Edward Rivera
- Listed as
- architect, designer, engineer
- Firm
- Rivera Consulting Group Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2004 to Sep 2026
87 permits since 2000 (engineer on 80 permits, architect on 6 permits, designer on 1 permit): 46 completed, 21 in progress, 8 never finaled, 12 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 22, 2026 | In progress filed Sep 2026, not yet issued | 30 Battery St | addition of 4 new ev charging station on basement level. accesibility upgrades to (e) charging station on level 1 to provide a van accessible space.Details
addition of 4 new ev charging station on basement level. accesibility upgrades to (e) charging station on level 1 to provide a van accessible space. | $625,000 | |
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 300 Clay St | alteration to the existing mech. system serviing specific. basement zones and ground flr zones. reduce (e) constent air volume w/variable air volume sf-12 an economizer. provide (n) vav boxes for sf-12 zones and replace hot water coils as indicated in hvac schedules provide (n) return fan rfb toDetails
alteration to the existing mech. system serviing specific. basement zones and ground flr zones. reduce (e) constent air volume w/variable air volume sf-12 an economizer. provide (n) vav boxes for sf-12 zones and replace hot water coils as indicated in hvac schedules provide (n) return fan rfb to | $875,345 | |
| Aug 26, 2026 | In progress issued Oct 2026 | 405 Howard St | Bear Flag Ironworks Llc | installation of steel posts on the roof of 405 howard st, the posts are part of a horizontal life line system. designed by others, to be used by maintenance personnel for fall protection. there is no public roof access.Details
installation of steel posts on the roof of 405 howard st, the posts are part of a horizontal life line system. designed by others, to be used by maintenance personnel for fall protection. there is no public roof access. | $375,000 |
| Aug 25, 2026 | In progress issued Sep 2026 | 201 Mission St | Richlen Construction | ref demo permit#: 202602055297. scope new concrete slb on grade, strucutural concrete, install pergola (separately) with footing. not include civil, mech, and electrical.Details
ref demo permit#: 202602055297. scope new concrete slb on grade, strucutural concrete, install pergola (separately) with footing. not include civil, mech, and electrical. | $322,135 |
| Aug 20, 2026 | In progress filed Aug 2026, not yet issued | 1 Front St | repave (e) plaza @ market st entry w/stone. (n) planter & seating; repave 9e) entry @ front st w/stone; repave portion of sidewalk w/stone; (n) waterproofing extending into public right of way. (n) awning; (n) storefront doors & recessed entry; refurbish (e) stair doorDetails
repave (e) plaza @ market st entry w/stone. (n) planter & seating; repave 9e) entry @ front st w/stone; repave portion of sidewalk w/stone; (n) waterproofing extending into public right of way. (n) awning; (n) storefront doors & recessed entry; refurbish (e) stair door | $277,065 | |
| Aug 4, 2026 | In progress issued Aug 2026 | 300 Mission St | M C S Construction Services | 6th fl - revision to 202512222450 installation of life safety seismic requirements for new (2) 1 person and (1) 2 person phone booths in an existing office total of 3 phone booths full restroom remodel includedDetails
6th fl - revision to 202512222450 installation of life safety seismic requirements for new (2) 1 person and (1) 2 person phone booths in an existing office total of 3 phone booths full restroom remodel included | |
| Jul 15, 2026 | In progress filed Jul 2026, not yet issued | 1 Market St | 1st fl: interior oly tenant improvement to construct new fitness center. mep deferred.Details
1st fl: interior oly tenant improvement to construct new fitness center. mep deferred. | $1,363,200 | |
| Jul 10, 2026 | In progress filed Jul 2026, not yet issued | 1 Market St | 1st fl - interior ti of approx 10,500 sf of amenity space which includes a new event spaceDetails
1st fl - interior ti of approx 10,500 sf of amenity space which includes a new event space | $1,491,000 | |
| May 14, 2026 | In progress filed May 2026, not yet issued | 300 Mission St | Gci, Inc | ev charging stations w/structural supportDetails
ev charging stations w/structural support | $150,000 |
| May 1, 2026 | In progress filed May 2026, not yet issued | 1 Market St | Field Construction Inc. | ev charging station - basement level garage. electrical and structural.Details
ev charging station - basement level garage. electrical and structural. | $300,000 |
