Narrowback Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Nov 2020
- Last 24 months
- 0 permits filed
351 permits since 2000: 255 completed, 50 never finaled, 46 expired or cancelled.
Of the 50 never-finaled permits, 16 are 5 to 10 years old, 34 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 351.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 12, 2020 | Completed final sign-off Mar 2021 | 2560 Marin St | replace damaged siding in kind per correction notice issued on 11/10/2020 by senior inspector. a fire has occurred at this address caused by homeless. please replace damaged siding in kind on north side (freeway side) of building. no plans requiredDetails
replace damaged siding in kind per correction notice issued on 11/10/2020 by senior inspector. a fire has occurred at this address caused by homeless. please replace damaged siding in kind on north side (freeway side) of building. no plans required | $30,000 |
| Nov 22, 2019 | Never finaled issued Nov 2019, no final | 89 Forest Side Av | street spaceDetails
street space | |
| Nov 22, 2019 | Never finaled issued Nov 2019, no final | 1436 Waller St | street spaceDetails
street space | |
| Nov 22, 2019 | Never finaled issued Nov 2019, no final | 28 02nd St | street spaceDetails
street space | |
| Nov 22, 2019 | Never finaled issued Nov 2019, no final | 2656 Mcallister St | street spaceDetails
street space | |
| Nov 22, 2019 | Never finaled issued Nov 2019, no final | 1326 Dolores St | street spaceDetails
street space | |
| Aug 26, 2019 | Completed final sign-off May 2020 | 1955 Carroll Av | remove (e) illegal construction stairs from 1955 carroll which are on 1828 egbert proprty - screw door shut and seal as needed - infill wal as needed. not visible from st. cbc705.5.Details
remove (e) illegal construction stairs from 1955 carroll which are on 1828 egbert proprty - screw door shut and seal as needed - infill wal as needed. not visible from st. cbc705.5. | $8,000 |
| Aug 16, 2019 | Completed final sign-off Sep 2019 | 2560 Marin St | remove interior non-load bearing woodstud partitions from office area to prepare for remodel under seperate permit.Details
remove interior non-load bearing woodstud partitions from office area to prepare for remodel under seperate permit. | $6,000 |
| Jul 31, 2019 | Completed final sign-off Aug 2022 | 133 02nd St | construction phase revision to pa201506259973. removal of brick wythe for shearwall. revision to 1 restroom, crating an accessible gener/neutral restroom. maher n/a.Details
construction phase revision to pa201506259973. removal of brick wythe for shearwall. revision to 1 restroom, crating an accessible gener/neutral restroom. maher n/a. | $5,000 |
| Jun 10, 2019 | Completed final sign-off Sep 2019 | 2560 Marin St | remove frp siding to expose (e) cedar siding - replace in-kind. no other work. remove damaged exterior plywood wood siding at windows. install new waterproofing/flashing @ windows. install new exterior cedar plywood to match (e) paint new workDetails
remove frp siding to expose (e) cedar siding - replace in-kind. no other work. remove damaged exterior plywood wood siding at windows. install new waterproofing/flashing @ windows. install new exterior cedar plywood to match (e) paint new work | $5,000 |
| May 21, 2019 | Never finaled issued May 2019, no final | 490 19th Av | street spaceDetails
street space | |
| May 15, 2019 | Completed final sign-off Feb 2020 | 235 Francisco St | various inteior renovations to include replacement of select windows & doors, removval of wet bar to allow expansion of sunroom to be used as 3rd bedroom, upgrade to roof deck with wood decking & new railing, upgrade to hvac & lighting, upgrade to 1st fl; fireplace with new gas fireplace, removal ofDetails
various inteior renovations to include replacement of select windows & doors, removval of wet bar to allow expansion of sunroom to be used as 3rd bedroom, upgrade to roof deck with wood decking & new railing, upgrade to hvac & lighting, upgrade to 1st fl; fireplace with new gas fireplace, removal of | $30,000 |
| May 14, 2019 | Completed final sign-off Nov 2019 | 802 Arguello Bl | revision to 201812178517. remodel bathrooms on 3rd and 4th flDetails
revision to 201812178517. remodel bathrooms on 3rd and 4th fl | $10,000 |
| May 10, 2019 | Completed final sign-off Jan 2020 | 490 19th Av | voluntary strengthening at ground level permit revision . reduction of scope of work per owners request. app#201901110229Details
voluntary strengthening at ground level permit revision . reduction of scope of work per owners request. app#201901110229 | |
