Sexton Construction
- Based in
- Novato
- On San Francisco permits
- Mar 2014 to Jun 2026
- Last 24 months
- 1 permit filed
24 permits since 2000: 20 completed, 2 in progress, 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 12, 2026 | In progress issued Jun 2026 | 445 Taraval St | removal of (e) sign boards, post (sign) and installation of new fencing in the area of the parking lot. trimming the trees for installing new fencingDetails
removal of (e) sign boards, post (sign) and installation of new fencing in the area of the parking lot. trimming the trees for installing new fencing | $27,500 |
| Oct 4, 2024 | In progress issued Oct 2024 | 1980 Grant Av | unit #8: bathroom remodel replace shower stall new tile/plumbing fixtures. replace old furnace, relocate electrical panel.Details
unit #8: bathroom remodel replace shower stall new tile/plumbing fixtures. replace old furnace, relocate electrical panel. | $16,000 |
| Oct 21, 2022 | Completed final sign-off Feb 2023 | 1670 09th Av | bathroom remodel in kind- window replacement in kind on side of building not visible from street. ufactor max. 0.30Details
bathroom remodel in kind- window replacement in kind on side of building not visible from street. ufactor max. 0.30 | $30,000 |
| Jan 5, 2022 | Completed final sign-off Feb 2023 | 1310 Montgomery St | remodel 2 bathrooms. 2nd floor - eliminate added soaking tub/ jacuzze & small shower & replace with a larger shower. 1st floor - apartment bath replace small tub/shower to larger shower. interior work only.Details
remodel 2 bathrooms. 2nd floor - eliminate added soaking tub/ jacuzze & small shower & replace with a larger shower. 1st floor - apartment bath replace small tub/shower to larger shower. interior work only. | $30,000 |
| Sep 14, 2021 | Never finaled issued Sep 2021, no final | 676 Clipper St | remodel 2nd floor bathroom change bath tub to shower keep everything in same location. he lighting per cec 150.0 k.Details
remodel 2nd floor bathroom change bath tub to shower keep everything in same location. he lighting per cec 150.0 k. | $22,000 |
| Dec 3, 2020 | Completed final sign-off Nov 2022 | 671 Ulloa St | remodel 2nd fl existing bathroom & bedroom closet. replace bathroom window not visible from street. no structural work.Details
remodel 2nd fl existing bathroom & bedroom closet. replace bathroom window not visible from street. no structural work. | $40,000 |
| Sep 23, 2020 | Completed final sign-off Jan 2021 | 115 Winfield St | install new shingles & new windows mathcing existing exterior due to dryrot. street facing.Details
install new shingles & new windows mathcing existing exterior due to dryrot. street facing. | $28,000 |
| May 27, 2020 | Completed final sign-off Jan 2021 | 16 Commonwealth Av | repair dry rot on exterior of building. maher na at front facade and right side - replace selected dry rot boards and replace in-kind with horizontal cedar siding boards (approx 300 sf). replace selected window trim in-kind.Details
repair dry rot on exterior of building. maher na at front facade and right side - replace selected dry rot boards and replace in-kind with horizontal cedar siding boards (approx 300 sf). replace selected window trim in-kind. | $6,000 |
| Jun 28, 2019 | Completed final sign-off Jan 2021 | 131 Hamerton Av | kitchen and bath remodel. remove wall from kitchen to new living room. (n) bedroom at front of 1st flr. 2 (n) windows at front of houseDetails
kitchen and bath remodel. remove wall from kitchen to new living room. (n) bedroom at front of 1st flr. 2 (n) windows at front of house | $80,000 |
| Feb 14, 2019 | Completed final sign-off May 2019 | 676 Clipper St | bathroom remodel. take out bathtub replace with shower. new vanitiy cabinets/toilet keep in same location. replace gas fire in living room with new fire box. adjust framing for box. no structural work under this permit.Details
