Barrett Karber Built Llc
- Based in
- Santa Monica
- On San Francisco permits
- Nov 2021 to Aug 2026
- Last 24 months
- 19 permits filed
32 permits since 2000: 18 completed, 11 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 24, 2026 | Completed final sign-off Sep 2026 | 2850 Filbert St | to obtain final inspection for work approved under pa# 202503071824. all work is complete.Details
to obtain final inspection for work approved under pa# 202503071824. all work is complete. | |
| Aug 21, 2026 | In progress issued Aug 2026 | 85 05th Av | revision to pa#202509094858, deatils related to simpson strong wallsDetails
revision to pa#202509094858, deatils related to simpson strong walls | |
| Aug 13, 2026 | In progress issued Aug 2026 | 2001 Pacific Av | interior remodel within e) building footprint, including limited structural work, exterior window, door replancement, and n) kitchen & bathroom fixtures and layoutDetails
interior remodel within e) building footprint, including limited structural work, exterior window, door replancement, and n) kitchen & bathroom fixtures and layout | $400,000 |
| May 22, 2026 | In progress issued Jun 2026 | 1035 Battery St | facade finishes entry lobby + elevator cab finishes, interior partitions + interior finishes + plumbing + lighting.Details
facade finishes entry lobby + elevator cab finishes, interior partitions + interior finishes + plumbing + lighting. | $600,000 |
| May 4, 2026 | In progress issued May 2026 | 85 05th Av | revision to pa# 202509094858: this revision omits foundation work along gridline 1 between d and e9. the existing footing was found to have sufficient embedment and bearing capacity.Details
revision to pa# 202509094858: this revision omits foundation work along gridline 1 between d and e9. the existing footing was found to have sufficient embedment and bearing capacity. | |
| Apr 7, 2026 | In progress issued Apr 2026 | 85 05th Av | revision 202509094858 to include strong wall details, includes rear yard details and minor updates to structural details under revision cloud 4.Details
revision 202509094858 to include strong wall details, includes rear yard details and minor updates to structural details under revision cloud 4. | |
| Mar 11, 2026 | In progress issued Mar 2026 | 21 18th Av | rev to pa# 2025-0728-1723: convert (e) storage rooms to (n) den, gym, bathroom, mudroom, laundry & mech room. on 1st fl. rebuild interior stair from fl. 1-2. remove full bath & expand (e) kitchen, add (n) powder rm & pantry on fl. 2. remodel & relocate (e) bathrooms, convert one bedroom to two (n)Details
rev to pa# 2025-0728-1723: convert (e) storage rooms to (n) den, gym, bathroom, mudroom, laundry & mech room. on 1st fl. rebuild interior stair from fl. 1-2. remove full bath & expand (e) kitchen, add (n) powder rm & pantry on fl. 2. remodel & relocate (e) bathrooms, convert one bedroom to two (n) | $150,000 |
| Feb 5, 2026 | In progress filed Feb 2026, not yet issued | 1200 Mason St | storefront window replacement & door replacement, exterior work only. ref to t.i. 202510097137Details
storefront window replacement & door replacement, exterior work only. ref to t.i. 202510097137 | $40,000 |
| Oct 16, 2025 | In progress issued Mar 2026 | 85 05th Av | renovation & expansion of (e) 1-story sfd into a 2-story 2752sf sfd and 268sf habitable roof open air roof deck. new construction of reinforced foundation and expansion of erection of structure, hardscaping, landscape design, plumbing and electrical upgrades and finishes.Details
renovation & expansion of (e) 1-story sfd into a 2-story 2752sf sfd and 268sf habitable roof open air roof deck. new construction of reinforced foundation and expansion of erection of structure, hardscaping, landscape design, plumbing and electrical upgrades and finishes. | $950,000 |
| Oct 9, 2025 | In progress issued Jan 2026 | 1200 Mason St | tenant improvement of an existing ground level cafe space for a new coffee shop with no structural revisions. mep deferDetails
tenant improvement of an existing ground level cafe space for a new coffee shop with no structural revisions. mep defer | $175,000 |
| Oct 2, 2025 | In progress issued Oct 2025 | 85 05th Av | remodel (e) 1 story to demolish and replace in kind the kitchen counter appliance kitchen window, stucco wall finish at kitchen and primary bathroom . no work visible from street.Details
remodel (e) 1 story to demolish and replace in kind the kitchen counter appliance kitchen window, stucco wall finish at kitchen and primary bathroom . no work visible from street. | $250,000 |