| Apr 27, 2026 | In progress issued Apr 2026 | 101 02nd St | Source Planning And Construction Inc | (ste# 350 / 3rd floor) revision to pa# 202603268312: work includes installation of 6 phone booths.Details
(ste# 350 / 3rd floor) revision to pa# 202603268312: work includes installation of 6 phone booths. | |
| Apr 16, 2026 | In progress filed Apr 2026, not yet issued | 1 Market St | floors: 31st to 43rd: installation of a 6 inch cold water riser between 31st-43rd story steel framed office towerDetails
floors: 31st to 43rd: installation of a 6 inch cold water riser between 31st-43rd story steel framed office tower | $26,000 | |
| Apr 8, 2026 | In progress issued Jun 2026 | 1 Market St | Otte North America Inc | exterior building maintanence unit replacement of existing. scope includes installation of anchor points on the roods of two office towers at spear and tower steuart.Details
exterior building maintanence unit replacement of existing. scope includes installation of anchor points on the roods of two office towers at spear and tower steuart. | $449,000 |
| Mar 9, 2026 | In progress issued Aug 2026 | 1 Market St | Field Construction Inc. | 29th & 30th fl: revision to pa #2025-1215-1798. stair demo and infill at 30th fl onlyDetails
29th & 30th fl: revision to pa #2025-1215-1798. stair demo and infill at 30th fl only | |
| Jan 21, 2026 | Expired or cancelled withdrawn Feb 2026 | 2311 Taraval St | revision to pa #2023-1130-1659: lower the reception ceiling and infusion center ceiling to accomodate security gate and minor structural connection revisions for security gate.Details
revision to pa #2023-1130-1659: lower the reception ceiling and infusion center ceiling to accomodate security gate and minor structural connection revisions for security gate. | ||
| Dec 17, 2025 | Completed final sign-off Jul 2026 | 300 Mission St | M C S Construction Services | 11th fl - install consists of intallation of life safety and seismic requirements for new 1 person phone booths in an existing office, total of 7 phone booths. restrooms accessibilty upgrades are included up to 20% construction cost and do not affect existing layout or occupancy of egress.Details
11th fl - install consists of intallation of life safety and seismic requirements for new 1 person phone booths in an existing office, total of 7 phone booths. restrooms accessibilty upgrades are included up to 20% construction cost and do not affect existing layout or occupancy of egress. | $75,000 |
| Dec 15, 2025 | In progress issued Feb 2026 | 1 Market St | Field Construction Inc. | 29th and 30th floors: demolition of 29th and 30th floor internal communicating stair to intermediary landing and floor infill at opening in an existing unoccupied space.Details
29th and 30th floors: demolition of 29th and 30th floor internal communicating stair to intermediary landing and floor infill at opening in an existing unoccupied space. | $150,000 |
| Oct 28, 2025 | In progress issued Nov 2025 | 1 Maritime Pz | Skyline Construction | interconnecting accessory (non-egress) stairs between levels 17 & 18Details
interconnecting accessory (non-egress) stairs between levels 17 & 18 | $65,700 |
| Oct 28, 2025 | In progress issued Nov 2025 | 300 Clay St | Skyline Construction | interconnecting accessory (non-egress) stairs between levels 18 and 19.Details
interconnecting accessory (non-egress) stairs between levels 18 and 19. | $113,150 |
| Sep 15, 2025 | In progress issued Nov 2025 | 4 Embarcadero Center | Skyline Construction | 14th fl - revision to approved structural element support operable partition ref pa 202508082665Details
14th fl - revision to approved structural element support operable partition ref pa 202508082665 | |
| Aug 15, 2025 | In progress filed Aug 2025, not yet issued | 875 Howard St | installation of (3) hp water heaters on a roof mounted steel platform, on the roof of a (6) story concrete office bldg. the mechanical scope of work includes replacing (e) main hot water boilers with new electric heat pump heaters, new circulation pumps & accessory components & electrical circuitingDetails
installation of (3) hp water heaters on a roof mounted steel platform, on the roof of a (6) story concrete office bldg. the mechanical scope of work includes replacing (e) main hot water boilers with new electric heat pump heaters, new circulation pumps & accessory components & electrical circuiting | $143,621 | |
| Jul 23, 2025 | Expired or cancelled withdrawn Feb 2026 | 2311 Taraval St | revision to 202311301659: fan coil installation structural only, no change on mechanical designDetails
