Bryan Fox
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Five Design
- Based in
- San Francisco
- On San Francisco permits
- Dec 2005 to Aug 2026
135 permits since 2000 (architect on 125 permits, authorized agent-others on 5 permits, designer on 3 permits, engineer on 3 permits): 78 completed, 32 in progress, 17 never finaled, 8 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 135.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 13, 2026 | In progress filed Aug 2026, not yet issued | 3348 Broderick St | rev to pa #202602246421: #3348: remove wood fireplace, install new direct-vent gas fireplace, relocate entry door & add laundry closet to guest room @ g/f. #3350 remove wood fireplace, install new direct-vent gas fireplace, 2 new windows & 1 new skylight on 4/f. voluntary structural improvements.Details
rev to pa #202602246421: #3348: remove wood fireplace, install new direct-vent gas fireplace, relocate entry door & add laundry closet to guest room @ g/f. #3350 remove wood fireplace, install new direct-vent gas fireplace, 2 new windows & 1 new skylight on 4/f. voluntary structural improvements. | $70,000 | |
| Aug 4, 2026 | In progress filed Aug 2026, not yet issued | 131 Parker Av | vertical addition to increase ceiling height @ 1st & 2nd flr,horizontal addition @ 1st & 2nd flr & complete remodel,conversion 1st flr unconditioned space into habitable space. addition of new partial 3rd flr.Details
vertical addition to increase ceiling height @ 1st & 2nd flr,horizontal addition @ 1st & 2nd flr & complete remodel,conversion 1st flr unconditioned space into habitable space. addition of new partial 3rd flr. | $1,000,000 | |
| Jun 15, 2026 | In progress filed Jun 2026, not yet issued | 647 11th Av | Caruso Construction Inc. | revision to issued permit #202512302994. removal of new exterior door and new backyard wooden deck from proposed scope. new pavers at driveway and entrywayDetails
revision to issued permit #202512302994. removal of new exterior door and new backyard wooden deck from proposed scope. new pavers at driveway and entryway | |
| May 18, 2026 | Completed final sign-off Jun 2026 | 411 Noriega St | C H Burnham Inc | revision to permit 202401315021, change proposed curd at rear room roof to 32" parapet to coordinate with approved structural design drawings. no work visible from street.Details
revision to permit 202401315021, change proposed curd at rear room roof to 32" parapet to coordinate with approved structural design drawings. no work visible from street. | $2,000 |
| May 6, 2026 | In progress issued May 2026 | 511 10th Av | C H Burnham Inc | revision to permit 202407025677. remove one skylight & one bathroom from third floor. relocate mudroom and laundry on ground floor. relocate water heater and hvac to garage. revise kitchen layout on second floor and remove west-facing kitchen window. revise window configuration at bedroom 3.Details
revision to permit 202407025677. remove one skylight & one bathroom from third floor. relocate mudroom and laundry on ground floor. relocate water heater and hvac to garage. revise kitchen layout on second floor and remove west-facing kitchen window. revise window configuration at bedroom 3. | $60,000 |
| Apr 29, 2026 | In progress issued Jun 2026 | 3880 Cesar Chavez St | C H Burnham Inc | revision to permit 202108045703, remove full bathroom from 1st floor proposed scope, convert to storage room with future bathroom rough-in plumbing.Details
revision to permit 202108045703, remove full bathroom from 1st floor proposed scope, convert to storage room with future bathroom rough-in plumbing. | |
| Feb 25, 2026 | In progress issued Aug 2026 | 3969 Washington St | Larkspur Builders Inc. | relocate front entry door, landscaping stair and install 3 direct vent gas fireplaces.Details
relocate front entry door, landscaping stair and install 3 direct vent gas fireplaces. | $40,000 |
| Feb 24, 2026 | In progress issued Mar 2026 | 3348 Broderick St | interior remodel for both units & ground fl guest room. in kind window replacement. new fixtures & cabinets in 3 bathrooms. 2 kitchens and kitchenette. new bathrooms on floor 2 & 4. relocate laundry. remove lightwell deck. no structural work.Details
interior remodel for both units & ground fl guest room. in kind window replacement. new fixtures & cabinets in 3 bathrooms. 2 kitchens and kitchenette. new bathrooms on floor 2 & 4. relocate laundry. remove lightwell deck. no structural work. | $287,000 | |
| Feb 11, 2026 | In progress issued Feb 2026 | 4121 20th St | Doran Construction & Design | revision to pa# 202308235085: extend depth of previously approved rear deck by 3'0" to reconcile to previously approved structure drawings. total new deck depth to be 6'2" with 5'6" extension for spiral stair to grade. all work within buildable lot area. (ref pa# 202507251674)Details
revision to pa# 202308235085: extend depth of previously approved rear deck by 3'0" to reconcile to previously approved structure drawings. total new deck depth to be 6'2" with 5'6" extension for spiral stair to grade. all work within buildable lot area. (ref pa# 202507251674) | $5,000 |
| Feb 11, 2026 | In progress issued Jul 2026 | 3969 Washington St | Larkspur Builders Inc. | exterior alterations: vertical roof addition / dormer to provide headroom for interior stair to 4th floor. interior alteration: construct new stair to 4th floor.Details
exterior alterations: vertical roof addition / dormer to provide headroom for interior stair to 4th floor. interior alteration: construct new stair to 4th floor. | $150,000 |
| Jan 9, 2026 | Completed final sign-off Aug 2026 | 154 Maywood Dr | S A Baxter Inc. | (n) fireplace @ 1st fl; additional bedrm & bathrm @ 2nd fl; remodel (e) bathrm; modify 2 (e) windows to comply with eerc; all (e) windows to remain unless otherwise; 3 (n) int'r doors; new trim & baseboards; (e) flooring to remain unless otherwise; all (n) electrical to replace (e) knob & tubeDetails
