Michael Baushke
- Listed as
- architect, engineer
- Firm
- Apparatus
- Based in
- San Francisco
- On San Francisco permits
- Jan 2005 to Aug 2026
62 permits since 2000 (architect on 61 permits, engineer on 1 permit): 47 completed, 2 in progress, 6 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 14, 2026 | In progress filed Aug 2026, not yet issued | 1037 Filbert St | new deck light-well infill.Details
new deck light-well infill. | $25,000 | |
| Feb 18, 2026 | Completed final sign-off Apr 2026 | 2139 Green St | Meryl & Miller Llc | unit i: removal of interior walls at kitchen. structural work is included. no expansion of building envelope, no additional sq.ft and no wor to the exterior. kitchen remodel in kind, replace toilets, replace 1 bath vanity, replace lights.Details
unit i: removal of interior walls at kitchen. structural work is included. no expansion of building envelope, no additional sq.ft and no wor to the exterior. kitchen remodel in kind, replace toilets, replace 1 bath vanity, replace lights. | $60,000 |
| Nov 24, 2025 | Completed final sign-off Mar 2026 | 342 London St | Meryl & Miller Llc | interior remodel including a (n) 1/2 bathroom next to (e) kitchen on 2nd floor. no structrual work, square footage, and change to building exteriorDetails
interior remodel including a (n) 1/2 bathroom next to (e) kitchen on 2nd floor. no structrual work, square footage, and change to building exterior | $25,000 |
| Nov 14, 2025 | Completed final sign-off Jun 2026 | 405 Hoffman Av | Meryl & Miller Llc | renovate kitchen in kind, renovate powder room in kind, expand bathroom. renovate and add re-used lights in living room and renovate laundry room inkind.Details
renovate kitchen in kind, renovate powder room in kind, expand bathroom. renovate and add re-used lights in living room and renovate laundry room inkind. | $98,000 |
| May 23, 2025 | Completed final sign-off Oct 2025 | 2252 Fillmore St | A B W Construction Inc, V And G Builders | interior remodel of existing commercial mercantile space on the gr fl or a 3 story building. no change of occupancy, no structural work, no change to building envelope or facade. limited restaurane use.Details
interior remodel of existing commercial mercantile space on the gr fl or a 3 story building. no change of occupancy, no structural work, no change to building envelope or facade. limited restaurane use. | $75,000 |
| May 20, 2025 | Completed final sign-off Mar 2026 | 55 Ford St | Meryl & Miller Llc | 3rd/fl: remodel existing 3rd floor dwelling including existing kitchen and new bathroom. no additional square footage and no expansion of existing building envelope.Details
3rd/fl: remodel existing 3rd floor dwelling including existing kitchen and new bathroom. no additional square footage and no expansion of existing building envelope. | $85,000 |
| Apr 22, 2025 | In progress issued Jul 2025 | 82 Shore View Av | Meryl & Miller Llc | remodel of existing kitchen and mudroom including associated plumbing, electrical and mechnical work. no additional conditioned square footage and no expansion of existing building envelopeDetails
remodel of existing kitchen and mudroom including associated plumbing, electrical and mechnical work. no additional conditioned square footage and no expansion of existing building envelope | $75,000 |
| Sep 17, 2024 | Completed final sign-off Jan 2025 | 492 Bartlett St | Continuum Construction | revision to 202206176631 (2nd floor) and 202206136184 [which revised 201807114267](1st floor) including new configuration of existing interior partition walls and new bath and kitchen fixtures at existing locations. no exterior work, no additional sqft.Details
revision to 202206176631 (2nd floor) and 202206136184 [which revised 201807114267](1st floor) including new configuration of existing interior partition walls and new bath and kitchen fixtures at existing locations. no exterior work, no additional sqft. | $100,000 |
| Aug 27, 2024 | Completed final sign-off Dec 2025 | 1238 26th Av | Brendan Waters Construction Inc | remodel to existing 3-story single family dwelling including existing kitchen and bathrooms plus a new 1/2 bath. no additional square footing and no explansion of existing building envelope.Details