revision to 202311301659: fan coil installation structural only, no change on mechanical design | ||
| Jul 9, 2025 | Expired or cancelled withdrawn Feb 2026 | 2311 Taraval St | revision to pa# 2023-1130-1659 change structural design with additional detailDetails
revision to pa# 2023-1130-1659 change structural design with additional detail | $50,000 | |
| Jul 1, 2025 | Completed final sign-off Apr 2026 | 301 Howard St | Bcci Construction Company | suite: 1100; revision to pa#: 202409191121. 5 new offices, alter 2 meeting rooms, 3 new phone booths, millwork, ceiling, light fixtures, and finish changes.Details
suite: 1100; revision to pa#: 202409191121. 5 new offices, alter 2 meeting rooms, 3 new phone booths, millwork, ceiling, light fixtures, and finish changes. | $65,000 |
| Dec 18, 2024 | In progress issued Dec 2024 | 50 California St | Bcci Construction Company | 24th fl- ref pa # 2024-0904-9993 structural for movable partitionsDetails
24th fl- ref pa # 2024-0904-9993 structural for movable partitions | |
| Sep 24, 2024 | Completed final sign-off Jul 2025 | 300 Clay St | Matrix Hg Inc | ground fl - replace (e) mechanical system serving the plaza level tenant space, bar sprezzatura. relocate heat pumps to permanent locations on ground fl; connect plaza level return to the heat pump units. unit not in the restaurantDetails
ground fl - replace (e) mechanical system serving the plaza level tenant space, bar sprezzatura. relocate heat pumps to permanent locations on ground fl; connect plaza level return to the heat pump units. unit not in the restaurant | $352,749 |
| May 17, 2024 | In progress issued Mar 2025 | 375 Woodside Av | modernize (e)elevator & provide(n)machine room access.remodel two (e) restroom on level 1 for ada accessibility. alternate 1: remodel two (e) restrooms on level 2 for ada accesiblity.Details
modernize (e)elevator & provide(n)machine room access.remodel two (e) restroom on level 1 for ada accessibility. alternate 1: remodel two (e) restrooms on level 2 for ada accesiblity. | $1,552,259 | |
| Dec 11, 2023 | Completed final sign-off Sep 2024 | 1 Maritime Pz | Hathaway Dinwiddie Co. | ste 15: interior demo of non-structural partition, doors and mep in a tenant suite on the street level. new non-structural partition and door, finishes, and mep for a satellite bake shop to support bar sprezzatura, an (e) restaurant on the plaza level (one level above).Details
ste 15: interior demo of non-structural partition, doors and mep in a tenant suite on the street level. new non-structural partition and door, finishes, and mep for a satellite bake shop to support bar sprezzatura, an (e) restaurant on the plaza level (one level above). | $518,000 |
| Jun 15, 2023 | Completed final sign-off Oct 2023 | 450 Sansome St | Gci, Inc | 16/f: operable partition wall ref pa 2022-1223-9077 & 2021-0728-5242Details
16/f: operable partition wall ref pa 2022-1223-9077 & 2021-0728-5242 | $2,000 |
| Apr 13, 2023 | Completed final sign-off Oct 2023 | 1 Market St | Skyline Construction | 39/f: revision to bpa#202211307363 for structural work associated w/proposed nana wall in lieu of modem fold wallDetails
39/f: revision to bpa#202211307363 for structural work associated w/proposed nana wall in lieu of modem fold wall | |
| Mar 2, 2023 | Never finaled issued Mar 2023, no final | 101 California St | Source Planning And Construction Inc | 30th flr - ste 3050 -rev to pa# 2022-1116-6644, addition of (1) p5500 lateral unistrut approx 10lf, extended (4) p5500 unistrut suppports and weld to lateral support.Details
30th flr - ste 3050 -rev to pa# 2022-1116-6644, addition of (1) p5500 lateral unistrut approx 10lf, extended (4) p5500 unistrut suppports and weld to lateral support. | |
| Jan 10, 2023 | Completed final sign-off Sep 2023 | 201 Mission St | Richlen Construction | revision to pa# 202208291499, to include structural scope. structural scope previously deferred.Details
revision to pa# 202208291499, to include structural scope. structural scope previously deferred. | $52,000 |
| Nov 17, 2022 | Never finaled issued Jan 2023, no final | 25 Van Ness Av | Mik Construction Inc | remove and replace damaged sections of sidewalk, sidewalk is over an occupied basement.Details
remove and replace damaged sections of sidewalk, sidewalk is over an occupied basement. | $26,000 |
| Oct 18, 2022 | Completed final sign-off Feb 2023 | 4 Embarcadero Center | Source Planning And Construction Inc | 30/f structural only - installation of core holes in steel floor beams at the 30th floor. ref 202207057733.Details
