Salvatore Italiano
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Spi Consulting Engineers
- Based in
- Lafayette
- On San Francisco permits
- Jan 2003 to Apr 2023
90 permits since 2000 (engineer on 80 permits, architect on 9 permits, authorized agent-others on 1 permit): 58 completed, 25 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 26, 2023 | Completed final sign-off Mar 2025 | 444 Presidio Av | Granite Excavation & Demolition Inc, Truebeck Construction | underpinning of existing structure in connection with work on the adjacent property at 3150 california street pa# 202205265118.Details
underpinning of existing structure in connection with work on the adjacent property at 3150 california street pa# 202205265118. | $225,000 |
| Nov 17, 2022 | Expired or cancelled cancelled Jan 2026 | 1800 Bryant St | Skyline Construction | commencement of work not started under previously approved bpa#201906032347 (underpinning - tiebacks)Details
commencement of work not started under previously approved bpa#201906032347 (underpinning - tiebacks) | $75,000 |
| Aug 15, 2022 | Never finaled filed Aug 2022, never issued | 1850 Bryant St | revise to 2019 0603 2349. construct soldier piles w/ tiebacks and soil-mixed lagging to temporarily retain excavations up to 33.5ft in depth, which is 6ft deeper than original plan and includes an allowance for underpinning.Details
revise to 2019 0603 2349. construct soldier piles w/ tiebacks and soil-mixed lagging to temporarily retain excavations up to 33.5ft in depth, which is 6ft deeper than original plan and includes an allowance for underpinning. | ||
| Aug 15, 2022 | Never finaled filed Aug 2022, never issued | 1800 Bryant St | revise to 2019 0603 2347. construct soldier piles w/ tiebacks and wood logging to temporarily retain excavations up to 33.5 ft in depth. note the revised plans actually show a shoring system that consists of a tied-back, steel soldier pile encased in concrete w/ soil-mix lagging, dmj 09/07/2022;Details
revise to 2019 0603 2347. construct soldier piles w/ tiebacks and wood logging to temporarily retain excavations up to 33.5 ft in depth. note the revised plans actually show a shoring system that consists of a tied-back, steel soldier pile encased in concrete w/ soil-mix lagging, dmj 09/07/2022; | ||
| Jul 15, 2021 | Never finaled issued Jan 2022, no final | 988 Oakdale Av | Minerva - Graniterock Jv | building e: the work on these drawings involves the construction of temoraray cantilevered beams & tiedback soldier beams with wood lagging. shoring work for future construction under bpa#2016-0229-0780-sDetails
building e: the work on these drawings involves the construction of temoraray cantilevered beams & tiedback soldier beams with wood lagging. shoring work for future construction under bpa#2016-0229-0780-s | $200,000 |
| Jul 15, 2021 | Never finaled issued Jan 2022, no final | 966 Oakdale Av | Minerva - Graniterock Jv | building n1: the work on these drawings involves construction of temporary cantilevered beams & tiedback soldier beams with wood lagging @ buildg p. shoring work for future construction under bpa#2014-1216-3796-sDetails
building n1: the work on these drawings involves construction of temporary cantilevered beams & tiedback soldier beams with wood lagging @ buildg p. shoring work for future construction under bpa#2014-1216-3796-s | $200,000 |
| Jul 15, 2021 | Never finaled issued Jan 2022, no final | 968 Oakdale Av | Minerva - Graniterock Jv | building l: the work shown on these drawings involves the construction of permanent cantilevered beams & tieback soldier beams with shotcrete lagging will be constructed at building l. shoring work for future construction uncer bpa #2016-0229-0747-sDetails
building l: the work shown on these drawings involves the construction of permanent cantilevered beams & tieback soldier beams with shotcrete lagging will be constructed at building l. shoring work for future construction uncer bpa #2016-0229-0747-s | $200,000 |
| Jul 15, 2021 | Never finaled issued Jan 2022, no final | 978 Oakdale Av | Minerva - Graniterock Jv | building i: the work on these drawings involves the construction of permanent cantilevered beams & tieback soldier beams with shotcrete lagging will be constructed @ building i. shoring work for future construction under bpa #2016-02229-0745-sDetails
building i: the work on these drawings involves the construction of permanent cantilevered beams & tieback soldier beams with shotcrete lagging will be constructed @ building i. shoring work for future construction under bpa #2016-02229-0745-s | $200,000 |
