Alan Wong Construction Inc
- Based in
- South San Francisco
- On San Francisco permits
- Oct 2002 to Feb 2026
- Last 24 months
- 5 permits filed
59 permits since 2000: 50 completed, 5 never finaled, 4 expired or cancelled.
Of the 5 never-finaled permits, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 12, 2026 | Completed final sign-off May 2026 | 232 Kenwood Wy | remodel kitchen 9 ft by 15 ft in 2nd floor, no structural work, replace cabinets, counter top, in kind, appliance, faucet sink and lighting, all interior work. in kind remodelDetails
remodel kitchen 9 ft by 15 ft in 2nd floor, no structural work, replace cabinets, counter top, in kind, appliance, faucet sink and lighting, all interior work. in kind remodel | $33,000 |
| Jul 11, 2025 | Completed final sign-off Aug 2025 | 1417 17th Av | remodel (e) bathroom 8ft x 5ft in kind. replace (e) shower pan in kind. add a electrical panel upgrade bedrooms outlets and wiring. no change to floor layout. no change to wall layout. no structural work. maintain all (e) fire rating and separation.Details
remodel (e) bathroom 8ft x 5ft in kind. replace (e) shower pan in kind. add a electrical panel upgrade bedrooms outlets and wiring. no change to floor layout. no change to wall layout. no structural work. maintain all (e) fire rating and separation. | $30,000 |
| Jun 5, 2025 | Completed final sign-off Jul 2025 | 2155 26th Av | remodel existing 5ft x 5ft bathroom install shower per 1st floor.Details
remodel existing 5ft x 5ft bathroom install shower per 1st floor. | $20,000 |
| Mar 27, 2025 | Completed final sign-off Oct 2025 | 29 Admiral Av | convert ground floor to living, with one bedroom, mini kitchen with 2 burners only and one bathroom. total of 583 sq ftDetails
convert ground floor to living, with one bedroom, mini kitchen with 2 burners only and one bathroom. total of 583 sq ft | $40,000 |
| Jan 16, 2025 | Completed final sign-off Jul 2026 | 1971 22nd Av | add a family room, a bedroom with a walk in closer, a full bathroom and a storage room at the garage level. replace furnace with heat pump type. replace water heaterDetails
add a family room, a bedroom with a walk in closer, a full bathroom and a storage room at the garage level. replace furnace with heat pump type. replace water heater | $80,000 |
| Aug 15, 2024 | Completed final sign-off Apr 2025 | 124 Whittier St | 2nd fl remodel - new bathroom. kitchen remodel to remove wall between kitchen and dining room. new kitchen cabinetsDetails
2nd fl remodel - new bathroom. kitchen remodel to remove wall between kitchen and dining room. new kitchen cabinets | $40,000 |
| Mar 23, 2023 | Completed final sign-off Apr 2024 | 364 16th Av | remodel and remove wall at kitchen relocate powder room remodel and relocate two full bathrooms new laundry room remove one bedroom replace furnace replace front windows in-kind new rear windows, new skylightsDetails
remodel and remove wall at kitchen relocate powder room remodel and relocate two full bathrooms new laundry room remove one bedroom replace furnace replace front windows in-kind new rear windows, new skylights | $30,000 |
| Feb 2, 2023 | Completed final sign-off Mar 2023 | 623 Geneva Av | remodel 1 kitchen 160 sqft. no wall changes and upgrade subpanel.Details
remodel 1 kitchen 160 sqft. no wall changes and upgrade subpanel. | $20,000 |
| Sep 27, 2021 | Completed final sign-off Jan 2022 | 2350 45th Av | remodel one 100 sf kitchen, one 40 sf bath. upgrade upstair electrical add sub panel. no wall changes. h.e. lighting and controlled per cec 150.0(k)Details
remodel one 100 sf kitchen, one 40 sf bath. upgrade upstair electrical add sub panel. no wall changes. h.e. lighting and controlled per cec 150.0(k) | $35,000 |
| Sep 13, 2021 | Completed final sign-off Nov 2021 | 1370 16th Av | unit 1: remodel one kitchen 110sf, one bathroom 40sf. h.e. lighting & controlled per cec 150.0(k)Details