30/f structural only - installation of core holes in steel floor beams at the 30th floor. ref 202207057733. | $10,000 |
| Jul 11, 2022 | Completed final sign-off Jul 2024 | 1 Market St | Skyline Construction | corporate office build-out on level 24: installation of a new 1 hour corridor between exit stair esntrances. demolition and remodel of extg core restrooms to comply with da checklist requirements.Details
corporate office build-out on level 24: installation of a new 1 hour corridor between exit stair esntrances. demolition and remodel of extg core restrooms to comply with da checklist requirements. | $4,000,000 |
| Jul 8, 2022 | Completed final sign-off Mar 2023 | 1 Beach St | Level 10 Construction Lp | revision to pa# 202011128788. incorporate structural field changes including expansion of ground floor slab replacement in stairway between lines 3 to 4 and removal of structural styrofoam in topping slab. add grade bm.Details
revision to pa# 202011128788. incorporate structural field changes including expansion of ground floor slab replacement in stairway between lines 3 to 4 and removal of structural styrofoam in topping slab. add grade bm. | |
| May 17, 2022 | Completed final sign-off Jun 2023 | 4 Embarcadero Center | Skyline Construction | 35th fl, suite 3500: deferred submittal for approved bpa#202202027136. overhead structural steel support for muraflex expo telescoping door system. fire alarm/sprinkler under sep permits.Details
35th fl, suite 3500: deferred submittal for approved bpa#202202027136. overhead structural steel support for muraflex expo telescoping door system. fire alarm/sprinkler under sep permits. | $50,000 |
| May 11, 2022 | Completed final sign-off Jul 2024 | 1 Market St | Skyline Construction | 23rd + 24th fl: demolition of an (e) connecting stair & slab infill betweeen 23rd & 24th fl. install (n) 1-hr corridor between exit stair entrances. modification to (e) core restrooms to comply with da checklist requirements. no change in use or exterior scope.Details
23rd + 24th fl: demolition of an (e) connecting stair & slab infill betweeen 23rd & 24th fl. install (n) 1-hr corridor between exit stair entrances. modification to (e) core restrooms to comply with da checklist requirements. no change in use or exterior scope. | $500,000 |
| Apr 29, 2022 | Completed final sign-off Sep 2024 | 50 Beale St | Field Construction Inc. | interior tenant improvement basement floor. demo & construction of non-structural partitions, ceilings, finishes, lighting, mechanical & electrical.Details
interior tenant improvement basement floor. demo & construction of non-structural partitions, ceilings, finishes, lighting, mechanical & electrical. | $391,000 |
| Mar 28, 2022 | Completed final sign-off Oct 2022 | 580 California St | San Francisco Commercial Builders Inc | 23rd fl: structural infill of slab opening on 23rd fl exit access, path of egress and exit stair existing to remain as is. mep & sprinkler system under speatate permit.Details
23rd fl: structural infill of slab opening on 23rd fl exit access, path of egress and exit stair existing to remain as is. mep & sprinkler system under speatate permit. | $190,000 |
| Mar 1, 2022 | Completed final sign-off Apr 2023 | 1 Maritime Pz | Matrix Hg Inc | 2 (e) steam boilers to be removed and replaced. add 4 (n) heating hot water boilers, 3 (n) air separators, 2 (n) heat exchangers, 6 (n) pumps, 2 (n) heating system expansion tanks to be provided to replace 4 (e) expansion tanks. no new fsd's are being added.Details
2 (e) steam boilers to be removed and replaced. add 4 (n) heating hot water boilers, 3 (n) air separators, 2 (n) heat exchangers, 6 (n) pumps, 2 (n) heating system expansion tanks to be provided to replace 4 (e) expansion tanks. no new fsd's are being added. | $2,128,734 |
| Dec 16, 2021 | Completed final sign-off Feb 2024 | 101 Spear St | Marchetti Group | revisionto pa 202010035855/r1 minor architectural revisions & aluminum frame; storefront glazing system structural engineering, mep engineering & title 24 energy compliance for warm shell gr fl vacant office spaces. disabled access restroom & path of travel compliances is documented and approved.Details
revisionto pa 202010035855/r1 minor architectural revisions & aluminum frame; storefront glazing system structural engineering, mep engineering & title 24 energy compliance for warm shell gr fl vacant office spaces. disabled access restroom & path of travel compliances is documented and approved. | $125,000 |