| Jul 15, 2021 | Never finaled issued Jan 2022, no final | 762 La Salle Av | Minerva - Graniterock Jv | building o: the work on thee drawings involves temporary soil nailing will be constructed at building o. shoring work for future construction bpa #2014-1216-3806-sDetails
building o: the work on thee drawings involves temporary soil nailing will be constructed at building o. shoring work for future construction bpa #2014-1216-3806-s | $200,000 |
| Jul 15, 2021 | Never finaled issued Jan 2022, no final | 878 La Salle Av | Minerva - Graniterock Jv | building n1: the work on thee drawings involves temporary soil nailing will be constructed at building n1. shoring work for future construction bpa #2014-1216-3800-sDetails
building n1: the work on thee drawings involves temporary soil nailing will be constructed at building n1. shoring work for future construction bpa #2014-1216-3800-s | $200,000 |
| Sep 12, 2020 | Never finaled issued Aug 2021, no final | 869 La Salle Av | Minerva - Graniterock Jv | bldg m-temporary shoring - the work shown on these drawings involves the construction of temporary cantilevered beams, and tiebacks soldier beams with wood lagging at building m.shoring work for future construction under pa# 201602179819.**comply w/ maher ord, route to dph**Details
bldg m-temporary shoring - the work shown on these drawings involves the construction of temporary cantilevered beams, and tiebacks soldier beams with wood lagging at building m.shoring work for future construction under pa# 201602179819.**comply w/ maher ord, route to dph** | $657,430 |
| Sep 12, 2020 | Never finaled issued Aug 2021, no final | 889 La Salle Av | Minerva - Graniterock Jv | bldg f-shoring work for future construction under pa#201602179815the work shown on these drawings involves the construction of temporary cantilevered beams, and tiebacks soldier beams with wood lagging at building f. **comply w/ maher ord, route to dph**Details
bldg f-shoring work for future construction under pa#201602179815the work shown on these drawings involves the construction of temporary cantilevered beams, and tiebacks soldier beams with wood lagging at building f. **comply w/ maher ord, route to dph** | $75,000 |
| Sep 12, 2020 | Never finaled issued Aug 2021, no final | 898 La Salle Av | Minerva - Graniterock Jv | bldg a-temporary shoring - shoring work for future construction under pa# 201603141951the work shown on these drawings involves the construction of temporary cantilevered beams with wood lagging at building a.**comply w/ maher ord, route to dph**Details
bldg a-temporary shoring - shoring work for future construction under pa# 201603141951the work shown on these drawings involves the construction of temporary cantilevered beams with wood lagging at building a.**comply w/ maher ord, route to dph** | $75,000 |
| Sep 12, 2020 | Never finaled issued Aug 2021, no final | 879 La Salle Av | Minerva - Graniterock Jv | bldg j-temporary shoring - the work shown on these drawings involves the construction of temporary cantilevered beams, and tiebacks soldier beams with wood lagging at building j. shoring work for future construction under pa#201602179818.**comply w/ maher ord, route to dph**Details
bldg j-temporary shoring - the work shown on these drawings involves the construction of temporary cantilevered beams, and tiebacks soldier beams with wood lagging at building j. shoring work for future construction under pa#201602179818.**comply w/ maher ord, route to dph** | $150,000 |
| Sep 8, 2020 | Never finaled issued Aug 2021, no final | 888 La Salle Av | Minerva - Graniterock Jv | bldg g-temporary shoring - the work shown on these drawings involves the construction of temporary cantilevered beams with wood lagging at building g. shoring work for future construction under pa# 201603141960.**comply w/ maher ord, route to dph**Details
bldg g-temporary shoring - the work shown on these drawings involves the construction of temporary cantilevered beams with wood lagging at building g. shoring work for future construction under pa# 201603141960.**comply w/ maher ord, route to dph** | $35,000 |
| Jun 3, 2019 | Never finaled issued Sep 2019, no final | 1800 Bryant St | Granite Excavation & Demolition Inc, Skyline Construction, Palisade Builders Inc | underpinning - tiebacksDetails
underpinning - tiebacks | $50,000 |