(n) fireplace @ 1st fl; additional bedrm & bathrm @ 2nd fl; remodel (e) bathrm; modify 2 (e) windows to comply with eerc; all (e) windows to remain unless otherwise; 3 (n) int'r doors; new trim & baseboards; (e) flooring to remain unless otherwise; all (n) electrical to replace (e) knob & tube | $150,000 |
| Dec 30, 2025 | In progress issued Apr 2026 | 647 11th Av | Caruso Construction Inc. | 2nd fl: kitchen remodel. all bedrooms remodeled. primary bath remodel, expansion of powder room to full bath. 1 new windows. 1 new exterior door to new backyard wood deck. all e windows replace in kind. all new interior doors, new trim and baseboards. e flooring to remin uon. no sliders at the fronDetails
2nd fl: kitchen remodel. all bedrooms remodeled. primary bath remodel, expansion of powder room to full bath. 1 new windows. 1 new exterior door to new backyard wood deck. all e windows replace in kind. all new interior doors, new trim and baseboards. e flooring to remin uon. no sliders at the fron | $150,000 |
| Dec 11, 2025 | In progress issued Mar 2026 | 2068 Pine St | Larkspur Builders Inc. | revision to pa# 202505277284, revised previously approved cantilevered awning at front door to wood portico supported on columns.Details
revision to pa# 202505277284, revised previously approved cantilevered awning at front door to wood portico supported on columns. | $15,000 |
| Oct 29, 2025 | In progress issued May 2026 | 55 Rosewood Dr | Cameron Builders Sf | horizontal addition @ front, replace all stucco, replace all windows and exterior doors, 2 new skylights, new roof, remove (e) hvac flues & chimney, new hvac, level floor in basement, new footings, slab & waterproofing @ basement, rebuild interior stair & stair railings, new flooring, remodel kitcheDetails
horizontal addition @ front, replace all stucco, replace all windows and exterior doors, 2 new skylights, new roof, remove (e) hvac flues & chimney, new hvac, level floor in basement, new footings, slab & waterproofing @ basement, rebuild interior stair & stair railings, new flooring, remodel kitche | $1,600,000 |
| Jul 31, 2025 | In progress issued Aug 2025 | 100 Judah St | Mcmahon Construction | maintain existing detached garage, widen garage door, and repair existing roof as needed, new siding, and doors. new fenceDetails
maintain existing detached garage, widen garage door, and repair existing roof as needed, new siding, and doors. new fence | $55,000 |
| Jul 25, 2025 | In progress issued Aug 2025 | 4121 20th St | Doran Construction & Design | revision to pa #202308235085 and 202406063893. convert approved basement gym to home office and construct new basement bathroom. relocate kitchen at 2nd floor. remove full bathroom at 2nd fl. and new bathroom at 3rd f. move primary bathroom at 3rd floor.Details
revision to pa #202308235085 and 202406063893. convert approved basement gym to home office and construct new basement bathroom. relocate kitchen at 2nd floor. remove full bathroom at 2nd fl. and new bathroom at 3rd f. move primary bathroom at 3rd floor. | $20,000 |
| Jul 16, 2025 | In progress issued Oct 2025 | 249 Santa Rosa Av | C H Burnham Inc | interior remodel and horizontal addition consisting of full interior remodel, horizontal addition at rear first and second level. landscape modification.Details
interior remodel and horizontal addition consisting of full interior remodel, horizontal addition at rear first and second level. landscape modification. | $190,000 |
| Jul 11, 2025 | In progress issued Jul 2025 | 1018 Shrader St | Orchard Construction | remodel at 1st fl, new powder room and dogwash station. remodeled stair from 1st to 2nd flDetails
remodel at 1st fl, new powder room and dogwash station. remodeled stair from 1st to 2nd fl | $40,000 |
| Jun 26, 2025 | Completed final sign-off Aug 2026 | 1225 17th Av | C H Burnham Inc | remodel new kitchenette & new window at 1st fl. remodel of kitchen & bathroom at 2nd fl. lighting & electrical upgrades. new boiler for radiant heat att 1st & 2nd fl. no new square footage, no horizontal or vertical additionDetails
remodel new kitchenette & new window at 1st fl. remodel of kitchen & bathroom at 2nd fl. lighting & electrical upgrades. new boiler for radiant heat att 1st & 2nd fl. no new square footage, no horizontal or vertical addition | $350,000 |
| May 22, 2025 | In progress issued Jul 2025 | 11 Surrey St | Kyle Wong Construction | interior kitchen remodel at the first floor. bathroom remodel at the second floor. removal and replacement of interior finishes on the 1st and 2nd floor for structural work associated for a future renovation/remodel/expansion project.Details
interior kitchen remodel at the first floor. bathroom remodel at the second floor. removal and replacement of interior finishes on the 1st and 2nd floor for structural work associated for a future renovation/remodel/expansion project. | $50,000 |
| May 16, 2025 | In progress issued Sep 2025 | 3969 Washington St | Larkspur Builders Inc. | demo 1-story rear addition at rear, 8'x8' roof dormer window, rear yard deck, retain (e) deck firewall. in-fill @ west side blind wall (a0.6 neighbor consent ltr). new rear windows & siding; demo interior partitions & fixtures, remodel interior areas, electrical, plumbing & hvac work; foundationDetails
demo 1-story rear addition at rear, 8'x8' roof dormer window, rear yard deck, retain (e) deck firewall. in-fill @ west side blind wall (a0.6 neighbor consent ltr). new rear windows & siding; demo interior partitions & fixtures, remodel interior areas, electrical, plumbing & hvac work; foundation | $1,500,000 |
