James E Roberts-Obayashi Corporation
- Based in
- Danville
- On San Francisco permits
- Jan 2000 to Aug 2025
- Last 24 months
- 1 permit filed
294 permits since 2000: 239 completed, 24 never finaled, 31 expired or cancelled.
Of the 24 never-finaled permits, 1 is 3 to 5 years old, 10 are 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 294.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 11, 2025 | Completed final sign-off Nov 2025 | 1550 17th St | to obtain final inspection for work approved upder pa#: 201606028994. all work is complete.Details
to obtain final inspection for work approved upder pa#: 201606028994. all work is complete. | |
| Sep 9, 2024 | Completed final sign-off Sep 2024 | 3001 24th St | correct complaint #202294900 for repair of tile wall and window w/o permit. owner did not pull permit. repair window and tiles at left side of main entrance door.Details
correct complaint #202294900 for repair of tile wall and window w/o permit. owner did not pull permit. repair window and tiles at left side of main entrance door. | $39,000 |
| May 30, 2024 | Completed final sign-off Apr 2025 | 55 Bruton St | rev pa201912169614-s5 fire sprinkler. to update locations of the (e) fire sprinkler and fire hydrants per sffd condition of approval.Details
rev pa201912169614-s5 fire sprinkler. to update locations of the (e) fire sprinkler and fire hydrants per sffd condition of approval. | |
| May 23, 2024 | Completed final sign-off Jul 2025 | 55 Bruton St | rev pa 202307212738. to update locations of the (e) fire hydrants and memorialize approve ab-005 for location of fdc.Details
rev pa 202307212738. to update locations of the (e) fire hydrants and memorialize approve ab-005 for location of fdc. | |
| Oct 16, 2023 | Completed final sign-off Mar 2025 | 55 Bruton St | revision to pa#: 201912169614 s4, to incorporate required venting to underside of exterior balconies at levels 3,4, and 5.Details
revision to pa#: 201912169614 s4, to incorporate required venting to underside of exterior balconies at levels 3,4, and 5. | |
| Jul 26, 2023 | Completed final sign-off Mar 2025 | 55 Bruton St | revision to pa#201912169614-s4 addendum 4, archmep. update mech and electrical details per plan.Details
revision to pa#201912169614-s4 addendum 4, archmep. update mech and electrical details per plan. | |
| Apr 21, 2023 | Completed final sign-off May 2023 | 99 Ocean Av | rev pa# 201912038490, to document changes to hvac system.Details
rev pa# 201912038490, to document changes to hvac system. | |
| Apr 21, 2023 | Completed final sign-off Mar 2025 | 55 Bruton St | 55-77 bruton c2.2 deferred submittal tie down system. ref pa 2019-1216-9614Details
55-77 bruton c2.2 deferred submittal tie down system. ref pa 2019-1216-9614 | $60,000 |
| Apr 17, 2023 | Completed final sign-off Nov 2023 | 99 Ocean Av | revision to pa 2019-1203-8490 for changes to horizontal exit doors from asymmetrical s-doors to asymmetrical swing door in the dame direction with panic hardware. exit swing doors swing in direction of egress travel where servubg a room or area containing an occupant load of 50 or more personsDetails
revision to pa 2019-1203-8490 for changes to horizontal exit doors from asymmetrical s-doors to asymmetrical swing door in the dame direction with panic hardware. exit swing doors swing in direction of egress travel where servubg a room or area containing an occupant load of 50 or more persons | |
| Apr 6, 2023 | Completed final sign-off May 2023 | 99 Ocean Av | revision to permit 201912038490 for changes to emergency power to corridor exhaust fans.Details
revision to permit 201912038490 for changes to emergency power to corridor exhaust fans. | |
| Dec 2, 2022 | Completed final sign-off Dec 2024 | 77 Bruton St | parcel c2.2 - tower crane erection; temporary use. potain mdt219 j10 tower crame with 164 ft long jib at 131.2ft in ht. ref site bpa# 201912169614. (mayor ed 17-02 priority)Details
parcel c2.2 - tower crane erection; temporary use. potain mdt219 j10 tower crame with 164 ft long jib at 131.2ft in ht. ref site bpa# 201912169614. (mayor ed 17-02 priority) | $70,000 |
| Sep 2, 2022 | Completed final sign-off Jul 2023 | 99 Ocean Av | revision to 201912038490 for change of the hvac system in the fire pump roomDetails
