Phase 2 Builders
- Based in
- San Francisco
- On San Francisco permits
- May 2009 to Jul 2026
- Last 24 months
- 6 permits filed
190 permits since 2000: 165 completed, 3 in progress, 8 never finaled, 14 expired or cancelled.
Of the 8 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 190.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 15, 2026 | In progress issued Jul 2026 | 75 Zircon Pl | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $15,000 |
| Jan 5, 2026 | In progress issued Aug 2026 | 33 Robinhood Dr | full interior home renovation & addition of primary bedroom & ensuite bathroom include general interior finished, new flooring & wall coverings, kitchen remodel. new cabinets, countertops & appliances. remodel all bathrooms, new doors & windows, updated electrical & lighting systems,Details
full interior home renovation & addition of primary bedroom & ensuite bathroom include general interior finished, new flooring & wall coverings, kitchen remodel. new cabinets, countertops & appliances. remodel all bathrooms, new doors & windows, updated electrical & lighting systems, | $2,000,000 |
| Dec 8, 2025 | Completed final sign-off Dec 2025 | 1080 Chestnut St | unit #13b: replace all exterior windows & doors to baclony(like for like). companion permit to pa #202511189863. (windows not visible from st).u factor<0.30Details
unit #13b: replace all exterior windows & doors to baclony(like for like). companion permit to pa #202511189863. (windows not visible from st).u factor<0.30 | $85,000 |
| Nov 18, 2025 | Completed final sign-off Dec 2025 | 1080 Chestnut St | to obtain final inspection for work approved under pa# 202410314129. all work is complete.Details
to obtain final inspection for work approved under pa# 202410314129. all work is complete. | |
| Jan 8, 2025 | In progress issued Jan 2025 | 33 Robinhood Dr | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $30,000 |
| Oct 31, 2024 | Expired or cancelled expired Dec 2025 | 1080 Chestnut St | unit 13b: apartment renovation- new kitchen and bathrooms.Details
unit 13b: apartment renovation- new kitchen and bathrooms. | $45,000 |
| Jul 3, 2024 | Completed final sign-off Aug 2024 | 72 Townsend St | unit #601: convert tub to shower only with new tile shower pan and shower valves.Details
unit #601: convert tub to shower only with new tile shower pan and shower valves. | $10,000 |
| Jun 3, 2024 | Completed final sign-off Nov 2024 | 255 Berry St | kitchen remodel in kindDetails
kitchen remodel in kind | $25,000 |
| Jan 10, 2024 | Completed final sign-off Feb 2025 | 2253 15th St | interior work only. remodel kitchen, primary bath room. add new powder (1/2). bath on 1st floor.Details
interior work only. remodel kitchen, primary bath room. add new powder (1/2). bath on 1st floor. | $50,000 |
| Jul 25, 2023 | Completed final sign-off Oct 2024 | 993 Tennessee St | unit #6: remodel kitchen (fourth floor) in kind. primary bathroom (3rd floor) in kind. replace fixtures only (4th floor) bathroom in kind. no structural work.Details
unit #6: remodel kitchen (fourth floor) in kind. primary bathroom (3rd floor) in kind. replace fixtures only (4th floor) bathroom in kind. no structural work. | $150,000 |
| Jul 13, 2023 | Completed final sign-off Mar 2024 | 2 Mint Pz | unit# 301: replace kitchen in kind with new countertops and appliances.Details
unit# 301: replace kitchen in kind with new countertops and appliances. | $35,000 |
| May 18, 2023 | Completed final sign-off Aug 2024 | 228 Liberty St | kitchen and bath remodel in lower unit of (e) 2 unit building. includes removal of some (e) walls. addition of new shear walls and related structural work. window replacement and patching of existing exterior siding at side walls only. no exterior work at front or rear facade.Details
kitchen and bath remodel in lower unit of (e) 2 unit building. includes removal of some (e) walls. addition of new shear walls and related structural work. window replacement and patching of existing exterior siding at side walls only. no exterior work at front or rear facade. | $77,859 |