| May 1, 2019 | Completed final sign-off Sep 2020 | 4307 20th St | new rear yard retaining wall, concrete stairs @ grade and guardrailDetails
new rear yard retaining wall, concrete stairs @ grade and guardrail | $22,600 |
| Apr 26, 2019 | Never finaled issued May 2019, no final | 1326 Dolores St | windows at the front - change existing wood hung windows with wood hung windows with og lugs. no bbns or planning code complaints.Details
windows at the front - change existing wood hung windows with wood hung windows with og lugs. no bbns or planning code complaints. | $2,000 |
| Apr 26, 2019 | Completed final sign-off May 2021 | 1326 Dolores St | renovation of (e) unit within a 2-story family house, no change to bldg envelope, to include: remodeled kitchen, bathrooms and bedrooms- replace (e) windows w/new to match, plm/ele and structural as neededDetails
renovation of (e) unit within a 2-story family house, no change to bldg envelope, to include: remodeled kitchen, bathrooms and bedrooms- replace (e) windows w/new to match, plm/ele and structural as needed | $129,000 |
| Apr 5, 2019 | Never finaled issued Jun 2019, no final | 33 Bartlett St | to add projecting electrical neon sign. (barrish since 1961 and bail open)Details
to add projecting electrical neon sign. (barrish since 1961 and bail open) | $1,000 |
| Mar 11, 2019 | Never finaled issued Jun 2019, no final | 33 Bartlett St | construction phase change to work approved per pa# 201811135595 submit compliance data for elevator (already included in cont estimate)Details
construction phase change to work approved per pa# 201811135595 submit compliance data for elevator (already included in cont estimate) | |
| Mar 5, 2019 | Expired or cancelled cancelled Jan 2026 | 1200 17th St | install accessible door and path of travel, maher not req. barrier removal.Details
install accessible door and path of travel, maher not req. barrier removal. | $14,700 |
| Mar 1, 2019 | Completed final sign-off Nov 2019 | 800 Arguello Bl | revision to 201811276764, 201812178517, 201812178539 corrections: construction type (both existing and proposed) is vb unsprinklered, not vb sprinklered.Details
revision to 201811276764, 201812178517, 201812178539 corrections: construction type (both existing and proposed) is vb unsprinklered, not vb sprinklered. | |
| Feb 28, 2019 | Completed final sign-off Sep 2022 | 1900 Eddy St | (for commercial) seismic strengthing at the(2) street levels to bring the building into compliance with sf mandatory seismic retrofic program. per ordiance 2016 cebc appendix a-4 application and plan set shared with pa: 201902284017Details
(for commercial) seismic strengthing at the(2) street levels to bring the building into compliance with sf mandatory seismic retrofic program. per ordiance 2016 cebc appendix a-4 application and plan set shared with pa: 201902284017 | $58,977 |
| Feb 28, 2019 | Completed final sign-off Sep 2022 | 1900 Eddy St | (for apartment). seismic strenghtening at the (2)street levels to bring the building into compliance with sf mandatory seismic retrofit program. per ordinance 2016 cebc appendix a-4 plan set shared with pa: 201902284019Details
(for apartment). seismic strenghtening at the (2)street levels to bring the building into compliance with sf mandatory seismic retrofit program. per ordinance 2016 cebc appendix a-4 plan set shared with pa: 201902284019 | $242,933 |
| Feb 28, 2019 | Expired or cancelled cancelled Jan 2026 | 600 Stockton St | installation of interior stair, remove elevator lobby smoke doors, install smoke guard at elevator hoist way, raise ceiling at new stair. fire sprinklers and life safety work under separate permitDetails
installation of interior stair, remove elevator lobby smoke doors, install smoke guard at elevator hoist way, raise ceiling at new stair. fire sprinklers and life safety work under separate permit | $38,450 |
| Feb 22, 2019 | Expired or cancelled cancelled Oct 2019 | 970 Tennessee St | revision to pa 2018-0725-5461 new openings in (e) property line wall, new openings not to provide required lighty or ventilation, required egress, or for emergency rescueDetails
revision to pa 2018-0725-5461 new openings in (e) property line wall, new openings not to provide required lighty or ventilation, required egress, or for emergency rescue | $50,000 |
| Feb 13, 2019 | Completed final sign-off Jul 2019 | 2646 San Bruno Av | exterior facade repair work only at (e) ground floor tenant business. replace (e) storefront entry door and transom to match existing. in-kind repairs, typ. no structural work. no mech, plumb, life safety mods. (n) replacement sign & electr under separate permitsDetails