unit 1: remodel one kitchen 110sf, one bathroom 40sf. h.e. lighting & controlled per cec 150.0(k) | $25,000 |
| Sep 8, 2021 | Completed final sign-off Oct 2021 | 402 08th Av | replace kitchen cabinets, counter tops and floor at 10 ft by 12 ft kitchen in unit #307Details
replace kitchen cabinets, counter tops and floor at 10 ft by 12 ft kitchen in unit #307 | $18,000 |
| Apr 20, 2021 | Completed final sign-off Apr 2022 | 693 02nd Av | interior remodel at 693 2nd ave: 1st floor remodel kitchen, convert living room to 2 bedrooms, add in new bath at kitchen area. 695 2nd ave 2nd floor: adding walk in closet and bathroom in master room.Details
interior remodel at 693 2nd ave: 1st floor remodel kitchen, convert living room to 2 bedrooms, add in new bath at kitchen area. 695 2nd ave 2nd floor: adding walk in closet and bathroom in master room. | $60,000 |
| Feb 1, 2021 | Completed final sign-off Feb 2023 | 35 Palos Pl | vert add above. new add to provide 2br, full bath, stairs to access the add from the hallway. replace asphalt shingle roofing material. stucco ext fin on n and w elev, patch and repair stucco. ext to be painted. remove stone veneer base on fr elev and replace w/ new stucco base.Details
vert add above. new add to provide 2br, full bath, stairs to access the add from the hallway. replace asphalt shingle roofing material. stucco ext fin on n and w elev, patch and repair stucco. ext to be painted. remove stone veneer base on fr elev and replace w/ new stucco base. | $105,000 |
| Sep 25, 2019 | Completed final sign-off Mar 2020 | 2691 35th Av | to add an exercise room, a guest bedroom, and a full bath in 1st fl.Details
to add an exercise room, a guest bedroom, and a full bath in 1st fl. | $50,000 |
| Jun 26, 2019 | Never finaled issued Jun 2019, no final | 29 Admiral Av | replace cabinets and counter top in 8 ft by 12 ft kitchen. remodel 2nd fl 8 ft by 6 feet bathDetails
replace cabinets and counter top in 8 ft by 12 ft kitchen. remodel 2nd fl 8 ft by 6 feet bath | $21,000 |
| Apr 8, 2019 | Completed final sign-off Oct 2019 | 29 Admiral Av | add new bathroom at 2nd floor and relocate one door.Details
add new bathroom at 2nd floor and relocate one door. | $5,000 |
| Mar 13, 2019 | Completed final sign-off Dec 2021 | 1921 Geneva Av | add adu unit per ord# 95-17 at ground flr incl 1 bedrooms & 2 bathrooms, 450 sq ft. comply w/ n.o.v 2018010117 enf.Details
add adu unit per ord# 95-17 at ground flr incl 1 bedrooms & 2 bathrooms, 450 sq ft. comply w/ n.o.v 2018010117 enf. | $30,000 |
| Feb 13, 2019 | Completed final sign-off Aug 2021 | 1967 22nd Av | 2nd flr:expand back to relocate kitchen,living,dining spaces w/ (n) deck over space below.(n)spiral stair from deck to grade. 1st flr:expand back & convert (e) space to living space. create adu unit w/ (n) kitchen, 2 dedrooms,2 baths,living & dining spaces per ord#95-17.new laundry.Details
2nd flr:expand back to relocate kitchen,living,dining spaces w/ (n) deck over space below.(n)spiral stair from deck to grade. 1st flr:expand back & convert (e) space to living space. create adu unit w/ (n) kitchen, 2 dedrooms,2 baths,living & dining spaces per ord#95-17.new laundry. | $360,000 |
| Nov 9, 2018 | Completed final sign-off Aug 2019 | 2134 33rd Av | add 2 master suite and mud room at ground floor. remodel extg kitchen, relocate extg bath and interior stair. add a bath and half bath with remove lightwell at 2nd floor.Details
add 2 master suite and mud room at ground floor. remodel extg kitchen, relocate extg bath and interior stair. add a bath and half bath with remove lightwell at 2nd floor. | $100,000 |
| Jul 17, 2018 | Expired or cancelled cancelled Oct 2018 | 230 Twin Peaks Bl | bathroom remodel in second floorDetails
bathroom remodel in second floor | $9,000 |
