Argos Construction
- Based in
- South Francisco
- On San Francisco permits
- Jan 2014 to Jul 2026
- Last 24 months
- 2 permits filed
40 permits since 2000: 30 completed, 2 in progress, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 2, 2026 | In progress issued Jul 2026 | 223 Sanchez St | remove existing drop-in shower; install new shower pan, wall tile, floor tile, and shower fixtures, no wall removal. existing vanity and toilet to remain. approximately 35sf. applicant informed of increase in valuation. 7/2/26 azDetails
remove existing drop-in shower; install new shower pan, wall tile, floor tile, and shower fixtures, no wall removal. existing vanity and toilet to remain. approximately 35sf. applicant informed of increase in valuation. 7/2/26 az | $4,000 |
| Apr 23, 2025 | In progress filed Apr 2025, not yet issued | 342 26th Av | install metal beam in the low unit. install new concrete floor and new pier. remodel existing bathroom and kitchen. replace lights in the ceiling. new sheetrock. add (n) bathroom and closet at 2nd flDetails
install metal beam in the low unit. install new concrete floor and new pier. remodel existing bathroom and kitchen. replace lights in the ceiling. new sheetrock. add (n) bathroom and closet at 2nd fl | $60,000 |
| Sep 29, 2022 | Completed final sign-off Feb 2023 | 783 24th Av | remodeling kitchen: replace cabinets and appliances. remodeling two bathrooms: replace tile, sink, lights, tub in both bathrooms. upgrade electrical panel to 200 amps.Details
remodeling kitchen: replace cabinets and appliances. remodeling two bathrooms: replace tile, sink, lights, tub in both bathrooms. upgrade electrical panel to 200 amps. | $27,500 |
| Jun 29, 2022 | Completed final sign-off Dec 2022 | 3687 Market St | interior remodel to include: add new master bathroom on 3/f. one new front window and one side window.Details
interior remodel to include: add new master bathroom on 3/f. one new front window and one side window. | $20,000 |
| Nov 12, 2021 | Never finaled issued Nov 2021, no final | 931 Grove St | remove & replace (4) front windows & garage door. selective stucco repair & paintDetails
remove & replace (4) front windows & garage door. selective stucco repair & paint | $21,143 |
| Jun 24, 2021 | Completed final sign-off Feb 2022 | 782 Haight St | administrative permit, to correct address on pa# 202106021447Details
administrative permit, to correct address on pa# 202106021447 | |
| Jun 14, 2021 | Completed final sign-off Feb 2022 | 780 Haight St | revision to pa #202011179113 - remove (e) post and beam on top floor residential unit. reinforce (e) roof with (n) joists for clear span property.Details
revision to pa #202011179113 - remove (e) post and beam on top floor residential unit. reinforce (e) roof with (n) joists for clear span property. | $19,750 |
| Jun 2, 2021 | Completed final sign-off Feb 2022 | 780 Haight St | to comply with physical inspection reportDetails
to comply with physical inspection report | $4,500 |
| Mar 11, 2021 | Completed final sign-off Nov 2021 | 1617 Church St | remodel kitchen and bath. replace all appliances, cabinets, tile, fixtures, outletsDetails
remodel kitchen and bath. replace all appliances, cabinets, tile, fixtures, outlets | $28,000 |
| Nov 21, 2020 | Expired or cancelled cancelled Jan 2026 | 737 Castro St | new rear deck in backyard. height=8'6". total size=167 sqft. l-shaped deck. (17'3" x 7'10") + (5'3" x 6'1").Details
new rear deck in backyard. height=8'6". total size=167 sqft. l-shaped deck. (17'3" x 7'10") + (5'3" x 6'1"). | $25,000 |
| Nov 17, 2020 | Completed final sign-off Feb 2022 | 780 Haight St | work to (e) residential unit on 2nd flr. renovate (e) kitchen, laundry room & bathroom in existing location. add new bathroom. reconfigure closets and access to bedrooms. no exterior work.Details
