Shimmick Construction Co. Inc.
- Based in
- Oakland
- On San Francisco permits
- Apr 2009 to May 2023
- Last 24 months
- 0 permits filed
10 permits since 2000: 9 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 26, 2023 | Completed final sign-off Nov 2023 | 301 Mission St | revision to pa 2021-0719-4668.increase size of bearing plate on high strength threaded rods to accommodate 1,000 kip jacking loads.Details
revision to pa 2021-0719-4668.increase size of bearing plate on high strength threaded rods to accommodate 1,000 kip jacking loads. | |
| Jan 14, 2022 | Expired or cancelled cancelled Jan 2026 | 865 Market St | relocation of fdc from the bart exit/entrance. parapet walls to the sidewalk adjacent to the mentioned exit/entrance.Details
relocation of fdc from the bart exit/entrance. parapet walls to the sidewalk adjacent to the mentioned exit/entrance. | $500,000 |
| Jul 19, 2021 | Completed final sign-off Oct 2023 | 301 Mission St | revision to pa# 201812047402,to reduce the quantity of piles from 52 to 18 and to reduce the vault extents accordingly,to relocate the piles 8" farther from the building face,to modify the locations of piles to avoid existing utilities,to increase the pile diameter in the rock socket form 20"to24".Details
revision to pa# 201812047402,to reduce the quantity of piles from 52 to 18 and to reduce the vault extents accordingly,to relocate the piles 8" farther from the building face,to modify the locations of piles to avoid existing utilities,to increase the pile diameter in the rock socket form 20"to24". | |
| Jul 19, 2021 | Completed final sign-off Aug 2023 | 301 Mission St | revision to pa# 201812077819, to revise the excavation and shoring extents due to the relocation and reduction in quantity of permanent piles to change the primary shoring system from jet groot columns to a secant pile wall, modify shoring wall to avoid conflicts with the pg&e vaults & conduits.Details
revision to pa# 201812077819, to revise the excavation and shoring extents due to the relocation and reduction in quantity of permanent piles to change the primary shoring system from jet groot columns to a secant pile wall, modify shoring wall to avoid conflicts with the pg&e vaults & conduits. | |
| Jul 19, 2021 | Completed final sign-off Aug 2023 | 301 Mission St | revision to pa# 2018-1207-7828. to abandon indicator pile no. 1 and to add indicator pile no. 2, with a rock-socket diameter of 24 inches, located 8 feet to the north along fremont street.Details
revision to pa# 2018-1207-7828. to abandon indicator pile no. 1 and to add indicator pile no. 2, with a rock-socket diameter of 24 inches, located 8 feet to the north along fremont street. | $50,000 |
| Dec 7, 2018 | Completed final sign-off Nov 2023 | 301 Mission St | **paralle plan check", shoring and excavation on freemont and mission. reference to perimeter pile upgrade permit application #201812047402Details
**paralle plan check", shoring and excavation on freemont and mission. reference to perimeter pile upgrade permit application #201812047402 | $4,800,000 |
| Dec 7, 2018 | Completed final sign-off Oct 2023 | 301 Mission St | indicator pile located on mission and fremont street sidewalk. reference to perimeter pile upgrade permit application #201812047402Details
indicator pile located on mission and fremont street sidewalk. reference to perimeter pile upgrade permit application #201812047402 | $1,800,000 |
| Dec 4, 2018 | Completed final sign-off Feb 2025 | 301 Mission St | parallel plan check, voluntary seismic upgrade and foundation stabilization, addition of new piles, extending to rock, and tranfer approximatly 20% of building weight to the new piles with intent of arresting boilding settlement and improving the foundation lateral capacity.Details
parallel plan check, voluntary seismic upgrade and foundation stabilization, addition of new piles, extending to rock, and tranfer approximatly 20% of building weight to the new piles with intent of arresting boilding settlement and improving the foundation lateral capacity. | $30,000,000 |
| Jul 20, 2009 | Completed final sign-off Nov 2010 | 2301 San Jose Av | construction of new metal building for storage of muni trains.Details
construction of new metal building for storage of muni trains. | $2,105,160 |
| Apr 6, 2009 | Completed final sign-off Dec 2011 | 2301 San Jose Av | upgrade to ada code compliance of the men's & women's locker rooms & path of travel to locker facilities. work is associated with new canopy structure to be submitted under a separate permit.Details
upgrade to ada code compliance of the men's & women's locker rooms & path of travel to locker facilities. work is associated with new canopy structure to be submitted under a separate permit. | $170,000 |