes in kind.Details
remove all plaster of the walls, new wiring , plumbing, drywall. install new cabinets and fixtures in kitchen. repair/patch all finishes in kind. | $120,000 |
| May 20, 2022 | Completed final sign-off Nov 2022 | 40 Alvarado St | front bldg - remove alllath and plaster. install new electric, plumbing, heating, insulation and drywall. kitchen and bathroom remodel in-kind (front bldg)Details
front bldg - remove alllath and plaster. install new electric, plumbing, heating, insulation and drywall. kitchen and bathroom remodel in-kind (front bldg) | $140,000 |
| May 5, 2022 | Completed final sign-off May 2022 | 70 Lupine Av | less than 35%, repair in-kind rear deckDetails
less than 35%, repair in-kind rear deck | $5,500 |
| Mar 1, 2022 | Completed final sign-off Apr 2022 | 1801 Turk St | unit #14: change cabinets & appliances. upgrade electrical & plumbing. kit remodel.Details
unit #14: change cabinets & appliances. upgrade electrical & plumbing. kit remodel. | $18,000 |
| Feb 10, 2022 | Completed final sign-off Apr 2022 | 35 Brosnan St | unit 2: change cabinets and appliances, no wall removal.Details
unit 2: change cabinets and appliances, no wall removal. | $20,000 |
| Feb 10, 2022 | Completed final sign-off Apr 2022 | 35 Brosnan St | unit 4: change cabinets and appliances, no wall removal.Details
unit 4: change cabinets and appliances, no wall removal. | $20,000 |
| Jan 20, 2022 | Completed final sign-off Apr 2022 | 35 Brosnan St | unit #5. in kitchen: change cabinet and appliances. no wallls removalDetails
unit #5. in kitchen: change cabinet and appliances. no wallls removal | $20,000 |
| Jan 20, 2022 | Completed final sign-off Apr 2022 | 35 Brosnan St | unit #6. in kitchen: change cabinets and appliances. no wall removalDetails
unit #6. in kitchen: change cabinets and appliances. no wall removal | $20,000 |
| Jan 7, 2022 | Completed final sign-off Feb 2025 | 416 Arguello Bl | rear horiz. addition. bsmt lvl: create 1 bedrm, living space, efficiency kitchen & bath. main lvl: open bearing wall btwn dining & kitch, remodel kitch, add 1/2 bath. upper lvl: remodel bath, add master bath, change closet drs, add w/d closet, install attic access pt & upper landing. new roof decks.Details
rear horiz. addition. bsmt lvl: create 1 bedrm, living space, efficiency kitchen & bath. main lvl: open bearing wall btwn dining & kitch, remodel kitch, add 1/2 bath. upper lvl: remodel bath, add master bath, change closet drs, add w/d closet, install attic access pt & upper landing. new roof decks. | $100,000 |
| Dec 14, 2021 | Completed final sign-off Mar 2022 | 540 Cole St | unit #4. replace cabinets and counter top in kitchen.Details
unit #4. replace cabinets and counter top in kitchen. | $8,000 |
| Nov 1, 2021 | Completed final sign-off Mar 2022 | 610 Central Av | kitchen/bath remodel - upgrade electrical & plumbing. remove all wall coverings. replace in kindDetails
kitchen/bath remodel - upgrade electrical & plumbing. remove all wall coverings. replace in kind | $90,000 |
| Oct 6, 2021 | Completed final sign-off Oct 2022 | 2644 Larkin St | one kitchen and 2 bathroom remodeling in kind. non structural.Details
one kitchen and 2 bathroom remodeling in kind. non structural. | $125,000 |
| Sep 2, 2021 | Completed final sign-off Oct 2022 | 2644 Larkin St | demo the kitchen cabinet and 2 bathrooms @ vacant building permit req to reinstallDetails
demo the kitchen cabinet and 2 bathrooms @ vacant building permit req to reinstall | $3,000 |
| Aug 24, 2021 | Completed final sign-off Oct 2021 | 1899 California St | abatement of complaint 2020-009656enf. replace of 6 street facing windows- fenestrations shall comply with cec 140.3-cDetails
abatement of complaint 2020-009656enf. replace of 6 street facing windows- fenestrations shall comply with cec 140.3-c | $2,500 |
| Jul 21, 2021 | Completed final sign-off Sep 2021 | 558 Steiner St | apt b: kitchen cabinets replaced, upgrade electrical. new tub in bathroom and new tiles.Details
apt b: kitchen cabinets replaced, upgrade electrical. new tub in bathroom and new tiles. | $28,000 |