work to (e) residential unit on 2nd flr. renovate (e) kitchen, laundry room & bathroom in existing location. add new bathroom. reconfigure closets and access to bedrooms. no exterior work. | $36,000 |
| Oct 30, 2020 | Completed final sign-off May 2021 | 308 Los Palmos Dr | add 2 new rooms down and full bathroom within (e) storage ara. no independent connection to street, open connectoin to floor above . no work visible from street.Details
add 2 new rooms down and full bathroom within (e) storage ara. no independent connection to street, open connectoin to floor above . no work visible from street. | $50,000 |
| Sep 10, 2020 | Completed final sign-off May 2021 | 308 Los Palmos Dr | demo (e) tile and install new tile in the bathroo. install new vanity. bathroom remodelDetails
demo (e) tile and install new tile in the bathroo. install new vanity. bathroom remodel | $14,500 |
| Mar 12, 2020 | Never finaled issued Mar 2020, no final | 36 Cameo Wy | demo existing opening and make it wider. install beam and posts. extend door openingDetails
demo existing opening and make it wider. install beam and posts. extend door opening | $15,000 |
| Oct 24, 2019 | Completed final sign-off Jul 2020 | 1776 Revere Av | revision to app#201904228596 per plans. reconfigure interior stairs, enlarge deck at rear. 2 new skylights.Details
revision to app#201904228596 per plans. reconfigure interior stairs, enlarge deck at rear. 2 new skylights. | |
| Jul 22, 2019 | Completed final sign-off Sep 2020 | 682 Castro St | int remodel of (e) 2 story sfd. ground flr - remodel int wall remodel kitchen, bath. 2nd flr - add new windows new stairs, new bathroom move front door. keep (e) deck, add new deck & jacuzziDetails
int remodel of (e) 2 story sfd. ground flr - remodel int wall remodel kitchen, bath. 2nd flr - add new windows new stairs, new bathroom move front door. keep (e) deck, add new deck & jacuzzi | $100,000 |
| Apr 22, 2019 | Completed final sign-off Jul 2020 | 1776 Revere Av | 1st fl: relocate interior stairs and bedroom. remodel bathroom. rooms approved under bpa #201502057655. 2nd fl: relocate kitchen & bath. and half bath and new deck at rear. attic: addstairs and 1 dormer. add hottub at rear, less than 3' from grade.Details
1st fl: relocate interior stairs and bedroom. remodel bathroom. rooms approved under bpa #201502057655. 2nd fl: relocate kitchen & bath. and half bath and new deck at rear. attic: addstairs and 1 dormer. add hottub at rear, less than 3' from grade. | $40,000 |
| Apr 6, 2018 | Completed final sign-off May 2019 | 1490 Ocean Av | t.i. for a tea store in an existing commercial space.Details
t.i. for a tea store in an existing commercial space. | $103,000 |
| Dec 22, 2017 | Completed final sign-off Feb 2018 | 3826 22nd St | 2/f (1) bathroom remodel, relocate plumbing for sink, toilet, remove washer/dryer, provide new gas line, replace new lights on ceiling, install linoleum onn floor, install gfci.Details
2/f (1) bathroom remodel, relocate plumbing for sink, toilet, remove washer/dryer, provide new gas line, replace new lights on ceiling, install linoleum onn floor, install gfci. | $8,000 |
| Oct 16, 2017 | Completed final sign-off Dec 2017 | 130 Belvedere St | remodel 1/2 bath to full bath. non-structural, all work to include electrical, plumbing. move toilet and sinkDetails
remodel 1/2 bath to full bath. non-structural, all work to include electrical, plumbing. move toilet and sink | $18,500 |
| Aug 1, 2017 | Completed final sign-off Oct 2017 | 1471 19th Av | apt 3: kitchen remodel: change cabinets, new countertop,new hardwood floor, installnew appliances. no walls moved, removed, added or infilled. all (e) layouts to remain unchanged.Details
apt 3: kitchen remodel: change cabinets, new countertop,new hardwood floor, installnew appliances. no walls moved, removed, added or infilled. all (e) layouts to remain unchanged. | $12,000 |