exterior facade repair work only at (e) ground floor tenant business. replace (e) storefront entry door and transom to match existing. in-kind repairs, typ. no structural work. no mech, plumb, life safety mods. (n) replacement sign & electr under separate permits | $15,000 |
| Jan 25, 2019 | Never finaled issued Feb 2019, no final | 75 14th St | tenant improvements to include new non bearing partition walls for workshop and storage spaces. mep and sprinklers to be design buildDetails
tenant improvements to include new non bearing partition walls for workshop and storage spaces. mep and sprinklers to be design build | $50,000 |
| Jan 15, 2019 | Expired or cancelled expired Nov 2023 | 28 02nd St | (n) 1st flr storfront design, awning & exterior lighting. remove rear fire escape. replace 1st fl office entry door & sidelights. remove finishes @ office lobby & restore ext cem plaster replace & relocate gas vent louversDetails
(n) 1st flr storfront design, awning & exterior lighting. remove rear fire escape. replace 1st fl office entry door & sidelights. remove finishes @ office lobby & restore ext cem plaster replace & relocate gas vent louvers | $79,000 |
| Jan 15, 2019 | Expired or cancelled expired Oct 2023 | 415 Tehama St | soft story structural strengthening on floors 1-2. fire sprinklers under sep permit. dwelling unit legalization alterations under 201709117482. adu alteration under 201709117484 to mitigate nov 201813461Details
soft story structural strengthening on floors 1-2. fire sprinklers under sep permit. dwelling unit legalization alterations under 201709117482. adu alteration under 201709117484 to mitigate nov 201813461 | $87,750 |
| Jan 11, 2019 | Completed final sign-off Jan 2020 | 490 19th Av | voluntary seismic upgrade of gr levelDetails
voluntary seismic upgrade of gr level | $25,000 |
| Nov 28, 2018 | Completed final sign-off Feb 2019 | 995 Market St | 5th - 7th flrs. demo of non-structural & non load-bearing interior partitions and ceilings incl walls, glazing doors and finishesDetails
5th - 7th flrs. demo of non-structural & non load-bearing interior partitions and ceilings incl walls, glazing doors and finishes | $337,513 |
| Nov 14, 2018 | Completed final sign-off Jan 2021 | 1328 Dolores St | renovation of upper unit to include master bedroom & bath, den bath/laundry, kitchen dinning (e) windows to match, plumbing, electrical, structural as requiredDetails
renovation of upper unit to include master bedroom & bath, den bath/laundry, kitchen dinning (e) windows to match, plumbing, electrical, structural as required | $95,000 |
| Nov 13, 2018 | Completed final sign-off Feb 2022 | 33 Bartlett St | remove and reconstruct mezzanine (same sq ft). add stair accessible restrooms. (e) lighting & mechanical systems to remainDetails
remove and reconstruct mezzanine (same sq ft). add stair accessible restrooms. (e) lighting & mechanical systems to remain | $120,000 |
| Nov 8, 2018 | Completed final sign-off Mar 2019 | 61 Manchester St | revision to 201804247258. structural rev based on field condition. replace 2 skylights in-kindDetails
revision to 201804247258. structural rev based on field condition. replace 2 skylights in-kind | $5,000 |
| Nov 2, 2018 | Completed final sign-off Jan 2021 | 1328 Dolores St | remove section of bearing wall on second and third floor, strengthen extg footings and add posts at floor 1 below.Details
remove section of bearing wall on second and third floor, strengthen extg footings and add posts at floor 1 below. | $10,000 |
| Oct 29, 2018 | Completed final sign-off Sep 2020 | 89 Forest Side Av | revision to 201806152002 & 201809211034, rear patio design revision and fence replacement and rebuildingDetails
revision to 201806152002 & 201809211034, rear patio design revision and fence replacement and rebuilding | $3,000 |
| Oct 29, 2018 | Never finaled issued Nov 2018, no final | 933 20th St | construct 2 doors at openings on the ground and mezzanine levels. upgrafe ada signage at accessible bathrooms and restripe stairsDetails
construct 2 doors at openings on the ground and mezzanine levels. upgrafe ada signage at accessible bathrooms and restripe stairs | $3,000 |
| Oct 3, 2018 | Never finaled issued Oct 2018, no final | 18 Belvedere St | strengthen beam on 1st elevated floor under laundry roomDetails
strengthen beam on 1st elevated floor under laundry room | $10,000 |