revision to 201912038490 for change of the hvac system in the fire pump room | |
| Aug 29, 2022 | Completed final sign-off Jul 2025 | 150 04th Ti St | parcel c2.1 - shoring companion permit associated with building parcel c2.2 (55-77 bruton st under pa# 202205174388.Details
parcel c2.1 - shoring companion permit associated with building parcel c2.2 (55-77 bruton st under pa# 202205174388. | |
| Jul 22, 2022 | Completed final sign-off May 2023 | 99 Ocean Av | interior signage deferred from new construction, ref bpa#201912038490Details
interior signage deferred from new construction, ref bpa#201912038490 | |
| May 17, 2022 | Completed final sign-off Dec 2024 | 55 Bruton St | shoring associated with new building under pa# 201912169614.Details
shoring associated with new building under pa# 201912169614. | $225,000 |
| May 16, 2022 | Completed final sign-off Dec 2024 | 55 Bruton St | grading associated to new building under pa #201912169614Details
grading associated to new building under pa #201912169614 | $225,000 |
| Apr 20, 2022 | Completed final sign-off Nov 2023 | 1820 Alemany Bl | prop h: tenant improvement. non-profit child care facility.Details
prop h: tenant improvement. non-profit child care facility. | $1,200,000 |
| Mar 21, 2022 | Completed final sign-off May 2023 | 99 Ocean Av | deferred submittal for bpa# 201912038490 for installation of new exterior building maintenance equipment at level 5 and roof level.Details
deferred submittal for bpa# 201912038490 for installation of new exterior building maintenance equipment at level 5 and roof level. | |
| Nov 16, 2021 | Completed final sign-off Jul 2023 | 99 Ocean Av | deferred submittal for pa# 201912038490. construction of steel stairs.Details
deferred submittal for pa# 201912038490. construction of steel stairs. | |
| Oct 1, 2021 | Never finaled issued Dec 2022, no final | 555 Larkin St | interior revisons related to covid.roof farm coordination & developement. revision to addendum #2 (bpa#2017/1215/6628s)aka 500 turk stDetails
interior revisons related to covid.roof farm coordination & developement. revision to addendum #2 (bpa#2017/1215/6628s)aka 500 turk st | |
| Sep 24, 2021 | Completed final sign-off Dec 2021 | 2060 Folsom St | amendment to addendum 2 pa# 2016-0805-4294. revised t-24 calcs to reflect as-built conditions.Details
amendment to addendum 2 pa# 2016-0805-4294. revised t-24 calcs to reflect as-built conditions. | |
| Sep 17, 2021 | Completed final sign-off May 2023 | 99 Ocean Av | deferred emergency responder radio coverage system submittal associated with issued bpa#201912038490Details
deferred emergency responder radio coverage system submittal associated with issued bpa#201912038490 | $88,000 |
| Sep 14, 2021 | Completed final sign-off Jul 2023 | 99 Ocean Av | (n) emergency voice alarm comm/voice evacuation fire alarm system & elevator landing/stairwell 2-way comm system for new building. deferred fire alarm system and emergency two-way communication system associated with issued bpa#201912038490Details
(n) emergency voice alarm comm/voice evacuation fire alarm system & elevator landing/stairwell 2-way comm system for new building. deferred fire alarm system and emergency two-way communication system associated with issued bpa#201912038490 | $123,410 |
| Aug 5, 2021 | Completed final sign-off May 2023 | 99 Ocean Av | dbi review of tower crane erection per abo23 associated with pa# 2019-1203-8490Details
dbi review of tower crane erection per abo23 associated with pa# 2019-1203-8490 | $49,113 |
| Apr 22, 2021 | Completed final sign-off Dec 2021 | 2060 Folsom St | amendment to pa #2016-0805-4294 addendum 2. electrical single line drawing revised to reflect as-built conditions.//these as builts take out the initial transfer switch fromt he fire pump to the generator, the building is not a high rise, therefore, this is not a requirement.Details
amendment to pa #2016-0805-4294 addendum 2. electrical single line drawing revised to reflect as-built conditions.//these as builts take out the initial transfer switch fromt he fire pump to the generator, the building is not a high rise, therefore, this is not a requirement. | |
| Mar 9, 2021 | Completed final sign-off Jul 2023 | 99 Ocean Av | administrative dbi plumbing inspection review of stormwater flow associated with pa# 201912038490.Details