| Jun 3, 2019 | Never finaled issued Sep 2019, no final | 1850 Bryant St | Granite Excavation & Demolition Inc, Skyline Construction, Palisade Builders Inc | shoring and excavationDetails
shoring and excavation | $200,000 |
| Jan 28, 2019 | Completed final sign-off Oct 2021 | 400 Winston Dr | Vcc, Llc | install 101 micropiles to prepare site for construction under previously listed permit. deferred submittal for 201711284984Details
install 101 micropiles to prepare site for construction under previously listed permit. deferred submittal for 201711284984 | |
| Apr 5, 2018 | Completed final sign-off Sep 2020 | 200 Van Ness Av | Charles Pankow Builders Ltd | temporary excavation shoring with cut up to 35' will be shored using a soil mixed cutoff walls with tiebacks along street sides of the excavation & underpinning slant piles, jet grout & tiebacks under the 150 hayes st bldg. ref pa# 201705055847-s ** maher: exempted - approval from dph on the plan **Details
temporary excavation shoring with cut up to 35' will be shored using a soil mixed cutoff walls with tiebacks along street sides of the excavation & underpinning slant piles, jet grout & tiebacks under the 150 hayes st bldg. ref pa# 201705055847-s ** maher: exempted - approval from dph on the plan ** | $511,000 |
| Apr 5, 2018 | Completed final sign-off Aug 2021 | 200 Van Ness Av | Charles Pankow Builders Ltd, Pacific States Environmental Contractors | excavation. temporary excavation shoring with cub up to 35' will be shored using a soil mixed cutoff walls with tiebacks along street sides of the excavation & underpinning slant piles, jet grout & tiebacks under the 150 hayes street building. ** maher: exempted - approval from dph on the plan **Details
excavation. temporary excavation shoring with cub up to 35' will be shored using a soil mixed cutoff walls with tiebacks along street sides of the excavation & underpinning slant piles, jet grout & tiebacks under the 150 hayes street building. ** maher: exempted - approval from dph on the plan ** | $438,000 |
| Apr 5, 2018 | Completed final sign-off Sep 2020 | 150 Hayes St | Charles Pankow Builders Ltd | shoring, underpinning & tiebacks on subject property adjacent to 200-214 van ness avenue. new construction ref pa# 2017/05/05/5847-s. ** maher: exempted - approval from dph on the plan **Details
shoring, underpinning & tiebacks on subject property adjacent to 200-214 van ness avenue. new construction ref pa# 2017/05/05/5847-s. ** maher: exempted - approval from dph on the plan ** | $310,000 |
| Sep 20, 2017 | Completed final sign-off Sep 2022 | 1298 Howard St | James E Roberts-Obayashi Corporation | construct tieback soldier beams and corner bracing w/ wood and soil mixed lagging to temporarly retain excavations up to 19 feet in depth (ref pa#201406067752s) comply with maher ord.Details
construct tieback soldier beams and corner bracing w/ wood and soil mixed lagging to temporarly retain excavations up to 19 feet in depth (ref pa#201406067752s) comply with maher ord. | $1,500,000 |
| Aug 1, 2017 | Completed final sign-off Apr 2018 | 1500 Mission St | Charles Pankow Builders Ltd | temp basement lateral support & temp historical wall bracing for the coca-cola bldg. ref pa# 2016/06/20/0387-s. ** maher: exempted. approval letter will follow **Details
temp basement lateral support & temp historical wall bracing for the coca-cola bldg. ref pa# 2016/06/20/0387-s. ** maher: exempted. approval letter will follow ** | $50,000 |
| Jun 7, 2017 | Completed final sign-off Apr 2019 | 399 Geary St | Fisher Development Inc | micropile anchorage and connection to the pile cap.Details
micropile anchorage and connection to the pile cap. | $80,000 |
| Jan 25, 2017 | Completed final sign-off May 2019 | 1693 Market St | Build Group Inc. | shoring & underpinning for new construction at 1699 market st (ref pa #2014-0610-8024s)Details
shoring & underpinning for new construction at 1699 market st (ref pa #2014-0610-8024s) | $177,000 |
| Jan 25, 2017 | Completed final sign-off May 2019 | 1707 Market St | Build Group Inc. | shoring & underpinning for new construction at 1699 market st (ref pa #2014-0610-8024s)Details
shoring & underpinning for new construction at 1699 market st (ref pa #2014-0610-8024s) | $307,500 |
| Jul 8, 2016 | Completed final sign-off Jul 2019 | 245 01st St | Webcor Construction Lp | temporary excavation shoring design tieback option on north wall (caltrans) ref. pa #2014-12-23-4418s. ** maher: exempted - see approval from dph attached to plans **Details