remodel to existing 3-story single family dwelling including existing kitchen and bathrooms plus a new 1/2 bath. no additional square footing and no explansion of existing building envelope. | $200,000 |
| May 10, 2024 | Completed final sign-off Aug 2024 | 357 Elizabeth St | Cooke And Mccann Inc | rev 202312263112 - includes changes to interior wall framing. no structural work, no work to exterior of buildingDetails
rev 202312263112 - includes changes to interior wall framing. no structural work, no work to exterior of building | |
| May 2, 2024 | Completed final sign-off Nov 2024 | 207 Guerrero St | Sasso Construction Inc. | interior remodel of extg bedroom and bath in extg condominium. no structural work, and no work to the exterior envelope of building.Details
interior remodel of extg bedroom and bath in extg condominium. no structural work, and no work to the exterior envelope of building. | $35,000 |
| Jan 11, 2024 | Completed final sign-off Sep 2024 | 2336 Chestnut St | 7 Hills Construction | ti (new use= restaurant) of (e) commercial space (current use= retail) including bathroom upgrades and associated plumbing, electrical, and mechanical work. no structural work , no expansion of building envelope and no work to street facade.Details
ti (new use= restaurant) of (e) commercial space (current use= retail) including bathroom upgrades and associated plumbing, electrical, and mechanical work. no structural work , no expansion of building envelope and no work to street facade. | $65,000 |
| Oct 12, 2023 | Completed final sign-off Jan 2025 | 75 Caselli Av | Grizzly Builders Inc. | remodel of (e) kitchen and bathroom plus on new bath and one new 1/2 bath conversion of lower level crawl space to habitable space, no expansion of (e) building envelope new winows at street facadeDetails
remodel of (e) kitchen and bathroom plus on new bath and one new 1/2 bath conversion of lower level crawl space to habitable space, no expansion of (e) building envelope new winows at street facade | $475,000 |
| May 2, 2023 | Completed final sign-off Apr 2024 | 601 Arkansas St | Hawke Construction | remodel of 3-story single family dwelling, kitchen/bathrooms, all associated plumbing, electrical/mechanical work. no additional square footage/structural workDetails
remodel of 3-story single family dwelling, kitchen/bathrooms, all associated plumbing, electrical/mechanical work. no additional square footage/structural work | $200,000 |
| Oct 4, 2022 | Never finaled issued Jan 2023, no final | 60 Temescal Tr | Brendan Waters Construction Inc | interior remodel including conversion of 252 sq ft of unconditioned space to conditioned within extg bldg envelope; includes new interior stairway, new half bath, and new laundry room.Details
interior remodel including conversion of 252 sq ft of unconditioned space to conditioned within extg bldg envelope; includes new interior stairway, new half bath, and new laundry room. | $150,000 |
| Jun 4, 2021 | Expired or cancelled cancelled Jan 2026 | 405 Hoffman Av | Meryl & Miller Llc | interior rmeodel of misc spaces including kitchen & bathroom. no structural work, no additoinal sf and no changes to exterior. removal of non-load bearing partitions.Details
interior rmeodel of misc spaces including kitchen & bathroom. no structural work, no additoinal sf and no changes to exterior. removal of non-load bearing partitions. | |
| Apr 1, 2021 | Never finaled issued Nov 2021, no final | 606 Arkansas St | Hawke Construction | remodel & addition to a 2-story single family residence. an addition of 126 sq ft conditioned space at rear of building including new bathroom. existing kitchen & bathroom are being remodeled including associated plumbing & electrical work.Details
remodel & addition to a 2-story single family residence. an addition of 126 sq ft conditioned space at rear of building including new bathroom. existing kitchen & bathroom are being remodeled including associated plumbing & electrical work. | $150,000 |