| Oct 13, 2016 | Completed final sign-off Dec 2016 | 78 Levant St | replace tub, install new stand shower, shower valve, lights on ceiling, vanity, cement boards, surround bath, tile; in-kind; no changes to wall locations.Details
replace tub, install new stand shower, shower valve, lights on ceiling, vanity, cement boards, surround bath, tile; in-kind; no changes to wall locations. | $15,975 |
| Aug 24, 2016 | Completed final sign-off Feb 2017 | 959 Wisconsin St | install new beam in the bedroom. upgrade extg bathroom with new shower pan, lights, and fan. bldg new kitchen with new plmg, cabinets. bldg new bedroom with new lights, bldg new bathroom instead of laundry room. upgrade electrical panel with new breakers.Details
install new beam in the bedroom. upgrade extg bathroom with new shower pan, lights, and fan. bldg new kitchen with new plmg, cabinets. bldg new bedroom with new lights, bldg new bathroom instead of laundry room. upgrade electrical panel with new breakers. | $31,000 |
| Jul 7, 2016 | Never finaled issued Aug 2016, no final | 4244 25th St | unit 1 & 2 (n) elec & plbg; unit 1 -structural to open wall bet (e) kitchen & dining.widen (e) opening into bedrm. revisions to (e) ktichen & (e) restrm @ separate permit.replace (e) heating sys. unit 2 -revision to (e) partitions,remodel (e) bathrm, add (n) bath,open ceiling above stair,add skyliteDetails
unit 1 & 2 (n) elec & plbg; unit 1 -structural to open wall bet (e) kitchen & dining.widen (e) opening into bedrm. revisions to (e) ktichen & (e) restrm @ separate permit.replace (e) heating sys. unit 2 -revision to (e) partitions,remodel (e) bathrm, add (n) bath,open ceiling above stair,add skylite | $100,000 |
| Jun 15, 2016 | Completed final sign-off Jul 2016 | 9 Broderick St | to comply with complaint # 201579372, install high efficiency furnace in basement, install new duct to master bedroom ,office, living room, beddroom. install new return & ductDetails
to comply with complaint # 201579372, install high efficiency furnace in basement, install new duct to master bedroom ,office, living room, beddroom. install new return & duct | $6,000 |
| Jun 1, 2016 | Never finaled issued Jun 2016, no final | 110 Steiner St | repair dryrot on siding - no framing has been damaged/needs repair/at south side. work not visible so far from the street.Details
repair dryrot on siding - no framing has been damaged/needs repair/at south side. work not visible so far from the street. | $4,000 |
| May 17, 2016 | Expired or cancelled withdrawn Dec 2016 | 51 Somerset St | revision to #2016-0329-3411. remodel bathroom, remodel kitchen on top floor. rebuild stair. relocate one skylight and make wider one skylight. build bathroom, den room, laundry on 1st floor. install the outside sliding doors. build new redwood patio. replace furnace.Details
revision to #2016-0329-3411. remodel bathroom, remodel kitchen on top floor. rebuild stair. relocate one skylight and make wider one skylight. build bathroom, den room, laundry on 1st floor. install the outside sliding doors. build new redwood patio. replace furnace. | $120,000 |
| Mar 29, 2016 | Never finaled issued Mar 2016, no final | 51 Somerset St | remove old kitchen. install backsplash, tile, cabinets. no walls moved. added or installed. all existing layouts to remain unchangedDetails
remove old kitchen. install backsplash, tile, cabinets. no walls moved. added or installed. all existing layouts to remain unchanged | $14,000 |
| Feb 12, 2016 | Completed final sign-off Feb 2017 | 959 Wisconsin St | rev. to 2016-0113-7022 - add 2 non bearing walls at kitchen .Details
rev. to 2016-0113-7022 - add 2 non bearing walls at kitchen . | $1,500 |
| Jan 13, 2016 | Completed final sign-off Jun 2016 | 959 Wisconsin St | replace cabinets with new, new flooring, hardwood, replace micorwave, gas stove, sink garbage disposal ., install electrical gfci outlets, replace dryer, washer, replace lights, to be high effeciency no walls moved or fixtures relocated.Details