administrative dbi plumbing inspection review of stormwater flow associated with pa# 201912038490. | |
| Feb 24, 2021 | Completed final sign-off Sep 2024 | 65 Ocean Av | deferred submittal for bpa# 2019 1203 8490. provide new fire sprinkler for the entir building. new fire service at garage level approved under pa# 2020 926 5026. installation of fs system at each level of 6 story (residential) bldg above grade + 1 level of garage parking below. install 1 electric...Details
deferred submittal for bpa# 2019 1203 8490. provide new fire sprinkler for the entir building. new fire service at garage level approved under pa# 2020 926 5026. installation of fs system at each level of 6 story (residential) bldg above grade + 1 level of garage parking below. install 1 electric... | |
| Feb 4, 2021 | Completed final sign-off Mar 2022 | 73 Arkansas St | sales center for new construction at 88 arkansas street project. new interior non-structural tenant improvements (interior partitions & finishes) on ground floor of existing 4-story building.Details
sales center for new construction at 88 arkansas street project. new interior non-structural tenant improvements (interior partitions & finishes) on ground floor of existing 4-story building. | $150,000 |
| Jan 4, 2021 | Never finaled issued Feb 2021, no final | 88 Arkansas St | revision to the issued s& (errcs) re pa # 2015-1102-1443; minor layout changes to rooms b13 & b15 - relocated errcs head end equipment from room b15 to b13, making b13 a room enclosed with 2-hour rated walls & a 90-minute door.Details
revision to the issued s& (errcs) re pa # 2015-1102-1443; minor layout changes to rooms b13 & b15 - relocated errcs head end equipment from room b15 to b13, making b13 a room enclosed with 2-hour rated walls & a 90-minute door. | |
| Dec 9, 2020 | Completed final sign-off Oct 2021 | 3001 24th St | exterior building maintenace-anchor systemDetails
exterior building maintenace-anchor system | $50,000 |
| Nov 13, 2020 | Completed final sign-off Feb 2021 | 75 Laguna St | caulk and repair dry wall only located at basement, first, and second floor (senior center)Details
caulk and repair dry wall only located at basement, first, and second floor (senior center) | $120,000 |
| Sep 26, 2020 | Completed final sign-off May 2023 | 65 Ocean Av | deferred submittal for bpa#201912038490. underground fire line installation & review for approval of new water connectionsDetails
deferred submittal for bpa#201912038490. underground fire line installation & review for approval of new water connections | $75,000 |
| Sep 17, 2020 | Completed final sign-off Feb 2022 | 1800 Alemany Bl | to document extension of tieback ground anchors into adjacent property line under bpa# 202009144142 associated with apn # 6954/018Details
to document extension of tieback ground anchors into adjacent property line under bpa# 202009144142 associated with apn # 6954/018 | |
| Sep 14, 2020 | Completed final sign-off Jul 2023 | 65 Ocean Av | excavation and shoring, drill displacement columns. site improvement permit to prepare for new bldg under pa# 201912038490. demolition of (e) building under separate permit.Details
excavation and shoring, drill displacement columns. site improvement permit to prepare for new bldg under pa# 201912038490. demolition of (e) building under separate permit. | $807,000 |
| Sep 9, 2020 | Completed final sign-off Dec 2021 | 2060 Folsom St | revision to s2 of pa# 201608054294. change of mobility feature unit on level 2 from unit 221 to unit 209. change 15 adaptable units above (e) mobility unit stack to mobility units, from level 6-9. the added mobility units are: unit 603,609,614,701,703,709,714,801,803,809,814,901,903,909,914.Details
revision to s2 of pa# 201608054294. change of mobility feature unit on level 2 from unit 221 to unit 209. change 15 adaptable units above (e) mobility unit stack to mobility units, from level 6-9. the added mobility units are: unit 603,609,614,701,703,709,714,801,803,809,814,901,903,909,914. | |
| Jun 11, 2020 | Never finaled issued Jun 2020, no final | 88 Arkansas St | street spaceDetails
street space | |
| Feb 6, 2020 | Completed final sign-off Mar 2023 | 500 Turk St | revision to (e) permit #201712156628-s1. foundation mat slab design revised for ground improvement element (ddc) layout.Details