| Sep 25, 2018 | Never finaled issued Sep 2018, no final | 1200 17th St | install door, interior partition and accessibility upgradesDetails
install door, interior partition and accessibility upgrades | $17,530 |
| Sep 21, 2018 | Completed final sign-off Sep 2020 | 89 Forest Side Av | rev to pa#201806152002, to add one more bedroom at 1/f within the (e) building envelope.Details
rev to pa#201806152002, to add one more bedroom at 1/f within the (e) building envelope. | $5,000 |
| Sep 20, 2018 | Completed final sign-off Feb 2022 | 33 Bartlett St | change of occupancy from s-1 to b & f-1 & s-1. new second floor within existing building envelope and mezzanineDetails
change of occupancy from s-1 to b & f-1 & s-1. new second floor within existing building envelope and mezzanine | $120,000 |
| Sep 20, 2018 | Expired or cancelled withdrawn Mar 2025 | 1370 Wallace Av | comply with nov #20145201m 201845202, 201842701, 201842931. change of occupancy from f-2,b to f-1,b.demolish/replace portion of east ext. wall;install nursery structure inside bldg; local lateral upgrade; mep and fire sprinklers/fire protection under sep. permits. **maher n/a**Details
comply with nov #20145201m 201845202, 201842701, 201842931. change of occupancy from f-2,b to f-1,b.demolish/replace portion of east ext. wall;install nursery structure inside bldg; local lateral upgrade; mep and fire sprinklers/fire protection under sep. permits. **maher n/a** | $140,000 |
| Sep 7, 2018 | Completed final sign-off Apr 2025 | 28 02nd St | voluntary seismic strengthing @ all flrs. basement through roof. upgrade interior lobby finishes replace guard & hand rails @ int stairs. add stair enclosure to omt stair @ basement. accessible toilet room alteration @ 2nd flr . no exterior work.Details
voluntary seismic strengthing @ all flrs. basement through roof. upgrade interior lobby finishes replace guard & hand rails @ int stairs. add stair enclosure to omt stair @ basement. accessible toilet room alteration @ 2nd flr . no exterior work. | $1,063,326 |
| Aug 3, 2018 | Completed final sign-off Jul 2020 | 901 Stanyan St | mandatory soft story retrofit sfebc chapter 4d sf building code (residential portion)Details
mandatory soft story retrofit sfebc chapter 4d sf building code (residential portion) | $72,250 |
| Jul 26, 2018 | Completed final sign-off Sep 2018 | 1200 17th St | install (2) doors and interior partitionsDetails
install (2) doors and interior partitions | $7,530 |
| Jul 6, 2018 | Completed final sign-off Mar 2019 | 61 Manchester St | rev to pa# 201804247258; structural revisions based on field conditionDetails
rev to pa# 201804247258; structural revisions based on field condition | |
| Jul 3, 2018 | Never finaled issued Aug 2019, no final | 840 Powell St | voluntary seismic improvements to existing parking garage. (common area)Details
voluntary seismic improvements to existing parking garage. (common area) | $792,000 |
| Jun 15, 2018 | Completed final sign-off Dec 2020 | 89 Forest Side Av | horizontal side addition (63.21 sq ft), kitchen remodel, front porch in kind replacement, garage door& driveway widening, stucco & window in kind replacement at front elevation, (e) pop out (@ kitchen) side, wall will be moved to be 3' clear of side setback. interior remodel.Details
horizontal side addition (63.21 sq ft), kitchen remodel, front porch in kind replacement, garage door& driveway widening, stucco & window in kind replacement at front elevation, (e) pop out (@ kitchen) side, wall will be moved to be 3' clear of side setback. interior remodel. | $95,000 |
| May 11, 2018 | Completed final sign-off Aug 2018 | 1801 Lombard St | g/f: addition of security gate and grill.Details
g/f: addition of security gate and grill. | $8,900 |
| Apr 30, 2018 | Completed final sign-off Oct 2018 | 125 Alpine Tr | renovation of extg master bathroom. no addition to extg house.Details
renovation of extg master bathroom. no addition to extg house. | $18,666 |
| Apr 24, 2018 | Completed final sign-off Mar 2019 | 61 Manchester St | new recessed entry & door. new basement window opening. new structural slab and voluntary seismic upgrades. 1 new bathroom, & 2 new bedrooms at extg finished basement. new windows and dry rot repair at rear. new front windows in kind.siding replacement/dry rot repairDetails
new recessed entry & door. new basement window opening. new structural slab and voluntary seismic upgrades. 1 new bathroom, & 2 new bedrooms at extg finished basement. new windows and dry rot repair at rear. new front windows in kind.siding replacement/dry rot repair | $62,500 |