| Apr 25, 2018 | Completed final sign-off Oct 2018 | 728 Cole St | changing facade of garage door. opening to remain the same, wood door, swinging in.Details
changing facade of garage door. opening to remain the same, wood door, swinging in. | $300 |
| Apr 7, 2017 | Expired or cancelled withdrawn Sep 2019 | 99 Saint Germain Av | to comply with nov.#201766111. prepair dry rot in and around elevator, elevator area and incidentals thereto, siding and door and top walkway, less than 50%. the elevator and walkway are shared by the owners of 95 & 99 saint germain and are located within an access easement at the property line.Details
to comply with nov.#201766111. prepair dry rot in and around elevator, elevator area and incidentals thereto, siding and door and top walkway, less than 50%. the elevator and walkway are shared by the owners of 95 & 99 saint germain and are located within an access easement at the property line. | $4,500 |
| Apr 3, 2017 | Completed final sign-off Jul 2017 | 710 Rivera St | remodel garage floor bathroom.Details
remodel garage floor bathroom. | $12,000 |
| Feb 16, 2017 | Expired or cancelled revoked Oct 2019 | 99 Saint Germain Av | repair outside elevator tower dry rot. woodsiding repair repair door. less than 50%Details
repair outside elevator tower dry rot. woodsiding repair repair door. less than 50% | $4,500 |
| Dec 30, 2016 | Completed final sign-off Jun 2017 | 1566 Howard St | interior remodel - install new handicap counter, new ada restroom, sink, hvac system at ground flr under separate permit maher naDetails
interior remodel - install new handicap counter, new ada restroom, sink, hvac system at ground flr under separate permit maher na | $80,000 |
| Nov 23, 2016 | Completed final sign-off Dec 2017 | 811 31st Av | kitchen remodel: change acbinte, stove, dishwasher install islandDetails
kitchen remodel: change acbinte, stove, dishwasher install island | $15,000 |
| Jul 21, 2016 | Completed final sign-off Jan 2017 | 99 Saint Germain Av | rebuild and repair extg exterior stairway in front of building.Details
rebuild and repair extg exterior stairway in front of building. | $80,000 |
| Jun 9, 2016 | Completed final sign-off Oct 2018 | 728 Cole St | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 | $20,000 |
| May 12, 2016 | Completed final sign-off Nov 2018 | 728 Cole St | garage use changing from accessory parking to public facility use for community education. relocation of fire escape. 144 sq. ft. addition on 1st floor. life safety on deferred submittal.Details
garage use changing from accessory parking to public facility use for community education. relocation of fire escape. 144 sq. ft. addition on 1st floor. life safety on deferred submittal. | |
| Apr 22, 2016 | Completed final sign-off Nov 2016 | 6947 California St | remodel kitchen and bathroomDetails
remodel kitchen and bathroom | $20,000 |
| Apr 15, 2016 | Completed final sign-off Aug 2016 | 567 Anderson St | remodel 1st flr bedroom, bath and garage. remodel (e) living and bedroom space on 2nd flr. new stir from 1st to 2nd flr. new windows and doors on 1st and 2nd flr. plumbing & electrical work - under sep permit. add w/d in garageDetails
remodel 1st flr bedroom, bath and garage. remodel (e) living and bedroom space on 2nd flr. new stir from 1st to 2nd flr. new windows and doors on 1st and 2nd flr. plumbing & electrical work - under sep permit. add w/d in garage | $125,000 |
| Feb 16, 2016 | Completed final sign-off Aug 2016 | 567 Anderson St | renovate kitchen, new cabinets, & new tile finishes.Details
renovate kitchen, new cabinets, & new tile finishes. | $1,000 |
| Sep 18, 2014 | Completed final sign-off May 2015 | 1142 Mariposa St | rear stair replacement in kind (to comply with nov #201071626 item #6); maher n/aDetails
rear stair replacement in kind (to comply with nov #201071626 item #6); maher n/a | $4,000 |