| Feb 5, 2021 | Completed final sign-off Apr 2023 | 214 Duncan St | remodel 3rd fl single family condo including addition of 47 sq ft of conditioned space (n) bath within (e) roof envelope & addition of (n) 3-story deck @ rear of bldg. (e) kitchen & bath are being remodeled including associated plumbing & electrical workDetails
remodel 3rd fl single family condo including addition of 47 sq ft of conditioned space (n) bath within (e) roof envelope & addition of (n) 3-story deck @ rear of bldg. (e) kitchen & bath are being remodeled including associated plumbing & electrical work | $150,000 | |
| Oct 23, 2020 | Expired or cancelled withdrawn Apr 2021 | 405 Hoffman Av | Meryl & Miller Llc | powder bath remodel in kind, add showersDetails
powder bath remodel in kind, add showers | $20,000 |
| Aug 24, 2020 | Completed final sign-off May 2021 | 3960 18th St | Brendan Waters Construction Inc | unit a: interior remodel to 1 one condo on 4th floor consisting of reconfiguring existing kitchen & bath. add a 2nd bath and a new w/d closet. all associated electrical & plumbing included. no work on exterior of building.Details
unit a: interior remodel to 1 one condo on 4th floor consisting of reconfiguring existing kitchen & bath. add a 2nd bath and a new w/d closet. all associated electrical & plumbing included. no work on exterior of building. | $125,000 |
| Dec 26, 2019 | Completed final sign-off Dec 2020 | 1062 Folsom St | Meryl & Miller Llc | interior remodel to existing office space at 2nd & 3rd floors of existing low-rise commercial building, no structural work, no additional sq. ft., including including elec.,plmg, & mech work. legalize use established as "photo studio" per permits 08905801(4-10-89) & 08909604(6-2-89)Details
interior remodel to existing office space at 2nd & 3rd floors of existing low-rise commercial building, no structural work, no additional sq. ft., including including elec.,plmg, & mech work. legalize use established as "photo studio" per permits 08905801(4-10-89) & 08909604(6-2-89) | $135,000 |
| Dec 9, 2019 | Completed final sign-off Apr 2021 | 3960 18th St | Phase 2 Builders | interior remodel to one condominium in 3-unit building consisting of reconfiguratiion of existing closet to accommodate new washer/dryer (no additional sq footage, no work to exterior of building).Details
interior remodel to one condominium in 3-unit building consisting of reconfiguratiion of existing closet to accommodate new washer/dryer (no additional sq footage, no work to exterior of building). | $10,000 |
| Nov 26, 2019 | Completed final sign-off Jun 2020 | 3958 18th St | Phase 2 Builders | interior remodel to 1 condominium in a 3 unit residential building (no expansion of bldg envelope, no add'l square footage) includes kitchen and bath and associated plumbing and electrical work, no exterior workDetails
interior remodel to 1 condominium in a 3 unit residential building (no expansion of bldg envelope, no add'l square footage) includes kitchen and bath and associated plumbing and electrical work, no exterior work | $75,000 |
| Nov 26, 2019 | Completed final sign-off Jun 2020 | 3960 18th St | Phase 2 Builders | interior remodel to 1 condominium in a 3-unit residential building to reconfigure (e) closet for a new washer and dryer, no expansion of bldg envelope no add'l square footage, no work at exteriorDetails
interior remodel to 1 condominium in a 3-unit residential building to reconfigure (e) closet for a new washer and dryer, no expansion of bldg envelope no add'l square footage, no work at exterior | $10,000 |
| Aug 29, 2019 | Completed final sign-off Apr 2023 | 59 Potomac St | Elisha Mayost | the proposed revision ("delta 6") to approved permit #2018-0419-6759 reduces the size of the proposed lightwell at the ground floor only. shear wall @ 1st floor shifted from grid 3.2 to 3 and w8x steel beam added aboveDetails
the proposed revision ("delta 6") to approved permit #2018-0419-6759 reduces the size of the proposed lightwell at the ground floor only. shear wall @ 1st floor shifted from grid 3.2 to 3 and w8x steel beam added above | $15,000 |