bathroom remodel. take out bathtub replace with shower. new vanitiy cabinets/toilet keep in same location. replace gas fire in living room with new fire box. adjust framing for box. no structural work under this permit. | $28,000 |
| Aug 8, 2018 | Completed final sign-off Dec 2018 | 2240 27th Av | remodel kitchen replace skylight, no inkind no change in wallsDetails
remodel kitchen replace skylight, no inkind no change in walls | $24,000 |
| Mar 2, 2018 | Completed final sign-off Oct 2018 | 1680 09th Av | add new bathroom in bedroom top floor. relocate closet in bedroom, relolcate windowDetails
add new bathroom in bedroom top floor. relocate closet in bedroom, relolcate window | $43,000 |
| Sep 22, 2017 | Completed final sign-off Feb 2018 | 654 Joost Av | kitchen remodel/fix dry rot on stairs area install new window, no walls moved, removed, added or infilled. all existing layout to remain unchangedDetails
kitchen remodel/fix dry rot on stairs area install new window, no walls moved, removed, added or infilled. all existing layout to remain unchanged | $26,000 |
| Mar 21, 2017 | Completed final sign-off Oct 2017 | 1335 41st Av | add bathroom in garage and new patio doors and back door and new window. install new post under structural beam & from wall under beam & bedroom and multipurpose roomDetails
add bathroom in garage and new patio doors and back door and new window. install new post under structural beam & from wall under beam & bedroom and multipurpose room | $147,580 |
| Sep 19, 2016 | Completed final sign-off Feb 2017 | 1467 42nd Av | remodel kitchen - new plumbing, new electric, replace existing skylight, new cabinets.Details
remodel kitchen - new plumbing, new electric, replace existing skylight, new cabinets. | |
| Jul 22, 2016 | Completed final sign-off May 2017 | 2327 47th Av | remodel bathroom keep all plumbing locations as is. replace (4) windows with new, same locations, replace sky light same locationDetails
remodel bathroom keep all plumbing locations as is. replace (4) windows with new, same locations, replace sky light same location | $22,000 |
| Mar 10, 2016 | Never finaled issued Mar 2016, no final | 2325 Francisco St | remodel kitchen, new led lights, plumbing, cabints same location, 2 new windows. not visible from streetDetails
remodel kitchen, new led lights, plumbing, cabints same location, 2 new windows. not visible from street | $30,000 |
| Dec 9, 2015 | Completed final sign-off Jun 2016 | 368 Hazelwood Av | remodel kitchen and bathroom, new cabinets, new fixtures. install sliding doors. block up back doorDetails
remodel kitchen and bathroom, new cabinets, new fixtures. install sliding doors. block up back door | $48,000 |
| Sep 28, 2015 | Completed final sign-off Dec 2015 | 2266 Francisco St | remodel kitchen, new plumbing, electric, and sheet rock walls. no structural work.Details
remodel kitchen, new plumbing, electric, and sheet rock walls. no structural work. | $25,000 |
| Jan 28, 2015 | Completed final sign-off Dec 2015 | 137 Winfield St | remodel e stairs to basement, relocate e bath and partial foundation repairs.legalize extg family room at basement.Details
remodel e stairs to basement, relocate e bath and partial foundation repairs.legalize extg family room at basement. | $20,000 |
| Jan 23, 2015 | Completed final sign-off Sep 2015 | 19 Arago St | new header on 1st floor, new skylight.Details
new header on 1st floor, new skylight. | $5,000 |
| Nov 19, 2014 | Completed final sign-off Feb 2015 | 1220 Ellis St | kitchen remodelDetails
kitchen remodel | $20,160 |
| Jul 9, 2014 | Completed final sign-off Oct 2014 | 4622 17th St | to comply with physical inspection report #cc-7704Details
to comply with physical inspection report #cc-7704 | $600 |
| Mar 21, 2014 | Completed final sign-off May 2018 | 213 Moulton St | new electrical upgrade, new bathoomr addition at ground floor. enclosure of extg stair. no changes to envelope.Details
new electrical upgrade, new bathoomr addition at ground floor. enclosure of extg stair. no changes to envelope. | $20,000 |