revision to (e) permit #201712156628-s1. foundation mat slab design revised for ground improvement element (ddc) layout. | |
| Jan 22, 2020 | Never finaled issued Mar 2020, no final | 601 Eddy St | temporary earth shoring system to accomodate foundation construction. shoring consists of cantilever soldier beams and lagging, soldier beams with raker, bracing and tiebacks.Details
temporary earth shoring system to accomodate foundation construction. shoring consists of cantilever soldier beams and lagging, soldier beams with raker, bracing and tiebacks. | $200,000 |
| Jan 22, 2020 | Never finaled issued Mar 2020, no final | 555 Larkin St | temporary earth shoring system to accomodate foundation construction. shoring consists of cantilever soldier beams and lagging, soldier beams with raker, bracing and tiebacks.Details
temporary earth shoring system to accomodate foundation construction. shoring consists of cantilever soldier beams and lagging, soldier beams with raker, bracing and tiebacks. | $123,000 |
| Jan 16, 2020 | Completed final sign-off Jun 2021 | 65 Ocean Av | building 3. to demolish a type 5, 1-story school.Details
building 3. to demolish a type 5, 1-story school. | $37,500 |
| Jan 16, 2020 | Completed final sign-off Jun 2021 | 65 Ocean Av | building 2. to demolish a type 5, 2-story school.Details
building 2. to demolish a type 5, 2-story school. | $37,500 |
| Jan 16, 2020 | Completed final sign-off Jun 2021 | 65 Ocean Av | building 4. to demolish a type 5, 1-story school.Details
building 4. to demolish a type 5, 1-story school. | $37,500 |
| Jan 16, 2020 | Completed final sign-off Jun 2021 | 65 Ocean Av | building 1. to demolish a type 5, 1-story school.Details
building 1. to demolish a type 5, 1-story school. | $37,500 |
| Dec 16, 2019 | Completed final sign-off Aug 2025 | 55 Bruton St | mayor ed #17-02. priority processing. ab-004 attached. to erect 6 stories, 1 basement, type 1-a, 178 residential units with mixed-used building (r-2,b,a-3,s-2). parcel-Details
mayor ed #17-02. priority processing. ab-004 attached. to erect 6 stories, 1 basement, type 1-a, 178 residential units with mixed-used building (r-2,b,a-3,s-2). parcel- | $84,400,000 |
| Dec 3, 2019 | Completed final sign-off Nov 2023 | 65 Ocean Av | to erect 6 stories, 1 basement, type i-a / iii-a, 193 residential units with child care, mix use building. (r-2,e,s-2)Details
to erect 6 stories, 1 basement, type i-a / iii-a, 193 residential units with child care, mix use building. (r-2,e,s-2) | $30,000,000 |
| Jun 6, 2019 | Completed final sign-off Mar 2023 | 500 Turk St | to demolish 1 story tire shop.Details
to demolish 1 story tire shop. | $80,000 |
| May 3, 2019 | Completed final sign-off Dec 2021 | 2060 Folsom St | shoring between property and sidewalk related to bpa#201608054294; maher ord 155-13 naDetails
shoring between property and sidewalk related to bpa#201608054294; maher ord 155-13 na | $134,600 |
| Apr 24, 2019 | Completed final sign-off Oct 2021 | 2060 Folsom St | erection of tower crane. ref pa #201608054294. ** maher: n/a **Details
erection of tower crane. ref pa #201608054294. ** maher: n/a ** | $150,000 |
| Jan 29, 2019 | Completed final sign-off Oct 2021 | 2060 Folsom St | stormwater control plan for application #201608054294. **maher n/a**Details
stormwater control plan for application #201608054294. **maher n/a** | |
| Nov 1, 2018 | Never finaled issued Dec 2018, no final | 95 Laguna St | installation of emergency responder radio coverage system. reference pa# 2015/07/06/0668. ** maher: n/a **Details
installation of emergency responder radio coverage system. reference pa# 2015/07/06/0668. ** maher: n/a ** | $50,000 |
| Aug 31, 2018 | Completed final sign-off Jun 2020 | 95 Laguna St | storm water control plan review. building under permit application #2015/0706/0668sDetails
storm water control plan review. building under permit application #2015/0706/0668s | $50,000 |
| Aug 2, 2018 | Completed final sign-off Nov 2019 | 1038 Mission St | ti build out of cold shell space, including open office, storage, conference, unisex restroom and breakroom 1068 sq ft. land use category per zoning (not occupancy ) is institutional.Details