| Apr 5, 2018 | Completed final sign-off Aug 2021 | 28 02nd St | 2,3,6 & 7/f -interior soft demolition only incl. finishes, suspended ceiling systems hvac ductork systems, int. non-bearing partitions, lighting, millwork plumbing fixtures, and surface mounted electrical distribution systemsDetails
2,3,6 & 7/f -interior soft demolition only incl. finishes, suspended ceiling systems hvac ductork systems, int. non-bearing partitions, lighting, millwork plumbing fixtures, and surface mounted electrical distribution systems | $23,350 |
| Apr 5, 2018 | Completed final sign-off Sep 2020 | 4307 20th St | interior remodel from ground flr to 3rd flr. replacement of existing windows throughout front facade. replacing railing at front porch and stair leading from sidewalk to match wood bannister. interior remodel including new interior stair, 3 bath remodels, expand kitchen and livingspaceDetails
interior remodel from ground flr to 3rd flr. replacement of existing windows throughout front facade. replacing railing at front porch and stair leading from sidewalk to match wood bannister. interior remodel including new interior stair, 3 bath remodels, expand kitchen and livingspace | $305,000 |
| Mar 23, 2018 | Completed final sign-off Jul 2019 | 2646 San Bruno Av | g/f -tenant improvement to existing restaurant space with new mep work and minor changes for kitchen layout. ref to 201411012847 on 1st ffr per plan. no exterior work.Details
g/f -tenant improvement to existing restaurant space with new mep work and minor changes for kitchen layout. ref to 201411012847 on 1st ffr per plan. no exterior work. | $150,000 |
| Mar 22, 2018 | Completed final sign-off May 2018 | 1200 17th St | revision to app#201612144906 barrier removal and accessible ramp and exit. n/a for maherDetails
revision to app#201612144906 barrier removal and accessible ramp and exit. n/a for maher | |
| Mar 19, 2018 | Completed final sign-off Mar 2019 | 1526 Wallace Av | tenant improvement for livestock processing 1 less than 2,500 sf. mechanical, electrical, plumbing, & fire-sprinkler under separate permit.Details
tenant improvement for livestock processing 1 less than 2,500 sf. mechanical, electrical, plumbing, & fire-sprinkler under separate permit. | $50,000 |
| Mar 16, 2018 | Completed final sign-off Sep 2020 | 4309 20th St | conversion of exterior 3rd fl rear site permit. yard (south) deck to interior living space & removal of stair to rear yard. (n) cantilever deck & exterior spiral staircase @ 3rd fl rear facade. no overall increase in bldg depth or height.Details
conversion of exterior 3rd fl rear site permit. yard (south) deck to interior living space & removal of stair to rear yard. (n) cantilever deck & exterior spiral staircase @ 3rd fl rear facade. no overall increase in bldg depth or height. | $56,000 |
| Mar 15, 2018 | Completed final sign-off May 2018 | 222 Eureka St | remove (e) kitchen cabinets, open walls as needed for new electric plugs & switches, re plumbing kitchen sink patch drywal las needed, instal new cabinets, refinish (e) wood floors, replace counter, new kitchen appliances no structural work, walls to remain, lighting comply w/cec 1500k, roughlyDetails
remove (e) kitchen cabinets, open walls as needed for new electric plugs & switches, re plumbing kitchen sink patch drywal las needed, instal new cabinets, refinish (e) wood floors, replace counter, new kitchen appliances no structural work, walls to remain, lighting comply w/cec 1500k, roughly | $25,000 |
| Mar 13, 2018 | Completed final sign-off Nov 2018 | 611 Washington St | unit 2205: remodel kitchen, new surface mount led lights to replace incandescents, new wood flooring, no new plumbing except new kitchen faucet to replace old kitchen faucet; n/a maherDetails
unit 2205: remodel kitchen, new surface mount led lights to replace incandescents, new wood flooring, no new plumbing except new kitchen faucet to replace old kitchen faucet; n/a maher | $45,000 |
| Feb 20, 2018 | Completed final sign-off Aug 2018 | 617 Arguello Bl | unit #5: remodel (e) kitchen cabs. replace with new cabs in same location. remodel (e) bath fixtures. install new bath fixtures and tile. plumbling locations same . remove (e) rotted t111 wood plywood siding. install new sheathing membrane and new wood plywood siding. repair/replace interiorDetails
unit #5: remodel (e) kitchen cabs. replace with new cabs in same location. remodel (e) bath fixtures. install new bath fixtures and tile. plumbling locations same . remove (e) rotted t111 wood plywood siding. install new sheathing membrane and new wood plywood siding. repair/replace interior | $35,000 |