| Dec 2, 2022 | Completed final sign-off Dec 2023 | 1080 Chestnut St | 7/f-unit 7c: renovation, new architectural partitions, new finishes, new cabinetry, (e) exhaust/mechanical to remain, new electrical wiring & new plumbing fixtures.Details
7/f-unit 7c: renovation, new architectural partitions, new finishes, new cabinetry, (e) exhaust/mechanical to remain, new electrical wiring & new plumbing fixtures. | $362,000 |
| Jul 14, 2022 | Completed final sign-off Oct 2023 | 75 Zircon Pl | remodel of 1st floor and 2nd floor guest bathrooms (2 total). existing plumbing locations, new finishes, new plumbing fixtures in same locations. non structural.Details
remodel of 1st floor and 2nd floor guest bathrooms (2 total). existing plumbing locations, new finishes, new plumbing fixtures in same locations. non structural. | $25,000 |
| May 27, 2022 | Completed final sign-off Mar 2023 | 357 Princeton St | remodel (e) kitchen. remodel (e) primary bathroom, add 2 new skylightsDetails
remodel (e) kitchen. remodel (e) primary bathroom, add 2 new skylights | $50,000 |
| May 25, 2022 | Completed final sign-off Aug 2023 | 1129 Tennessee St | covert ground fl commercial space to a dwelling unit. new kitchen at break room kitchenette remodel bathroom. no structural work.Details
covert ground fl commercial space to a dwelling unit. new kitchen at break room kitchenette remodel bathroom. no structural work. | $30,000 |
| May 25, 2022 | Completed final sign-off Jan 2025 | 1129 Tennessee St | comply with physical inspection report 8544. no structure work. modify deck railing per dbi specifications e) steel materials to reciece top bar & spacer to raise hright. e) exterior balcony to be raised to mini height, cladding to march e)Details
comply with physical inspection report 8544. no structure work. modify deck railing per dbi specifications e) steel materials to reciece top bar & spacer to raise hright. e) exterior balcony to be raised to mini height, cladding to march e) | $10,000 |
| May 23, 2022 | Completed final sign-off Aug 2024 | 39 Brewster St | this is for recomencement of work under pa 201905291898.Details
this is for recomencement of work under pa 201905291898. | $10,000 |
| Mar 11, 2022 | Completed final sign-off May 2023 | 217 Cumberland St | remodel (e) kitchen, bathroom and water closet in (e) location. no structural changes, like for like remodel kitchen and bath in (e) locations.Details
remodel (e) kitchen, bathroom and water closet in (e) location. no structural changes, like for like remodel kitchen and bath in (e) locations. | $120,000 |
| Feb 4, 2022 | Completed final sign-off Aug 2022 | 75 Zircon Pl | remodel of 2/f office. add 3 receptacles and l/v cat6. new drywall and flooring. new casewori with under cabinet lighitng. using (e) ckts.Details
remodel of 2/f office. add 3 receptacles and l/v cat6. new drywall and flooring. new casewori with under cabinet lighitng. using (e) ckts. | $5,000 |
| Feb 4, 2022 | Never finaled issued Feb 2022, no final | 75 Zircon Pl | remodel of master bathroom. new plumbing and electrical fixtures, new flooring and tile, new casework.Details
remodel of master bathroom. new plumbing and electrical fixtures, new flooring and tile, new casework. | $10,000 |
| Sep 2, 2021 | Completed final sign-off Aug 2022 | 75 Zircon Pl | remodel 1/f bath led lites & (1) laundry room. (e) plumbing locations, new applances & fixtures in-kind. replace exhaust fan. replace washer/dryer and reconnect (e) ventDetails
remodel 1/f bath led lites & (1) laundry room. (e) plumbing locations, new applances & fixtures in-kind. replace exhaust fan. replace washer/dryer and reconnect (e) vent | $20,000 |
| Aug 23, 2021 | Completed final sign-off Aug 2022 | 97 Hill St | remodel kitchen (10'x12')and master bathroom (8'x5'), in kind repair back stair case in kind, less than 50%. no change in unit #2-location or design. h.e. lighting and controlled per cec 150.0(k)Details
remodel kitchen (10'x12')and master bathroom (8'x5'), in kind repair back stair case in kind, less than 50%. no change in unit #2-location or design. h.e. lighting and controlled per cec 150.0(k) | $20,000 |
| Aug 23, 2021 | Completed final sign-off Aug 2022 | 99 Hill St | remodel kitchen (10'x12') and master bathroom (8'x5')in kind. remodel powder room (5'x5')in kind. h.e. lighting and controlled per cec 150.0(k)Details