| Aug 26, 2019 | Expired or cancelled withdrawn Oct 2020 | 1350 Hayes St | Meryl & Miller Llc | to erect a detached 2-story, type vb, no basement, single family bldg at the rear yard of an (e) signle family bldg.Details
to erect a detached 2-story, type vb, no basement, single family bldg at the rear yard of an (e) signle family bldg. | $500,000 |
| Aug 8, 2019 | Never finaled issued Aug 2019, no final | 3111 24th St | Meryl & Miller Llc | to comply with nov 201796681, item 3 - reconfigure closet wall and doors to create a code compliant trash enclosure for common tenant usage @ 3rd floor landingDetails
to comply with nov 201796681, item 3 - reconfigure closet wall and doors to create a code compliant trash enclosure for common tenant usage @ 3rd floor landing | $1,000 |
| Jul 1, 2019 | Completed final sign-off Apr 2023 | 59 Potomac St | Elisha Mayost | the proposed revision (delta 7) to approved pa# 201804196759 includes the enclosing of an exterior roof deck at the rear of the structure 3/f. this change will add 87 sq ft to the total conditiioned area of the house.Details
the proposed revision (delta 7) to approved pa# 201804196759 includes the enclosing of an exterior roof deck at the rear of the structure 3/f. this change will add 87 sq ft to the total conditiioned area of the house. | $20,000 |
| Jun 6, 2019 | Completed final sign-off Apr 2023 | 59 Potomac St | Elisha Mayost | revision (delta 6) to 201804196759. new work includes revised foundation detail for portions of wall along south prop line changing approved continous pour to an a-b-c staggered pourDetails
revision (delta 6) to 201804196759. new work includes revised foundation detail for portions of wall along south prop line changing approved continous pour to an a-b-c staggered pour | $2,500 |
| Apr 29, 2019 | Completed final sign-off Aug 2019 | 591 Buena Vista Ave West Av | Living Structure Inc | installation of a new prefabricated heated spa at the rear yard of (e) sfd, including all necessary eletrical and plumbing.Details
installation of a new prefabricated heated spa at the rear yard of (e) sfd, including all necessary eletrical and plumbing. | $15,000 |
| Apr 4, 2019 | Completed final sign-off Aug 2019 | 4448 18th St | revision to pa 2018-0918-0583 (issued 1/9/19). revision includes conditions of ratification from access appeals commision for unreasonable hardship request that was approved as part of issued permit. ordinance 51-16.Details
revision to pa 2018-0918-0583 (issued 1/9/19). revision includes conditions of ratification from access appeals commision for unreasonable hardship request that was approved as part of issued permit. ordinance 51-16. | $1,000 | |
| Mar 28, 2019 | Completed final sign-off Apr 2020 | 1350 Hayes St | Meryl & Miller Llc | interior remodel to an existing 2 story sfd (no expansion of bldg envelope, no additional conditioned sqft)including a kitchen & 2 1/2 baths, all associated plumbing, electrical, & mechanical work. new windows, doors deck/stairway @ the rear, seismic structural retrofitDetails
interior remodel to an existing 2 story sfd (no expansion of bldg envelope, no additional conditioned sqft)including a kitchen & 2 1/2 baths, all associated plumbing, electrical, & mechanical work. new windows, doors deck/stairway @ the rear, seismic structural retrofit | $400,000 |
| Nov 7, 2018 | Expired or cancelled withdrawn Aug 2019 | 3039 California St | remodel of 4 (e) units on floors 2&3. 1 unit on 3rd flr is being expanded into (e) attic space & into a vertical add. @ the rear half of bldg. this expansion creates 4th flr of occupancy. (n) stairway is being added as 2nd means of egress & illegal studio @ 1st flr is being legalized per ord# 162-16Details
remodel of 4 (e) units on floors 2&3. 1 unit on 3rd flr is being expanded into (e) attic space & into a vertical add. @ the rear half of bldg. this expansion creates 4th flr of occupancy. (n) stairway is being added as 2nd means of egress & illegal studio @ 1st flr is being legalized per ord# 162-16 | $800,000 | |
| Sep 18, 2018 | Completed final sign-off Aug 2019 | 4448 18th St | per mandatory disablity access improvement program. install new ada compliant deadbolt with thumb turn at extg 1st floor commercial space and request approval of unreasonable hardship regarding other disablity access improvements. to comply with ordinance #51-16Details
