Edenavow Construction & Design
- Based in
- San Francisco
- On San Francisco permits
- Jul 2008 to Aug 2026
- Last 24 months
- 14 permits filed
161 permits since 2000: 115 completed, 7 in progress, 29 never finaled, 10 expired or cancelled.
Of the 29 never-finaled permits, 5 are 3 to 5 years old, 18 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 161.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 10, 2026 | In progress issued Aug 2026 | 54 Douglass St | frame opening in wall.Details
frame opening in wall. | $5,000 |
| Apr 9, 2026 | In progress issued Apr 2026 | 4332 19th St | bathroom remodel in-kind fixtures.Details
bathroom remodel in-kind fixtures. | $50,000 |
| Apr 9, 2026 | Completed final sign-off Jun 2026 | 301 Eureka St | to obtain final inspection for work approved under pa# 201812047373 ad 202308154454. all work is complete.Details
to obtain final inspection for work approved under pa# 201812047373 ad 202308154454. all work is complete. | |
| Feb 3, 2026 | In progress issued Feb 2026 | 4331 23rd St | revision to bpa: 202512222388 - updated master bath layout, elimination of transom window above door at west elevation, change from sliding window to sliding door at south elevation and sistering of (e) brick foundation with new concrete footing at property line shear walls an on gl5Details
revision to bpa: 202512222388 - updated master bath layout, elimination of transom window above door at west elevation, change from sliding window to sliding door at south elevation and sistering of (e) brick foundation with new concrete footing at property line shear walls an on gl5 | $2,000 |
| Dec 22, 2025 | In progress issued Dec 2025 | 4331 23rd St | enclosing lower lvel deck into livable space, small associated layout change. new lower level deck. reframe and raise st fl sunroom fl and ceiling to align w floor/ceiling throughout 1st fl.remodel kitchen. 2nd fl bath remodel, new deck2nd fl top of sunroom.new lower lvl deckDetails
enclosing lower lvel deck into livable space, small associated layout change. new lower level deck. reframe and raise st fl sunroom fl and ceiling to align w floor/ceiling throughout 1st fl.remodel kitchen. 2nd fl bath remodel, new deck2nd fl top of sunroom.new lower lvl deck | $500,000 |
| Dec 17, 2025 | In progress issued Feb 2026 | 1969 10th Av | interior remodel within e building envelope. new livable space 1st fl level space 1st level, new storage loft over garage. new stair btwn floors. new elec plumb as req at area of remodel. replace windows in kind w new dbl glazed. 1 new fire rated window. new deck at grade, 4 new skylightsDetails
interior remodel within e building envelope. new livable space 1st fl level space 1st level, new storage loft over garage. new stair btwn floors. new elec plumb as req at area of remodel. replace windows in kind w new dbl glazed. 1 new fire rated window. new deck at grade, 4 new skylights | $350,000 |
| Oct 2, 2025 | Completed final sign-off Jan 2026 | 577 Sanchez St | replace 300 sq ft of tile and waterproofing with a four layer urethane membrane gaco western on front deck and stairs. apply ditra drain & install with new tiles. less than 50% in-kind.Details
replace 300 sq ft of tile and waterproofing with a four layer urethane membrane gaco western on front deck and stairs. apply ditra drain & install with new tiles. less than 50% in-kind. | $15,000 |
| Apr 7, 2025 | Completed final sign-off Jan 2026 | 261 Sweeny St | kitchen and bathroom remodel in kind. no wall removal.Details
kitchen and bathroom remodel in kind. no wall removal. | $70,000 |
| Apr 7, 2025 | Completed final sign-off May 2025 | 874 Alvarado St | interior drywall at front of building 3rd floor remove 6 sheets of drywall located bedroom. patch and repair and paint exterior front of buildingDetails
interior drywall at front of building 3rd floor remove 6 sheets of drywall located bedroom. patch and repair and paint exterior front of building | $40,000 |
| Apr 4, 2025 | Completed final sign-off Dec 2025 | 2541 Filbert St | 1st/fl: remodel bedroom and bathroom, 2nd/fl: replace 1 window in kitchen, and 3rd fl/: 3 windows in bedroomDetails
1st/fl: remodel bedroom and bathroom, 2nd/fl: replace 1 window in kitchen, and 3rd fl/: 3 windows in bedroom | $60,000 |
| Mar 26, 2025 | Completed final sign-off Apr 2025 | 37 Ashbury Tr | to obtain final inspection for work approved under pa# 201808086818. all work is complete.Details
to obtain final inspection for work approved under pa# 201808086818. all work is complete. | |