remodel kitchen (10'x12') and master bathroom (8'x5')in kind. remodel powder room (5'x5')in kind. h.e. lighting and controlled per cec 150.0(k) | $20,000 |
| May 21, 2021 | Completed final sign-off May 2021 | 629 Alvarado St | to obtain final inspection for work approved under permit application # 201707071286. all work is complete.Details
to obtain final inspection for work approved under permit application # 201707071286. all work is complete. | $25,000 |
| May 5, 2021 | Completed final sign-off Sep 2022 | 377 Capp St | remodel kitchen (1), master bath (1), 1/2 bath (1) & laundry (1) to include new plumbing and electrical fixtures. redo flooring in both units. upgrade hvac & new furnace.Details
remodel kitchen (1), master bath (1), 1/2 bath (1) & laundry (1) to include new plumbing and electrical fixtures. redo flooring in both units. upgrade hvac & new furnace. | $25,000 |
| May 5, 2021 | Never finaled issued May 2021, no final | 379 Capp St | remodel kitchen to include new plumbing and electrical fixtures, new appliances (kitchen) , upgrade and redo new furnace existing floors.Details
remodel kitchen to include new plumbing and electrical fixtures, new appliances (kitchen) , upgrade and redo new furnace existing floors. | $25,000 |
| Mar 22, 2021 | Completed final sign-off Feb 2022 | 1945 Washington St | unit 202 - repair & replace in-kind - flooring, drywall, lighting fixtures, plumbing fixtures cabinets & appliances in unit damaged by fire sprinklers. no structural work - 2 baths, 1 kitchen, 1 laundry. to comply w/ nov 202045331Details
unit 202 - repair & replace in-kind - flooring, drywall, lighting fixtures, plumbing fixtures cabinets & appliances in unit damaged by fire sprinklers. no structural work - 2 baths, 1 kitchen, 1 laundry. to comply w/ nov 202045331 | $80,000 |
| Mar 2, 2021 | Completed final sign-off Jul 2021 | 67 Rudden Av | kitchen remodel, new electrical, plumbing and appliances in same location. new flooring, cabinets, appliances, countertopDetails
kitchen remodel, new electrical, plumbing and appliances in same location. new flooring, cabinets, appliances, countertop | $20,000 |
| Feb 11, 2021 | Completed final sign-off Dec 2021 | 1945 Washington St | apt 502: repair & replace in kind. flooring, drywall, lighting fixtures, electrical, plumbing fixtures, cabinets, appliances in unit damaged by smoke, water. no structural changes - 2 bath, 1 kitchen, 1 laundry, living/dining, 2 bedroom.Details
apt 502: repair & replace in kind. flooring, drywall, lighting fixtures, electrical, plumbing fixtures, cabinets, appliances in unit damaged by smoke, water. no structural changes - 2 bath, 1 kitchen, 1 laundry, living/dining, 2 bedroom. | $60,000 |
| Feb 1, 2021 | Completed final sign-off Aug 2021 | 1945 Washington St | #203: repair & replace in kind flooring, drywall, lighting & electrical, plumbing fixtures, cabinets, appliances in unit damaged by water/fire. no sturctural changes - 2 baths, 1 itchen , 1 laundry.Details
#203: repair & replace in kind flooring, drywall, lighting & electrical, plumbing fixtures, cabinets, appliances in unit damaged by water/fire. no sturctural changes - 2 baths, 1 itchen , 1 laundry. | $40,000 |
| Jan 20, 2021 | Completed final sign-off Nov 2021 | 1080 Chestnut St | administrative permit correction to 202101142629 wrong unit number- correct unit #5aDetails
administrative permit correction to 202101142629 wrong unit number- correct unit #5a | |
| Jan 14, 2021 | Completed final sign-off Nov 2021 | 1080 Chestnut St | unit 5b: remodel of guest bath & master bath. new plumbing fixtures in existing locations.Details
unit 5b: remodel of guest bath & master bath. new plumbing fixtures in existing locations. | $20,000 |
| Jan 6, 2021 | Completed final sign-off Jul 2021 | 1945 Washington St | #301: repair & replace in kind drywall & flooring caused by water/fire damage. new paint, floors, trim, (e) kitchen cabinets, appliances, plumbing fixtures. no structural changes. re-install electrical fixtures.Details