| Apr 11, 2025 | Completed final sign-off May 2026 | 2467 46th Av | Aotearoa Construction | construct new ground floor media room, laundry, and bathroom at ground floor. new rear yard deck and stair to rear yard. new swing door at frontDetails
construct new ground floor media room, laundry, and bathroom at ground floor. new rear yard deck and stair to rear yard. new swing door at front | $200,000 |
| Nov 19, 2024 | Completed final sign-off Apr 2026 | 900 Chenery St | Barker-O'donoghue Master Bldrs | revision to pa#202101072240. minor re-orginazation to basement media room and media bathroom, minor re-organization of 1st floor kitchen, replacement of 2 metal gates with glass doors, elimination of 2 metal awnings, reduction in cabinetry, simplification of rear yard.Details
revision to pa#202101072240. minor re-orginazation to basement media room and media bathroom, minor re-organization of 1st floor kitchen, replacement of 2 metal gates with glass doors, elimination of 2 metal awnings, reduction in cabinetry, simplification of rear yard. | |
| Nov 4, 2024 | In progress issued Dec 2025 | 511 10th Av | C H Burnham Inc | remove non historic exterior cladding; infill under (e) elevated 2 story wing facing rear yard; replace 7 exterior windows; replace windows w/(n) clad windows; 1st fl excavation increase ceiling ht; construct (n) bedrm & (n) bath; 2nd fl - kitchen remodel & (n) powder rm; 3rd fl - remodel 2 (e) bathDetails
remove non historic exterior cladding; infill under (e) elevated 2 story wing facing rear yard; replace 7 exterior windows; replace windows w/(n) clad windows; 1st fl excavation increase ceiling ht; construct (n) bedrm & (n) bath; 2nd fl - kitchen remodel & (n) powder rm; 3rd fl - remodel 2 (e) bath | $400,000 |
| Oct 15, 2024 | In progress issued Oct 2024 | 782 Lakeview Av | C H Burnham Inc | revision to pa # 2022-1230-9538 for changes to s2.1 & s2.2 to be more consistent with approved architectural drawings.Details
revision to pa # 2022-1230-9538 for changes to s2.1 & s2.2 to be more consistent with approved architectural drawings. | $5,000 |
| Oct 11, 2024 | In progress issued Oct 2024 | 2605 Diamond St | Urban Builder General Contracting Inc | construct new exterior stair in rear yard, construct new wood fence at rear yard.Details
construct new exterior stair in rear yard, construct new wood fence at rear yard. | $20,000 |
| Oct 9, 2024 | Completed final sign-off Aug 2025 | 1466 07th Av | Mcmahon Construction | revision to 202206236955. reduced scope at proposed adu. existing kitchen to remain existing mudroom and closet to remain. existing windows to remain. no structural changes.Details
revision to 202206236955. reduced scope at proposed adu. existing kitchen to remain existing mudroom and closet to remain. existing windows to remain. no structural changes. | |
| Sep 5, 2024 | In progress issued Sep 2024 | 481 Dewey Bl | S A Baxter Inc. | enlarge opening at living room into den at 1st fl. add new bathroom and closet at 2nd fl. no new square footage, no changes to exteriorDetails
enlarge opening at living room into den at 1st fl. add new bathroom and closet at 2nd fl. no new square footage, no changes to exterior | $50,000 |
| Jul 30, 2024 | Completed final sign-off Apr 2026 | 100 Judah St | Mcmahon Construction | revision to pa 202403077342 1st fl demo & rebuild sun room & utility rooms; revise location of originally proposed powder roomDetails
revision to pa 202403077342 1st fl demo & rebuild sun room & utility rooms; revise location of originally proposed powder room | $10,000 |
| Jul 2, 2024 | In progress issued Jan 2025 | 4121 20th St | Doran Construction & Design | revision to permit application 2023-0823-5085. basement: excavate crawl space to create additional storage room, convert south storage room to mechanical room. omit spiral stair and construct new 3rd stair and landing. first floor: relocate kitchen, relocate bedroom, create new exterior grade-levelDetails
revision to permit application 2023-0823-5085. basement: excavate crawl space to create additional storage room, convert south storage room to mechanical room. omit spiral stair and construct new 3rd stair and landing. first floor: relocate kitchen, relocate bedroom, create new exterior grade-level | $40,000 |
| Jun 21, 2024 | In progress issued Jul 2025 | 3969 Washington St | Larkspur Builders Inc. | replace (9) direct set remodel windows at front with (n) wood double hung windows with integral drop lugs in kindDetails
replace (9) direct set remodel windows at front with (n) wood double hung windows with integral drop lugs in kind | $35,000 |
| May 6, 2024 | Completed final sign-off Sep 2024 | 184 Aptos Av | Reynolds - Sebastiani Design Services | new wood deck with wood stair to rear yard at coffee stationDetails
new wood deck with wood stair to rear yard at coffee station | $20,000 |
| Mar 27, 2024 | Completed final sign-off Nov 2024 | 715 Ashbury St | Deep Elm Construction Llc | revision to 202302101835: revision to size of new elevated rear yard deck, stair and firewall. deck elevation less than 10ft from grade. no work visible from street.Details
revision to 202302101835: revision to size of new elevated rear yard deck, stair and firewall. deck elevation less than 10ft from grade. no work visible from street. | $10,000 |
| Mar 27, 2024 | Completed final sign-off Jan 2025 | 184 Aptos Av | Mcmahon Construction | remodel (e) kitchen & pantry area. replace kitchen window & rear facing pantry window with new exterior door w an opening protective device to prevent door from opening. opening to lead onto deck under sep permit 202405061498Details
remodel (e) kitchen & pantry area. replace kitchen window & rear facing pantry window with new exterior door w an opening protective device to prevent door from opening. opening to lead onto deck under sep permit 202405061498 | $100,000 |