| Mar 25, 2025 | Completed final sign-off Nov 2025 | 560 Clipper St | bathroom remodel non structuralDetails
bathroom remodel non structural | $40,000 |
| Mar 6, 2025 | In progress issued Mar 2025 | 2700 Great Hy | repair 18 window in kind. 10 windows are visible from the street. change one door at the back.Details
repair 18 window in kind. 10 windows are visible from the street. change one door at the back. | $70,000 |
| Feb 21, 2025 | Completed final sign-off Sep 2025 | 89 Roosevelt Wy | unit 3: kitchen remodel, replace fixtures, electrical plumbing/hvac seperate permitDetails
unit 3: kitchen remodel, replace fixtures, electrical plumbing/hvac seperate permit | $40,000 |
| Aug 5, 2024 | Completed final sign-off Jan 2025 | 4276 26th St | replacing 3 street facing windows in same opening w aluminum clad exterior, 2 double hung and 1 fixed center. no divided lites, one-over-oneDetails
replacing 3 street facing windows in same opening w aluminum clad exterior, 2 double hung and 1 fixed center. no divided lites, one-over-one | $2,000 |
| Aug 5, 2024 | Completed final sign-off Sep 2025 | 1026 Castro St | replace 1 street facing window in same opening with aluminum clad exterior, 2 casements with fixed center pane. ufactor .28Details
replace 1 street facing window in same opening with aluminum clad exterior, 2 casements with fixed center pane. ufactor .28 | $1,000 |
| Jul 26, 2024 | In progress filed Jul 2024, not yet issued | 381 Lexington St | replacement of 4 street facing window sin kind with marvin wood framed to match existingDetails
replacement of 4 street facing window sin kind with marvin wood framed to match existing | $6,000 |
| Jun 27, 2024 | Completed final sign-off Jan 2025 | 381 Lexington St | interior remodel (non structual) to kitchen and bathroom. addition of laundry closet. replace all non street facing door and windows in kind.Details
interior remodel (non structual) to kitchen and bathroom. addition of laundry closet. replace all non street facing door and windows in kind. | $60,000 |
| May 21, 2024 | Completed final sign-off Nov 2024 | 451 Sanchez St | voluntary strengthening of an existing masonry and concrete foundationDetails
voluntary strengthening of an existing masonry and concrete foundation | $150,000 |
| Mar 11, 2024 | Completed final sign-off Mar 2024 | 638 11th Av | renew building permit# 201706199703 to schedule for final inspectionDetails
renew building permit# 201706199703 to schedule for final inspection | |
| Mar 11, 2024 | Completed final sign-off Apr 2024 | 638 11th Av | to obtain final inspection for work approved under pa# 2015-0522-6996 abd 2017-0829-6304. all work is complete.Details
to obtain final inspection for work approved under pa# 2015-0522-6996 abd 2017-0829-6304. all work is complete. | |
| Jan 26, 2024 | Completed final sign-off Mar 2024 | 145 Divisadero St | to obtain final inspection for work approved under pa# 201807164641 all work is complete.Details
to obtain final inspection for work approved under pa# 201807164641 all work is complete. | |
| Jan 26, 2024 | Completed final sign-off Sep 2024 | 124 Saturn St | 552 sq ft remodel to basement level. add new bath, bedroom, and laundry room. demo attic bathroom and exterior walkway to unconditioned attic. no work to front facade. (partially comply with nov# 202294956 - attic portion)Details
552 sq ft remodel to basement level. add new bath, bedroom, and laundry room. demo attic bathroom and exterior walkway to unconditioned attic. no work to front facade. (partially comply with nov# 202294956 - attic portion) | $150,000 |
| Jan 19, 2024 | Completed final sign-off Jun 2024 | 373 Cumberland St | replace 6 windows with marvin ultimate alum and clad casement and pictue windows at front of house, replace 8 windows with marvin elevate casement windows at rear of house, replace 1 door at rear replace 1 skylight, extend island in kitchen, replace rear siding repair dry rot at rear,Details
replace 6 windows with marvin ultimate alum and clad casement and pictue windows at front of house, replace 8 windows with marvin elevate casement windows at rear of house, replace 1 door at rear replace 1 skylight, extend island in kitchen, replace rear siding repair dry rot at rear, | $100,000 |
| Jan 18, 2024 | Completed final sign-off Sep 2024 | 1227 14th Av | revision to pa# 2022-1213-8226; horizontl extension in rear increased by 3'-0" in depthDetails
revision to pa# 2022-1213-8226; horizontl extension in rear increased by 3'-0" in depth | $14,000 |