ti build out of cold shell space, including open office, storage, conference, unisex restroom and breakroom 1068 sq ft. land use category per zoning (not occupancy ) is institutional. | $189,000 |
| Jun 26, 2018 | Completed final sign-off Jun 2020 | 1301 16th St | this is for tower crane ab-023 only. building is under construction under other permit. ref appln #201705025455.Details
this is for tower crane ab-023 only. building is under construction under other permit. ref appln #201705025455. | $200,000 |
| Jun 4, 2018 | Completed final sign-off Jun 2021 | 3001 24th St | priority processing. demolish 2-story, recreation buildingDetails
priority processing. demolish 2-story, recreation building | $50,000 |
| Jun 4, 2018 | Completed final sign-off Dec 2021 | 3001 24th St | priority processing. erect (n) 5-story, 45 dwelling units, commercial, courtyard, & terrace building.Details
priority processing. erect (n) 5-story, 45 dwelling units, commercial, courtyard, & terrace building. | $14,672,122 |
| Mar 20, 2018 | Expired or cancelled cancelled Nov 2022 | 88 Arkansas St | structural revisions to issued s1 for pa #2015-1102-1443. changes in shear wall core, mat foundation, design mild steel & post-tensioned slab design rebar & tendons added & relocatedl removal of solarium & penthouse; add slab & relocate various columns.Details
structural revisions to issued s1 for pa #2015-1102-1443. changes in shear wall core, mat foundation, design mild steel & post-tensioned slab design rebar & tendons added & relocatedl removal of solarium & penthouse; add slab & relocate various columns. | |
| Mar 16, 2018 | Expired or cancelled cancelled Nov 2022 | 1550 17th St | revision pa 2016-0602-8994 slant piles with wood lagging were changed to micropiles with soil nails at the face of the west shoring wall. the micropiles with soil nails are covered with shotcrete to hold (e) soil in placeDetails
revision pa 2016-0602-8994 slant piles with wood lagging were changed to micropiles with soil nails at the face of the west shoring wall. the micropiles with soil nails are covered with shotcrete to hold (e) soil in place | $12,000 |
| Feb 23, 2018 | Completed final sign-off Mar 2018 | 2051 03rd St | as builts plans to reflect shut off valve & timer for roof deck fire pit, bba & heater maher naDetails
as builts plans to reflect shut off valve & timer for roof deck fire pit, bba & heater maher na | |
| Jan 31, 2018 | Completed final sign-off Sep 2018 | 5050 Mission St | install emergency respoinders radio coverage system - errcs for main permit 2010006104250 maher naDetails
install emergency respoinders radio coverage system - errcs for main permit 2010006104250 maher na | $55,000 |
| Jan 23, 2018 | Completed final sign-off Feb 2018 | 645 Texas St | for record purposes only. permit appln #201312093691-s to revise record from 94 units to 91 units. ** maher: n/a **Details
for record purposes only. permit appln #201312093691-s to revise record from 94 units to 91 units. ** maher: n/a ** | |
| Dec 27, 2017 | Never finaled issued Aug 2018, no final | 705 Natoma St | revision to 201507131250 note for new windows between community room & dining room to be fire rated (e) & proposed conditions do not require windows to be fire rated . propose non-fire rated windows to be installed. maher naDetails
revision to 201507131250 note for new windows between community room & dining room to be fire rated (e) & proposed conditions do not require windows to be fire rated . propose non-fire rated windows to be installed. maher na | |
| Dec 15, 2017 | Completed final sign-off Mar 2023 | 500 Turk St | to erect 8 stories, no basement, type i-a,108 units residential with commerical/retail mixed used (r-2,m)Details
to erect 8 stories, no basement, type i-a,108 units residential with commerical/retail mixed used (r-2,m) | $40,000,000 |
| Dec 5, 2017 | Expired or cancelled cancelled Oct 2022 | 5050 Mission St | courtesy plan check by sfpuc- cpb (steve panelli)Details
courtesy plan check by sfpuc- cpb (steve panelli) | |
| Nov 29, 2017 | Completed final sign-off Mar 2018 | 705 Natoma St | improvements to the existing elevator. ref 2015-0713-1250 s2.Details
improvements to the existing elevator. ref 2015-0713-1250 s2. | $10,000 |