| Oct 25, 2021 | Completed final sign-off Dec 2023 | 1480 Folsom St | Bcci Construction Company | conversion of ext single story + or - 40000 sq ft automotive repair bldg to trade shop with accessory parking and storage. all associated ti fit out.Details
conversion of ext single story + or - 40000 sq ft automotive repair bldg to trade shop with accessory parking and storage. all associated ti fit out. | $2,000,000 |
| Aug 13, 2021 | Completed final sign-off Mar 2022 | 505 Montgomery St | Principal Builders Inc. | suite 1400: revision to pa# 202107013657. revisions include closets, shelving and installation of metal screen.Details
suite 1400: revision to pa# 202107013657. revisions include closets, shelving and installation of metal screen. | |
| May 19, 2021 | Completed final sign-off Feb 2022 | 405 Howard St | Gci, Inc | voluntary seismic strengthening of historic unreinforced bearing wall building, previously reinforced with steel braces, & out of plane wall anchors. current retrofit installs additional out of plane wall anchors.Details
voluntary seismic strengthening of historic unreinforced bearing wall building, previously reinforced with steel braces, & out of plane wall anchors. current retrofit installs additional out of plane wall anchors. | $94,000 |
| May 3, 2021 | Never finaled issued Jun 2021, no final | 121 Spear St | Marchetti Group | removal & replacement of sections of 1st floor slab. interior location.Details
removal & replacement of sections of 1st floor slab. interior location. | $15,000 |
| Apr 28, 2021 | Expired or cancelled withdrawn Jun 2021 | 575 Market St | replacement of 4 (e) cooling towers at penthouse level. towers shall be replaced in situ and connected to (e) mechanical, electrical & plumbing.Details
replacement of 4 (e) cooling towers at penthouse level. towers shall be replaced in situ and connected to (e) mechanical, electrical & plumbing. | $1,100,000 | |
| Dec 2, 2020 | Completed final sign-off Nov 2021 | 20 Heron St | C C I Commercial Construction & Improv | minor rev to pa202003036027 including removal of kitchenettes on floors 1-3, and shower at g/f. door added to switch gear from and changes to elevator / lobby wall layout.Details
minor rev to pa202003036027 including removal of kitchenettes on floors 1-3, and shower at g/f. door added to switch gear from and changes to elevator / lobby wall layout. | |
| Nov 25, 2020 | Completed final sign-off Mar 2022 | 201 Mission St | Field Construction Inc. | parking lot lighting. demo of existing asphalt paving and curbs repaving w/new asphalt surface sloped to drain, construction of new curbs & lighting.Details
parking lot lighting. demo of existing asphalt paving and curbs repaving w/new asphalt surface sloped to drain, construction of new curbs & lighting. | $260,000 |
| Oct 22, 2020 | Completed final sign-off Oct 2021 | 888 Brannan St | Lewis M Merlo Inc | replacment of concrete parapet, severly deteriorated with a new concrete parapet. 20lf along wall is falling hazard. we request expedited approval on an emergency basis.Details
replacment of concrete parapet, severly deteriorated with a new concrete parapet. 20lf along wall is falling hazard. we request expedited approval on an emergency basis. | $5,000 |
| Oct 9, 2020 | Completed final sign-off Dec 2021 | 1 Embarcadero Center | Skyline Construction | 9/f: demo of (e) suite & construction of t.i for single tenant future sublease space. new ceiling, lighting & partitions etc. meps, life safety, sprinklers & structural if needed under separate permit. (bldg fully sprinklered)Details
9/f: demo of (e) suite & construction of t.i for single tenant future sublease space. new ceiling, lighting & partitions etc. meps, life safety, sprinklers & structural if needed under separate permit. (bldg fully sprinklered) | $4,300,000 |
| Oct 8, 2020 | Completed final sign-off Nov 2021 | 20 Heron St | C C I Commercial Construction & Improv | (n) elevator extension to roof deck, plus new vehicle/man door entrance at rodgers st and new property line windows.Details
(n) elevator extension to roof deck, plus new vehicle/man door entrance at rodgers st and new property line windows. | $48,000 |
| Sep 19, 2020 | Completed final sign-off Aug 2021 | 444 Battery St | Gci, Inc | replacement of cast gypsum roof with concrete filled met deck & other diaphragm strengthening. alterations to the mechanical/mezzanine and repairs to interior concrete block walls.Details
replacement of cast gypsum roof with concrete filled met deck & other diaphragm strengthening. alterations to the mechanical/mezzanine and repairs to interior concrete block walls. | $1,500,000 |