| Nov 17, 2023 | Completed final sign-off Aug 2024 | 2244 19th St | revision to permit 202105110179-s1 to include framing change due to field coordination, change of finish at stairs and floor at level 3, and a new glass guardrail @ level 2 stair opening.Details
revision to permit 202105110179-s1 to include framing change due to field coordination, change of finish at stairs and floor at level 3, and a new glass guardrail @ level 2 stair opening. | |
| Aug 31, 2023 | Completed final sign-off Sep 2023 | 1595 38th Av | replacement of 3x street facing windows in kind. u-factor less than 0.3. wood aluminum clad windows within the existing openings.Details
replacement of 3x street facing windows in kind. u-factor less than 0.3. wood aluminum clad windows within the existing openings. | $10,000 |
| Aug 15, 2023 | Completed final sign-off Apr 2026 | 301 Eureka St | revision to pa# 2018-1204-7373, to reduce the new restroom from extending into a storage area which required engineering the new configuration will be within the (e) space & still meet ada requirements for restroom. there are no revisions to any other areas of the permitted set.Details
revision to pa# 2018-1204-7373, to reduce the new restroom from extending into a storage area which required engineering the new configuration will be within the (e) space & still meet ada requirements for restroom. there are no revisions to any other areas of the permitted set. | $1,500 |
| Jul 31, 2023 | Completed final sign-off Oct 2023 | 241 Telegraph Hill Bl | replacement of (3) windows (to rear/not street facing) in kind. replacement of (3) sliding doors (rear/not street facing) in kind. all low-e , u factor 0.35 and above.Details
replacement of (3) windows (to rear/not street facing) in kind. replacement of (3) sliding doors (rear/not street facing) in kind. all low-e , u factor 0.35 and above. | $60,000 |
| Mar 30, 2023 | Completed final sign-off Jul 2023 | 1314 07th Av | 2nd fl: bathroom remodelDetails
2nd fl: bathroom remodel | $20,000 |
| Feb 3, 2023 | Completed final sign-off Feb 2023 | 1595 38th Av | replace channel cedas siding 1x10 w/ james hardie cement, board 1x10 400 sq ft rear of building (not street facing)Details
replace channel cedas siding 1x10 w/ james hardie cement, board 1x10 400 sq ft rear of building (not street facing) | $10,000 |
| Dec 22, 2022 | Completed final sign-off Jan 2023 | 50 Natick St | to comply with nov complaint # 202299698: exterior flue for old stove- demo and repair siding as needed. garden shed (60 sq ft) demo (no replacement, no plumbing, or electric).Details
to comply with nov complaint # 202299698: exterior flue for old stove- demo and repair siding as needed. garden shed (60 sq ft) demo (no replacement, no plumbing, or electric). | $6,500 |
| Dec 13, 2022 | Completed final sign-off Sep 2024 | 1227 14th Av | 375sf single story horizontal addition on first floor, remodel (e) kitchen, add (n) bathroom, add 340sf conditioned basement below grade.Details
375sf single story horizontal addition on first floor, remodel (e) kitchen, add (n) bathroom, add 340sf conditioned basement below grade. | $135,000 |
| Sep 2, 2022 | Completed final sign-off Dec 2023 | 1231 44th Av | remodel exsting rear stairs with code complaint stairs & deck. new 1-hr fire rated wall along property line.Details
remodel exsting rear stairs with code complaint stairs & deck. new 1-hr fire rated wall along property line. | $150,000 |
| Aug 3, 2022 | Completed final sign-off Jan 2024 | 3982 Cesar Chavez St | interior remodel including kitchen and bathroom on 1/f. new electrical and plumbing at rea of new work. new exterior door & windows at area of new work (not street facing). deck addition to rear yard. replacement of rotten siding at area of new work.Details
interior remodel including kitchen and bathroom on 1/f. new electrical and plumbing at rea of new work. new exterior door & windows at area of new work (not street facing). deck addition to rear yard. replacement of rotten siding at area of new work. | $100,000 |
| Jul 7, 2022 | Never finaled issued Jul 2022, no final | 823 14th St | add in-unit washer/dryer to hallway closet.Details
add in-unit washer/dryer to hallway closet. | $7,000 |
| Jul 7, 2022 | Never finaled issued Jul 2022, no final | 823 14th St | replace 6 windows to front (street facing) with marvin double hung inserts/ ogee sash lugs (true wood). replace 10 windows in-kind to sides and rear.Details