per mandatory disablity access improvement program. install new ada compliant deadbolt with thumb turn at extg 1st floor commercial space and request approval of unreasonable hardship regarding other disablity access improvements. to comply with ordinance #51-16 | $150 | |
| Aug 8, 2018 | Never finaled issued Jan 2019, no final | 2971 21st St | Brendan Waters Construction Inc | addition of (n) deck @ rear of house & installation of (n) sliding door from (e) kitchen to (n) deck. (n) deck & associated fire wall are less than 10 feet above finished grage. no additional conditionad square footage.Details
addition of (n) deck @ rear of house & installation of (n) sliding door from (e) kitchen to (n) deck. (n) deck & associated fire wall are less than 10 feet above finished grage. no additional conditionad square footage. | $50,000 |
| Aug 7, 2018 | Completed final sign-off Jan 2019 | 178 Eureka St | Wellbuilt Construction Inc | revision to pemrit # 2018-0720-5170. reframe (2) openings in kitchen per structural drawings. no exterior work, no work visible from stret.Details
revision to pemrit # 2018-0720-5170. reframe (2) openings in kitchen per structural drawings. no exterior work, no work visible from stret. | $7,500 |
| Jul 5, 2018 | Completed final sign-off Feb 2020 | 2971 21st St | Brendan Waters Construction Inc | interior remodel of (e) 2 story sfd. remodel kitchen and 1/2 bath plus associated structural, plumbing & electrical work. no new sq ft & no new work thatis visible from the streetDetails
interior remodel of (e) 2 story sfd. remodel kitchen and 1/2 bath plus associated structural, plumbing & electrical work. no new sq ft & no new work thatis visible from the street | $75,000 |
| Apr 19, 2018 | Completed final sign-off Apr 2023 | 59 Potomac St | Elisha Mayost, Seapoint Construction | 3-story rear addition, includes a new family rm on 1st (ground) flr, a new kitchen on the 2nd flr, enlarged bedroom & new bath @ the 3rd flr. also includes interior remodel of misc spaces, replacement of all (e) windows w/ in kind wood windows & repainting of (e) wood siding & trim.Details
3-story rear addition, includes a new family rm on 1st (ground) flr, a new kitchen on the 2nd flr, enlarged bedroom & new bath @ the 3rd flr. also includes interior remodel of misc spaces, replacement of all (e) windows w/ in kind wood windows & repainting of (e) wood siding & trim. | $671,500 |
| Dec 17, 2015 | Completed final sign-off Aug 2016 | 1339 Cole St | Brendan Waters Construction Inc | demo of (e) exterior stairwell along side property line & incorporation of exterior space into new conditioned square footage at bathroom remodel of 3rd floor unit. new work at 1st and 2nd floor unit to be subject of separate permit. no work visible from street.Details
demo of (e) exterior stairwell along side property line & incorporation of exterior space into new conditioned square footage at bathroom remodel of 3rd floor unit. new work at 1st and 2nd floor unit to be subject of separate permit. no work visible from street. | $75,000 |
| Dec 17, 2015 | Completed final sign-off Aug 2016 | 1337 Cole St | Brendan Waters Construction Inc | demo of (e) exterior stairwell along side property line & incorporation of exterior space into new common storage room at 1st floor garage and new conditioned square - footage at bathroom remodel of 2nd floor unit. new work at 3rd floor unit to be subject of separate permit. no work visible from strDetails
demo of (e) exterior stairwell along side property line & incorporation of exterior space into new common storage room at 1st floor garage and new conditioned square - footage at bathroom remodel of 2nd floor unit. new work at 3rd floor unit to be subject of separate permit. no work visible from str | $85,000 |
| Dec 14, 2015 | Never finaled issued Dec 2015, no final | 532 Jessie St | revision to pa 2015-0811-3981: request for approval of local equivalency of existing communicating opening between buildings on separte properties. no other revision to pa 2015-0811-3981Details