| Mar 5, 2020 | Completed final sign-off Dec 2020 | 4 Embarcadero Center | Source Planning And Construction Inc | 20th fl - structural work for ti for a mobile partition. ref pa 2019-0815-8941Details
20th fl - structural work for ti for a mobile partition. ref pa 2019-0815-8941 | $5,000 |
| Jan 21, 2020 | Completed final sign-off Apr 2021 | 300 Mission St | Bcci Construction Company | floors 20-23; structural deferred submittal for approved arch plans ref pa# 201911217836, 201911217840, 201911217838, 2019111147260 n/a maherDetails
floors 20-23; structural deferred submittal for approved arch plans ref pa# 201911217836, 201911217840, 201911217838, 2019111147260 n/a maher | $15,000 |
| Dec 26, 2019 | Completed final sign-off Dec 2020 | 450 Sansome St | Emcor Services/Mesa Energy Systems Inc | structural revision to pa# 2019-1011-4211. change to beam size.Details
structural revision to pa# 2019-1011-4211. change to beam size. | |
| Nov 4, 2019 | Never finaled issued Nov 2019, no final | 101 Spear St | Marchetti Group | project scope includes the construction of raised platforms withtin the atrium of rincon center located at 121 spear street. referece pa 2019-0806-7976Details
project scope includes the construction of raised platforms withtin the atrium of rincon center located at 121 spear street. referece pa 2019-0806-7976 | |
| Jun 13, 2019 | Never finaled issued Jul 2019, no final | 50 Beale St | Skyline Construction | ref pa# 201903145206; ahu replacement on 3rd fl.Details
ref pa# 201903145206; ahu replacement on 3rd fl. | $510,000 |
| May 20, 2019 | Expired or cancelled expired Dec 2019 | 4 Embarcadero Center | Turner Construction Co | 25th fl: interior tenant improvements work non-bearing walls & ceilings. mep under separate permit.Details
25th fl: interior tenant improvements work non-bearing walls & ceilings. mep under separate permit. | $3,000,000 |
| Apr 8, 2019 | Completed final sign-off Oct 2019 | 50 Beale St | Skyline Construction | rev to pa# 201903145206; beam penetrations at 4th fl. framing plan for 3rd fl. tenant improvementsDetails
rev to pa# 201903145206; beam penetrations at 4th fl. framing plan for 3rd fl. tenant improvements | $20,000 |
| Jan 9, 2019 | Completed final sign-off Mar 2020 | 300 Clay St | Gci, Inc | phase 2 seismic strengthening partial/continues for tenant floors 10, 12, 13, 15, 16 under pa #2017-0802-3712 and original pa #2000-0526-1165 as open core & shell per ab017.Details
phase 2 seismic strengthening partial/continues for tenant floors 10, 12, 13, 15, 16 under pa #2017-0802-3712 and original pa #2000-0526-1165 as open core & shell per ab017. | $250,000 |
| May 31, 2018 | Completed final sign-off Oct 2018 | 201 Potrero Av | M C S Construction Services | interior remodel - 2nd flr only - removal of door and widening of (e) door opening in (e) brick wallDetails
interior remodel - 2nd flr only - removal of door and widening of (e) door opening in (e) brick wall | $32,000 |
| Apr 26, 2018 | Completed final sign-off Jun 2018 | 33 New Montgomery St | Rudolph Commercial Interiors Inc, Rci | revision to 201603081420 -structural anchors to concrete pad per inspector maher naDetails
revision to 201603081420 -structural anchors to concrete pad per inspector maher na | |
| Mar 9, 2018 | Expired or cancelled cancelled Nov 2024 | 901 Market St | fabrication & installation of catwalk system on roof for washing skylight windows; & installation of roof anchors for unscheduled maintenance of exterior facade. none of the improvments will be visible from street since the catwalk is lower than the skylight & the roof anchors are 12" highDetails
fabrication & installation of catwalk system on roof for washing skylight windows; & installation of roof anchors for unscheduled maintenance of exterior facade. none of the improvments will be visible from street since the catwalk is lower than the skylight & the roof anchors are 12" high | $45,000 | |
| Sep 7, 2017 | Expired or cancelled withdrawn Feb 2019 | 925 Pierce St | soft story wood framed retrofit of 1st level. retro consists of addition of plywood shtg design per asce/sec 41-13.Details
soft story wood framed retrofit of 1st level. retro consists of addition of plywood shtg design per asce/sec 41-13. | $45,000 | |
| Sep 1, 2017 | Completed final sign-off Sep 2018 | 2124 Hyde St | Dave Mason Building | soft story wood frame seidmic retrofit 1st level fema p807 design criteriaDetails
soft story wood frame seidmic retrofit 1st level fema p807 design criteria | $35,000 |