replace 6 windows to front (street facing) with marvin double hung inserts/ ogee sash lugs (true wood). replace 10 windows in-kind to sides and rear. | $25,000 |
| May 2, 2022 | Completed final sign-off Jun 2022 | 132 Corbett Av | replacement of siding at rear (not street facing). 17' h x 25' w. replacing v-groose ceder 1 x 8 w james hardy v-groove 1 x 8.Details
replacement of siding at rear (not street facing). 17' h x 25' w. replacing v-groose ceder 1 x 8 w james hardy v-groove 1 x 8. | $10,000 |
| Apr 11, 2022 | Completed final sign-off Jun 2022 | 132 Corbett Av | replacement of siding (not street facing) 14' h x 38' w (each side). replacing v-groove cedar 1 x 8 w. james hardy v-groove 1 x 8. replacement of siding to front (street facing) - in kind 17 h x 25 ' w. replacing cedar shingle- in kind.Details
replacement of siding (not street facing) 14' h x 38' w (each side). replacing v-groove cedar 1 x 8 w. james hardy v-groove 1 x 8. replacement of siding to front (street facing) - in kind 17 h x 25 ' w. replacing cedar shingle- in kind. | $25,000 |
| Apr 4, 2022 | Completed final sign-off Oct 2022 | 577 Sanchez St | 1st floor- master bathroom remodel in kind. no removal of wallsDetails
1st floor- master bathroom remodel in kind. no removal of walls | $25,000 |
| Feb 22, 2022 | Completed final sign-off Mar 2022 | 577 Sanchez St | replacing 200 sqft pressure treated 2 x 6 decking planks with 2 x 6 redwood planks. less than 50% of total deck. rear yard/not street facing.Details
replacing 200 sqft pressure treated 2 x 6 decking planks with 2 x 6 redwood planks. less than 50% of total deck. rear yard/not street facing. | $10,000 |
| Feb 18, 2022 | Completed final sign-off Oct 2022 | 577 Sanchez St | interior remodel of kitchen to 2/f. interior remodel of laundry room on 1/f to include additional of one bath. replacment of patio door not street facing. electrical and plumbing at areas of new work.Details
interior remodel of kitchen to 2/f. interior remodel of laundry room on 1/f to include additional of one bath. replacment of patio door not street facing. electrical and plumbing at areas of new work. | $120,000 |
| Feb 14, 2022 | Never finaled issued Mar 2022, no final | 10 Perego Tr | interior remodeling: 1st flr: in extg closet & hallway to build a new 34 sq ft. bathroom; extg master bathroom: remove extg tub & install nw standing shower; 2nd story: remove partition wall between kitchen & hallway per plan, per structural. remove & replace cabinets & fixtures. nw island, nw sinkDetails
interior remodeling: 1st flr: in extg closet & hallway to build a new 34 sq ft. bathroom; extg master bathroom: remove extg tub & install nw standing shower; 2nd story: remove partition wall between kitchen & hallway per plan, per structural. remove & replace cabinets & fixtures. nw island, nw sink | $150,000 |
| Jan 3, 2022 | Never finaled issued Jan 2022, no final | 10 Perego Tr | kitchen remodel in kind.Details
kitchen remodel in kind. | $35,000 |
| Nov 30, 2021 | Never finaled issued Dec 2021, no final | 445 Beacon St | 3rd fl: addition of walk-in closet. replacement of window (in kind)in master bedroom, no visible from street. u factor .3 max.Details
3rd fl: addition of walk-in closet. replacement of window (in kind)in master bedroom, no visible from street. u factor .3 max. | $8,000 |
| Oct 15, 2021 | Completed final sign-off Apr 2022 | 1638 14th Av | one kitchen and one bathroom remodel in kind. replacement of fixtures fittings and equipment in kind. non structural.Details
one kitchen and one bathroom remodel in kind. replacement of fixtures fittings and equipment in kind. non structural. | $45,000 |
| Sep 10, 2021 | Never finaled issued Sep 2021, no final | 445 Beacon St | master bathroom remodel (in kind). replacement of fixtures, fittings & tile. lights per cenc 150.0 (k)Details
master bathroom remodel (in kind). replacement of fixtures, fittings & tile. lights per cenc 150.0 (k) | $35,000 |
| Sep 10, 2021 | Completed final sign-off Oct 2021 | 145 Divisadero St | 400 sqft of decking replacement. replacing redwood to trex composite material. not visible from street / rear of property. repairs are 50% or less. lights per cenc 150.0 (k)Details
400 sqft of decking replacement. replacing redwood to trex composite material. not visible from street / rear of property. repairs are 50% or less. lights per cenc 150.0 (k) | $10,000 |
| Aug 20, 2021 | Completed final sign-off Nov 2021 | 2030 Franklin St | 1/f: dry rot repairs to fire escape balcony (in kind) to comply with nov 202180005.Details
