Ronald Hamburger
- Listed as
- architect, engineer
- Firm
- Simpson Gumpertz & Heger
- Based in
- San Francisco
- On San Francisco permits
- Nov 2004 to Jun 2021
22 permits since 2000 (engineer on 19 permits, architect on 3 permits): 18 completed, 4 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 24, 2021 | Completed final sign-off Feb 2022 | 409 Illinois St | Truebeck Construction | install new fall arrest tie down on e mech screen structure, penthouse roofs, mech equip padsDetails
install new fall arrest tie down on e mech screen structure, penthouse roofs, mech equip pads | $95,000 |
| Jun 24, 2021 | Completed final sign-off Feb 2022 | 499 Illinois St | Truebeck Construction | install new fall arrest tie down on e mech screen structure, penthouse roofs, mech equip padsDetails
install new fall arrest tie down on e mech screen structure, penthouse roofs, mech equip pads | $95,000 |
| Dec 17, 2020 | Completed final sign-off Mar 2022 | 50 California St | Hathaway Dinwiddie Co. | existing office tenant improvements for 11th fl. interior demo under pa# 202010196863.Details
existing office tenant improvements for 11th fl. interior demo under pa# 202010196863. | $1,092,700 |
| Dec 17, 2020 | Completed final sign-off Jan 2022 | 50 California St | Hathaway Dinwiddie Construct Co | a new communication stair and portal between 11th & 12th fl.Details
a new communication stair and portal between 11th & 12th fl. | $700,000 |
| May 30, 2019 | Never finaled issued Sep 2019, no final | 1 La Avanzada | Best Endeavours | voluntary structural (seismic & wind) upgrade. note: link to environmental case #20070206e-3Details
voluntary structural (seismic & wind) upgrade. note: link to environmental case #20070206e-3 | $1,250,000 |
| Dec 7, 2018 | Completed final sign-off Oct 2023 | 301 Mission St | Shimmick Construction Co. Inc. | indicator pile located on mission and fremont street sidewalk. reference to perimeter pile upgrade permit application #201812047402Details
indicator pile located on mission and fremont street sidewalk. reference to perimeter pile upgrade permit application #201812047402 | $1,800,000 |
| Dec 7, 2018 | Completed final sign-off Nov 2023 | 301 Mission St | Shimmick Construction Co. Inc. | **paralle plan check", shoring and excavation on freemont and mission. reference to perimeter pile upgrade permit application #201812047402Details
**paralle plan check", shoring and excavation on freemont and mission. reference to perimeter pile upgrade permit application #201812047402 | $4,800,000 |
| Dec 4, 2018 | Completed final sign-off Feb 2025 | 301 Mission St | Shimmick Construction Co. Inc. | parallel plan check, voluntary seismic upgrade and foundation stabilization, addition of new piles, extending to rock, and tranfer approximatly 20% of building weight to the new piles with intent of arresting boilding settlement and improving the foundation lateral capacity.Details
parallel plan check, voluntary seismic upgrade and foundation stabilization, addition of new piles, extending to rock, and tranfer approximatly 20% of building weight to the new piles with intent of arresting boilding settlement and improving the foundation lateral capacity. | $30,000,000 |
| Sep 13, 2018 | Completed final sign-off Jun 2019 | 301 Mission St | Accelerated Engineering Services Inc, Swinerton Builders | sub surface exploration consisting of 2 borings to approx. 250 feet below the top of the basement mat foundation, to obtain data for future foundation retrofit design, no exterior work.Details
sub surface exploration consisting of 2 borings to approx. 250 feet below the top of the basement mat foundation, to obtain data for future foundation retrofit design, no exterior work. | $40,000 |
| Sep 22, 2017 | Never finaled issued Sep 2019, no final | 1 La Avanzada | Best Endeavours | reconfigure broadcast antenna for kgo, kron, kbcw, lptv, kfog to accomodate federally. mandated frequency band modification includes remove & replace mast atop leg b. structural strengthening as necessitated by above.Details
reconfigure broadcast antenna for kgo, kron, kbcw, lptv, kfog to accomodate federally. mandated frequency band modification includes remove & replace mast atop leg b. structural strengthening as necessitated by above. | $500,000 |
| Feb 16, 2016 | Completed final sign-off Oct 2020 | 1 La Avanzada | Wadleigh Group, Inc. | installation of eight foot parapet wall extension. move antennas to new locations on roof; screening existing antennas. relocation only no additional antennasDetails
installation of eight foot parapet wall extension. move antennas to new locations on roof; screening existing antennas. relocation only no additional antennas | $200,000 |
| Aug 14, 2015 | Completed final sign-off Feb 2024 | 100 Alpine Tr | Moroso Construction Inc | vertical addition. add 2-story to existing garage create new single family dwelling.Details
vertical addition. add 2-story to existing garage create new single family dwelling. | $887,000 |
| Jul 21, 2015 | Completed final sign-off Feb 2017 | 1 La Avanzada | install 1 low power fm antenna on sutro tower.Details
install 1 low power fm antenna on sutro tower. | $10,000 | |
| Oct 16, 2014 | Completed final sign-off Aug 2016 | 1 La Avanzada | Jtd Consulting Inc Dba Wireless Infrast | install a new broadcast transmitter, equipment rack, 200 amp electrical panel, new tuss, new ac unit, new heat exchanger and new metal stud wall.Details
install a new broadcast transmitter, equipment rack, 200 amp electrical panel, new tuss, new ac unit, new heat exchanger and new metal stud wall. | $120,000 |
| Apr 12, 2013 | Never finaled issued May 2015, no final | 1 La Avanzada | Tower Consultants Inc | addition of 50 wireless/tv/fm broadcast + reception antennas to (e) tower.Details
addition of 50 wireless/tv/fm broadcast + reception antennas to (e) tower. | $250,000 |
| Dec 26, 2012 | Completed final sign-off Dec 2014 | 50 Laguna St | Narrowback Construction Co. | voluntary partial seismic upgrade to asce 31-0-3Details
voluntary partial seismic upgrade to asce 31-0-3 | $70,000 |
| Dec 26, 2012 | Completed final sign-off Dec 2014 | 16 Laguna St | Narrowback Construction Co. | voluntary parital seismic upgrade to asce 31-03Details
voluntary parital seismic upgrade to asce 31-03 | $50,000 |
| Apr 25, 2012 | Completed final sign-off Feb 2013 | 1 La Avanzada | replace approx 1300 sq ft of 8ft chain link fenceDetails
replace approx 1300 sq ft of 8ft chain link fence | $25,000 | |
| Jun 16, 2011 | Completed final sign-off Apr 2012 | 1 La Avanzada | replace 1 30' antenna mast.Details
replace 1 30' antenna mast. | $20,000 | |
| May 27, 2010 | Completed final sign-off May 2013 | 1 La Avanzada | addition of 14 antenna on (e) mount locations. previously approved by planning.Details
addition of 14 antenna on (e) mount locations. previously approved by planning. | $25,000 | |
| Jun 21, 2006 | Completed final sign-off Apr 2009 | 1 La Avanzada | replace 4 microwave receive antennas. install 1 microwave receive antenna.Details
replace 4 microwave receive antennas. install 1 microwave receive antenna. | $50,000 | |
| Nov 5, 2004 | Never finaled filed Nov 2004, never issued | 1 La Avanzada | Mcclier Corporation | install new stand by generator, associated fuel tank,switches,boards.construct masonry enclosure toDetails
install new stand by generator, associated fuel tank,switches,boards.construct masonry enclosure to | $295,000 |