revision to pa 2015-0811-3981: request for approval of local equivalency of existing communicating opening between buildings on separte properties. no other revision to pa 2015-0811-3981 | $15,000 | |
| Aug 11, 2015 | Completed final sign-off Dec 2015 | 532 Jessie St | Roman Hunt | to comply with n.o.v. #2015586118. install hood,oven, 3 compartment sink and other kitchen equipment and finishes.convert 2 non-ada to one ada bathroom. separate garage from kitchen area with non-bearing wall.Details
to comply with n.o.v. #2015586118. install hood,oven, 3 compartment sink and other kitchen equipment and finishes.convert 2 non-ada to one ada bathroom. separate garage from kitchen area with non-bearing wall. | $125,000 |
| Jan 26, 2015 | Completed final sign-off Jul 2015 | 531 Jackson St | Roman Hunt | revision to permit 201411030482; to separate storefront work and collect planning fees: replace existing entry doors & window @ existing facade entry opening with new glass storefront (no change to existing facade entry opening or structure) maher n/aDetails
revision to permit 201411030482; to separate storefront work and collect planning fees: replace existing entry doors & window @ existing facade entry opening with new glass storefront (no change to existing facade entry opening or structure) maher n/a | $10,000 |
| Jan 20, 2015 | Completed final sign-off Aug 2015 | 531 Jackson St | Roman Hunt | new exhaust hood (replace existing hood) at restaurant kitchen, revision to permit 201411030482; maher n/aDetails
new exhaust hood (replace existing hood) at restaurant kitchen, revision to permit 201411030482; maher n/a | $15,000 |
| Dec 12, 2014 | Completed final sign-off Mar 2015 | 1701 Octavia St | Alsterlind Construction Inc. | g/f - provide 7/8" hat channel at extg dining room ceiling with one layer of 5/8" type x gyp board.Details
g/f - provide 7/8" hat channel at extg dining room ceiling with one layer of 5/8" type x gyp board. | $3,000 |
| Nov 3, 2014 | Completed final sign-off Aug 2015 | 531 Jackson St | Roman Hunt | tenant improvement of existing ground floor restaurant; maher n/aDetails
tenant improvement of existing ground floor restaurant; maher n/a | $200,000 |
| Aug 4, 2014 | Completed final sign-off Aug 2014 | 4450 18th St | Cruz Construction | construction of new storage mezzanine within existing ground floor commercial space.Details
construction of new storage mezzanine within existing ground floor commercial space. | $5,000 |
| May 20, 2014 | Completed final sign-off Nov 2014 | 377 Clipper St | Hawke Construction | interior remodel including kitchen and 1/2 bath on 2nd floor. new shower at bath on 1st floor and new built in at bedroom on 3rd floor. no additional floor/envelope square footage. extension to extg rear deck.Details
interior remodel including kitchen and 1/2 bath on 2nd floor. new shower at bath on 1st floor and new built in at bedroom on 3rd floor. no additional floor/envelope square footage. extension to extg rear deck. | $85,000 |
| May 8, 2014 | Completed final sign-off Sep 2014 | 307 Chattanooga St | Elisha Mayost | interior remodel including kitchen & 1 bath & add 1 bath on 2nd floor . no changes to front or near facade. no additional floor or envelope square footage.Details
interior remodel including kitchen & 1 bath & add 1 bath on 2nd floor . no changes to front or near facade. no additional floor or envelope square footage. | $75,000 |
| May 2, 2014 | Never finaled issued May 2014, no final | 552 Laguna St | Brendan Waters Construction Inc | repair sheathing and stucco on facade. remodel commercial storefront, install 3 windows, all work is visible from the street. arch., mep, fa under separate permit. n/a maher ordinance # 155-13Details
repair sheathing and stucco on facade. remodel commercial storefront, install 3 windows, all work is visible from the street. arch., mep, fa under separate permit. n/a maher ordinance # 155-13 | $10,000 |
| Dec 16, 2013 | Completed final sign-off Apr 2016 | 591 Buena Vista West Av | merger of 2 units bldg into single family residence, the work includes remodel of kitchen, removeal of one kitchen, remodel of 4 baths, 1 new bath, reconfiguration of windows at side window/light well, reconfiguration of ext doors at rear facade, one new skylight on roof, reconfg partition & bear wlDetails