| Nov 15, 2017 | Completed final sign-off Apr 2019 | 95 Laguna St | erect tower crane for construction of 79 unit senior residence ref pa 2015-0706-0668. will be erecting a potain mdt 219-510 jib 131ft, hook 114'Details
erect tower crane for construction of 79 unit senior residence ref pa 2015-0706-0668. will be erecting a potain mdt 219-510 jib 131ft, hook 114' | $40,000 |
| Nov 15, 2017 | Completed final sign-off Aug 2018 | 5050 Mission St | fire alarm system for appln #201006104250Details
fire alarm system for appln #201006104250 | $50,000 |
| Oct 12, 2017 | Completed final sign-off Dec 2017 | 11 Innes Ct | to obtain final inspection for work approved under pa# 201308124121. all work is complete.Details
to obtain final inspection for work approved under pa# 201308124121. all work is complete. | |
| Oct 11, 2017 | Completed final sign-off Sep 2018 | 5050 Mission St | deferred submittal for steel stairs. ref pa# 2010/06/10/4250. ** maher: n/a **Details
deferred submittal for steel stairs. ref pa# 2010/06/10/4250. ** maher: n/a ** | $25,000 |
| Sep 20, 2017 | Completed final sign-off Sep 2022 | 1298 Howard St | construct tieback soldier beams and corner bracing w/ wood and soil mixed lagging to temporarly retain excavations up to 19 feet in depth (ref pa#201406067752s) comply with maher ord.Details
construct tieback soldier beams and corner bracing w/ wood and soil mixed lagging to temporarly retain excavations up to 19 feet in depth (ref pa#201406067752s) comply with maher ord. | $1,500,000 |
| Aug 15, 2017 | Completed final sign-off Oct 2018 | 1036 Mission St | clarification of the type of dimensions of the access panels at the elevator overun penthouses. revision to pa #201406269523-s2Details
clarification of the type of dimensions of the access panels at the elevator overun penthouses. revision to pa #201406269523-s2 | |
| Aug 3, 2017 | Never finaled issued Aug 2017, no final | 645 Texas St | temporary use ground floor retail for condo sales office. no work proposed or required; no architectural, structural, mechanical or life safety improvements proposed. ref pa 2013-1209-3691s; 2-year limitDetails
temporary use ground floor retail for condo sales office. no work proposed or required; no architectural, structural, mechanical or life safety improvements proposed. ref pa 2013-1209-3691s; 2-year limit | |
| Jun 20, 2017 | Completed final sign-off Oct 2018 | 1036 Mission St | deferred submittal for steel stairs ref 201406269523Details
deferred submittal for steel stairs ref 201406269523 | $150,000 |
| May 31, 2017 | Completed final sign-off Jun 2017 | 55 Laguna St | to obtain final inspection for work approved unper pa#s. 2015-12-21-5607, 2016-04-25-5585, 2016-05-06-6808. all work is completeDetails
to obtain final inspection for work approved unper pa#s. 2015-12-21-5607, 2016-04-25-5585, 2016-05-06-6808. all work is complete | |
| May 10, 2017 | Completed final sign-off Sep 2018 | 5050 Mission St | erection of tower crane. reference to building permit application no. 201006104250 s ** maher: n/a **Details
erection of tower crane. reference to building permit application no. 201006104250 s ** maher: n/a ** | $35,000 |
| May 8, 2017 | Completed final sign-off Jun 2017 | 350 08th St | revision to pa #2013-0730-3137-s2, configuration of roof deck layout modification. occupancy area of the deck remain the same. maximum occupant load on roof deck not to exceed 49 occupants.Details
revision to pa #2013-0730-3137-s2, configuration of roof deck layout modification. occupancy area of the deck remain the same. maximum occupant load on roof deck not to exceed 49 occupants. | |
| Apr 27, 2017 | Completed final sign-off Sep 2018 | 5050 Mission St | revision to approved bldg appl 2010-06-10-4250. change exterior siding at corners from metal siding to plaster at bay/corner upper floors. no change to ground floors.Details
revision to approved bldg appl 2010-06-10-4250. change exterior siding at corners from metal siding to plaster at bay/corner upper floors. no change to ground floors. | |
| Apr 27, 2017 | Completed final sign-off Aug 2018 | 5050 Mission St | revision to approved bldg appl 2010-06-10-4250. for fire sprinkler system only.Details
revision to approved bldg appl 2010-06-10-4250. for fire sprinkler system only. | |