| Aug 25, 2025 | Completed final sign-off Apr 2026 | 348 Hayes St | remodel of (e) storefront. no structural. (n) storefront system in (e) openings. (n) internal dividing walls creating 3 (n) rooms for client consultation & reception area. (n) sinks in each room with (n) plumbing connect to (e) waste lines. (n) lighting.Details
remodel of (e) storefront. no structural. (n) storefront system in (e) openings. (n) internal dividing walls creating 3 (n) rooms for client consultation & reception area. (n) sinks in each room with (n) plumbing connect to (e) waste lines. (n) lighting. | $127,000 |
| Aug 14, 2025 | Completed final sign-off Sep 2026 | 1428 Lake St | interior remodel at both levels of an existing 2 story single family home. scope includes new windows & new exterior french door at the rear.Details
interior remodel at both levels of an existing 2 story single family home. scope includes new windows & new exterior french door at the rear. | $90,000 |
| Jul 21, 2025 | In progress issued Aug 2025 | 1200 Mason St | remove lath & plaster finish of interior wall to expose fixtures and replace in kind.Details
remove lath & plaster finish of interior wall to expose fixtures and replace in kind. | $6,000 |
| Jun 27, 2025 | Completed final sign-off Jan 2026 | 2850 Filbert St | leak found in window sills in primary bedroom. windows must be replaced due to rot. 2 operable casement windows and one picture window. rear facade level 3Details
leak found in window sills in primary bedroom. windows must be replaced due to rot. 2 operable casement windows and one picture window. rear facade level 3 | $12,000 |
| Jun 12, 2025 | Completed final sign-off Nov 2025 | 744 Irving St | ti of (e) space, prior use will match new use. coffee shop includes coffee bar, back of house, seating area, updated finishes throughout. mep deferred.Details
ti of (e) space, prior use will match new use. coffee shop includes coffee bar, back of house, seating area, updated finishes throughout. mep deferred. | $150,000 |
| Mar 7, 2025 | Expired or cancelled expired Sep 2026 | 2850 Filbert St | deck repair. full deck demolition due to rot in column structure. new deck and footings within existing deck footprint.Details
deck repair. full deck demolition due to rot in column structure. new deck and footings within existing deck footprint. | $50,000 |
| Jan 28, 2025 | Completed final sign-off Jun 2025 | 1401 Polk St | expand food service area on ground floor. adding approved health coving and cart on wheels divider with sneeze guard. no ada access work will be disrupted and a hand sink will be added to comply with current health code. all work will be interior.Details
expand food service area on ground floor. adding approved health coving and cart on wheels divider with sneeze guard. no ada access work will be disrupted and a hand sink will be added to comply with current health code. all work will be interior. | $5,000 |
| Jan 14, 2025 | Completed final sign-off May 2025 | 135 15th Av | revision to (e) permit# 202409050135. relocate garage seperation wall, move it 3ft on plan to increase garage size from 600 sq ft to 625 sq ftDetails
revision to (e) permit# 202409050135. relocate garage seperation wall, move it 3ft on plan to increase garage size from 600 sq ft to 625 sq ft | $10,000 |
| Sep 12, 2024 | Completed final sign-off Feb 2026 | 2850 Filbert St | kitchen remodel of (e) single family residence with alteration to (e) kitchen rear deck doors and windows. new structural beam for kitchen door and wall removalDetails
kitchen remodel of (e) single family residence with alteration to (e) kitchen rear deck doors and windows. new structural beam for kitchen door and wall removal | $75,000 |
| Sep 5, 2024 | Completed final sign-off Jun 2025 | 135 15th Av | interior non-structural remodel of 3 story single family residence. scope of work includes demo, electrical and plumbing permit - 1 kitchen & 3.5 barhrooms. no exterior workDetails
interior non-structural remodel of 3 story single family residence. scope of work includes demo, electrical and plumbing permit - 1 kitchen & 3.5 barhrooms. no exterior work | $150,000 |
| Jul 29, 2024 | Completed final sign-off Jan 2025 | 3238 Balboa St | replacing (6) windows on front of building, and (1) in lightwell. wood aluminum clad windows. uf<=0.3Details
replacing (6) windows on front of building, and (1) in lightwell. wood aluminum clad windows. uf<=0.3 | $20,000 |