1/f: dry rot repairs to fire escape balcony (in kind) to comply with nov 202180005. | $5,000 |
| Jun 15, 2021 | Completed final sign-off Sep 2021 | 311 Baden St | legalize work at ground fl. full bath and bedroomDetails
legalize work at ground fl. full bath and bedroom | |
| Jun 8, 2021 | Never finaled issued Jun 2021, no final | 3982 Cesar Chavez St | french drain installation at rear of building approx 25 lf. drain to protect water entering from basement.Details
french drain installation at rear of building approx 25 lf. drain to protect water entering from basement. | $30,000 |
| May 21, 2021 | Never finaled issued May 2021, no final | 1643 15th St | siding replacement in-kind with james hardie v rustic cement board in-kind. ~1500 sqft. visible from street at side ally. no structural work.Details
siding replacement in-kind with james hardie v rustic cement board in-kind. ~1500 sqft. visible from street at side ally. no structural work. | $30,000 |
| May 11, 2021 | Completed final sign-off Aug 2024 | 2244 19th St | horizontal & verticial addition single family house adding 3rd story. interior remodel & reocation of (e) kitchen & bathrooms. add 3rd bathroom, (n) stairway, (n) balconies & (n) stairs to the rear yardDetails
horizontal & verticial addition single family house adding 3rd story. interior remodel & reocation of (e) kitchen & bathrooms. add 3rd bathroom, (n) stairway, (n) balconies & (n) stairs to the rear yard | $390,000 |
| May 10, 2021 | Completed final sign-off May 2021 | 3896 19th St | to obtain final inspection for work approved under permit application no# 201708286100. all work is completed.Details
to obtain final inspection for work approved under permit application no# 201708286100. all work is completed. | $20,000 |
| Apr 30, 2021 | Completed final sign-off Aug 2021 | 1482 11th Av | 4 x window replacement (in kind) not visible from street.Details
4 x window replacement (in kind) not visible from street. | $4,000 |
| Apr 9, 2021 | Completed final sign-off May 2021 | 2683 17th Av | replacement skylight in bathroom(in-kind). u-max=0.30Details
replacement skylight in bathroom(in-kind). u-max=0.30 | $2,000 |
| Mar 31, 2021 | Completed final sign-off Sep 2022 | 1374 Alabama St | demolish (e) rear stair. construct new stairs & decks.Details
demolish (e) rear stair. construct new stairs & decks. | $19,000 |
| Mar 5, 2021 | Completed final sign-off Aug 2021 | 1482 11th Av | remodel ktichen & bathroom. replacement of fixtures in-kind.Details
remodel ktichen & bathroom. replacement of fixtures in-kind. | $65,000 |
| Mar 5, 2021 | Completed final sign-off Dec 2021 | 1921 Jefferson St | 2 bathroom remodels: tiles nd fixtures in-kind.Details
2 bathroom remodels: tiles nd fixtures in-kind. | $40,000 |
| Mar 3, 2021 | Completed final sign-off Jul 2022 | 340 Urbano Dr | addition of insulation and gypsum wallboard to ceiling of (e) garage. replace (e) 2 furnaces. remodel (e) kitchen and (e) bathroom. relocate (e) bathroom. replace (e) aluminum windows at living room and kitchen with wood windows.Details
addition of insulation and gypsum wallboard to ceiling of (e) garage. replace (e) 2 furnaces. remodel (e) kitchen and (e) bathroom. relocate (e) bathroom. replace (e) aluminum windows at living room and kitchen with wood windows. | $95,000 |
| Feb 5, 2021 | Completed final sign-off Apr 2022 | 115 Wool St | foundation repair. add concrete cap to (e) concrete foundation due to fault grade at the north elevation of the building.Details
foundation repair. add concrete cap to (e) concrete foundation due to fault grade at the north elevation of the building. | $15,000 |
| Feb 4, 2021 | Completed final sign-off Feb 2021 | 185 Beaver St | renewal of permit 201709269569: kitchen remodel final inspection building.Details
renewal of permit 201709269569: kitchen remodel final inspection building. | $20,000 |
| Feb 2, 2021 | Completed final sign-off May 2021 | 2683 17th Av | remodel of existing bathroom in kind.Details
remodel of existing bathroom in kind. | $20,000 |
| Dec 9, 2020 | Completed final sign-off Jan 2021 | 4826 Anza St | repair fire gate garage, 30 sheets. drywall tapet mud. building enclose around laundry. building storage for gym equipment, not visibile to the public.Details
repair fire gate garage, 30 sheets. drywall tapet mud. building enclose around laundry. building storage for gym equipment, not visibile to the public. | $20,000 |