| Mar 7, 2024 | Completed final sign-off Apr 2026 | 100 Judah St | Mcmahon Construction | expansion and remodel of basement: new powder room, gym, storage, mech room & laundry closet. 1 nw window, 1st floor kitchen remodel, demo & rebuild of extg sunrm & utility rooms, new powder room & pantry. 1 nw window. 2nd fl: remodel, 2 nw full bathrooms, 3rd fl remodel: 2 nw full baths & laundryDetails
expansion and remodel of basement: new powder room, gym, storage, mech room & laundry closet. 1 nw window, 1st floor kitchen remodel, demo & rebuild of extg sunrm & utility rooms, new powder room & pantry. 1 nw window. 2nd fl: remodel, 2 nw full bathrooms, 3rd fl remodel: 2 nw full baths & laundry | $450,000 |
| Feb 20, 2024 | Completed final sign-off Jun 2025 | 118 09th Av | Larkspur Builders Inc. | move door to closet in garage, remove extg 2nd floor powder room. remodel kitchen, remodel 3rd floor extg bathrooms 2 add, 4 new skylights, replace 7 street facing windows.Details
move door to closet in garage, remove extg 2nd floor powder room. remodel kitchen, remodel 3rd floor extg bathrooms 2 add, 4 new skylights, replace 7 street facing windows. | $130,000 |
| Dec 29, 2023 | In progress issued Dec 2024 | 35 Valley St | Christopher Gate Construction Inc, Dan Gillies Construction Services Inc | vertical and horizontal addition and interior remodel of existing single family home, pursuant to 2022-004380cua. mse required for front stair sidewalk encroachment.Details
vertical and horizontal addition and interior remodel of existing single family home, pursuant to 2022-004380cua. mse required for front stair sidewalk encroachment. | $950,000 |
| Oct 10, 2023 | In progress issued May 2024 | 3880 Cesar Chavez St | C H Burnham Inc | revision to pa# 202108045703. revise primary bath layout. reduce rear yard deck (no fire wall), remove deck stairs, reduce landscape patio at rear. revise kitchen layout. revise 1st fl bathroom layout. revise location of rear-facing windows. no work visible from st.Details
revision to pa# 202108045703. revise primary bath layout. reduce rear yard deck (no fire wall), remove deck stairs, reduce landscape patio at rear. revise kitchen layout. revise 1st fl bathroom layout. revise location of rear-facing windows. no work visible from st. | |
| Sep 27, 2023 | In progress issued Apr 2024 | 79 28th St | the proposed project includes a full interior & rear and front horizontal addition. legalized a full separate unit(1495 s.f.) @ 1st flr. main unit(3368 s.f.) w/ 3 bedrms. smaller unit w/ 1 bedrm. two-car garage shared by 2 units. roof change from ridged to flat roof.Details
the proposed project includes a full interior & rear and front horizontal addition. legalized a full separate unit(1495 s.f.) @ 1st flr. main unit(3368 s.f.) w/ 3 bedrms. smaller unit w/ 1 bedrm. two-car garage shared by 2 units. roof change from ridged to flat roof. | $800,000 | |
| Aug 23, 2023 | In progress issued Mar 2024 | 4121 20th St | Doran Construction & Design | basement: replace damaged footings, create foyer and interior stair to lower unit. 1st fl: remodel (e) unit, reconfigure entry doors. 2nd fl: lower ceiling height, remodel unit. 3rd fl: legalize habitable attic space & remodel unit & add dormers. exterior: replace windows in-kind wood atDetails
basement: replace damaged footings, create foyer and interior stair to lower unit. 1st fl: remodel (e) unit, reconfigure entry doors. 2nd fl: lower ceiling height, remodel unit. 3rd fl: legalize habitable attic space & remodel unit & add dormers. exterior: replace windows in-kind wood at | $700,000 |
| Aug 3, 2023 | Expired or cancelled withdrawn May 2025 | 11 Surrey St | interior remodel at 2nd floor; living room. interior remodel at 1st floor; kitchen. new 2nd floor addition; bedroom 3.Details
interior remodel at 2nd floor; living room. interior remodel at 1st floor; kitchen. new 2nd floor addition; bedroom 3. | $100,000 | |
| Jul 25, 2023 | In progress issued Jan 2025 | 447 Hoffman Av | interior remodel & vertical& horizontal addition.converting the 1st level, which is an unconditioned space to habitable space.horizontal addition @ rear,@ first @ 2nd levels.full interior remodel of the second level,modifying the entry level in order to accommodate for a deeper front porch.Details
interior remodel & vertical& horizontal addition.converting the 1st level, which is an unconditioned space to habitable space.horizontal addition @ rear,@ first @ 2nd levels.full interior remodel of the second level,modifying the entry level in order to accommodate for a deeper front porch. | $500,000 | |
| Jul 12, 2023 | Completed final sign-off Aug 2024 | 844 Page St | C H Burnham Inc | rear bldg/ revision to 202206297404: 1st fl-construct new laundry room, remove powder rm, modify 1st fl bedroom from original. 2nd fl: modify bathroom from originalDetails
rear bldg/ revision to 202206297404: 1st fl-construct new laundry room, remove powder rm, modify 1st fl bedroom from original. 2nd fl: modify bathroom from original | |
| Jun 30, 2023 | Completed final sign-off Nov 2024 | 715 Ashbury St | Deep Elm Construction Llc | revision to bpa#202302101835, relocate proposed new 3/f bathroom to new location on 3/f. convert one bedroom into office (on 3rd flr).Details
revision to bpa#202302101835, relocate proposed new 3/f bathroom to new location on 3/f. convert one bedroom into office (on 3rd flr). | |
| Jun 20, 2023 | Completed final sign-off Aug 2023 | 10 Hillway Av | Initial Construction | remove kitchen wall. install new beam. construct kitchen island.Details
remove kitchen wall. install new beam. construct kitchen island. | $30,000 |
| May 18, 2023 | Completed final sign-off Jun 2023 | 184 Aptos Av | C H Burnham Inc | rev to pa# 202212218900, to add a closet to 2nd flr foyer & open shelving behind it at office.Details
rev to pa# 202212218900, to add a closet to 2nd flr foyer & open shelving behind it at office. | $1,000 |