| Feb 13, 2024 | Completed final sign-off Jul 2024 | 1525 Union St | mep improvement of gr fl in ref to 202310319864. scope of work to include new restroom and new coffee barDetails
mep improvement of gr fl in ref to 202310319864. scope of work to include new restroom and new coffee bar | $50,000 |
| Jan 18, 2024 | Completed final sign-off Jan 2024 | 4248 23rd St | revision to permit 202302021280. revise drawings to remove reference to fire alarms/domes. remove note indicating fire permits per bldg inspector request and fire requirement not required by code. existing 2-hr assembly between occupancies. not required by codeDetails
revision to permit 202302021280. revise drawings to remove reference to fire alarms/domes. remove note indicating fire permits per bldg inspector request and fire requirement not required by code. existing 2-hr assembly between occupancies. not required by code | |
| Dec 28, 2023 | Completed final sign-off Oct 2024 | 111 Liberty St | water leak repair. replacing 2 damaged kitchens, 1 damaged bathroom and electrical fixtures. all replacements are in like kind.Details
water leak repair. replacing 2 damaged kitchens, 1 damaged bathroom and electrical fixtures. all replacements are in like kind. | $150,000 |
| Oct 31, 2023 | Completed final sign-off Jul 2024 | 1525 Union St | base building improvement at (e) ground fl. scope of work included removal of (e) partial exterior storefront to receive (n) second exist to comply existing requirment per cbb, remove (e) interior stair, remove (e) non-bearing interior partitions, and remove (e) restroom/new construction ofDetails
base building improvement at (e) ground fl. scope of work included removal of (e) partial exterior storefront to receive (n) second exist to comply existing requirment per cbb, remove (e) interior stair, remove (e) non-bearing interior partitions, and remove (e) restroom/new construction of | $217,000 |
| Sep 27, 2023 | Completed final sign-off Jan 2024 | 120 Folsom St | revision to (e) permit #202212067724: addition of metal framing details for soffit over coffee bar.Details
revision to (e) permit #202212067724: addition of metal framing details for soffit over coffee bar. | |
| Feb 2, 2023 | Never finaled issued Mar 2023, no final | 4248 23rd St | in kind remodel of 2 (e) restrooms & 1 kitchen on 2nd fl. new paint & finishes. widen (e) door opening btw living and kitchen.Details
in kind remodel of 2 (e) restrooms & 1 kitchen on 2nd fl. new paint & finishes. widen (e) door opening btw living and kitchen. | $50,000 |
| Feb 2, 2023 | Completed final sign-off Jan 2024 | 4248 23rd St | t.i. on ground fl: demo of (e) interior partitions, electrical, plumbing and new finishes thruout, use to remain as (e)Details
t.i. on ground fl: demo of (e) interior partitions, electrical, plumbing and new finishes thruout, use to remain as (e) | $125,000 |
| Dec 6, 2022 | Completed final sign-off Jan 2024 | 120 Folsom St | we are building a coffee shop inside a newly constructed commercial condo at 120 folsom st. includes coffee bar & service counter w/seating for the sale + consumption of coffee and pastry. first time t.i.Details
we are building a coffee shop inside a newly constructed commercial condo at 120 folsom st. includes coffee bar & service counter w/seating for the sale + consumption of coffee and pastry. first time t.i. | $250,000 |
| Apr 22, 2022 | Completed final sign-off Sep 2023 | 221 Clara St | unit #3: remodel (e) kitchen in kind. nw layout for kitchen. new appliances include steam oven and built in espresso machine. run new dedicated plugs for new appliances. move gas line for new location of stove. move water lines for moving of sink.Details
unit #3: remodel (e) kitchen in kind. nw layout for kitchen. new appliances include steam oven and built in espresso machine. run new dedicated plugs for new appliances. move gas line for new location of stove. move water lines for moving of sink. | $50,000 |
| Nov 12, 2021 | Never finaled issued Nov 2022, no final | 326 Prague St | interior upgrades: revert to extg (org.) stairs, reconnection extg 1st and 2nd floor. new m. bedroom bath, new window at kitchen to replace extg, replace m. bedroom window, family room, sliding egress door, new rear yard access wd deck at + 30" above grade.Details
interior upgrades: revert to extg (org.) stairs, reconnection extg 1st and 2nd floor. new m. bedroom bath, new window at kitchen to replace extg, replace m. bedroom window, family room, sliding egress door, new rear yard access wd deck at + 30" above grade. | $20,000 |