Orchard Construction
- Based in
- Novato
- On San Francisco permits
- Jun 2018 to Nov 2025
- Last 24 months
- 9 permits filed
30 permits since 2000: 21 completed, 5 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 21, 2025 | In progress issued May 2026 | 1018 Shrader St | revision to pa #202507110631 infill redundant doorway and steps on the lower level. provide verified sffd ladder path which has been confirmed in the fieldDetails
revision to pa #202507110631 infill redundant doorway and steps on the lower level. provide verified sffd ladder path which has been confirmed in the field | $1,200 |
| Oct 9, 2025 | Completed final sign-off Feb 2026 | 572 Funston Av | bathroom remodel, in kind.electrical and plumbing in separate permits.Details
bathroom remodel, in kind.electrical and plumbing in separate permits. | $40,000 |
| Jul 11, 2025 | In progress issued Jul 2025 | 1018 Shrader St | remodel at 1st fl, new powder room and dogwash station. remodeled stair from 1st to 2nd flDetails
remodel at 1st fl, new powder room and dogwash station. remodeled stair from 1st to 2nd fl | $40,000 |
| May 12, 2025 | Completed final sign-off Aug 2025 | 1358 16th Av | dryrot repair. replace or patch front facade stucco.Details
dryrot repair. replace or patch front facade stucco. | $25,000 |
| Apr 16, 2025 | In progress issued May 2025 | 2257 Filbert St | expansion of garage interior for 2 car parking. no exterior work.Details
expansion of garage interior for 2 car parking. no exterior work. | $25,000 |
| Mar 27, 2025 | In progress issued Mar 2025 | 100 Parker Av | replace in kind kitchen cabinets and kitchen floor tile. replace in kind bath, sink, tub and toilet. all fixtures being rpelaced in same locations.Details
replace in kind kitchen cabinets and kitchen floor tile. replace in kind bath, sink, tub and toilet. all fixtures being rpelaced in same locations. | $60,000 |
| Jan 27, 2025 | In progress issued Jan 2025 | 5299 California St | demo existing bathroom & replace in kind no walls or fixtures are changing location.Details
demo existing bathroom & replace in kind no walls or fixtures are changing location. | $30,000 |
| Jan 21, 2025 | Completed final sign-off Dec 2025 | 10 Ina Ct | remodel to include (n) interior partitions, relocate (e) kitchen, relocate 2 (e) bathrooms and add 1 (n) bathroom at 2nd floor. convert (e) garage into conditioned space. adding 1 (n) skylight at rear roof and add 5 (n) windows throughout house not visible from street and replace (e) windows.Details
remodel to include (n) interior partitions, relocate (e) kitchen, relocate 2 (e) bathrooms and add 1 (n) bathroom at 2nd floor. convert (e) garage into conditioned space. adding 1 (n) skylight at rear roof and add 5 (n) windows throughout house not visible from street and replace (e) windows. | $100,000 |
| Nov 15, 2024 | Completed final sign-off Nov 2025 | 3233 Jackson St | replace site retaining wall at property line (southwest)Details
replace site retaining wall at property line (southwest) | $80,000 |
| May 3, 2024 | Completed final sign-off Aug 2024 | 764 Clayton St | 2 bathroom + 1 kitchen remodel. replace in kind. all work on the 2nd floor. not moving walls. all fixtures in the same location. all work in kind. all work on 2nd fl. not moving walls. all fixtures in the same location/ place.Details
2 bathroom + 1 kitchen remodel. replace in kind. all work on the 2nd floor. not moving walls. all fixtures in the same location. all work in kind. all work on 2nd fl. not moving walls. all fixtures in the same location/ place. | $40,000 |
| Jun 12, 2023 | Completed final sign-off Jul 2023 | 2409 Washington St | to comply with nov# 202306337, permeable grouting of sand at property line.Details
to comply with nov# 202306337, permeable grouting of sand at property line. | $4,000 |
| Jan 5, 2023 | Completed final sign-off Apr 2023 | 280 Clipper St | bathroom remodelDetails
bathroom remodel | $15,000 |
| Dec 19, 2022 | Completed final sign-off Aug 2023 | 76 Divisadero St | mandatory soft story retrofit. approval notice attached.Details
mandatory soft story retrofit. approval notice attached. | $80,000 |
| Nov 17, 2022 | Completed final sign-off Feb 2023 | 185 19th Av | demo existing bathroom at gr fl unit. replace in kind. no wall changesDetails
demo existing bathroom at gr fl unit. replace in kind. no wall changes | $12,000 |
| Mar 22, 2022 | Completed final sign-off Jul 2022 | 2130 Beach St | existing stucco to be removed and new stucco to be applied to the front facade only.Details
existing stucco to be removed and new stucco to be applied to the front facade only. | $25,000 |
| Mar 3, 2022 | Completed final sign-off Mar 2023 | 259 Divisadero St | new interior wall opening between kitchen & living room and remove interior post on 2/f & 3/f.Details
new interior wall opening between kitchen & living room and remove interior post on 2/f & 3/f. | $15,000 |