temporary excavation shoring design tieback option on north wall (caltrans) ref. pa #2014-12-23-4418s. ** maher: exempted - see approval from dph attached to plans ** | $468,661 |
| May 27, 2016 | Completed final sign-off May 2019 | 1699 Market St | Build Group Inc. | temporary excavation shoring for new construction as 1699 market street. ref pa# 2014/06/10/8024-s.Details
temporary excavation shoring for new construction as 1699 market street. ref pa# 2014/06/10/8024-s. | $1,000,000 |
| May 11, 2016 | Completed final sign-off Oct 2017 | 525 Brannan St | Swinerton Builders | tie backs for shoring systems @ 505 brannan (ref pa 2016-0316-2258)Details
tie backs for shoring systems @ 505 brannan (ref pa 2016-0316-2258) | |
| May 11, 2016 | Completed final sign-off Oct 2017 | 501 Brannan St | Swinerton Builders | tie backs for shoring systems @ 505 brannan (ref pa 2016-0316-2258). maher naDetails
tie backs for shoring systems @ 505 brannan (ref pa 2016-0316-2258). maher na | |
| Feb 17, 2016 | Completed final sign-off Dec 2016 | 72 Langton St | Cahill Contractors Inc | common area- slant piles and temp tiedback soldier beams for 1140 folsom shoring and excavation. ref app#201509308460. n/a for maherDetails
common area- slant piles and temp tiedback soldier beams for 1140 folsom shoring and excavation. ref app#201509308460. n/a for maher | $12,000 |
| Feb 17, 2016 | Completed final sign-off Nov 2016 | 1122 Folsom St | Cahill Contractors Inc | slant piles and tie backs for 1140 folsom shoring and excavation ref 201509308460. n/a maher ord. 155-13Details
slant piles and tie backs for 1140 folsom shoring and excavation ref 201509308460. n/a maher ord. 155-13 | $60,000 |
| Feb 12, 2016 | Never finaled issued Dec 2016, no final | 400 Bay St | Thompson Builders Corp | to erect 4 stories of 13 dwelling units, with roof deckDetails
to erect 4 stories of 13 dwelling units, with roof deck | $3,500,000 |
| Dec 29, 2015 | Completed final sign-off Jun 2020 | 245 01st St | Webcor Construction Lp | excavation & shoring for new construction. ref pa# 2014/12/23/4418-s. ** maher: exempted - approval from dph attached **Details
excavation & shoring for new construction. ref pa# 2014/12/23/4418-s. ** maher: exempted - approval from dph attached ** | $2,795,350 |
| Dec 29, 2015 | Expired or cancelled cancelled Sep 2016 | 245 01st St | Webcor Construction Lp | underpinning @ north property line (caltrans). ref pa# 2014/12/23/4418-s. ** maher: exempted - approval from dph attached **Details
underpinning @ north property line (caltrans). ref pa# 2014/12/23/4418-s. ** maher: exempted - approval from dph attached ** | $419,650 |
| Dec 29, 2015 | Completed final sign-off Jun 2020 | 245 01st St | Webcor Construction Lp | shoring & tiebacks for new construction. ref pa# 2014/12/23/4418-s. ** maher: exempted - approval from dph attached **Details
shoring & tiebacks for new construction. ref pa# 2014/12/23/4418-s. ** maher: exempted - approval from dph attached ** | $1,258,950 |
| Nov 3, 2015 | Completed final sign-off May 2019 | 800 Indiana St | Avalon Bay Communities | temporary shoring @ west property line (caltrans). ref# 2014/06/25/9383-s. ** maher: exempted. see attached approval from dph **Details
temporary shoring @ west property line (caltrans). ref# 2014/06/25/9383-s. ** maher: exempted. see attached approval from dph ** | $71,000 |
| Oct 30, 2015 | Completed final sign-off May 2019 | 800 Indiana St | temporary shoring along the right of way for 20th st & indiana. (ref pa#2014-06-25-9383s). ** maher: exempted - see attached approval from dph **Details
temporary shoring along the right of way for 20th st & indiana. (ref pa#2014-06-25-9383s). ** maher: exempted - see attached approval from dph ** | $350,000 | |
| Jul 21, 2015 | Completed final sign-off Jul 2016 | 1651 Oak St | Plant Construction Co, Lp | temporary shoring and excavation to accomodate construction at 1639 oak st. pls. note urban school is doing the work along 1651-1655 oak. st. property lineDetails
temporary shoring and excavation to accomodate construction at 1639 oak st. pls. note urban school is doing the work along 1651-1655 oak. st. property line | $15,000 |
| Jul 21, 2015 | Completed final sign-off Jul 2016 | 1611 Oak St | Plant Construction Co, Lp | temporary excavation and shoring to accomodate construction at 1639 oak stDetails
temporary excavation and shoring to accomodate construction at 1639 oak st | $100,000 |
| Jun 19, 2015 | Completed final sign-off Jul 2016 | 1625 Oak St | Plant Construction Co, Lp | temporary shoring & excavation to accomondate construction at 1639 oak street.Details