| Sep 16, 2020 | Completed final sign-off Dec 2020 | 155 Beaver St | bathroom remodel in-kind. no structural workDetails
bathroom remodel in-kind. no structural work | $25,000 |
| Aug 13, 2020 | Completed final sign-off Jun 2021 | 256 Santa Clara Av | remodel of bathroom in kind. new tiles new fixtures.Details
remodel of bathroom in kind. new tiles new fixtures. | $14,000 |
| Aug 13, 2020 | Completed final sign-off Nov 2020 | 3982 Cesar Chavez St | remodel bathroom in kind, new tiles/ new fixtures remove drywall in front bedroom, insulate, install new dry wall. 5/8" type x drywall.Details
remodel bathroom in kind, new tiles/ new fixtures remove drywall in front bedroom, insulate, install new dry wall. 5/8" type x drywall. | $12,000 |
| Mar 13, 2020 | Completed final sign-off Nov 2021 | 311 Baden St | to obtain a final inspection for work approved under previous permit pa 201604114393 & 201608124858. all work is completeDetails
to obtain a final inspection for work approved under previous permit pa 201604114393 & 201608124858. all work is complete | |
| Feb 12, 2020 | Completed final sign-off Oct 2021 | 2683 17th Av | voluntary seismic strengthening @ ground floorDetails
voluntary seismic strengthening @ ground floor | $20,000 |
| Jan 15, 2020 | Completed final sign-off Oct 2020 | 2639 17th Av | rev to pa201910285681: in garage - remove (e) post and wood beams and replace with (n) steel beam with post and footing.Details
rev to pa201910285681: in garage - remove (e) post and wood beams and replace with (n) steel beam with post and footing. | $6,000 |
| Dec 11, 2019 | Completed final sign-off Jun 2020 | 15 Divisadero St | bathroom addition at level 2, removal of structural wall between kitchen and dining room, post to extend to garage levelDetails
bathroom addition at level 2, removal of structural wall between kitchen and dining room, post to extend to garage level | $50,000 |
| Dec 9, 2019 | Completed final sign-off Dec 2019 | 2053 Ellis St | to obtain final inspection for work approved under pa#201702028497 (to comply with nov 201649062, rebuild of (e) front wood stair in-kind under sf historic building code). all work is complete.Details
to obtain final inspection for work approved under pa#201702028497 (to comply with nov 201649062, rebuild of (e) front wood stair in-kind under sf historic building code). all work is complete. | |
| Oct 28, 2019 | Completed final sign-off Oct 2020 | 2639 17th Av | level one:expansion of habitable area with some excavation to create a nw split level. the extg bathroom & bedroom to be remodeled, and second bedroom, media room, laundry, & mechanical created. on level 2: remodel kitchen & bathroom and add 2nd bathroom. new stairway & windows added.Details
level one:expansion of habitable area with some excavation to create a nw split level. the extg bathroom & bedroom to be remodeled, and second bedroom, media room, laundry, & mechanical created. on level 2: remodel kitchen & bathroom and add 2nd bathroom. new stairway & windows added. | $250,000 |
| Oct 21, 2019 | Never finaled issued Oct 2019, no final | 337 Baden St | remodel of kitchen & bathroom. no altering of wallsDetails
remodel of kitchen & bathroom. no altering of walls | $10,000 |
| Oct 17, 2019 | Never finaled issued Oct 2019, no final | 960 Natoma St | demo + replace 10 sheets of t-11 siding with hardi plank cement siding.Details
demo + replace 10 sheets of t-11 siding with hardi plank cement siding. | $5,000 |
| Sep 19, 2019 | Completed final sign-off Mar 2020 | 115 Scott St | dbi inspection report cc-8386, building comment# 5. exterior stairs required for fire safety / building replace / rear stairs.Details
dbi inspection report cc-8386, building comment# 5. exterior stairs required for fire safety / building replace / rear stairs. | $3,000 |
| Aug 20, 2019 | Completed final sign-off Sep 2019 | 115 Scott St | condo corrections common area - fire rating 200 sf. 5/8" type rock. mep seperate. item # 3 cc 8386Details
condo corrections common area - fire rating 200 sf. 5/8" type rock. mep seperate. item # 3 cc 8386 | $4,000 |
| May 14, 2019 | Completed final sign-off Oct 2020 | 1026 Castro St | rooms down at garage incl fam rm, media rm, study rm, full bath, laundry. stair being added & partial infill of lightwell.Details
rooms down at garage incl fam rm, media rm, study rm, full bath, laundry. stair being added & partial infill of lightwell. | $100,000 |
| May 8, 2019 | Completed final sign-off Jul 2019 | 495 Fulton St | remove and replace e staircase inkindDetails