| Mar 23, 2023 | Completed final sign-off Apr 2024 | 364 16th Av | Alan Wong Construction Inc | remodel and remove wall at kitchen relocate powder room remodel and relocate two full bathrooms new laundry room remove one bedroom replace furnace replace front windows in-kind new rear windows, new skylightsDetails
remodel and remove wall at kitchen relocate powder room remodel and relocate two full bathrooms new laundry room remove one bedroom replace furnace replace front windows in-kind new rear windows, new skylights | $30,000 |
| Mar 20, 2023 | Completed final sign-off Jul 2024 | 336 Cumberland St | Planart Construction Corp | 1/f: interior remodel. primary bedroom, primary bath, primary wic , desk area. 2/f: interior remodel. bath, sheetrock repair and paint.Details
1/f: interior remodel. primary bedroom, primary bath, primary wic , desk area. 2/f: interior remodel. bath, sheetrock repair and paint. | $200,000 |
| Mar 9, 2023 | Completed final sign-off Aug 2024 | 844 Page St | C H Burnham Inc | new 241sf roof deck on existing single-family home located within the required rear yard. roof deck to have open railings. construct new single exit deck access stair. no new bldg envelope increase proposed.Details
new 241sf roof deck on existing single-family home located within the required rear yard. roof deck to have open railings. construct new single exit deck access stair. no new bldg envelope increase proposed. | $100,000 |
| Mar 7, 2023 | Completed final sign-off Aug 2023 | 111 Noe St | C H Burnham Inc | revision to pa#202301059726. clarifying scope at extg deck to be replaced in kind. clarifying dry rot repair to include storage space. less than 50%. reinforcment of dropped ceiling in kitchen and dry rot repair as needed.Details
revision to pa#202301059726. clarifying scope at extg deck to be replaced in kind. clarifying dry rot repair to include storage space. less than 50%. reinforcment of dropped ceiling in kitchen and dry rot repair as needed. | |
| Feb 13, 2023 | Completed final sign-off May 2024 | 644 Oak St | front(e):add width to driveway,new concrete pavers,replace(e)steel guardrail @ (e)property line retaining wall w/steel & wood guardrail.1st fl:replace guardrail next to(e) stairs w/(n)wood handrail.2nd fl:replace entry door @,replace kitchen countertop,(n)bedroom by adding walls & door to (e)office.Details
front(e):add width to driveway,new concrete pavers,replace(e)steel guardrail @ (e)property line retaining wall w/steel & wood guardrail.1st fl:replace guardrail next to(e) stairs w/(n)wood handrail.2nd fl:replace entry door @,replace kitchen countertop,(n)bedroom by adding walls & door to (e)office. | $60,000 | |
| Feb 10, 2023 | Completed final sign-off Nov 2024 | 715 Ashbury St | Deep Elm Construction Llc | 1/f: in-fill under 2-st0ry cantilever on north side, in-fill under 1-story cantilever on west side, remove e deck & construct n deck & spiral convenience stairs to grade. interior - restore lower unit - change from 562 sf. ground fl apartment to 630 sf; replace brick foundation. 2nd fl remodel ofDetails
1/f: in-fill under 2-st0ry cantilever on north side, in-fill under 1-story cantilever on west side, remove e deck & construct n deck & spiral convenience stairs to grade. interior - restore lower unit - change from 562 sf. ground fl apartment to 630 sf; replace brick foundation. 2nd fl remodel of | $400,000 |
| Jan 5, 2023 | Completed final sign-off Aug 2023 | 111 Noe St | C H Burnham Inc | unit a: remodel bathroom, kitchen, and bedroom closet. replace 8 windows in rear and exterior rear door. repair dry rot at ceiling membrane under (e) roof deck less than 50%Details
unit a: remodel bathroom, kitchen, and bedroom closet. replace 8 windows in rear and exterior rear door. repair dry rot at ceiling membrane under (e) roof deck less than 50% | $20,000 |
| Dec 30, 2022 | Never finaled filed Dec 2022, never issued | 1128 Lake St | redevelopment of 2-unit r3 building into 3-unit r2 building (add accessory dwelling unit). horizontal and vertical additions. relocate front facade towards street. install fire sprinklers. ref. planning file 2019-006995prj.Details
redevelopment of 2-unit r3 building into 3-unit r2 building (add accessory dwelling unit). horizontal and vertical additions. relocate front facade towards street. install fire sprinklers. ref. planning file 2019-006995prj. | $1,700,000 | |
| Dec 30, 2022 | In progress issued Jul 2024 | 782 Lakeview Av | C H Burnham Inc | 1) vertical addition of 1120sf to (e) 1-story house with basement. 2) interior remodel of (e) house, add laundry, office, mudroom and stairs to addition.Details
1) vertical addition of 1120sf to (e) 1-story house with basement. 2) interior remodel of (e) house, add laundry, office, mudroom and stairs to addition. | $400,000 |
| Dec 21, 2022 | Completed final sign-off Jun 2023 | 184 Aptos Av | C H Burnham Inc | 3/flr: remodel 2 bathrooms, add laundry closet. replace 9 metal windows with wood windows, replace gravity furnace w/ new electric heat pump hvac. replace knob and tube electrical throughout.Details
3/flr: remodel 2 bathrooms, add laundry closet. replace 9 metal windows with wood windows, replace gravity furnace w/ new electric heat pump hvac. replace knob and tube electrical throughout. | $250,000 |
| Dec 21, 2022 | Completed final sign-off Dec 2024 | 258 Judson Av | interior remodel of existing kitchenDetails
interior remodel of existing kitchen | $20,000 | |
| Oct 6, 2022 | In progress issued Feb 2026 | 99 Cedro Av | Hps Palo Alto Inc. | to erect 1 story, no basement, type v-b of a new detached garage.Details
to erect 1 story, no basement, type v-b of a new detached garage. | $40,000 |