temporary shoring & excavation to accomondate construction at 1639 oak street. | $20,000 |
| Jun 18, 2015 | Completed final sign-off Jul 2016 | 1639 Oak St | Plant Construction Co, Lp | temporary shoring and excavation along oak st to accomodate construction at 1639 oak stDetails
temporary shoring and excavation along oak st to accomodate construction at 1639 oak st | $75,000 |
| Jun 15, 2015 | Completed final sign-off Jul 2016 | 1520 Page St | Plant Construction Co, Lp | temporary excavation and shoring to accomodate construction at 1639 oak st.Details
temporary excavation and shoring to accomodate construction at 1639 oak st. | $150,000 |
| Jun 15, 2015 | Completed final sign-off Jul 2016 | 1025 Masonic Av | Plant Construction Co, Lp | temporary excavation and shoring to accomodate construction at 1639 oak st.Details
temporary excavation and shoring to accomodate construction at 1639 oak st. | $100,000 |
| Jun 15, 2015 | Completed final sign-off Jul 2016 | 1530 Page St | Plant Construction Co, Lp | temporary excavation and shoring to accomodate construction at 1639 oakDetails
temporary excavation and shoring to accomodate construction at 1639 oak | $100,000 |
| Oct 24, 2014 | Expired or cancelled withdrawn Apr 2015 | 635 Texas St | James E Roberts-Obayashi Corporation | temporary excavation shoring & underpinning for new construction @ 645 texas street. ref pa# 2013/12/09/3691 's'. ** maher: compliance with ordinance no# 155-13 not required **Details
temporary excavation shoring & underpinning for new construction @ 645 texas street. ref pa# 2013/12/09/3691 's'. ** maher: compliance with ordinance no# 155-13 not required ** | $450,000 |
| Oct 24, 2014 | Expired or cancelled withdrawn Apr 2015 | 645 Texas St | James E Roberts-Obayashi Corporation | temporary excavation shoring design for new construction @ 645 texas street. ref pa# 2013/12/09/3691 's'. ** maher: compliance with ordinance no# 155-13 required, route to dph **Details
temporary excavation shoring design for new construction @ 645 texas street. ref pa# 2013/12/09/3691 's'. ** maher: compliance with ordinance no# 155-13 required, route to dph ** | $820,000 |
| Oct 6, 2014 | Never finaled issued Apr 2015, no final | 2101 16th St | Build Group Inc. | shoring &underpinning involves the use of soldier beams, wood lagging & tiebacks to return cuts up to 19 feet high, required for below grade parking on the 346 potrero ave development. (pa #2013-11-20-2405s) ** maher: compliance with ordinance no# 155-13 not required **Details
shoring &underpinning involves the use of soldier beams, wood lagging & tiebacks to return cuts up to 19 feet high, required for below grade parking on the 346 potrero ave development. (pa #2013-11-20-2405s) ** maher: compliance with ordinance no# 155-13 not required ** | $82,875 |
| Oct 6, 2014 | Completed final sign-off Sep 2016 | 346 Potrero Av | Build Group Inc. | excavation shoring & tieback involves the use of soldier beams, wood lagging & tiebacks to retain cuts up to 19 feet high, required for below grade parking on the 346 potrero ave development. (pa #201311202405s) ** maher: exempted **Details
excavation shoring & tieback involves the use of soldier beams, wood lagging & tiebacks to retain cuts up to 19 feet high, required for below grade parking on the 346 potrero ave development. (pa #201311202405s) ** maher: exempted ** | $165,750 |
| Oct 6, 2014 | Never finaled issued Apr 2015, no final | 2450 17th St | Build Group Inc. | shoring & tieback involves the use of soldier beams, wood lagging & tiebacks to retain cuts up to 19 feet high, required for below grade parking for the 346 potrero ave development. (pa #2013-11-20-2405s)Details
shoring & tieback involves the use of soldier beams, wood lagging & tiebacks to retain cuts up to 19 feet high, required for below grade parking for the 346 potrero ave development. (pa #2013-11-20-2405s) | $193,375 |
| Oct 6, 2014 | Never finaled issued Apr 2015, no final | 388 Potrero Av | Build Group Inc. | shoring & tieback involves the use of soldier beams, wood lagging & tiebacks to retain cuts up to 19 feet high required for below grade parking on the 346 potrero ave development. (pa #201311202405s) ** maher: compliance with ordinance no# 155-13 not required **Details
shoring & tieback involves the use of soldier beams, wood lagging & tiebacks to retain cuts up to 19 feet high required for below grade parking on the 346 potrero ave development. (pa #201311202405s) ** maher: compliance with ordinance no# 155-13 not required ** | $110,500 |