remove and replace e staircase inkind | $10,000 |
| Dec 26, 2018 | Completed final sign-off Apr 2019 | 2106 Baker St | interior remodel of( e ) bathroom on the 2nd fl into 2 baths and laundry nookDetails
interior remodel of( e ) bathroom on the 2nd fl into 2 baths and laundry nook | $30,000 |
| Dec 4, 2018 | Expired or cancelled expired Apr 2026 | 301 Eureka St | to address the street entry to commercial non-confirming space. modify front entrance to meet accesible entry requiements. modify sidewalk, remodel (e) restroom to meet ada requirements, install wireless bollard push panels. (n) electrical for front doors. (n) plumbing for restroom.Details
to address the street entry to commercial non-confirming space. modify front entrance to meet accesible entry requiements. modify sidewalk, remodel (e) restroom to meet ada requirements, install wireless bollard push panels. (n) electrical for front doors. (n) plumbing for restroom. | $30,000 |
| Sep 17, 2018 | Never finaled issued Oct 2018, no final | 3365 Clay St | ground level interior remodel. 2 bedrooms modified, relocate laundry rm, add new door to garage from living area. replace windows in-kind at living areaDetails
ground level interior remodel. 2 bedrooms modified, relocate laundry rm, add new door to garage from living area. replace windows in-kind at living area | $20,000 |
| Aug 20, 2018 | Completed final sign-off Sep 2018 | 716 Cole St | replacement of 4 sets of double hung windows in kind on front facade. windows will be dg fir primed with insulated glass.Details
replacement of 4 sets of double hung windows in kind on front facade. windows will be dg fir primed with insulated glass. | $4,000 |
| Aug 8, 2018 | Expired or cancelled expired Apr 2025 | 37 Ashbury Tr | remodel two bathrooms on 2nd floor: remove & replace exist'g fixtures & tiles, new cabinets & new sheetrock. no new wall & no exist'g wall relocation. electrical & plumbing under separate permit. new lighting shall comply with cec 150.0(k)5.Details
remodel two bathrooms on 2nd floor: remove & replace exist'g fixtures & tiles, new cabinets & new sheetrock. no new wall & no exist'g wall relocation. electrical & plumbing under separate permit. new lighting shall comply with cec 150.0(k)5. | $30,000 |
| Jul 16, 2018 | Expired or cancelled expired Mar 2024 | 145 Divisadero St | rear interior renovatrion of top floor condo in 2 unit condo bldg, renovate (e) kitchen+bathroom, add closet and bathroom. no alteration to facade or exterior no addition in height of area. all work in unit 145.Details
rear interior renovatrion of top floor condo in 2 unit condo bldg, renovate (e) kitchen+bathroom, add closet and bathroom. no alteration to facade or exterior no addition in height of area. all work in unit 145. | $92,300 |
| May 30, 2018 | Completed final sign-off Jan 2019 | 744 Teresita Bl | remodel of (e) kitchen and bathroom on 1st level. remodel in an unoccupied garage area. adding full bathroom,mechanical room and den to garage level. replacing ground floor window with new sliding doors and replace & remove extg door.Details
remodel of (e) kitchen and bathroom on 1st level. remodel in an unoccupied garage area. adding full bathroom,mechanical room and den to garage level. replacing ground floor window with new sliding doors and replace & remove extg door. | $60,000 |
| May 22, 2018 | Completed final sign-off Sep 2018 | 2106 Baker St | replace 3 sets of existing doors in kind. replace siding on rear with new trim. repair and replace 10 sheets of dryrotted plywoodDetails
replace 3 sets of existing doors in kind. replace siding on rear with new trim. repair and replace 10 sheets of dryrotted plywood | $15,000 |
| May 9, 2018 | Completed final sign-off Sep 2020 | 191 Christopher Dr | excavate trench 18" x 36" deep for french drain & catch basin at side of building, 40 linear feet. not visible to street.Details
excavate trench 18" x 36" deep for french drain & catch basin at side of building, 40 linear feet. not visible to street. | $3,000 |
| Mar 16, 2018 | Never finaled issued Mar 2018, no final | 56 Surrey St | remodel of 3 bathrooms r&r fixtures & tiles in kind electrical & plumbing seperate permits (no alternation of nay (e) walls )Details
remodel of 3 bathrooms r&r fixtures & tiles in kind electrical & plumbing seperate permits (no alternation of nay (e) walls ) | $10,000 |