| Mar 31, 2017 | Completed final sign-off Sep 2018 | 5050 Mission St | revision to approved building permit application #2010-0610-4250 for mep only.Details
revision to approved building permit application #2010-0610-4250 for mep only. | |
| Mar 24, 2017 | Completed final sign-off Aug 2018 | 705 Natoma St | new roof anchors to be attached to existing roof framing. type 1-a. maher not reqDetails
new roof anchors to be attached to existing roof framing. type 1-a. maher not req | $15,000 |
| Mar 17, 2017 | Completed final sign-off May 2018 | 2051 03rd St | furnish and install 2 way emergency communications system throughout 6-story type iii r-2/b/s-2.Details
furnish and install 2 way emergency communications system throughout 6-story type iii r-2/b/s-2. | $10,000 |
| Jan 13, 2017 | Completed final sign-off Mar 2018 | 2051 03rd St | add elevator details & smoke detector access panel in preparation for fire alarm plans submittal (under separate permit) ref pa 2014-0627-9814(s2). maher naDetails
add elevator details & smoke detector access panel in preparation for fire alarm plans submittal (under separate permit) ref pa 2014-0627-9814(s2). maher na | $200 |
| Dec 23, 2016 | Expired or cancelled withdrawn Jun 2017 | 55 Laguna St | add a security gate at hermann st, former entry to the bldg. the stair & door on hermann is not a required exit for the building. reference 201604255585,regarding stair & door on hermann st., (ref.201306270646)Details
add a security gate at hermann st, former entry to the bldg. the stair & door on hermann is not a required exit for the building. reference 201604255585,regarding stair & door on hermann st., (ref.201306270646) | $15,000 |
| Dec 9, 2016 | Completed final sign-off Oct 2018 | 1036 Mission St | erect tower craneDetails
erect tower crane | $50,000 |
| Nov 18, 2016 | Completed final sign-off Oct 2017 | 645 Texas St | owner improvements for sales center located in ground flr uits; install paint, carpet, millwork, furniture & lighting in sf sales center. (ref pa #2013-1209-3691 s)Details
owner improvements for sales center located in ground flr uits; install paint, carpet, millwork, furniture & lighting in sf sales center. (ref pa #2013-1209-3691 s) | $50,000 |
| Oct 26, 2016 | Completed final sign-off Jun 2017 | 350 08th St | install a non-combustible layer of protection under the bbq1 & fire pit area.the protection layer consists of a 24 ga sheet metal that is adhered to 2" rigid non-combustible mineral wool insulation on top of drain mat & (e)permitted roof,safety metal mesh screen is added to fire pit; maher n/aDetails
install a non-combustible layer of protection under the bbq1 & fire pit area.the protection layer consists of a 24 ga sheet metal that is adhered to 2" rigid non-combustible mineral wool insulation on top of drain mat & (e)permitted roof,safety metal mesh screen is added to fire pit; maher n/a | $10,000 |
| Sep 8, 2016 | Completed final sign-off May 2018 | 1550 17th St | construction of new non-load bearing wall at property line condition where none exists and accessible upgrades, restroom upgrade. n/a for maherDetails
construction of new non-load bearing wall at property line condition where none exists and accessible upgrades, restroom upgrade. n/a for maher | $22,000 |
| Sep 1, 2016 | Completed final sign-off Aug 2017 | 2198 Market St | for deferred submittal of sturctural calculation based on original design approved in previous permit addendum #201312134180 - steel staris, misc metal guardrails, signage bands, handrails.Details
for deferred submittal of sturctural calculation based on original design approved in previous permit addendum #201312134180 - steel staris, misc metal guardrails, signage bands, handrails. | |
| Aug 5, 2016 | Completed final sign-off Dec 2021 | 2070 Folsom St | mohcd project erect 9 stories, no basement, type 1-b of 127 dwelling units residential, retail, office & childcare, mix use (r-2, b, e, a-3). site plan onlyDetails
mohcd project erect 9 stories, no basement, type 1-b of 127 dwelling units residential, retail, office & childcare, mix use (r-2, b, e, a-3). site plan only | $40,254,600 |
| Aug 4, 2016 | Completed final sign-off Apr 2017 | 55 Laguna St | install emergency responders radio coverage system ref#2013-06-27-0646.Details