| Nov 22, 2021 | Completed final sign-off Mar 2023 | 261 Divisadero St | units 261 and 263 divisadero st. doing 2 kitchen remodels and 2 bathroom remodels in both units. replace cabinets, replace plumbing fixtures. install new recessed cans and new floors. "remodel in kind"Details
units 261 and 263 divisadero st. doing 2 kitchen remodels and 2 bathroom remodels in both units. replace cabinets, replace plumbing fixtures. install new recessed cans and new floors. "remodel in kind" | $14,000 |
| Jul 20, 2021 | Completed final sign-off Jan 2022 | 135 El Camino Del Mar | rev to pa 201912048693: modify window documentation for window 006 on a1.2&a2.2 from fixted to double hung and resize window 049 from 3 fixed wdw to 1 casement at east elevation.Details
rev to pa 201912048693: modify window documentation for window 006 on a1.2&a2.2 from fixted to double hung and resize window 049 from 3 fixed wdw to 1 casement at east elevation. | |
| Oct 10, 2020 | Completed final sign-off Aug 2021 | 55 Lundys Ln | replace partial section of existing failing retaining wall.Details
replace partial section of existing failing retaining wall. | $10,000 |
| Dec 4, 2019 | Completed final sign-off Jan 2022 | 135 El Camino Del Mar | comply with nov #200864297,#200865117 & #200989665.san francisco superior court cgc-13-530290.alteration to sfd to remove additon built without proper permits and planning renew.removal of portions of veranda, dining terrace, balconies at east wall.Details
comply with nov #200864297,#200865117 & #200989665.san francisco superior court cgc-13-530290.alteration to sfd to remove additon built without proper permits and planning renew.removal of portions of veranda, dining terrace, balconies at east wall. | $50,000 |
| Oct 21, 2019 | Completed final sign-off May 2022 | 259 Randall St | as-built set of plans to catalog the following: rebuilt (e) winder stairs in kind. remove 2nd flr desk niche and 1/2 bath, (n) 1st flr framing along grid 1.8. add a new skylight in master bathroom. change layout of stairs. remove 2nd flr bath window from scope ref 2019-0307-4143Details
as-built set of plans to catalog the following: rebuilt (e) winder stairs in kind. remove 2nd flr desk niche and 1/2 bath, (n) 1st flr framing along grid 1.8. add a new skylight in master bathroom. change layout of stairs. remove 2nd flr bath window from scope ref 2019-0307-4143 | $2,000 |
| Oct 8, 2019 | Completed final sign-off Jun 2020 | 2137 Jones St | replace (e) rear decks and stairs with new code compliant decks and stairsDetails
replace (e) rear decks and stairs with new code compliant decks and stairs | $25,000 |
| Jul 30, 2019 | Completed final sign-off May 2022 | 259 Randall St | replace stucco in-kindDetails
replace stucco in-kind | $6,000 |
| Jul 25, 2019 | Expired or cancelled withdrawn Jul 2019 | 259 Randall St | revision to pa 201809140219. to comply w/ complaint 201971611. replace stucco on front faced and replace w/ siding.Details
revision to pa 201809140219. to comply w/ complaint 201971611. replace stucco on front faced and replace w/ siding. | |
| Jun 25, 2019 | Never finaled issued Oct 2019, no final | 2137 Jones St | revisions to voluntary seismic upgrade per existing permit #201903044287. add concrete wall to mitigate moisture penetration at (e) retaining wall on neighboring property. (not a tenent pass through cost).Details
revisions to voluntary seismic upgrade per existing permit #201903044287. add concrete wall to mitigate moisture penetration at (e) retaining wall on neighboring property. (not a tenent pass through cost). | $30,000 |
| Mar 4, 2019 | Never finaled issued Apr 2019, no final | 2137 Jones St | voluntary seismic upgrade retrofit per ab-094 for pa# 201806252805 for additional work.Details
voluntary seismic upgrade retrofit per ab-094 for pa# 201806252805 for additional work. | $100,000 |
| Mar 1, 2019 | Completed final sign-off May 2020 | 259 Randall St | revision to app#201809140219. new 233 sq ft roof deck on extg flat roof. no change in bldg envelope. repair rear sunroom foundation - less than 50% demo. replace in kind garage retaining wall and front entrance side wall.Details
revision to app#201809140219. new 233 sq ft roof deck on extg flat roof. no change in bldg envelope. repair rear sunroom foundation - less than 50% demo. replace in kind garage retaining wall and front entrance side wall. | $15,000 |
| Sep 14, 2018 | Completed final sign-off May 2020 | 259 Randall St | interior remodel and patio in rear yard.Details
interior remodel and patio in rear yard. | $95,000 |
| Jun 25, 2018 | Never finaled issued Apr 2019, no final | 2137 Jones St | construction of 63 sf infill additionDetails
construction of 63 sf infill addition | $15,000 |
| Jun 21, 2018 | Completed final sign-off Feb 2019 | 15 Ardenwood Wy | remodel & reconfigure (e) ground floor. expand (e) 1/2 to full bath, add laundry room, and mudroom, add media room; per plans.Details
remodel & reconfigure (e) ground floor. expand (e) 1/2 to full bath, add laundry room, and mudroom, add media room; per plans. | $38,000 |