| Mar 5, 2018 | Never finaled issued Aug 2018, no final | 761 Tehama St | enclose existing spiral staircase at graage level with new walls and new door, demo part of existing wall in the upper floor to move sink from inside the bedroom to inside the master bathroom, new outlets and lightsDetails
enclose existing spiral staircase at graage level with new walls and new door, demo part of existing wall in the upper floor to move sink from inside the bedroom to inside the master bathroom, new outlets and lights | $3,000 |
| Feb 26, 2018 | Never finaled issued May 2018, no final | 2325 03rd St | create a doorway btw 2 adjacent tenant spaces, removal of a kitchen area, createof a small enclosed private work space. assoc mech/ele/plm/fire/life safety scopes to be design - build and to be under sep permits. scope of work is all int. no work affects the extDetails
create a doorway btw 2 adjacent tenant spaces, removal of a kitchen area, createof a small enclosed private work space. assoc mech/ele/plm/fire/life safety scopes to be design - build and to be under sep permits. scope of work is all int. no work affects the ext | $12,500 |
| Dec 14, 2017 | Completed final sign-off Dec 2017 | 1063 Oak St | to comply with nov# 201720651, stair repair, sheetrock repair, stair replace siding on sides items # 2& 11, repalce attic windows in the backDetails
to comply with nov# 201720651, stair repair, sheetrock repair, stair replace siding on sides items # 2& 11, repalce attic windows in the back | $2,000 |
| Sep 26, 2017 | Expired or cancelled expired Feb 2021 | 185 Beaver St | remodel of kitchen cabinets, countertops, appliances, electrical & plumbing permits pulled separatelyDetails
remodel of kitchen cabinets, countertops, appliances, electrical & plumbing permits pulled separately | $10,000 |
| Sep 13, 2017 | Never finaled issued Sep 2017, no final | 307 Baden St | ref pa201705085994 to include demo and renovation of bathoomon 3/f. all fixtuers will be repolace in the same place. sep permits for plumbing & electric by others. no wall or layouts changes.Details
ref pa201705085994 to include demo and renovation of bathoomon 3/f. all fixtuers will be repolace in the same place. sep permits for plumbing & electric by others. no wall or layouts changes. | $5,000 |
| Aug 29, 2017 | Expired or cancelled expired Apr 2024 | 638 11th Av | 1)widening 1 window on the east facade. 2)new skylight in master bathroom. no work visible from the street.Details
1)widening 1 window on the east facade. 2)new skylight in master bathroom. no work visible from the street. | $3,000 |
| Aug 28, 2017 | Expired or cancelled expired May 2021 | 3896 19th St | remodel of bathroom & kitchen, replacement of fixtures, cabinets & tiles, lighting, plumbing.Details
remodel of bathroom & kitchen, replacement of fixtures, cabinets & tiles, lighting, plumbing. | $20,000 |
| Aug 28, 2017 | Never finaled issued Aug 2017, no final | 178 Midcrest Wy | remove & replace dryrot in rear deck, joists & posts, 50% or less repair.Details
remove & replace dryrot in rear deck, joists & posts, 50% or less repair. | $10,000 |
| Jun 19, 2017 | Expired or cancelled expired Mar 2024 | 638 11th Av | interior remodel converting 2 (e) bedrooms into a masterbedroom & mstr bath. replace 5 windows on the east side of the 2nd flr. new windows to be marvin fiberglass.Details
interior remodel converting 2 (e) bedrooms into a masterbedroom & mstr bath. replace 5 windows on the east side of the 2nd flr. new windows to be marvin fiberglass. | $25,000 |
| May 17, 2017 | Never finaled issued Aug 2018, no final | 12 Divisadero St | addition of a (n) rear deck to the lower unit of a 2 unit bldg on 2nd flr of bldg. deck is 3'-5 1/4 x 10'-6" does not intrude into minimum rear setback. not visible from street.Details
addition of a (n) rear deck to the lower unit of a 2 unit bldg on 2nd flr of bldg. deck is 3'-5 1/4 x 10'-6" does not intrude into minimum rear setback. not visible from street. | $9,750 |
| May 8, 2017 | Never finaled issued May 2017, no final | 307 Baden St | demolition, renovation and new construction (at "infill") to renovate and create living space on the ground floor. a new stair connection, new bedroom and bathroom & storage areas. the kitchen will be renovated. (n) walls, doors, windows, finishes, plumbing & electrical per plansDetails
demolition, renovation and new construction (at "infill") to renovate and create living space on the ground floor. a new stair connection, new bedroom and bathroom & storage areas. the kitchen will be renovated. (n) walls, doors, windows, finishes, plumbing & electrical per plans | $93,389 |