merger of 2 units bldg into single family residence, the work includes remodel of kitchen, removeal of one kitchen, remodel of 4 baths, 1 new bath, reconfiguration of windows at side window/light well, reconfiguration of ext doors at rear facade, one new skylight on roof, reconfg partition & bear wl | $350,000 | |
| Nov 12, 2013 | Completed final sign-off Sep 2014 | 2979 21st St | Maddern Conrstruction Inc | 2nd & 3rd floor interior remodel of sfd residence including kitchen & two bath (no additional square footage, no change to existing bldg envelope)Details
2nd & 3rd floor interior remodel of sfd residence including kitchen & two bath (no additional square footage, no change to existing bldg envelope) | $75,000 |
| Nov 7, 2013 | Completed final sign-off Nov 2015 | 851 Corbett Av | Brendan Waters Construction Inc | to erect 4 stories, no basement, 2 units residential building.Details
to erect 4 stories, no basement, 2 units residential building. | $589,000 |
| Nov 7, 2013 | Completed final sign-off May 2015 | 851 Corbett Av | Brendan Waters Construction Inc | to demolish 3 stories, single family resident.Details
to demolish 3 stories, single family resident. | $10,000 |
| Apr 1, 2013 | Completed final sign-off Aug 2013 | 199 Bonview St | Brendan Waters Construction Inc | remodel of existing bath, two bedrooms & closets (2 new skylights, not visible from street.) no work on ground floor.Details
remodel of existing bath, two bedrooms & closets (2 new skylights, not visible from street.) no work on ground floor. | $30,000 |
| Sep 26, 2012 | Expired or cancelled withdrawn Nov 2013 | 851 Corbett Av | to comply with nov# 200344379 & 200883155. vertical extension to (e) 3 story single family residence to be remodeled into a 4 story, 2 units residential building with a new 2 car garages.Details
to comply with nov# 200344379 & 200883155. vertical extension to (e) 3 story single family residence to be remodeled into a 4 story, 2 units residential building with a new 2 car garages. | $350,000 | |
| Jun 13, 2012 | Completed final sign-off Aug 2013 | 1462 11th Av | Brendan Waters Construction Inc | 2nd floor: kitchen remodel, bath remodel, new bath. 1st floor: conversion of unconditional space to include addtitional laundry, bath, family room & bedroom.Details
2nd floor: kitchen remodel, bath remodel, new bath. 1st floor: conversion of unconditional space to include addtitional laundry, bath, family room & bedroom. | $125,000 |
| Mar 30, 2012 | Expired or cancelled cancelled Mar 2020 | 199 Bonview St | add dormers to existing roof.Details
add dormers to existing roof. | $20,000 | |
| Oct 5, 2011 | Completed final sign-off Mar 2012 | 1110 Page St | Maddern Conrstruction Inc | new roof dormer with new bath, new interior partition walls, new plumbing/electerical. no additional square footageDetails
new roof dormer with new bath, new interior partition walls, new plumbing/electerical. no additional square footage | $50,000 |
| Jul 30, 2008 | Completed final sign-off Dec 2008 | 3401 Mission St | demo of some existing interior walls, including some structural work, addition of new interior partition walls & new lighting, change occupancy from e to b. non-medical office.Details
demo of some existing interior walls, including some structural work, addition of new interior partition walls & new lighting, change occupancy from e to b. non-medical office. | $40,000 | |
| Feb 10, 2005 | Expired or cancelled expired Oct 2006 | 754 12th Av | non structural kitchen remodel in unit 756 including new appliances electricl & plumbing workDetails
non structural kitchen remodel in unit 756 including new appliances electricl & plumbing work | $12,000 | |
| Jan 27, 2005 | Completed final sign-off Apr 2005 | 377 Cumberland St | removal of kitchenette cooking appliance, comply with bid#200456086. removal of conditioning ductworDetails
removal of kitchenette cooking appliance, comply with bid#200456086. removal of conditioning ductwor | $30,000 |