| Sep 8, 2022 | Completed final sign-off Dec 2022 | 1620 Broadway | C H Burnham Inc | unit 6: rev to pa 202106142341. revise scope to include 5 new replacement windows at sides and rear (not visible from street) only second floor roof safety rail. omit third flr roof. review roof curb detail and rail designDetails
unit 6: rev to pa 202106142341. revise scope to include 5 new replacement windows at sides and rear (not visible from street) only second floor roof safety rail. omit third flr roof. review roof curb detail and rail design | |
| Sep 6, 2022 | Completed final sign-off Mar 2024 | 650 Delancey St | S A Baxter Inc. | unit 413: interior remodel, replace e cabinets, backsplash & floor tile at kitchen, replace e vanity & floor tile in guest bathrm, replace e light fixtures, outlets & switches , n lighting, outlets & switches, paint all int walls & doors, no structural, no walls moved, no changeDetails
unit 413: interior remodel, replace e cabinets, backsplash & floor tile at kitchen, replace e vanity & floor tile in guest bathrm, replace e light fixtures, outlets & switches , n lighting, outlets & switches, paint all int walls & doors, no structural, no walls moved, no change | $110,000 |
| Jul 1, 2022 | Completed final sign-off Nov 2022 | 1682 23rd Av | San Francisco Design & Constr. | remodel one powder room and one master bath room. all works are located on second floor.Details
remodel one powder room and one master bath room. all works are located on second floor. | $37,000 |
| Jun 29, 2022 | Completed final sign-off Aug 2024 | 844 Page St | C H Burnham Inc | rear building: new internal stair to connect (e) conditioned 1/ to 2/f. interior remodel 1/f: construction of (2) bedroos, convert (e) door to eero windows.construction (n) powder room. construction (n) media room. interior remodel, 2/f: convert (e) bedroom to living room, convert (e) bed to (n)ofceDetails
rear building: new internal stair to connect (e) conditioned 1/ to 2/f. interior remodel 1/f: construction of (2) bedroos, convert (e) door to eero windows.construction (n) powder room. construction (n) media room. interior remodel, 2/f: convert (e) bedroom to living room, convert (e) bed to (n)ofce | $275,000 |
| Jun 16, 2022 | Completed final sign-off Apr 2023 | 48 Westgate Dr | C H Burnham Inc | interior remodel of existing kitchen and dining room.Details
interior remodel of existing kitchen and dining room. | $50,000 |
| Jun 7, 2022 | Completed final sign-off May 2023 | 737 Moultrie St | Atlas General Construction | (n) deck in (e) lightwell. replace (e) ext stairs & landing. remodel(e) mudroom, partially expand into lightwell.Details
(n) deck in (e) lightwell. replace (e) ext stairs & landing. remodel(e) mudroom, partially expand into lightwell. | $50,000 |
| May 31, 2022 | Never finaled issued Feb 2023, no final | 238 Francisco St | construct cantilievered deck at upper unit at rear. ref prj 2019-021107prj/varDetails
construct cantilievered deck at upper unit at rear. ref prj 2019-021107prj/var | $12,000 | |
| May 18, 2022 | Completed final sign-off Apr 2023 | 318 Avila St | raise headers @ three existing interior doorways. no exterior workDetails
raise headers @ three existing interior doorways. no exterior work | $5,000 | |
| Mar 17, 2022 | Completed final sign-off Apr 2024 | 254 28th Av | S A Baxter Inc., Mcmahon Construction | remodel 1 (e) bathroom. remodle and remove wall at ktichen.rebuild interal stair to g/f . excavate at g/f to add new conditioned living space, including media room, new full bathroom and new bedroom. replace furnace.Details
remodel 1 (e) bathroom. remodle and remove wall at ktichen.rebuild interal stair to g/f . excavate at g/f to add new conditioned living space, including media room, new full bathroom and new bedroom. replace furnace. | $300,000 |
| Feb 14, 2022 | Completed final sign-off Jul 2023 | 220 San Marcos Av | Cs Construction Co | 2/f: remodel (e) kitchen and 2 bathrooms. replace window and remove wall at kitchen. add recessed lighting and replace wood flooring. construct new cabinet at dining room. work to repair/comply with nov 202183505.Details
2/f: remodel (e) kitchen and 2 bathrooms. replace window and remove wall at kitchen. add recessed lighting and replace wood flooring. construct new cabinet at dining room. work to repair/comply with nov 202183505. | $200,000 |
| Dec 14, 2021 | In progress issued Nov 2024 | 99 Cedro Av | Hps Palo Alto Inc. | demolition of garageDetails
demolition of garage | $10,000 |
| Sep 28, 2021 | Expired or cancelled cancelled Jan 2026 | 338 Main St | Larkspur Builders Inc. | revision to pa 201803153740. reduce height of proposed deck wind screen from 5' to 3'6" above deck finish floor.Details
revision to pa 201803153740. reduce height of proposed deck wind screen from 5' to 3'6" above deck finish floor. | |
| Aug 4, 2021 | Never finaled issued Sep 2022, no final | 3880 Cesar Chavez St | C H Burnham Inc | alter site to revise site pa#201703312927-s. reduction of approved 4-story 23'-3" horizontal addition to smaller 3-story 2'-8" horizontal addition with 16'-0" 2nd fl deck and stair to grade in rear yd (18'-8" total proposed horizontal addition). no change to street facade aside from restoration workDetails
alter site to revise site pa#201703312927-s. reduction of approved 4-story 23'-3" horizontal addition to smaller 3-story 2'-8" horizontal addition with 16'-0" 2nd fl deck and stair to grade in rear yd (18'-8" total proposed horizontal addition). no change to street facade aside from restoration work | |
| Jun 14, 2021 | Completed final sign-off Dec 2022 | 1620 Broadway | C H Burnham Inc | 3rd flr #6 - replace 5 (e) winoows at side & rear of unit 6 (non visible from st). replace (e) safety rail at non-occupied 3rd fl roof. add safety rail @ 4th fl roof. add skylight at unit 6 kitchen. no roof deck existing or proposed.Details