| Feb 9, 2018 | Completed final sign-off Sep 2018 | 75 14th St | revision to app#201609066864: enclosed office space at extg mazzanine. n/a for maherDetails
revision to app#201609066864: enclosed office space at extg mazzanine. n/a for maher | $5,000 |
| Feb 9, 2018 | Completed final sign-off Nov 2018 | 101 Townsend St | create (3) communicating opening on a shared wall between 101 & 111 townsend st at 1st, 2nd & 3rd foors. add 1 gender neutral bathroom @ 101 townsendDetails
create (3) communicating opening on a shared wall between 101 & 111 townsend st at 1st, 2nd & 3rd foors. add 1 gender neutral bathroom @ 101 townsend | $60,000 |
| Feb 9, 2018 | Completed final sign-off Nov 2018 | 111 Townsend St | create 3 communicating opening on a shared wall between 101 & 111 at 1st, 2nd and 3rd floors. townsend. add 1 new ramp @ 111 townsendDetails
create 3 communicating opening on a shared wall between 101 & 111 at 1st, 2nd and 3rd floors. townsend. add 1 new ramp @ 111 townsend | $30,000 |
| Dec 8, 2017 | Completed final sign-off Dec 2017 | 1801 Scott St | revision to pa 2013-1122-2590, alternate rebar detail as approved by structural engineer and requested by building inspectorDetails
revision to pa 2013-1122-2590, alternate rebar detail as approved by structural engineer and requested by building inspector | |
| Nov 10, 2017 | Completed final sign-off Apr 2018 | 4329 23rd St | work at rear not visable from st - remove 1 damaged siding, replace with new hardy board. remove 7 9e) single glazed windows. replace with (n) marvin double hung clad exterior wood interior. remove 2 doors install 2 new doors. paint all new work. same size, location. max u factor .32Details
work at rear not visable from st - remove 1 damaged siding, replace with new hardy board. remove 7 9e) single glazed windows. replace with (n) marvin double hung clad exterior wood interior. remove 2 doors install 2 new doors. paint all new work. same size, location. max u factor .32 | $20,000 |
| Nov 10, 2017 | Never finaled issued Nov 2017, no final | 176 Nevada St | work at rear not visable from st remove stucco from rear of structure. remove 4 (e) windows. replace 4 window with new marvin integrity replace stucco. paint new work. repair in-kind same size, same location, max u factor .32Details
work at rear not visable from st remove stucco from rear of structure. remove 4 (e) windows. replace 4 window with new marvin integrity replace stucco. paint new work. repair in-kind same size, same location, max u factor .32 | $20,000 |
| Oct 18, 2017 | Completed final sign-off Mar 2018 | 3020 Clay St | rebuild wood fence in kind at rear, max. 10 ft.Details
rebuild wood fence in kind at rear, max. 10 ft. | $8,500 |
| Sep 26, 2017 | Completed final sign-off Sep 2018 | 75 14th St | rev. to bpa# 201609066864. relocate egress corridor reconfigure bathroom and kitchenette and replace 1 existing solid core door with glazed door, new glazed egress door, new glazed roll up door mep deferred; n/a maherDetails
rev. to bpa# 201609066864. relocate egress corridor reconfigure bathroom and kitchenette and replace 1 existing solid core door with glazed door, new glazed egress door, new glazed roll up door mep deferred; n/a maher | $10,000 |
| Sep 21, 2017 | Completed final sign-off Sep 2019 | 6900 Fulton St | compliance w/ mandatory seismic retrofit program per 2016 sfebc chapter 4d & 2016 sfebc appx a4Details
compliance w/ mandatory seismic retrofit program per 2016 sfebc chapter 4d & 2016 sfebc appx a4 | $43,000 |
| Sep 5, 2017 | Completed final sign-off Feb 2018 | 515 Arkansas St | remove (e) stucco on front (only) of building. repair damaged sheathing as needed. remove 3 (e) vinyl windows replace with marvin clad exterior (white) with wood interior. insulate as needed. restucco to match. paint as needed.Details
remove (e) stucco on front (only) of building. repair damaged sheathing as needed. remove 3 (e) vinyl windows replace with marvin clad exterior (white) with wood interior. insulate as needed. restucco to match. paint as needed. | $25,000 |
| Aug 28, 2017 | Completed final sign-off Nov 2018 | 431 Bryant St | construction phase revision to work underway per pa#201708144675, change of occupancy from warehouse to office (business), no construction under this permit. n/a ordinance #155-13. mechanical/electrical separate permit. ** maher: n/a **Details
construction phase revision to work underway per pa#201708144675, change of occupancy from warehouse to office (business), no construction under this permit. n/a ordinance #155-13. mechanical/electrical separate permit. ** maher: n/a ** | |
