Permit GraphShortlistSan Francisco building permits since 2000

Wadleigh Group, Inc.

Contractor license
1014801
State license record
Based in
Fairfax
On San Francisco permits
Feb 2016 to Jan 2024
Last 24 months
0 permits filed

8 permits since 2000: 4 completed, 4 never finaled.

Of the 4 never-finaled permits, 4 are 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
Jan 18, 2024Completed
final sign-off Dec 2025
1 La Avanzadavoluntary of exterior cladding on horizontal levels 2, 3, and 4.
Details
Permit
202401184187
Status
complete
Filed
Jan 18, 2024
Permit issued
Apr 1, 2025
Final sign-off
Dec 2, 2025
Declared cost
$300,500
Address
1 La Avanzada

voluntary of exterior cladding on horizontal levels 2, 3, and 4.

Open the permit page

$300,500
Nov 23, 2021Completed
final sign-off Jun 2024
1 La Avanzadavoluntary upgrade of the lower cladding wind resistance through. replace of cladding on interior faces of horizontal level 2,3, & 4. paint new cladding to match extg aviation theme.
Details
Permit
202111233043
Status
complete
Filed
Nov 23, 2021
Permit issued
Nov 4, 2022
Final sign-off
Jun 13, 2024
Declared cost
$250,000
Address
1 La Avanzada

voluntary upgrade of the lower cladding wind resistance through. replace of cladding on interior faces of horizontal level 2,3, & 4. paint new cladding to match extg aviation theme.

Open the permit page

$250,000
Dec 9, 2019Never finaled
issued Dec 2019, no final
1 La Avanzadaalteration of an (e) tv transmitter space @ sutro tower to accomodate new rf and electrical equipment. scope of work includes arch, elec and mechanical alterations
Details
Permit
201912099010
Status
issued
Filed
Dec 9, 2019
Permit issued
Dec 10, 2019
Declared cost
$500,000
Address
1 La Avanzada

alteration of an (e) tv transmitter space @ sutro tower to accomodate new rf and electrical equipment. scope of work includes arch, elec and mechanical alterations

Open the permit page

$500,000
Aug 15, 2019Never finaled
issued Sep 2019, no final
1 La Avanzadaalteration of an existing tv transmitter space at sutro tower to accommodate new rf and electrical equipment. scope of work include architectural, electrical and mechanical alterations
Details
Permit
201908158862
Status
issued
Filed
Aug 15, 2019
Permit issued
Sep 20, 2019
Declared cost
$750,000
Address
1 La Avanzada

alteration of an existing tv transmitter space at sutro tower to accommodate new rf and electrical equipment. scope of work include architectural, electrical and mechanical alterations

Open the permit page

$750,000
May 21, 2019Never finaled
issued Aug 2019, no final
1 La Avanzadaalteration of existing tv transmitter, electrical for new transmitter and hvac, replace existing hvac with (2) new 15 ton split system
Details
Permit
201905211241
Status
issued
Filed
May 21, 2019
Permit issued
Aug 16, 2019
Declared cost
$550,000
Address
1 La Avanzada

alteration of existing tv transmitter, electrical for new transmitter and hvac, replace existing hvac with (2) new 15 ton split system

Open the permit page

$550,000
Jan 8, 2019Completed
final sign-off Jul 2024
1 La Avanzadato comply with nov# 202178667. remove cladding on leg b remove cladding legs a and c from 30 ft above base. paint tower legs and the horizontal and vertical faces of the horizontal levels 2, 3, and 4 and all of levels 5 and 6 in aviation orange and white.
Details
Permit
201901089873
Status
complete
Filed
Jan 8, 2019
Permit issued
Jul 9, 2024
Final sign-off
Jul 10, 2024
Declared cost
$500,000
Address
1 La Avanzada

to comply with nov# 202178667. remove cladding on leg b remove cladding legs a and c from 30 ft above base. paint tower legs and the horizontal and vertical faces of the horizontal levels 2, 3, and 4 and all of levels 5 and 6 in aviation orange and white.

Open the permit page

$500,000
Dec 14, 2018Never finaled
issued Feb 2019, no final
1 La Avanzadainterior ti on third floor of 2 new non structural partitions, 3 interior doors. replace existing hvac and electrical for new equipment racks
Details
Permit
201812148341
Status
issued
Filed
Dec 14, 2018
Permit issued
Feb 12, 2019
Declared cost
$150,000
Address
1 La Avanzada

interior ti on third floor of 2 new non structural partitions, 3 interior doors. replace existing hvac and electrical for new equipment racks

Open the permit page

$150,000
Feb 16, 2016Completed
final sign-off Oct 2020
1 La Avanzadainstallation of eight foot parapet wall extension. move antennas to new locations on roof; screening existing antennas. relocation only no additional antennas
Details
Permit
201602169635
Status
complete
Filed
Feb 16, 2016
Permit issued
Jul 19, 2017
Final sign-off
Oct 14, 2020
Declared cost
$200,000
Address
1 La Avanzada

installation of eight foot parapet wall extension. move antennas to new locations on roof; screening existing antennas. relocation only no additional antennas

Open the permit page

$200,000