Best Endeavours
- Based in
- Incline Village
- On San Francisco permits
- Apr 2013 to Jun 2021
- Last 24 months
- 0 permits filed
5 permits since 2000: 1 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 17, 2021 | Expired or cancelled withdrawn Jun 2024 | 1 La Avanzada | revision to pa #201907024914 & to comply with complaint 202178667 - temporary removal of cladding on tower legs from ground to 4th level to facilitate construction of broadcast repacking and structural upgrade performed under separate permits. cladding will be replaced upon completionDetails
revision to pa #201907024914 & to comply with complaint 202178667 - temporary removal of cladding on tower legs from ground to 4th level to facilitate construction of broadcast repacking and structural upgrade performed under separate permits. cladding will be replaced upon completion | $300,000 |
| Jul 2, 2019 | Never finaled issued Sep 2019, no final | 1 La Avanzada | temporary removal of cladding on tower legs above 4th level. to facilitate construction of broadcast repacking and structural upgrade performed under separate permits. cladding will be replaced after completion.Details
temporary removal of cladding on tower legs above 4th level. to facilitate construction of broadcast repacking and structural upgrade performed under separate permits. cladding will be replaced after completion. | $500,000 |
| May 30, 2019 | Never finaled issued Sep 2019, no final | 1 La Avanzada | voluntary structural (seismic & wind) upgrade. note: link to environmental case #20070206e-3Details
voluntary structural (seismic & wind) upgrade. note: link to environmental case #20070206e-3 | $1,250,000 |
| Sep 22, 2017 | Never finaled issued Sep 2019, no final | 1 La Avanzada | reconfigure broadcast antenna for kgo, kron, kbcw, lptv, kfog to accomodate federally. mandated frequency band modification includes remove & replace mast atop leg b. structural strengthening as necessitated by above.Details
reconfigure broadcast antenna for kgo, kron, kbcw, lptv, kfog to accomodate federally. mandated frequency band modification includes remove & replace mast atop leg b. structural strengthening as necessitated by above. | $500,000 |
| Apr 12, 2013 | Completed final sign-off Jun 2017 | 1 La Avanzada | site improvements including: new retaining wall, drainage, paving & driveway repair. installation of 1 at-grade dish antenna.Details
site improvements including: new retaining wall, drainage, paving & driveway repair. installation of 1 at-grade dish antenna. | $250,000 |