#301: repair & replace in kind drywall & flooring caused by water/fire damage. new paint, floors, trim, (e) kitchen cabinets, appliances, plumbing fixtures. no structural changes. re-install electrical fixtures. | $50,000 |
| Dec 10, 2020 | Completed final sign-off Aug 2023 | 2416 15th St | horizontal addition of adu per state law to existing r3 3-story single family residence first floor: expand existing conditioned area at rear yard with 12'-foot permitted obstruction per planning code section 136 with new sleeping, eating, living areas and bathroom at grade.Details
horizontal addition of adu per state law to existing r3 3-story single family residence first floor: expand existing conditioned area at rear yard with 12'-foot permitted obstruction per planning code section 136 with new sleeping, eating, living areas and bathroom at grade. | $203,750 |
| Dec 3, 2020 | Completed final sign-off Aug 2023 | 90 Saturn St | remodel (e) bathroom and add (n) clerestory window above stair on 4/f.remodel (e) kitchen and bathroom on 3/f.remodel entry at g/f.(n) finishes at front facade including replacement garage door.(n) roofing at roof above 3/f. no change in floor area or conditioned space.Details
remodel (e) bathroom and add (n) clerestory window above stair on 4/f.remodel (e) kitchen and bathroom on 3/f.remodel entry at g/f.(n) finishes at front facade including replacement garage door.(n) roofing at roof above 3/f. no change in floor area or conditioned space. | $125,000 |
| Nov 3, 2020 | Completed final sign-off Mar 2021 | 653 Connecticut St | bathroom remodel, replace tub, tile, vanity in kind.Details
bathroom remodel, replace tub, tile, vanity in kind. | $10,000 |
| Oct 30, 2020 | Completed final sign-off Dec 2021 | 1632 Vallejo St | unit 2: finsh & fixtures upgrasdes to (e) 2 bathrooms. new built-in closet in mster bedroom, replacement of 7 interior doors & guardrail updates.Details
unit 2: finsh & fixtures upgrasdes to (e) 2 bathrooms. new built-in closet in mster bedroom, replacement of 7 interior doors & guardrail updates. | $82,000 |
| Oct 20, 2020 | Completed final sign-off Jun 2021 | 1945 Washington St | repair and replace in kind drywall, flooring caused by water damage work to include new paint, floors, interior trim, reinstall (e) kitchen cabinets, appliances, plumbing fixtures, no structural changes. reinstall electrical fixures.Details
repair and replace in kind drywall, flooring caused by water damage work to include new paint, floors, interior trim, reinstall (e) kitchen cabinets, appliances, plumbing fixtures, no structural changes. reinstall electrical fixures. | $50,000 |
| Oct 20, 2020 | Completed final sign-off Apr 2021 | 1945 Washington St | repair and replace in-kind drywall, flooring caused by water damage. work to include new paint, floors, interior trim, reinstall (e) kitchen cabinets, appliances, plumbing fixtures, no structural changes. reinstall (e) electrical fixtures.Details
repair and replace in-kind drywall, flooring caused by water damage. work to include new paint, floors, interior trim, reinstall (e) kitchen cabinets, appliances, plumbing fixtures, no structural changes. reinstall (e) electrical fixtures. | $50,000 |
| Sep 18, 2020 | Completed final sign-off Jun 2021 | 1744 Sanchez St | revision bpa#201908148814. previously submitted 1/2 bath to full baht w/shower. modify kitchen cabinetry & appliance layoutDetails
revision bpa#201908148814. previously submitted 1/2 bath to full baht w/shower. modify kitchen cabinetry & appliance layout | |
| Jul 21, 2020 | Completed final sign-off Oct 2020 | 67 Rudden Av | 1 bathroom remodel, 120 sq ft. new plumbing fixtures - tub, toilet, vanity, all at same locationsDetails
1 bathroom remodel, 120 sq ft. new plumbing fixtures - tub, toilet, vanity, all at same locations | $25,000 |
| Jul 7, 2020 | Completed final sign-off Oct 2020 | 2167 Grove St | remodel 2 bathrooms in-kind, new fixtures. no walls modified or filled and layout remains unchanged, new laundry location.Details
remodel 2 bathrooms in-kind, new fixtures. no walls modified or filled and layout remains unchanged, new laundry location. | $30,000 |
| Feb 27, 2020 | Completed final sign-off Jun 2020 | 718 Cole St | replace concrete slab-on-grade in garage & storage room, add ne footing & shearwall @ the west exterior wall of the storage roomDetails