| Aug 28, 2017 | Completed final sign-off May 2019 | 421 Bryant St | change of occupancy from warehouse to office, no construction under this permit. all work performed under pa#201708144673. mechanical and electrical work under seperate permit. n/a ordinance #155-13Details
change of occupancy from warehouse to office, no construction under this permit. all work performed under pa#201708144673. mechanical and electrical work under seperate permit. n/a ordinance #155-13 | |
| Aug 10, 2017 | Completed final sign-off Apr 2018 | 400 Vallejo St | compliance with mandatory steismic retrofit programDetails
compliance with mandatory steismic retrofit program | $15,000 |
| Aug 7, 2017 | Completed final sign-off Oct 2017 | 300 Connecticut St | replace existing storefront glass, mechanical & electrical work under separate permit. construction phase change to work under pa#201612296214Details
replace existing storefront glass, mechanical & electrical work under separate permit. construction phase change to work under pa#201612296214 | $10,000 |
| Aug 1, 2017 | Completed final sign-off Jan 2018 | 2134 Green St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. n/a for maherDetails
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. n/a for maher | $120,000 |
| Jul 17, 2017 | Expired or cancelled expired Mar 2022 | 1436 Waller St | convert basement storage space to adu per ord #162-16Details
convert basement storage space to adu per ord #162-16 | $60,000 |
| Jul 13, 2017 | Expired or cancelled expired Mar 2022 | 1436 Waller St | revision to pa#201506300342 substitute new steel frame for shearwall at gridline a.2, replace (e) footing at gridline 4.5 & a with (n) footing, replace (e) slab with new slab on grade.Details
revision to pa#201506300342 substitute new steel frame for shearwall at gridline a.2, replace (e) footing at gridline 4.5 & a with (n) footing, replace (e) slab with new slab on grade. | $30,000 |
| Jul 12, 2017 | Completed final sign-off Apr 2018 | 176 Nevada St | int. renovation of (e) kitchen. replacement of (e) skylight and windows in kitchen.Details
int. renovation of (e) kitchen. replacement of (e) skylight and windows in kitchen. | $10,000 |
| Jul 7, 2017 | Expired or cancelled cancelled Jan 2026 | 1801 Scott St | rev to pa#201311222590 s1 - construction phase revision to work underway under (e) permit.Details
rev to pa#201311222590 s1 - construction phase revision to work underway under (e) permit. | |
| Jun 30, 2017 | Completed final sign-off Sep 2018 | 75 14th St | mezzanine structural related to building pa 2016-0906-6864Details
mezzanine structural related to building pa 2016-0906-6864 | |
| Mar 23, 2017 | Completed final sign-off Dec 2017 | 48 Gold St | revision to 201605177644 revised foot detail - 4 locations increased depth to bearing strats maher naDetails
revision to 201605177644 revised foot detail - 4 locations increased depth to bearing strats maher na | |
| Mar 15, 2017 | Completed final sign-off Nov 2018 | 1966 California St | revisions to ap 2016-0516-7544, legalization of 824.8 sq ft unit on 1st floor, per ord #43-14 (maher) lower the footings & slab for headroom htDetails
revisions to ap 2016-0516-7544, legalization of 824.8 sq ft unit on 1st floor, per ord #43-14 (maher) lower the footings & slab for headroom ht | $30,000 |
| Jan 13, 2017 | Completed final sign-off Jan 2018 | 101 Townsend St | t.i for change to cafe use. hvac works inclued tied into (e) building system. new commercial cafe t.i. to include new air handler, new restroom, electrical & plumbing. cabinets & kitchen equipment. ** maher: n/a **Details
t.i for change to cafe use. hvac works inclued tied into (e) building system. new commercial cafe t.i. to include new air handler, new restroom, electrical & plumbing. cabinets & kitchen equipment. ** maher: n/a ** | $175,000 |
| Dec 29, 2016 | Completed final sign-off Oct 2017 | 300 Connecticut St | renovate restaurant kitchen and dining area, disabled access upgrades, no exterior changes, mech & elec under separate permit.Details
renovate restaurant kitchen and dining area, disabled access upgrades, no exterior changes, mech & elec under separate permit. | $130,000 |
| Dec 22, 2016 | Completed final sign-off Dec 2017 | 101 Townsend St | revision to 201607081849: structural sheets only 2794 maher naDetails
revision to 201607081849: structural sheets only 2794 maher na | |
