- 11 permits filed
24 permits since 2000: 10 completed, 12 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 5, 2026 | In progress issued Mar 2026 | 55 Rosewood Dr | permit is seaparate from 202507181160: exploratory demo of upper & middle floors.Details
permit is seaparate from 202507181160: exploratory demo of upper & middle floors. | $10,000 |
| Dec 17, 2025 | In progress issued Dec 2025 | 614 Elizabeth St | replacement of windows at front facade-10 total windos to be replaced. no changes in size or placement. level 2 - new aluminum clad wood windows to replace (e) wood window 3 double hung and 2 fixed windows to be replaced. level3 - 4 double hung windows to be replaced. level 4, 1 double hung windowDetails
replacement of windows at front facade-10 total windos to be replaced. no changes in size or placement. level 2 - new aluminum clad wood windows to replace (e) wood window 3 double hung and 2 fixed windows to be replaced. level3 - 4 double hung windows to be replaced. level 4, 1 double hung window | $15,300 |
| Dec 16, 2025 | In progress issued Mar 2026 | 248 04th Av | remove and replace rear runpout, deck and stairs. remodel bath at top floor unit, remodel kitchen at top floor unit.Details
remove and replace rear runpout, deck and stairs. remodel bath at top floor unit, remodel kitchen at top floor unit. | $160,000 |
| Oct 29, 2025 | In progress issued May 2026 | 55 Rosewood Dr | horizontal addition @ front, replace all stucco, replace all windows and exterior doors, 2 new skylights, new roof, remove (e) hvac flues & chimney, new hvac, level floor in basement, new footings, slab & waterproofing @ basement, rebuild interior stair & stair railings, new flooring, remodel kitcheDetails
horizontal addition @ front, replace all stucco, replace all windows and exterior doors, 2 new skylights, new roof, remove (e) hvac flues & chimney, new hvac, level floor in basement, new footings, slab & waterproofing @ basement, rebuild interior stair & stair railings, new flooring, remodel kitche | $1,600,000 |
| Aug 8, 2025 | Completed final sign-off Oct 2025 | 231 11th Av | demolish existing unpermitted 7x8 storage shed connected to the rear of the existing first floor unit and rebuild to current codes in the same locationDetails
demolish existing unpermitted 7x8 storage shed connected to the rear of the existing first floor unit and rebuild to current codes in the same location | $21,000 |
| Jul 18, 2025 | In progress issued Jul 2025 | 55 Rosewood Dr | exploritory demo of lower bedroom and office. no structual all work interior.Details
exploritory demo of lower bedroom and office. no structual all work interior. | $5,000 |
| Jul 13, 2025 | In progress issued Feb 2026 | 614 Elizabeth St | revision to pa# 202408269419, 1/f- new driveway and new garage door. 4/f- upgrades include a new bathroom, new bedroom, new playroom and a new stair from level 3 to 4. and new penthouse to allow for code min headroom at stair. new forced air heating throughout to replace radiant.Details
revision to pa# 202408269419, 1/f- new driveway and new garage door. 4/f- upgrades include a new bathroom, new bedroom, new playroom and a new stair from level 3 to 4. and new penthouse to allow for code min headroom at stair. new forced air heating throughout to replace radiant. | $155,100 |
| Jul 3, 2025 | Completed final sign-off Dec 2025 | 1632 Hayes St | window modification @ east breezeway (1) removal, (1) replacement, (1) new to match replacement; replace and relcoate existing exterior door @ rear facade.Details
window modification @ east breezeway (1) removal, (1) replacement, (1) new to match replacement; replace and relcoate existing exterior door @ rear facade. | $2,125 |
| Jun 25, 2025 | In progress issued Jun 2025 | 614 Elizabeth St | provide excavation sequence & shoring to accomdated foundation installation ref to 202408269419Details
provide excavation sequence & shoring to accomdated foundation installation ref to 202408269419 | $25,000 |
| Jun 6, 2025 | In progress issued Jul 2025 | 1632 Hayes St | interior renovation of (e) kitchen,laundry & house bath:addition of primary bath en suite within (e)interior floor plan,mechanical system replacement: new air handler and heat pump, new waterheater; new electrical fixtures and devices in areas of work. new plumbing fixtures at area of work.Details
interior renovation of (e) kitchen,laundry & house bath:addition of primary bath en suite within (e)interior floor plan,mechanical system replacement: new air handler and heat pump, new waterheater; new electrical fixtures and devices in areas of work. new plumbing fixtures at area of work. | $74,900 |
| Mar 24, 2025 | In progress issued Jun 2025 | 3666 Baker St | revision to pa# 202305037030 convert basement storage to media room & change media room to office. remove(e) brick walls in basement, remove (e) wood post & beam and replace interior footings. new slab on grade and interior footings (ref# 202403047022)Details
revision to pa# 202305037030 convert basement storage to media room & change media room to office. remove(e) brick walls in basement, remove (e) wood post & beam and replace interior footings. new slab on grade and interior footings (ref# 202403047022) | $100,000 |
| Oct 4, 2024 | In progress issued Apr 2025 | 614 Elizabeth St | convert 1st fl storage to new foundations, bathroom, bedroom, & family room. 2nd fl- relocate kitchen & bath. revise interior partitions & structural upgrades. 3rd fl- relocate bath. add new bath. revise interior partitions & structural upgrades. new windows at rear. new radiant heating throughtout.Details