replace concrete slab-on-grade in garage & storage room, add ne footing & shearwall @ the west exterior wall of the storage room | $100,000 |
| Dec 9, 2019 | Completed final sign-off Apr 2021 | 3960 18th St | interior remodel to one condominium in 3-unit building consisting of reconfiguratiion of existing closet to accommodate new washer/dryer (no additional sq footage, no work to exterior of building).Details
interior remodel to one condominium in 3-unit building consisting of reconfiguratiion of existing closet to accommodate new washer/dryer (no additional sq footage, no work to exterior of building). | $10,000 |
| Nov 26, 2019 | Completed final sign-off Jun 2020 | 3958 18th St | interior remodel to 1 condominium in a 3 unit residential building (no expansion of bldg envelope, no add'l square footage) includes kitchen and bath and associated plumbing and electrical work, no exterior workDetails
interior remodel to 1 condominium in a 3 unit residential building (no expansion of bldg envelope, no add'l square footage) includes kitchen and bath and associated plumbing and electrical work, no exterior work | $75,000 |
| Nov 26, 2019 | Completed final sign-off Jun 2020 | 3960 18th St | interior remodel to 1 condominium in a 3-unit residential building to reconfigure (e) closet for a new washer and dryer, no expansion of bldg envelope no add'l square footage, no work at exteriorDetails
interior remodel to 1 condominium in a 3-unit residential building to reconfigure (e) closet for a new washer and dryer, no expansion of bldg envelope no add'l square footage, no work at exterior | $10,000 |
| Aug 14, 2019 | Completed final sign-off Jun 2021 | 1744 Sanchez St | extend 1st fl interior stairs down into basement/garage & add a closet. remodel 1st fl kitchen, bathroom, hallway closet area & office. remodel 2nd fl storage closet into wash/dry room, & remodel/extend 2nd flmaster bath toward rear yard over (e) 1st flroof. minor re-route of fahu & elect work.Details
extend 1st fl interior stairs down into basement/garage & add a closet. remodel 1st fl kitchen, bathroom, hallway closet area & office. remodel 2nd fl storage closet into wash/dry room, & remodel/extend 2nd flmaster bath toward rear yard over (e) 1st flroof. minor re-route of fahu & elect work. | $225,000 |
| May 29, 2019 | Completed final sign-off Aug 2024 | 39 Brewster St | interior remodel of 2 story residence including an exterior roof deck with access by new stair and operatable skylightDetails
interior remodel of 2 story residence including an exterior roof deck with access by new stair and operatable skylight | $75,000 |
| Apr 18, 2019 | Completed final sign-off Jun 2025 | 1 Daniel Burnham Ct | on 10th floor unit 1014 -interior renovation including kitchen and bath n/a maherDetails
on 10th floor unit 1014 -interior renovation including kitchen and bath n/a maher | $35,000 |
| Apr 11, 2019 | Completed final sign-off Nov 2019 | 562 Sanchez St | (1) full kitchen remodel including floors on the main levelDetails
(1) full kitchen remodel including floors on the main level | $35,000 |
| Mar 26, 2019 | Expired or cancelled expired Jan 2023 | 1032 Broadway | interior renovation of extg living and dining room to repair water damage. removing one set of stairs, removal of 2 wood burning fire places. reface extg kitchen cabinets. reconfiguring 2 bathrooms upstairs. new led lighting in modified areas. no change to exterior. n/a for maherDetails
interior renovation of extg living and dining room to repair water damage. removing one set of stairs, removal of 2 wood burning fire places. reface extg kitchen cabinets. reconfiguring 2 bathrooms upstairs. new led lighting in modified areas. no change to exterior. n/a for maher | $100,000 |
| Mar 20, 2019 | Completed final sign-off Mar 2019 | 82 Carr St | to obtain final inspection for work approved under pa# 2016-1222-5678. all work is complete.Details
to obtain final inspection for work approved under pa# 2016-1222-5678. all work is complete. | |