3rd flr #6 - replace 5 (e) winoows at side & rear of unit 6 (non visible from st). replace (e) safety rail at non-occupied 3rd fl roof. add safety rail @ 4th fl roof. add skylight at unit 6 kitchen. no roof deck existing or proposed. | $30,000 |
| Apr 26, 2021 | Completed final sign-off Jul 2022 | 2482 Great Hy | Unicon Construction Solutions Llc | unit 2482 & 2484: remodel kitchen and bathroom laundry at both units, in-kind replacement of all windows, enlarge storage at ground floorDetails
unit 2482 & 2484: remodel kitchen and bathroom laundry at both units, in-kind replacement of all windows, enlarge storage at ground floor | $120,000 |
| Apr 26, 2021 | Completed final sign-off May 2021 | 3035 Pierce St | Forsythe General Contractors | revision to pa# 202002285698. revise scope to remove exterior convenience stair and firewall from project.Details
revision to pa# 202002285698. revise scope to remove exterior convenience stair and firewall from project. | $300 |
| Apr 23, 2021 | Expired or cancelled cancelled Jan 2026 | 1261 28th Av | interior remmodel of (e) first floor /conversion of 505 sqft from unconditioned to conditioned, relocate bathroom and laundry, creation of new family room, no work at upper floors, no work visible from streetDetails
interior remmodel of (e) first floor /conversion of 505 sqft from unconditioned to conditioned, relocate bathroom and laundry, creation of new family room, no work at upper floors, no work visible from street | $75,000 | |
| Mar 4, 2021 | Completed final sign-off Sep 2021 | 3384 Sacramento St | Damar Construction And Remodeling Inc | install recessed lighting and controls in retail space, bathroom, and back of house. deferred submittal for pa# 202010066008.Details
install recessed lighting and controls in retail space, bathroom, and back of house. deferred submittal for pa# 202010066008. | $7,000 |
| Jan 22, 2021 | Completed final sign-off Jan 2022 | 54 Bret Harte Tr | Larkspur Builders Inc. | remodel 2 existing bathrooms. add 3rd new bathroom.Details
remodel 2 existing bathrooms. add 3rd new bathroom. | $105,000 |
| Jan 7, 2021 | Completed final sign-off Apr 2026 | 900 Chenery St | Barker-O'donoghue Master Bldrs | horizontal addition at 1st & 2nd floor of (e) 2 story house over basement. remodel basement and add guest suite. remodel existing house and add bathroom & master suite with balcony.Details
horizontal addition at 1st & 2nd floor of (e) 2 story house over basement. remodel basement and add guest suite. remodel existing house and add bathroom & master suite with balcony. | $750,000 |
| Dec 29, 2020 | Never finaled issued Feb 2021, no final | 11 Surrey St | C H Burnham Inc | revision to pa #202008222416 - foundation replacement beneath breakfast room to replace posts and piers with continuous footing. extension of curb detail across front of mechanical roomDetails
revision to pa #202008222416 - foundation replacement beneath breakfast room to replace posts and piers with continuous footing. extension of curb detail across front of mechanical room | $3,000 |
| Dec 17, 2020 | Expired or cancelled expired May 2025 | 833 Rockdale Dr | H T H Construction | new deck and stair in rear yard; remove side kitchen door & stair to gradeDetails
new deck and stair in rear yard; remove side kitchen door & stair to grade | $15,000 |
| Dec 16, 2020 | Completed final sign-off Apr 2022 | 859 Wisconsin St | San Francisco Design & Constr. | reduction of scope to permit #201711143951. new scope: 174 sq ft addition to existing 2-story duplex. remodel lower unit (add 50 sq ft). remodel upper unit (add 124 sq ft).Details
reduction of scope to permit #201711143951. new scope: 174 sq ft addition to existing 2-story duplex. remodel lower unit (add 50 sq ft). remodel upper unit (add 124 sq ft). | |
| Dec 3, 2020 | Completed final sign-off Nov 2022 | 671 Ulloa St | Richard De Nola, Sexton Construction | remodel 2nd fl existing bathroom & bedroom closet. replace bathroom window not visible from street. no structural work.Details
remodel 2nd fl existing bathroom & bedroom closet. replace bathroom window not visible from street. no structural work. | $40,000 |
| Nov 24, 2020 | Expired or cancelled cancelled Feb 2022 | 307 Parker Av | Larkspur Builders Inc. | 1/f: add new bathroom & new laundry. no exterior workk.Details
1/f: add new bathroom & new laundry. no exterior workk. | $90,000 |
| Nov 24, 2020 | Completed final sign-off Dec 2021 | 4430 24th St | H T H Construction | new stairs & landscape walls at the rear yard.Details
new stairs & landscape walls at the rear yard. | $90,000 |
| Oct 30, 2020 | Completed final sign-off May 2021 | 308 Los Palmos Dr | Argos Construction | add 2 new rooms down and full bathroom within (e) storage ara. no independent connection to street, open connectoin to floor above . no work visible from street.Details
add 2 new rooms down and full bathroom within (e) storage ara. no independent connection to street, open connectoin to floor above . no work visible from street. | $50,000 |
| Oct 30, 2020 | Never finaled issued Feb 2021, no final | 109 Noe St | Larkspur Builders Inc. | remodel bathrooms, kitchen, living room. (unit 109)Details
remodel bathrooms, kitchen, living room. (unit 109) | $100,000 |
| Oct 30, 2020 | Completed final sign-off Dec 2023 | 10 Hillway Av | H T H Construction | horizontal expansion of deck at second floor. horizontal expansion of new laundry room (unconditioned)/storage at first floor.Details
horizontal expansion of deck at second floor. horizontal expansion of new laundry room (unconditioned)/storage at first floor. | $60,000 |
| Sep 30, 2020 | Completed final sign-off Jan 2021 | 3035 Pierce St | Forsythe General Contractors | rev to pa202002285698: structural upgrade at (e) garage door opening.Details
rev to pa202002285698: structural upgrade at (e) garage door opening. | $10,000 |