replace cabinets with new, new flooring, hardwood, replace micorwave, gas stove, sink garbage disposal ., install electrical gfci outlets, replace dryer, washer, replace lights, to be high effeciency no walls moved or fixtures relocated. | $12,000 |
| Jan 8, 2016 | Completed final sign-off Mar 2016 | 150 San Felipe Av | replace bath, shower pan, all tile, lights, floor tile, replace shower valve, install gfci. n/a ordinance #155-13Details
replace bath, shower pan, all tile, lights, floor tile, replace shower valve, install gfci. n/a ordinance #155-13 | $11,500 |
| Dec 7, 2015 | Completed final sign-off Mar 2016 | 68 Rosemont Pl | add new non-load bearing wall to add a new bedroom, remove a non-load bearing wall.Details
add new non-load bearing wall to add a new bedroom, remove a non-load bearing wall. | $20,000 |
| Aug 26, 2015 | Completed final sign-off Oct 2015 | 799 La Playa | convert bathroom to stand shower room. relocate drainage, vanity in hally. install like-in hallway.Details
convert bathroom to stand shower room. relocate drainage, vanity in hally. install like-in hallway. | $12,000 |
| May 28, 2015 | Completed final sign-off Aug 2015 | 423 Waller St | unit 8: replace sink, hood, subpanel & provide separate electrical lines for dishwasher & microwave. replace hardwood floor, relocate gas stove, install cabinets. no change to walls & doors.Details
unit 8: replace sink, hood, subpanel & provide separate electrical lines for dishwasher & microwave. replace hardwood floor, relocate gas stove, install cabinets. no change to walls & doors. | $14,000 |
| Jan 28, 2015 | Expired or cancelled cancelled Feb 2015 | 438 Melrose Av | revision: ground all existing outlets (4 rooms) and install 4 lights on the ceiling in dining room. provide new line from bathroom to the main panel. revision to permit ap#201412012675.Details
revision: ground all existing outlets (4 rooms) and install 4 lights on the ceiling in dining room. provide new line from bathroom to the main panel. revision to permit ap#201412012675. | $11,000 |
| Jan 20, 2015 | Completed final sign-off Apr 2015 | 655 Corbett Av | remodel existing kitchen cabients, range, sink etc enlarge existing closet and remove island centerDetails
remodel existing kitchen cabients, range, sink etc enlarge existing closet and remove island center | $10,000 |
| Dec 1, 2014 | Completed final sign-off Mar 2015 | 438 Melrose Av | remodel one bathroom on upper level. install fan (no heat). replace vanity, toilet, flooring. any lighting change will be high efficacy. no work on (e) tub separate shower stall. no change in wall and openings.Details
remodel one bathroom on upper level. install fan (no heat). replace vanity, toilet, flooring. any lighting change will be high efficacy. no work on (e) tub separate shower stall. no change in wall and openings. | $11,000 |
| May 5, 2014 | Completed final sign-off Jul 2014 | 783 25th Av | proposed new stair from second floor dining area to rear yard.Details
proposed new stair from second floor dining area to rear yard. | $4,000 |
| Mar 3, 2014 | Completed final sign-off May 2014 | 783 25th Av | move window 18" aside from existing location @ 3/f bathroom, cover with framing existing door and install new plywood and siding outside this opening on 2/f bathroom. not visable from the street.Details
move window 18" aside from existing location @ 3/f bathroom, cover with framing existing door and install new plywood and siding outside this opening on 2/f bathroom. not visable from the street. | $200 |
| Jan 27, 2014 | Completed final sign-off May 2014 | 783 25th Av | remodeling 2 bathrooms with insulation walls, plumbing relocate, electric lights, tile change shower to bath tub on 2nd flr, lighting shall comply with t-24Details
remodeling 2 bathrooms with insulation walls, plumbing relocate, electric lights, tile change shower to bath tub on 2nd flr, lighting shall comply with t-24 | $18,000 |