| Dec 4, 2018 | Completed final sign-off Jun 2019 | 585 Rockdale Dr | interior remodel of (e) kitchen and bathroom at 2nd flr incl new fixtures and lighting, kitchen cabinetry, applinaces, flooring. no structural changes proposedDetails
interior remodel of (e) kitchen and bathroom at 2nd flr incl new fixtures and lighting, kitchen cabinetry, applinaces, flooring. no structural changes proposed | $36,000 |
| Oct 25, 2018 | Completed final sign-off Feb 2019 | 4179 20th St | 1/f: remodel kitchen including new cabinets, appliances,tile and countertops. no structural work, replace in-kind only.Details
1/f: remodel kitchen including new cabinets, appliances,tile and countertops. no structural work, replace in-kind only. | $36,000 |
| Oct 25, 2018 | Completed final sign-off Apr 2019 | 301 Gough St | remodel master & guest bathroom. including new plumbing fixtures, tilet, tub and shower in same location.Details
remodel master & guest bathroom. including new plumbing fixtures, tilet, tub and shower in same location. | $25,000 |
| Oct 1, 2018 | Completed final sign-off Oct 2022 | 1501 California St | ground floor t.i. for restaurant (b-0c.) incl. mech, elect, plbg, and finishes, exhaust hood under sep permit. extg storefront and ext hc. restroom to remain.Details
ground floor t.i. for restaurant (b-0c.) incl. mech, elect, plbg, and finishes, exhaust hood under sep permit. extg storefront and ext hc. restroom to remain. | $132,000 |
| Sep 19, 2018 | Expired or cancelled cancelled Jan 2026 | 61 Hartford St | remodel ground flr - living area including kitchen and bathroom, new exterior door and remodel exterior deckDetails
remodel ground flr - living area including kitchen and bathroom, new exterior door and remodel exterior deck | $20,000 |
| Aug 30, 2018 | Completed final sign-off Sep 2018 | 39 Brewster St | remove deck in accordance with complaint # 201875907 ) built without a permit)Details
remove deck in accordance with complaint # 201875907 ) built without a permit) | $5,000 |
| Aug 13, 2018 | Completed final sign-off Apr 2019 | 1080 Chestnut St | apt 1g: kitchen remodel to include new cabinets, tile and appliances only. bathroomremodel: new tile and fixtures. no change to electrical or walls. maher n/a.Details
apt 1g: kitchen remodel to include new cabinets, tile and appliances only. bathroomremodel: new tile and fixtures. no change to electrical or walls. maher n/a. | $20,000 |
| Jun 6, 2018 | Completed final sign-off Mar 2019 | 61 Hartford St | full master bathroom and kitchen renovation to include new cabinetry, appliances, flooring and tile. no structural work proposed. replace in-kind only at basement level/lower unitDetails
full master bathroom and kitchen renovation to include new cabinetry, appliances, flooring and tile. no structural work proposed. replace in-kind only at basement level/lower unit | $20,000 |
| Apr 16, 2018 | Completed final sign-off Dec 2018 | 175 Haight St | interior remodel of existing kitchen & bathroom, proposes additon of (1) full bathroom, all new appliances in kitchen, proposes upgrading lighting & receptacles in area of work, no structural changesDetails
interior remodel of existing kitchen & bathroom, proposes additon of (1) full bathroom, all new appliances in kitchen, proposes upgrading lighting & receptacles in area of work, no structural changes | $82,000 |
| Feb 23, 2018 | Completed final sign-off Jun 2018 | 209 Montcalm St | remove existing wall between kitchen and dining room, add new post beams and shear wallDetails
remove existing wall between kitchen and dining room, add new post beams and shear wall | $10,000 |
| Nov 6, 2017 | Completed final sign-off Jan 2018 | 2365 Bush St | renovate e powder room - 3rd floor - to include addition of tub with shower, tile and new fixturesDetails
renovate e powder room - 3rd floor - to include addition of tub with shower, tile and new fixtures | $20,000 |
| Oct 31, 2017 | Completed final sign-off Jun 2018 | 47 Mars St | renovate master bathroom to include new fixtures, tub & tile.Details
renovate master bathroom to include new fixtures, tub & tile. | $20,000 |
| Aug 15, 2017 | Completed final sign-off Jan 2018 | 2169 Folsom St | 1st floor: bathroom remodel. no wall modification. no structural workDetails