| Jul 9, 2014 | Completed final sign-off Nov 2016 | 340 Fremont St | Suffolk Constr Co. Inc. Dba Suffolk-Roel | revision to addenda 2: 200509193271(s2); revise shoringDetails
revision to addenda 2: 200509193271(s2); revise shoring | |
| May 27, 2014 | Completed final sign-off Oct 2014 | 2675 Bush St | Midstate Residential Construction | revision to the issue pa# 2013/04/04/3801. shoring & underpinning for new construction at 2655 bush street (ref pa# 2012/11/09/3966)Details
revision to the issue pa# 2013/04/04/3801. shoring & underpinning for new construction at 2655 bush street (ref pa# 2012/11/09/3966) | |
| May 27, 2014 | Completed final sign-off Oct 2014 | 1745 Divisadero St | Midstate Residential Construction | revision to the issue pa# 2013/04/04/3803. shoring & underpinning for new construction at 2655 bush street (ref pa# 2012/11/09/3966)Details
revision to the issue pa# 2013/04/04/3803. shoring & underpinning for new construction at 2655 bush street (ref pa# 2012/11/09/3966) | |
| Nov 20, 2013 | Expired or cancelled expired Jan 2018 | 100 Buchanan St | Build Group Inc. | shoring along herman st using soil nail wall and shoring along palm lane using cantilever beams and lagging systemDetails
shoring along herman st using soil nail wall and shoring along palm lane using cantilever beams and lagging system | $25,000 |
| Sep 13, 2013 | Expired or cancelled expired Jan 2018 | 100 Buchanan St | Build Group Inc. | revision to 201306280730. shoring and tie back for new constructionDetails
revision to 201306280730. shoring and tie back for new construction | $22,000 |
| Sep 6, 2013 | Never finaled issued Dec 2013, no final | 55 Laguna St | Build Group Inc. | temporary excavation and shoring for temporary parking lot to be located on land demo under pa #2013-08-06-3614.Details
temporary excavation and shoring for temporary parking lot to be located on land demo under pa #2013-08-06-3614. | $35,000 |
| Apr 15, 2013 | Completed final sign-off Jul 2014 | 2770 Jackson St | Herrero Builders Incorporated | excavation shoring system for the construction of below grade improvements at the town shcool for boys site in s.f maximum cut heights of 37-feet will be retained with a temporary soil neil system.Details
excavation shoring system for the construction of below grade improvements at the town shcool for boys site in s.f maximum cut heights of 37-feet will be retained with a temporary soil neil system. | $1,000 |
| Apr 15, 2013 | Completed final sign-off Jun 2016 | 386 01st St | Build Group Inc. | tiebacks as a result of adjacent new construction 45 lansing street project. (ref approved pa# 2010/09/14/0800)Details
tiebacks as a result of adjacent new construction 45 lansing street project. (ref approved pa# 2010/09/14/0800) | $100,000 |
| Apr 4, 2013 | Completed final sign-off Oct 2014 | 2655 Bush St | Midstate Residential Construction, Build Group Inc. | shoring & excavation up to 23' high with soldier beams, tiebacks, imperal bracing & wood lagging - for new construction at 2655 bush (2012-1109-3966-s).Details
shoring & excavation up to 23' high with soldier beams, tiebacks, imperal bracing & wood lagging - for new construction at 2655 bush (2012-1109-3966-s). | $166,000 |
| Apr 4, 2013 | Completed final sign-off Oct 2014 | 1638 Broderick St | Midstate Residential Construction, Build Group Inc. | shoring/underpinning a 19' excavation with soldier beams, tiebacks & wood lagging - for new construction at 2655 bush (2012-11-09-3966s).Details
shoring/underpinning a 19' excavation with soldier beams, tiebacks & wood lagging - for new construction at 2655 bush (2012-11-09-3966s). | $78,000 |
| Apr 4, 2013 | Completed final sign-off Feb 2017 | 2675 Bush St | Midstate Residential Construction, Build Group Inc. | shoring/underpinning an excavation up to 20' high with a combination of soldier beams, underpinning piers, tiebacks & wood lagging - for new construction at 2655 bush (2012-11-09-3966s).Details
shoring/underpinning an excavation up to 20' high with a combination of soldier beams, underpinning piers, tiebacks & wood lagging - for new construction at 2655 bush (2012-11-09-3966s). | $78,000 |
| Apr 4, 2013 | Completed final sign-off Oct 2014 | 1745 Divisadero St | Midstate Residential Construction, Build Group Inc. | shoring/underpinning an excavation up to 15' high with underpinning piers, tiebacks & wood lagging - for new construction at 2655 bush (2012-11-09-3966s).Details