| Sep 19, 2020 | Completed final sign-off May 2025 | 833 Rockdale Dr | S A Baxter Inc., H T H Construction | to comply with nov # 202049291; interior remodel - ( n ) bath at 1st flr, ( n ) window in bath not visible from street. relocate washer & dryer, ( n ) water heater. deck under separate permit.Details
to comply with nov # 202049291; interior remodel - ( n ) bath at 1st flr, ( n ) window in bath not visible from street. relocate washer & dryer, ( n ) water heater. deck under separate permit. | $20,000 |
| Aug 22, 2020 | Completed final sign-off Jun 2023 | 11 Surrey St | C H Burnham Inc | interior remodel of (e) 2-story residence with 267 unconditioned crawl space; remodel bath, add skylight, (n) window, family rm, remodel living rm/kitchen/breakfast rm. move doors in 2 bedrooms. convert crawl space into conditioned space w/ laundry/bath/mech room. new deck/stairs and wall.Details
interior remodel of (e) 2-story residence with 267 unconditioned crawl space; remodel bath, add skylight, (n) window, family rm, remodel living rm/kitchen/breakfast rm. move doors in 2 bedrooms. convert crawl space into conditioned space w/ laundry/bath/mech room. new deck/stairs and wall. | $100,000 |
| Aug 6, 2020 | Completed final sign-off Mar 2021 | 92 Sanchez St | Larkspur Builders Inc. | interior remodel of 2/f, 2-story duplex: remove wall @ front rooms, remodel kitchen, add new bathroom, add recessed lighting per plan, replace 10 windows in-kind w/new clad windows (not visible from street). no change to building facade or historic windows in front of building.Details
interior remodel of 2/f, 2-story duplex: remove wall @ front rooms, remodel kitchen, add new bathroom, add recessed lighting per plan, replace 10 windows in-kind w/new clad windows (not visible from street). no change to building facade or historic windows in front of building. | $175,000 |
| Jul 1, 2020 | Never finaled issued Jul 2020, no final | 92 Sanchez St | in kind remodel of existing full bath, water closet & kitchen on second floor.Details
in kind remodel of existing full bath, water closet & kitchen on second floor. | $50,000 | |
| Feb 19, 2020 | Completed final sign-off Feb 2021 | 42 Clairview Ct | Hardtke Construction | remodel lower floor - new office, remodel family room, relocate bath 2, new laundry room, new guest bedroom, remodel upper floor - remodel bath 1, (n) deck, (n) patio doors. (e) garage door to remain.Details
remodel lower floor - new office, remodel family room, relocate bath 2, new laundry room, new guest bedroom, remodel upper floor - remodel bath 1, (n) deck, (n) patio doors. (e) garage door to remain. | $200,000 |
| Feb 12, 2020 | Never finaled issued Feb 2020, no final | 833 Douglass St | Acri Ddc | unit 833: infill pocket door between living rm and bedroomDetails
unit 833: infill pocket door between living rm and bedroom | $3,000 |
| Jan 23, 2020 | Never finaled issued Jan 2020, no final | 704 Ashbury St | Larkspur Builders Inc. | remodel existing kitchen on 2nd floor. no work visible from street, no change to exterior of building, no drawings. kitchen remodel in-kindDetails
remodel existing kitchen on 2nd floor. no work visible from street, no change to exterior of building, no drawings. kitchen remodel in-kind | $20,000 |
| Jan 21, 2020 | Completed final sign-off Oct 2020 | 835 Douglass St | Acri Ddc | remodel kitchen, living room (e) bathroom, construct (n) bathroom install beam at livng room, replace top floor windows at rearDetails
remodel kitchen, living room (e) bathroom, construct (n) bathroom install beam at livng room, replace top floor windows at rear | $50,000 |
| Jan 9, 2020 | Never finaled issued Jan 2020, no final | 181 Fremont St | Baxter Construction | 181 fremont st 56d aka 43d: reconfigure master closet, install new pocket door at closet. relocate master bedroom door. no structural electrical work under separate permit. sprinkler work under separate permit.Details
181 fremont st 56d aka 43d: reconfigure master closet, install new pocket door at closet. relocate master bedroom door. no structural electrical work under separate permit. sprinkler work under separate permit. | $35,000 |
| Oct 18, 2019 | Completed final sign-off Jan 2020 | 488 Folsom St | Aaron Gordon Construction Inc | non-structural reconfiguration at condo entry and master closet; add sliding door at laundry, add recessed lighting, minor electrical receptacle layout modificaiton. no change to unit fire separation and no work wisible from public right of wayDetails
non-structural reconfiguration at condo entry and master closet; add sliding door at laundry, add recessed lighting, minor electrical receptacle layout modificaiton. no change to unit fire separation and no work wisible from public right of way | $75,000 |
| Oct 9, 2019 | Completed final sign-off Dec 2021 | 2104 Divisadero St | Rozen Home Builders Inc, Level 8 Construction Inc | rooms down project - adding a family room with a bathroom. includes new underground plumbing, new electrical, new plumbing. adding new led lights, new high eff forced air system, new patio,Details
rooms down project - adding a family room with a bathroom. includes new underground plumbing, new electrical, new plumbing. adding new led lights, new high eff forced air system, new patio, | $200,000 |
| Sep 20, 2019 | Completed final sign-off Feb 2020 | 301 Main St | Aaron Gordon Construction Inc | in-kind remodel of common-use kitchen in resident's clubhouse not for general public use. remodel work to comply with sfdbi information sheet da-11 regarding application of 2016 c.b.c chapter 11a and the federal fair housing design manual. maher naDetails
in-kind remodel of common-use kitchen in resident's clubhouse not for general public use. remodel work to comply with sfdbi information sheet da-11 regarding application of 2016 c.b.c chapter 11a and the federal fair housing design manual. maher na | $25,000 |