| Jun 30, 2014 | Completed final sign-off Nov 2014 | 819 31st Av | comply with nov #201481211 dated june 23, 2014. demolish illegal wall at side of lightwell. revert bact to original condition. add (n) half bath, remodel two full bath at 2nd flr and add full bath at penthouse level.Details
comply with nov #201481211 dated june 23, 2014. demolish illegal wall at side of lightwell. revert bact to original condition. add (n) half bath, remodel two full bath at 2nd flr and add full bath at penthouse level. | $5,000 |
| Jun 3, 2014 | Completed final sign-off Nov 2014 | 819 31st Av | remodel kitchen 8x10Details
remodel kitchen 8x10 | $12,000 |
| Apr 24, 2014 | Completed final sign-off Jun 2014 | 15 Van Buren St | remodel bathroom, replace lights, faucets, new tile and paint. 5 ft by 8 ft, no walls to be removedDetails
remodel bathroom, replace lights, faucets, new tile and paint. 5 ft by 8 ft, no walls to be removed | $8,000 |
| Jul 17, 2013 | Never finaled issued Jul 2013, no final | 99 Saint Germain Av | window replacement, in kind, visable from street, fiberglass, no mullions, operations same as existing quantity, 8 windows & 3 sliding doors.Details
window replacement, in kind, visable from street, fiberglass, no mullions, operations same as existing quantity, 8 windows & 3 sliding doors. | $14,600 |
| Jul 12, 2013 | Completed final sign-off Feb 2014 | 27 Graystone Tr | add new 6'-7" x 6'4" deck. new french door.Details
add new 6'-7" x 6'4" deck. new french door. | $5,000 |
| Jun 24, 2013 | Completed final sign-off Mar 2014 | 99 Saint Germain Av | remodel 3 bathrooms and kitchenDetails
remodel 3 bathrooms and kitchen | $50,000 |
| May 28, 2013 | Never finaled issued Jun 2013, no final | 27 Graystone Tr | revision to app#201210101734. add steel beam and footing to accomodate extg framing.Details
revision to app#201210101734. add steel beam and footing to accomodate extg framing. | $1,900 |
| Mar 5, 2013 | Completed final sign-off Jul 2013 | 2630 31st Av | remodel upstair bathroom 8x8 lighting must comply with cec 150 kDetails
remodel upstair bathroom 8x8 lighting must comply with cec 150 k | $9,500 |
| Oct 10, 2012 | Expired or cancelled expired Oct 2015 | 27 Graystone Tr | apartment alteration. enclose rear interior entry, move entry door, move kitchen, add bathroom, move bedroom into crawlspace, create office in extg kitchen/rear interior entry.Details
apartment alteration. enclose rear interior entry, move entry door, move kitchen, add bathroom, move bedroom into crawlspace, create office in extg kitchen/rear interior entry. | $22,000 |
| Oct 1, 2012 | Completed final sign-off Jan 2013 | 2427 35th Av | develop habitable rooms on ground floor including one bathroom, install new furnace and water heater in garage per plans.Details
develop habitable rooms on ground floor including one bathroom, install new furnace and water heater in garage per plans. | $38,000 |
| Sep 18, 2012 | Never finaled issued Sep 2012, no final | 75 Shore View Av | kitchen remodel , replace cabinets countertop appliances and lighting , no structual workDetails
kitchen remodel , replace cabinets countertop appliances and lighting , no structual work | $15,000 |
| Oct 13, 2011 | Completed final sign-off Mar 2012 | 2632 Cabrillo St | interior remodeling: add (n) playroom & bath at ground floor. relocate kitchen & bedroom, add study room & (n) bath at 2nd. floor as per plan.Details
interior remodeling: add (n) playroom & bath at ground floor. relocate kitchen & bedroom, add study room & (n) bath at 2nd. floor as per plan. | $45,000 |
| May 19, 2011 | Completed final sign-off Sep 2011 | 710 Rivera St | replace extg dryrot stairs in kind and partial foundation. replace 1 damaged window in kind in front.Details
replace extg dryrot stairs in kind and partial foundation. replace 1 damaged window in kind in front. | $23,850 |