shoring/underpinning an excavation up to 15' high with underpinning piers, tiebacks & wood lagging - for new construction at 2655 bush (2012-11-09-3966s). | $88,000 |
| Apr 4, 2013 | Completed final sign-off Feb 2017 | 2655 Bush St | Midstate Residential Construction, Build Group Inc. | excavation/shoring at 2655 bush st for new construction at 2655 bush. ref to 2012-11-09-3966s.Details
excavation/shoring at 2655 bush st for new construction at 2655 bush. ref to 2012-11-09-3966s. | $325,000 |
| Feb 6, 2013 | Completed final sign-off Apr 2016 | 45 Lansing St | Build Group Inc. | shoring & tiebacks as a result of a new construction. reference approved pa# 2010/09/14/0800.Details
shoring & tiebacks as a result of a new construction. reference approved pa# 2010/09/14/0800. | $200,000 |
| Feb 6, 2013 | Completed final sign-off Jun 2016 | 81 Lansing St | Build Group Inc. | tiebacks as a result of adjacent new construction on 45 lansing street project. reference approved pa# 2010/09/14/0800.Details
tiebacks as a result of adjacent new construction on 45 lansing street project. reference approved pa# 2010/09/14/0800. | $200,000 |
| Jan 29, 2013 | Completed final sign-off Sep 2014 | 1738 Diamond St | Casement Construction | excavation and new retaining wall for future dwelling unit at 1738 diamondDetails
excavation and new retaining wall for future dwelling unit at 1738 diamond | $17,025 |
| Jan 29, 2013 | Completed final sign-off Jul 2014 | 1710 Diamond St | Casement Construction | excavation retaining wall for new dwelling unit.Details
excavation retaining wall for new dwelling unit. | $39,725 |
| Dec 27, 2012 | Never finaled issued Jan 2013, no final | 55 Dolores St | Granite Excavation & Demolition Inc | underpinning for 25 dolores street project. (reference: approved permit #201205180774)Details
underpinning for 25 dolores street project. (reference: approved permit #201205180774) | $50,000 |
| Dec 27, 2012 | Never finaled issued Jan 2013, no final | 15 Dolores St | Granite Excavation & Demolition Inc | underpinning for 35 dolores street project. (reference: approved permit #201205180774)Details
underpinning for 35 dolores street project. (reference: approved permit #201205180774) | $50,000 |
| Dec 27, 2012 | Never finaled issued Feb 2013, no final | 25 Dolores St | Granite Excavation & Demolition Inc | shoring for excavation at 25 dolores st project. (reference: approved permit #201205180774)Details
shoring for excavation at 25 dolores st project. (reference: approved permit #201205180774) | $250,000 |
| Dec 21, 2012 | Expired or cancelled cancelled Mar 2020 | 260 05th St | Webcor Construction Lp | revision to pa# 2012/03/19/6331. change driven soldier beams to pre-drilled soldier beams.Details
revision to pa# 2012/03/19/6331. change driven soldier beams to pre-drilled soldier beams. | |
| Jul 20, 2012 | Completed final sign-off Aug 2013 | 1675 Pacific Av | Cahill Contractors Inc | shoring the west sides of the proposed 1645 pacific avenue project site using a tieback underpinning system.Details
shoring the west sides of the proposed 1645 pacific avenue project site using a tieback underpinning system. | $23,500 |
| Jul 20, 2012 | Completed final sign-off Aug 2013 | 1625 Pacific Av | Cahill Contractors Inc, Granite Excavation & Demolition Inc | shoring the east sides of the proposed 1645 pacific avenue project site using a tieback underpinning system.Details
shoring the east sides of the proposed 1645 pacific avenue project site using a tieback underpinning system. | $60,500 |
| Jul 20, 2012 | Completed final sign-off Jun 2014 | 1645 Pacific Av | Cahill Contractors Inc, Granite Excavation & Demolition Inc | shoring the north & south sides of the proposed 1645 pacific avenue project site using a tieback soldier beam system on the north elevation & a cantilevered soldier beam on the south side. new construction pa# 2011/10/14/6841 & demo pa# 2012/07/03/4043.Details
shoring the north & south sides of the proposed 1645 pacific avenue project site using a tieback soldier beam system on the north elevation & a cantilevered soldier beam on the south side. new construction pa# 2011/10/14/6841 & demo pa# 2012/07/03/4043. | $60,000 |
| Jul 20, 2012 | Completed final sign-off Aug 2013 | 1665 Pacific Av | Cahill Contractors Inc, Granite Excavation & Demolition Inc | shoring the west sides of the proposed 1645 pacific avenue project site using a tieback underpinning system.Details
shoring the west sides of the proposed 1645 pacific avenue project site using a tieback underpinning system. | $37,000 |
