Hawthorne Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2025 to Aug 2026
- Last 24 months
- 6 permits filed
6 permits since 2000: 2 completed, 4 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2026 | In progress issued Aug 2026 | 2102 Baker St | unit 2100: install kitchen exhaust hood (less than 30#), mounted to exterior wall and vented through the wall exterior.Details
unit 2100: install kitchen exhaust hood (less than 30#), mounted to exterior wall and vented through the wall exterior. | $2,500 |
| Apr 13, 2026 | Completed final sign-off Jun 2026 | 1611 Lyon St | build a (n) less than 6 foot tall by 14 foot long wood fence along the side of property visible from street. fence to be 75% open at front setback and solid beyond.Details
build a (n) less than 6 foot tall by 14 foot long wood fence along the side of property visible from street. fence to be 75% open at front setback and solid beyond. | $1,000 |
| Mar 23, 2026 | In progress issued Apr 2026 | 170 Caselli Av | 170-172 caselli avenue: repair (e) dry-rot wooden deck like to like @ rear, less than 50%. #170: replace window w/ sliding door @ 2/f. #172: repair (e) cantilever balcony @ 3/f. remodel kitchen for open design. raise ceiling @ (e) hall to match 3/f (e) ceiling height.Details
170-172 caselli avenue: repair (e) dry-rot wooden deck like to like @ rear, less than 50%. #170: replace window w/ sliding door @ 2/f. #172: repair (e) cantilever balcony @ 3/f. remodel kitchen for open design. raise ceiling @ (e) hall to match 3/f (e) ceiling height. | $80,000 |
| Mar 18, 2026 | In progress issued Mar 2026 | 2694 Mcallister St | provide new stairs to replace the existing stair to/from basements. no exerior work. remove/remodel (e) kitchen & bathroom. new washer & dryer closets. remove partition wall between kitchen and dining room.Details
provide new stairs to replace the existing stair to/from basements. no exerior work. remove/remodel (e) kitchen & bathroom. new washer & dryer closets. remove partition wall between kitchen and dining room. | $75,000 |
| Feb 11, 2026 | In progress issued May 2026 | 124 Saturn St | work includes addressing remaining items in nov 202294956. kitchen and bathroom remodel to existing family home also window replacementDetails
work includes addressing remaining items in nov 202294956. kitchen and bathroom remodel to existing family home also window replacement | $150,000 |
| Dec 19, 2025 | Completed final sign-off Dec 2025 | 53 Prospect Av | to comply with nov 202547027: replace 5 window hardware in kind, screw loose handrail brackets, replace 3 deck boards that have dryrot, replace damaged drywall. all work at rear or interior of bldg.Details
to comply with nov 202547027: replace 5 window hardware in kind, screw loose handrail brackets, replace 3 deck boards that have dryrot, replace damaged drywall. all work at rear or interior of bldg. | $700 |