| Jul 15, 2021 | Completed final sign-off Oct 2021 | 2085 Hayes St | #5: install new kitchen cabnets and appliances. electrical upgrades. no moving walls.Details
#5: install new kitchen cabnets and appliances. electrical upgrades. no moving walls. | $18,000 |
| Jun 8, 2021 | Completed final sign-off Sep 2021 | 477 Sanchez St | one kitcen remodel- change cabinets, countertops. no structuralDetails
one kitcen remodel- change cabinets, countertops. no structural | $12,000 |
| Mar 12, 2021 | Completed final sign-off Mar 2021 | 1575 17th Av | remove 80 sf ft of stucco from bannister wall and reframe and stucco to match.Details
remove 80 sf ft of stucco from bannister wall and reframe and stucco to match. | $7,000 |
| Jan 12, 2021 | Completed final sign-off Feb 2021 | 455 Euclid Av | 80 square feet of stucco and repair roofDetails
80 square feet of stucco and repair roof | $2,800 |
| Nov 20, 2020 | Completed final sign-off Jan 2021 | 480 Union St | kitchen cabinet and appliance upgradeDetails
kitchen cabinet and appliance upgrade | $16,000 |
| Sep 15, 2020 | Completed final sign-off Nov 2020 | 1200 17th Av | unit 303 - remodeling kitchen and bathroom in-kindDetails
unit 303 - remodeling kitchen and bathroom in-kind | $45,000 |
| Jun 18, 2020 | Completed final sign-off Aug 2020 | 52 Mercedes Wy | repair / replace in-kind brick patio and stucco for dryrot repair of damaged lumber throughout building with pressure treated lumber. all work per fox structural & termite control report # 16971 dated 3/13/2020.Details
repair / replace in-kind brick patio and stucco for dryrot repair of damaged lumber throughout building with pressure treated lumber. all work per fox structural & termite control report # 16971 dated 3/13/2020. | $45,000 |
| Jun 4, 2020 | Completed final sign-off Jul 2020 | 801 Corbett Av | to comply with nov# 202035901. unit #2 & #10, remove existing countertops and replace with new stone material.Details
to comply with nov# 202035901. unit #2 & #10, remove existing countertops and replace with new stone material. | $5,500 |
| Jan 29, 2020 | Completed final sign-off Apr 2020 | 1250 Pine St | unit 3. kitchen & bathroom remodeling, in-kindDetails
unit 3. kitchen & bathroom remodeling, in-kind | $18,500 |
| Nov 13, 2018 | Completed final sign-off Dec 2018 | 140 Dolores St | remove 50sq ft of stucco and repair. damage wood, not visible from street.Details
remove 50sq ft of stucco and repair. damage wood, not visible from street. | $2,200 |
| Sep 26, 2018 | Completed final sign-off Mar 2019 | 2040 17th St | provide handicap ramp to office as per ordinance 51-16 accessible business entrance programDetails
provide handicap ramp to office as per ordinance 51-16 accessible business entrance program | $8,000 |
| Sep 22, 2017 | Completed final sign-off Feb 2018 | 151 Molimo Dr | to comply with nov# 201787301 - revision to pa 2017-0208-8995 to repair more than 50% of rear cantelevered deck and increase deck width approx 18" to 4'-6"Details
to comply with nov# 201787301 - revision to pa 2017-0208-8995 to repair more than 50% of rear cantelevered deck and increase deck width approx 18" to 4'-6" | $16,000 |
| Sep 6, 2017 | Completed final sign-off Nov 2017 | 4650 Ocean Av | remove approx 400 sq ft of deck & wall stucco and repair and replace w/new stucco & new deck materials.Details
remove approx 400 sq ft of deck & wall stucco and repair and replace w/new stucco & new deck materials. | $12,000 |
| Feb 8, 2017 | Completed final sign-off Mar 2017 | 151 Molimo Dr | repair of rear deck (at least 50% to remain). no change to size or configuration.Details
repair of rear deck (at least 50% to remain). no change to size or configuration. | $12,000 |
| Sep 23, 2016 | Completed final sign-off Jan 2017 | 436 Hamilton St | bathroom addition in playroom. replace exterior swinging door with slidingDetails
bathroom addition in playroom. replace exterior swinging door with sliding | $25,000 |
| Aug 12, 2015 | Completed final sign-off Sep 2015 | 804 29th Av | in-kind dry rot repair of stucco on front facade; includes arch above garage and bay above arch.Details