| Mar 14, 2012 | Completed final sign-off Jun 2014 | 2001 Market St | Granite Excavation & Demolition Inc | excavation & shoring for new approved under pa# 2010-1220-6990sDetails
excavation & shoring for new approved under pa# 2010-1220-6990s | $250,000 |
| Dec 1, 2011 | Completed final sign-off Jun 2013 | 1595 Pacific Av | Ross Douglas Construction | revision to drilled pier approved under 200711148042 s1Details
revision to drilled pier approved under 200711148042 s1 | |
| Jul 16, 2010 | Completed final sign-off Mar 2012 | 1150 Ocean Av | Avalon Bay Communities | construction of a temporary excavation system. the system utilizes soldier beams & tiebacks with shotcrete lagging to temporarily retain the site soils.Details
construction of a temporary excavation system. the system utilizes soldier beams & tiebacks with shotcrete lagging to temporarily retain the site soils. | $1,350,000 |
| Sep 16, 2009 | Completed final sign-off Dec 2009 | 14 Moss St | Herrero Builders Incorporated | revision to appl #200903204499 - concrete piers added to perperation grout underpinning previsouly permitted under 200903204499. ( permit 1182621). compt 200919221.Details
revision to appl #200903204499 - concrete piers added to perperation grout underpinning previsouly permitted under 200903204499. ( permit 1182621). compt 200919221. | $20,000 |
| Sep 16, 2009 | Completed final sign-off Dec 2009 | 225 07th St | Herrero Builders Incorporated | revision to appl #200903134045 - concrete piers added to perpreation grout underpinning previously permited.Details
revision to appl #200903134045 - concrete piers added to perpreation grout underpinning previously permited. | $20,000 |
| Mar 20, 2009 | Completed final sign-off Dec 2009 | 14 Moss St | Herrero Builders Incorporated | underpinning of14 moss st. for new construction at 255 - 7th st. using permeation grouting.Details
underpinning of14 moss st. for new construction at 255 - 7th st. using permeation grouting. | $30,000 |
| Mar 20, 2009 | Completed final sign-off Dec 2009 | 56 Moss St | Herrero Builders Incorporated | revise underpinning of 56 moss, previously approved under appl. 200901140159. to increase depth of permeation grouting. this is all for new building construction @ 255 - 7th st. (2005-09-23-3708).Details
revise underpinning of 56 moss, previously approved under appl. 200901140159. to increase depth of permeation grouting. this is all for new building construction @ 255 - 7th st. (2005-09-23-3708). | $10,000 |
| Mar 13, 2009 | Completed final sign-off Dec 2009 | 225 07th St | Herrero Builders Incorporated | underpinning at 225 7th street for the new construction at 255 7th street using permeation groutingDetails
underpinning at 225 7th street for the new construction at 255 7th street using permeation grouting | $36,000 |
| Jan 14, 2009 | Completed final sign-off Dec 2009 | 259 07th St | Herrero Builders Incorporated | underpinning 259 7th street for the new construction at 255 7th st, a.p. #200509233708, using permeation grouting.Details
underpinning 259 7th street for the new construction at 255 7th st, a.p. #200509233708, using permeation grouting. | $45,000 |
| Jan 14, 2009 | Never finaled issued Mar 2009, no final | 56 Moss St | Herrero Builders Incorporated | underpin 56 moss street for new construction on 255 7th street using permeation grouting appl#200509233708.Details
underpin 56 moss street for new construction on 255 7th street using permeation grouting appl#200509233708. | $25,000 |
| Aug 17, 2006 | Completed final sign-off Feb 2009 | 900 Minnesota St | R J S & Associates Inc. | temporary shoring & excavation. reference pa# 2005/12/02/9382.Details
temporary shoring & excavation. reference pa# 2005/12/02/9382. | $1,750,000 |
| Mar 8, 2006 | Never finaled issued Apr 2006, no final | 368 Elm St | provide chemical grouting soil stabilization at property line for shoring work on adjacent bldg. (871 turk appl#200602275524)Details
provide chemical grouting soil stabilization at property line for shoring work on adjacent bldg. (871 turk appl#200602275524) | $35,000 | |
| Feb 27, 2006 | Completed final sign-off Mar 2008 | 871 Turk St | shoring work for new construction approved under pa 20506165225Details
shoring work for new construction approved under pa 20506165225 | $92,000 | |
| Jan 3, 2003 | Completed final sign-off Mar 2003 | 3916 22nd St | underpinning foundation at 3916 22nd street, per n.o.v. 200236305Details
underpinning foundation at 3916 22nd street, per n.o.v. 200236305 | $21,000 |