| Jul 13, 2017 | Completed final sign-off Oct 2018 | 116 New Montgomery St | Donald S. Maclean, Inc | sidewalk rehab over subbasement. inclucing ada ramp at the corner of mission st & new montgomery st, s/e corner. reference street improvement permit 171e-0425. n/a maherDetails
sidewalk rehab over subbasement. inclucing ada ramp at the corner of mission st & new montgomery st, s/e corner. reference street improvement permit 171e-0425. n/a maher | $10,000 |
| Oct 11, 2016 | Completed final sign-off Feb 2017 | 2099 Market St | Wickman Development And Construction | alteration to non residential section of the 2nd floor, including removal of a portion of the existing mezzanine and installing new framing (beams and colums) to support floor structure to remain.Details
alteration to non residential section of the 2nd floor, including removal of a portion of the existing mezzanine and installing new framing (beams and colums) to support floor structure to remain. | $80,000 |
| Aug 10, 2016 | Completed final sign-off Aug 2018 | 116 New Montgomery St | Dome Construction Corp | installation of guardrails at penthouse roof and 2nd fl roof, including access ladder between roof and penthouse roofDetails
installation of guardrails at penthouse roof and 2nd fl roof, including access ladder between roof and penthouse roof | $25,000 |
| Jul 22, 2016 | Completed final sign-off Mar 2017 | 1 Maritime Pz | Hathaway Dinwiddie Co. | 16th floor: structural permit for 2016 0518 7736. adding structural beam for new sliding glass door maher naDetails
16th floor: structural permit for 2016 0518 7736. adding structural beam for new sliding glass door maher na | $5,000 |
| May 3, 2016 | Completed final sign-off Feb 2017 | 2099 Market St | Wickman Development And Construction | seismic retrofit upgrade for existing building.Details
seismic retrofit upgrade for existing building. | $200,000 |
| Jan 11, 2016 | Never finaled issued Jan 2016, no final | 111 Sutter St | Source Planning And Construction Inc | 16th floor: structural for 201511092076. n/a for maherDetails
16th floor: structural for 201511092076. n/a for maher | $20,000 |
| Aug 12, 2015 | Completed final sign-off Apr 2016 | 101 Townsend St | Narrowback Construction Co. | 1st floor t.i. revision to pa #201504214160: architectural & structural - original permit #201504214160 took out raise floor & room on raised floor. this permit puts it back w/structural added etc. n/a maher ordinanceDetails
1st floor t.i. revision to pa #201504214160: architectural & structural - original permit #201504214160 took out raise floor & room on raised floor. this permit puts it back w/structural added etc. n/a maher ordinance | |
| Jun 17, 2015 | Completed final sign-off May 2016 | 1 Market St | Bcci Construction Company | 24/f: structural work assocviates with approved pa#201506169073 & a revised architectural sheet a0224to add battery information. compliance with maher ordinance 155-13 not required.Details
24/f: structural work assocviates with approved pa#201506169073 & a revised architectural sheet a0224to add battery information. compliance with maher ordinance 155-13 not required. | $4,500 |
| Jun 8, 2015 | Never finaled issued Aug 2015, no final | 116 New Montgomery St | Dome Construction Corp | installation of roof anchors & steel supports for use by window washing equipment. all installations on roof & roof over penthouse. all behind parapet - not visible from exterior. (maher ordinance - extended ordinance no.155-13 not required)Details
installation of roof anchors & steel supports for use by window washing equipment. all installations on roof & roof over penthouse. all behind parapet - not visible from exterior. (maher ordinance - extended ordinance no.155-13 not required) | $35,000 |
| Feb 18, 2015 | Completed final sign-off Mar 2016 | 300 Clay St | Matrix Hg Inc | 26th flr -construct (1) interior wall w/(2) double doors, modify duct work to accomodate (1) new supply fan, replace (1) exhaust fan, replace (20 chillers w/(2) new liked kind chillers, modify piping connected to chillers, modify elect connections to chillers,install new refrigerant monitor systemDetails
26th flr -construct (1) interior wall w/(2) double doors, modify duct work to accomodate (1) new supply fan, replace (1) exhaust fan, replace (20 chillers w/(2) new liked kind chillers, modify piping connected to chillers, modify elect connections to chillers,install new refrigerant monitor system | $875,000 |