| Dec 21, 2016 | Completed final sign-off Aug 2017 | 1507 California St | add gas meter room in basement per pg&e requirements (construction phase change to work underway per pa 2014-0710-0977)Details
add gas meter room in basement per pg&e requirements (construction phase change to work underway per pa 2014-0710-0977) | $5,000 |
| Dec 14, 2016 | Completed final sign-off May 2018 | 1200 17th St | barrier removal, add accessible ramp and door. n/a ordinance #155-13Details
barrier removal, add accessible ramp and door. n/a ordinance #155-13 | $12,800 |
| Dec 8, 2016 | Completed final sign-off Jul 2017 | 301 Divisadero St | to obtain final inspection for work approved under pa#201507091096 & 201410169163. all work is complete.Details
to obtain final inspection for work approved under pa#201507091096 & 201410169163. all work is complete. | |
| Nov 28, 2016 | Completed final sign-off Jan 2018 | 969 Page St | remodel bathroom at 2nd floor. add bay window. not visible fromDetails
remodel bathroom at 2nd floor. add bay window. not visible from | $25,000 |
| Nov 23, 2016 | Completed final sign-off Dec 2016 | 269 Potrero Av | ti & no change to (e) lighting or hvac maher naDetails
ti & no change to (e) lighting or hvac maher na | $9,500 |
| Nov 3, 2016 | Completed final sign-off Oct 2017 | 790 20th Av | soft story retrofit to comply with sfbc chapter 34b onm iebc appx a4 calcs.Details
soft story retrofit to comply with sfbc chapter 34b onm iebc appx a4 calcs. | $45,000 |
| Oct 28, 2016 | Completed final sign-off Oct 2019 | 550 14th St | mandatory soft story upgrade per ordinance no 66-13 soft story ground floor retrofit per col 2 iebc app 4x caomply with 201642241Details
mandatory soft story upgrade per ordinance no 66-13 soft story ground floor retrofit per col 2 iebc app 4x caomply with 201642241 | $45,000 |
| Oct 14, 2016 | Completed final sign-off Sep 2018 | 17 Boardman Pl | residential- soft story retrofit per sfbc chpater 34b engineering criteria 2012 iebc appendix a-4 (residential) soft story for commercial under pa 2016-0816-5173Details
residential- soft story retrofit per sfbc chpater 34b engineering criteria 2012 iebc appendix a-4 (residential) soft story for commercial under pa 2016-0816-5173 | $100,000 |
| Sep 19, 2016 | Completed final sign-off Dec 2016 | 1290 12th Av | replace all front windows with aluminum-clad wood dh windows with ogee lugs; match existing original muntin pattern (grid on top half) using raised profile simulated lite with spacersDetails
replace all front windows with aluminum-clad wood dh windows with ogee lugs; match existing original muntin pattern (grid on top half) using raised profile simulated lite with spacers | $30,000 |
| Sep 15, 2016 | Completed final sign-off Oct 2017 | 501 38th Av | mandatory seismic retrofit sec 34b 2012 iebc appendix a-4.Details
mandatory seismic retrofit sec 34b 2012 iebc appendix a-4. | $125,000 |
| Sep 9, 2016 | Completed final sign-off Nov 2016 | 121 Chicago Wy | repair/replace post and railing on existing front deck in kind wood replacement; less than 50% of porch; voluntary bolt-down to foundation, anchors thru (n02x6 ptdf pressure blocking with 2 nails to (e) sill.Details
repair/replace post and railing on existing front deck in kind wood replacement; less than 50% of porch; voluntary bolt-down to foundation, anchors thru (n02x6 ptdf pressure blocking with 2 nails to (e) sill. | $9,400 |
| Aug 24, 2016 | Never finaled issued Aug 2016, no final | 75 14th St | Details
| |
| Aug 24, 2016 | Never finaled issued Aug 2016, no final | 1507 California St | street spaceDetails
street space | |
| Aug 22, 2016 | Completed final sign-off Nov 2016 | 123 Corwin St | demo e kitchen cabinets provide & install new, replace counter top fixture at same location, demo (e) master bathm install new fixtures same location, install (n) tile at floor & shower, demo 3 (e) windows at rear, install new marvin integrity windows, max u facor .032Details
demo e kitchen cabinets provide & install new, replace counter top fixture at same location, demo (e) master bathm install new fixtures same location, install (n) tile at floor & shower, demo 3 (e) windows at rear, install new marvin integrity windows, max u facor .032 | $35,000 |
| Aug 19, 2016 | Expired or cancelled cancelled Jan 2026 | 1077 Post St | remodel of commercial space to include interior/removal of non load bearing partitions, new ada bathroom, removal of door to meet code. maher naDetails
remodel of commercial space to include interior/removal of non load bearing partitions, new ada bathroom, removal of door to meet code. maher na | $31,000 |