in-kind dry rot repair of stucco on front facade; includes arch above garage and bay above arch. | $8,000 |
| Oct 21, 2014 | Completed final sign-off Aug 2015 | 1514 Underwood Av | replace e front exterior stairs and landing 100% in kind to comply with 2014908784 item 2Details
replace e front exterior stairs and landing 100% in kind to comply with 2014908784 item 2 | $5,000 |
| Mar 31, 2014 | Completed final sign-off Jun 2014 | 1495 25th Av | remove stucco and dryrot as per section, items in report and replace with new framing, plywood and stucco; report 20142073, items to be carried out is (3b, 3c, 3d, 3g) only; dated 3/4/2014Details
remove stucco and dryrot as per section, items in report and replace with new framing, plywood and stucco; report 20142073, items to be carried out is (3b, 3c, 3d, 3g) only; dated 3/4/2014 | $7,500 |
| Feb 14, 2014 | Completed final sign-off Jun 2014 | 28 Atalaya Tr | remodel existing kitchen. no changes to building envelope or footprnt. no new heated space addedDetails
remodel existing kitchen. no changes to building envelope or footprnt. no new heated space added | $45,000 |
| Jul 1, 2013 | Completed final sign-off Sep 2013 | 115 Carl St | dry rot repair to exist exterior stair landing & walkway, not visible from the street. replace posts and beam only on stairs.Details
dry rot repair to exist exterior stair landing & walkway, not visible from the street. replace posts and beam only on stairs. | $12,000 |
| Jan 23, 2013 | Completed final sign-off Feb 2013 | 501 Crestlake Dr | remove and replace 300 sq ft stucco on the side of the bldg.Details
remove and replace 300 sq ft stucco on the side of the bldg. | $2,700 |
| Oct 31, 2012 | Completed final sign-off Mar 2016 | 204 Valencia St | asi scope of work is limited to repair in kind due to fire damage only. does not include seismic upgrade. up grade of any extg condition and to comply with #201224641Details
asi scope of work is limited to repair in kind due to fire damage only. does not include seismic upgrade. up grade of any extg condition and to comply with #201224641 | $100,000 |
| Jun 19, 2012 | Completed final sign-off Jul 2012 | 115 Carl St | 200 sq ft of dryrot in between two bldgsDetails
200 sq ft of dryrot in between two bldgs | $7,000 |
| Apr 4, 2011 | Completed final sign-off Oct 2011 | 1986 17th Av | stucco repair & replacements on 4-sides.Details
stucco repair & replacements on 4-sides. | $15,000 |
| Jan 4, 2011 | Completed final sign-off Oct 2011 | 454 Brannan St | replace all windows on street facing facade, revise main entrance and stair to be accesible, create new entry at north end of buildingDetails
replace all windows on street facing facade, revise main entrance and stair to be accesible, create new entry at north end of building | $75,000 |
| Oct 22, 2010 | Completed final sign-off Nov 2010 | 608 38th Av | dryrot 4'x4' replace 2x10 plywood. not visable from street.Details
dryrot 4'x4' replace 2x10 plywood. not visable from street. | $500 |
| Jul 22, 2010 | Never finaled issued Jul 2010, no final | 719 Noe St | removing 20 sq ft stucco and damaged plywood at back of building in-kind: replacing damaged plywood with new plywood and replacing existing access door and frame to sub area with new. plywood shall be minimum 1/2" thick nailed with 10d @ 6"o.c. at all edges & 10d @ 12"o.c. at field.Details
removing 20 sq ft stucco and damaged plywood at back of building in-kind: replacing damaged plywood with new plywood and replacing existing access door and frame to sub area with new. plywood shall be minimum 1/2" thick nailed with 10d @ 6"o.c. at all edges & 10d @ 12"o.c. at field. | $2,500 |
| Feb 13, 2009 | Completed final sign-off May 2009 | 2872 23rd St | minor damage to wall framing at bathroom, wall covering throughout unit to be replace. replace 4 new windows at rearDetails
minor damage to wall framing at bathroom, wall covering throughout unit to be replace. replace 4 new windows at rear | $144,000 |