| Dec 2, 2010 | Completed final sign-off Jan 2011 | 421 Congo St | legalize bathroom at gr floorDetails
legalize bathroom at gr floor | $5,000 |
| Apr 27, 2010 | Completed final sign-off Jun 2010 | 629 Grand View Av | remodel (e) 1st bathroom with shower pan, replace fixtures, tile, exhaust fan, provide exhaust fan to exteriorDetails
remodel (e) 1st bathroom with shower pan, replace fixtures, tile, exhaust fan, provide exhaust fan to exterior | $13,041 |
| Nov 16, 2009 | Completed final sign-off Dec 2009 | 8 Naylor St | installation of non-bearing partition to (e) storage rooms at the basement area per plan. complaint 200923011-his.Details
installation of non-bearing partition to (e) storage rooms at the basement area per plan. complaint 200923011-his. | $2,500 |
| Aug 28, 2009 | Never finaled issued Aug 2009, no final | 7 Middlefield Dr | revision to pa# 2009.07.22.3214. raise floor by 4" for new family room & mud room at garage level up to 8' ceiling height.Details
revision to pa# 2009.07.22.3214. raise floor by 4" for new family room & mud room at garage level up to 8' ceiling height. | $1,000 |
| Jul 22, 2009 | Completed final sign-off Oct 2009 | 7 Middlefield Dr | convert 330 s/f of habitable space in lower floor. add one hour rated wall & ceiling to garage.Details
convert 330 s/f of habitable space in lower floor. add one hour rated wall & ceiling to garage. | $50,000 |
| Nov 25, 2008 | Completed final sign-off Mar 2009 | 2195 12th Av | retile floors & walls. replace light fixture, replace wall. paint walls, replace toilet, vanity & mirror (bathroom remodel).Details
retile floors & walls. replace light fixture, replace wall. paint walls, replace toilet, vanity & mirror (bathroom remodel). | $8,300 |
| Sep 2, 2008 | Completed final sign-off Nov 2008 | 2346 26th Av | to add 2 bedroom. 1 full bathrm. 1 storage & laundry rm on (e) grnd fl per plan. remove (e) 3 posts & beam above. provide new 2 8x6 posts w. new glu. lambeam(glb) above & new post footing & provide new wall footing on grnd fl.Details
to add 2 bedroom. 1 full bathrm. 1 storage & laundry rm on (e) grnd fl per plan. remove (e) 3 posts & beam above. provide new 2 8x6 posts w. new glu. lambeam(glb) above & new post footing & provide new wall footing on grnd fl. | $53,000 |
| Nov 15, 2007 | Completed final sign-off Jul 2008 | 1963 22nd Av | one story rear addition with roof deck to single family dwelling.Details
one story rear addition with roof deck to single family dwelling. | $39,000 |
| Feb 26, 2007 | Completed final sign-off Sep 2007 | 608 Laguna Honda Bl | add family room, workshop, and full bath at groundfloor. reinforce portion of foundation.Details
add family room, workshop, and full bath at groundfloor. reinforce portion of foundation. | $30,000 |
| Aug 18, 2005 | Completed final sign-off Nov 2005 | 1430 43rd Av | rev. to pa#2005/06/30/6432 - provide underpinning & grade beam on groundfloor per planDetails
rev. to pa#2005/06/30/6432 - provide underpinning & grade beam on groundfloor per plan | $10,000 |
| Jun 30, 2005 | Completed final sign-off Nov 2005 | 1430 43rd Av | add 1 bedroom, 1 family rm, 1 full bathrm on exist gr flr. remove 3 post & replaced by new beam andDetails
add 1 bedroom, 1 family rm, 1 full bathrm on exist gr flr. remove 3 post & replaced by new beam and | $48,100 |
| Feb 3, 2004 | Completed final sign-off Jun 2004 | 69 Madison St | construct a dark room next to the familyroom . revi to #200307028554. install door for storage roomDetails
construct a dark room next to the familyroom . revi to #200307028554. install door for storage room | $800 |
| Oct 10, 2002 | Completed final sign-off Dec 2002 | 3301 Cabrillo St | replace window in front & repair dryrot in front facade.Details
replace window in front & repair dryrot in front facade. | $9,000 |