| Jan 22, 2014 | Completed final sign-off Nov 2014 | 1 Market St | Dpr Construction | steuart tower 5/f, 6/f- selective demolition of existing floor slab and structural elements as indicated, new construction to include addition of inter-connecting stairs, guardrails and structure as required. compliance with ordinance 155-13 not required.Details
steuart tower 5/f, 6/f- selective demolition of existing floor slab and structural elements as indicated, new construction to include addition of inter-connecting stairs, guardrails and structure as required. compliance with ordinance 155-13 not required. | $93,740 |
| Jan 13, 2014 | Completed final sign-off Feb 2016 | 55 02nd St | Hathaway Dinwiddie Co. | 12th & 14th flr structural for project under pa #2014.0113.6092 - existing communicaiton stair being replaced. (da checklist under #2012.0418.8562) compliance with ordinance #155-13 not required. excavation <50 cu yd.Details
12th & 14th flr structural for project under pa #2014.0113.6092 - existing communicaiton stair being replaced. (da checklist under #2012.0418.8562) compliance with ordinance #155-13 not required. excavation <50 cu yd. | $47,000 |
| Sep 11, 2012 | Never finaled issued Sep 2012, no final | 1 Market St | Novo Construction Inc | 26th floor ste 2600 -structural work for tenant improvement. ref #201203196335.Details
26th floor ste 2600 -structural work for tenant improvement. ref #201203196335. | $2,000 |
| Mar 21, 2011 | Completed final sign-off Feb 2012 | 467 Turk St | Highland Property Construction | revision to 2010-0125-5240. this application is to amend existing 201001255240 for the construction of an underground transformer vault for pg&e to be constructed in the public sidewalk. the sfdpw bsm sidewalk vault encroachment permit for this work is #iiv-0011.Details
revision to 2010-0125-5240. this application is to amend existing 201001255240 for the construction of an underground transformer vault for pg&e to be constructed in the public sidewalk. the sfdpw bsm sidewalk vault encroachment permit for this work is #iiv-0011. | $35,000 |
| Jul 18, 2007 | Expired or cancelled expired Feb 2010 | 2391 Filbert St | Gene Peterson General Contractor | work on #2391. received permit for kitchen remodel on 06/08/07. pa#200706083441. during demolition found (e) floor joists were cut 4" to accomodate plumging for 3rd fl bathroom. we are proposing to strenthen (e) floor joists remove (e) plumbing and re arrange & replace 3rd fl bathroom fixtures toDetails
work on #2391. received permit for kitchen remodel on 06/08/07. pa#200706083441. during demolition found (e) floor joists were cut 4" to accomodate plumging for 3rd fl bathroom. we are proposing to strenthen (e) floor joists remove (e) plumbing and re arrange & replace 3rd fl bathroom fixtures to | $25,000 |
| Dec 19, 2006 | Expired or cancelled expired Oct 2007 | 300 Clay St | Plant Construction Company Lp | revision to pa 200610165157 relocation of hi density file on 21st floorDetails
revision to pa 200610165157 relocation of hi density file on 21st floor | |
| Dec 11, 2006 | Completed final sign-off Mar 2007 | 405 Howard St | new 4x 12 slab opening for new mechanical shaft . permit of slab demolition onlyDetails
new 4x 12 slab opening for new mechanical shaft . permit of slab demolition only | $16,000 | |
| Aug 9, 2005 | Expired or cancelled expired Mar 2008 | 1 Market St | Hathaway Dinwiddie Co. | architectural work & accessibility with regards to an increased area of high density files in litigations center for sedgwick on the 5th floor.Details
architectural work & accessibility with regards to an increased area of high density files in litigations center for sedgwick on the 5th floor. | $40,000 |
| Jun 23, 2005 | Expired or cancelled expired Mar 2008 | 1 Market St | Hathaway Dinwiddie Co. | extend structural reinforcing of slab on 5th floor for high density mobil files. girder strengthening & slab reinforcing @ 5th floor only.Details
extend structural reinforcing of slab on 5th floor for high density mobil files. girder strengthening & slab reinforcing @ 5th floor only. | $20,000 |
| Mar 7, 2005 | Expired or cancelled expired May 2006 | 731 Market St | remove existing rooftop air handling unit supports &replc w/ new steel platforms.repair exist chilleDetails
remove existing rooftop air handling unit supports &replc w/ new steel platforms.repair exist chille | $15,000 | |
| Dec 20, 2004 | Completed final sign-off Jul 2005 | 201 Mission St | Bcci Construction Company | infill stair that goes between floor 5 & 6,stair is tenant convinence stair and does not affect exitDetails
infill stair that goes between floor 5 & 6,stair is tenant convinence stair and does not affect exit | $25,000 |