install emergency responders radio coverage system ref#2013-06-27-0646. | $45,000 |
| Jul 15, 2016 | Completed final sign-off Aug 2018 | 705 Natoma St | replace all existing exterior siding facing 8th st and natoma st. replace all existing windows facing 8th st and natoma st. replace existing cement plaster at corner turret maher not reqDetails
replace all existing exterior siding facing 8th st and natoma st. replace all existing windows facing 8th st and natoma st. replace existing cement plaster at corner turret maher not req | $100,000 |
| Jul 14, 2016 | Completed final sign-off Jun 2017 | 55 Laguna St | revision to pa #201306070646, #201512215607 & 201604255585 - revise exterior stair from wood to concrete. build exterior concrete retaining wall at north side.Details
revision to pa #201306070646, #201512215607 & 201604255585 - revise exterior stair from wood to concrete. build exterior concrete retaining wall at north side. | $80,000 |
| Jun 29, 2016 | Completed final sign-off Nov 2016 | 2011 03rd St | 2nd, 3rd & 4th floors: remove non compliant windows on property line. infill with new fire rated wall at south wallDetails
2nd, 3rd & 4th floors: remove non compliant windows on property line. infill with new fire rated wall at south wall | $20,000 |
| Jun 27, 2016 | Completed final sign-off Mar 2018 | 2051 03rd St | revision to app#2014-0627-9814 "s-1" for structural only at interior mezzanine level. no envelope changes.Details
revision to app#2014-0627-9814 "s-1" for structural only at interior mezzanine level. no envelope changes. | |
| Jun 6, 2016 | Completed final sign-off Mar 2017 | 350 08th St | bldg 3 only. minor t.i. of 1,500 sf per story for (e) permitted 4-story shell bldg. no exterior work as part of the t.i. interior improvement incl conference rooms, bathrooms, kitchen area & hvac & electrical/lighting. (ref pa 2013-07-30-3137s). ** maher: n/a **Details
bldg 3 only. minor t.i. of 1,500 sf per story for (e) permitted 4-story shell bldg. no exterior work as part of the t.i. interior improvement incl conference rooms, bathrooms, kitchen area & hvac & electrical/lighting. (ref pa 2013-07-30-3137s). ** maher: n/a ** | $200,000 |
| Jun 2, 2016 | Never finaled issued Aug 2017, no final | 121 Wisconsin St | shoring/tiebacks for (n) construction at 88 arkansas st. ref #201511021443-s. ** maher: disturbance of at least 50 cu.yd.of soil; route to dph **Details
shoring/tiebacks for (n) construction at 88 arkansas st. ref #201511021443-s. ** maher: disturbance of at least 50 cu.yd.of soil; route to dph ** | $140,000 |
| Jun 2, 2016 | Completed final sign-off Mar 2022 | 88 Arkansas St | excavation/shoring for (n) construction. ref #201511021443-s. ** maher: disturbance of at least 50 cu.yd. of soil; route to dph **Details
excavation/shoring for (n) construction. ref #201511021443-s. ** maher: disturbance of at least 50 cu.yd. of soil; route to dph ** | $300,000 |
| Jun 2, 2016 | Never finaled issued May 2017, no final | 1550 17th St | underpinning for (n) construction @ 88 arkansas st. ref #201511021443-s. ** maher: disturbance of at least 50 cu.yd. of soil: route to dph **Details
underpinning for (n) construction @ 88 arkansas st. ref #201511021443-s. ** maher: disturbance of at least 50 cu.yd. of soil: route to dph ** | $240,000 |
| Jun 1, 2016 | Completed final sign-off May 2018 | 88 Arkansas St | demolish of two story of warehouse. maher ordinance no.155-13.Details
demolish of two story of warehouse. maher ordinance no.155-13. | $90,000 |
| Jun 1, 2016 | Completed final sign-off May 2018 | 1530 17th St | demolish of two story of warehouse. n/a for maher ordinance no.155-13.Details
demolish of two story of warehouse. n/a for maher ordinance no.155-13. | $50,000 |
| May 17, 2016 | Completed final sign-off Sep 2018 | 350 08th St | revision to 201307303137-s2 (arch/mep); show exact location of the hoistway opening, the specific hatch door & associated metal cage for the smoke detector, specific hoistway wall construction & specific metal shelf within the metal cage.Details
revision to 201307303137-s2 (arch/mep); show exact location of the hoistway opening, the specific hatch door & associated metal cage for the smoke detector, specific hoistway wall construction & specific metal shelf within the metal cage. |