convert 1st fl storage to new foundations, bathroom, bedroom, & family room. 2nd fl- relocate kitchen & bath. revise interior partitions & structural upgrades. 3rd fl- relocate bath. add new bath. revise interior partitions & structural upgrades. new windows at rear. new radiant heating throughtout. | $921,596 |
| May 22, 2024 | Completed final sign-off Feb 2025 | 306 Rutledge St | interioer renovation of 2 bedrooms and 2 bathrooms. revision of rear deck and stairs. no work visible from the street.Details
interioer renovation of 2 bedrooms and 2 bathrooms. revision of rear deck and stairs. no work visible from the street. | $150,000 |
| Mar 26, 2024 | Completed final sign-off May 2025 | 4027 23rd St | rev to pa# 2024-0109-3669; structural revisions to lower level footing. remove 1st floor framing and re-frame at elevation of 10-inches lower.Details
rev to pa# 2024-0109-3669; structural revisions to lower level footing. remove 1st floor framing and re-frame at elevation of 10-inches lower. | |
| Mar 22, 2024 | In progress issued Oct 2024 | 3666 Baker St | revision to pa#202305037030. revise basement layout and add rooms down, add kitchenette with 2 burner cooktop (no oven) add windows on non-street facing facade, replace footing at rear and side.Details
revision to pa#202305037030. revise basement layout and add rooms down, add kitchenette with 2 burner cooktop (no oven) add windows on non-street facing facade, replace footing at rear and side. | $125,000 |
| Jan 22, 2024 | Completed final sign-off Feb 2024 | 4027 23rd St | exploritory demo soft finishes only.Details
exploritory demo soft finishes only. | $10,000 |
| Jan 9, 2024 | Completed final sign-off May 2025 | 4027 23rd St | interior remodel of kitchen and bath add bath. removal of wall between kitchen and dining.Details
interior remodel of kitchen and bath add bath. removal of wall between kitchen and dining. | $150,000 |
| Dec 5, 2023 | Completed final sign-off Jun 2025 | 712 10th Av | exterior: rebuild front porch and stairs.two inch wider patio and two more steps. interior: minor reviison to pa 202111051910 3rd floor bathroom master closet. plumbing fixtures stay the same.Details
exterior: rebuild front porch and stairs.two inch wider patio and two more steps. interior: minor reviison to pa 202111051910 3rd floor bathroom master closet. plumbing fixtures stay the same. | $25,000 |
| Nov 9, 2023 | In progress issued Jan 2024 | 3666 Baker St | revision to 202305037030 (no plan): remodel kitchen & 3 bathrooms. replace exterior doors at non st facing, replace (e) 1-story deck & stair in-kind within buildbale area. replace (e) cemeent plaster at all exterior walls. repair damaged front 1-story detached garageDetails
revision to 202305037030 (no plan): remodel kitchen & 3 bathrooms. replace exterior doors at non st facing, replace (e) 1-story deck & stair in-kind within buildbale area. replace (e) cemeent plaster at all exterior walls. repair damaged front 1-story detached garage | $100,000 |
| Jun 14, 2023 | Completed final sign-off Feb 2025 | 527 Alvarado St | revision to 2021-1101-1515. structural changesDetails
revision to 2021-1101-1515. structural changes | |
| Jun 13, 2023 | Never finaled issued Jun 2023, no final | 3666 Baker St | to comply with nov# 202287505. dry rot repair at 2 windows. replace 2 custom non-rated sashs only (x2). repair framing & window (x2) south facing above entry stairs (3rd window).Details
to comply with nov# 202287505. dry rot repair at 2 windows. replace 2 custom non-rated sashs only (x2). repair framing & window (x2) south facing above entry stairs (3rd window). | $10,000 |
| May 3, 2023 | Never finaled issued May 2023, no final | 3666 Baker St | remodel kitchen replace in kind. remodel bathroom replace in kind. new floors in kind. remove boiler and heating system replace inkind. remodel 2 bathrooms on 3rd floor .fix repair wall in garage (inkind) to comply with nov #202182607Details
remodel kitchen replace in kind. remodel bathroom replace in kind. new floors in kind. remove boiler and heating system replace inkind. remodel 2 bathrooms on 3rd floor .fix repair wall in garage (inkind) to comply with nov #202182607 | $400,000 |
| Nov 5, 2021 | Completed final sign-off Jun 2025 | 712 10th Av | 1st fl. develope habitable space at rear, with bath, bedroom and family room, 2nd fl. relocate kitche, add (n) bath and (n) interior stairs to 1st fl. 3rd. fl. upgrade kitchen, relocate bath, (n) master bathDetails
1st fl. develope habitable space at rear, with bath, bedroom and family room, 2nd fl. relocate kitche, add (n) bath and (n) interior stairs to 1st fl. 3rd. fl. upgrade kitchen, relocate bath, (n) master bath | $450,000 |
| Nov 1, 2021 | Completed final sign-off Feb 2025 | 527 Alvarado St | addition to rear of building. no alteration to front. interior remodel & extension of 2nd fl kitchen & dining room. cantilevered extension of 3rd fl & layout reconfiguration with 1 (n) bedroom & bathroom. replace (e) interior stair, skylights & (n) flat roof construction. rear yard landscaping.Details
addition to rear of building. no alteration to front. interior remodel & extension of 2nd fl kitchen & dining room. cantilevered extension of 3rd fl & layout reconfiguration with 1 (n) bedroom & bathroom. replace (e) interior stair, skylights & (n) flat roof construction. rear yard landscaping. | $500,000 |