1st floor: bathroom remodel. no wall modification. no structural work | $20,000 |
| Aug 15, 2017 | Completed final sign-off Jun 2018 | 209 Montcalm St | kitchen remodelto include cabinets and flooring. remodel master bath, guest bath, and powder room. no change in structural or floor plan. no wall modification. no structural work.Details
kitchen remodelto include cabinets and flooring. remodel master bath, guest bath, and powder room. no change in structural or floor plan. no wall modification. no structural work. | $60,000 |
| Jul 7, 2017 | Expired or cancelled expired May 2021 | 629 Alvarado St | 3/f: master bathroom remodel & guest bathroom on g/f. no structural alts, no electrical to be performed. no walls moved, removed, added or infilled. all (e) layouts to remain unchanged.Details
3/f: master bathroom remodel & guest bathroom on g/f. no structural alts, no electrical to be performed. no walls moved, removed, added or infilled. all (e) layouts to remain unchanged. | $20,000 |
| Jul 7, 2017 | Completed final sign-off Oct 2017 | 60 Pearl St | remodel ktichenonly on 2/f to including new cabinets, counters, and floors. no walls moved, removed, added or infilled. all (e) layouts to remain unchanged.Details
remodel ktichenonly on 2/f to including new cabinets, counters, and floors. no walls moved, removed, added or infilled. all (e) layouts to remain unchanged. | $20,000 |
| May 4, 2017 | Completed final sign-off Apr 2018 | 1080 Chestnut St | unit 4b: full remodel of master bathroom, powder room and kitchen , includes new floor throughout,. update plumbing and electrical. no structural work. same layout.Details
unit 4b: full remodel of master bathroom, powder room and kitchen , includes new floor throughout,. update plumbing and electrical. no structural work. same layout. | $20,000 |
| May 1, 2017 | Completed final sign-off Oct 2017 | 39 Brewster St | kitchen & bathroom remodel; repair (e) interior stair case less than 50% in-kind; no structural alterations.Details
kitchen & bathroom remodel; repair (e) interior stair case less than 50% in-kind; no structural alterations. | $20,000 |
| Apr 14, 2017 | Never finaled issued Apr 2017, no final | 870 Noe St | to obtain final inspection for work approved under pa#201312305192. all work is complete.Details
to obtain final inspection for work approved under pa#201312305192. all work is complete. | |
| Apr 12, 2017 | Completed final sign-off Apr 2017 | 629 Alvarado St | revision to 201601056396: list of items not completed on approved plan to be removed from scopeDetails
revision to 201601056396: list of items not completed on approved plan to be removed from scope | |
| Mar 30, 2017 | Completed final sign-off Apr 2018 | 166 Ewing Tr | revision to pa 2016-1123-3465 omit fireplace on 1st floor (sheet a100)Details
revision to pa 2016-1123-3465 omit fireplace on 1st floor (sheet a100) | |
| Mar 21, 2017 | Completed final sign-off Jun 2019 | 2169 Folsom St | unit m301: minor exterior alterations: (2) new skylights, (n) outdoor shower, widen (e) door 9". n/a for maherDetails
unit m301: minor exterior alterations: (2) new skylights, (n) outdoor shower, widen (e) door 9". n/a for maher | $28,000 |
| Mar 10, 2017 | Completed final sign-off Oct 2017 | 1747 43rd Av | kitchen remodel including addition of a door leading from kitchen to a new deck less than 30" high in rear yard. addition of a bathroom with in the extg laundry room area. install hydronic radiant floor heating.Details
kitchen remodel including addition of a door leading from kitchen to a new deck less than 30" high in rear yard. addition of a bathroom with in the extg laundry room area. install hydronic radiant floor heating. | $18,000 |
| Feb 24, 2017 | Completed final sign-off Oct 2017 | 4110 20th St | demo & replace kitchen counters, cabinets & fixtures. new 1/2 bath on 1st flr. new finished floorDetails
demo & replace kitchen counters, cabinets & fixtures. new 1/2 bath on 1st flr. new finished floor | $20,000 |
| Dec 22, 2016 | Expired or cancelled expired Mar 2019 | 82 Carr St | replace e damaged front entry stair in kindDetails
replace e damaged front entry stair in kind | $10,000 |
| Dec 22, 2016 | Completed final sign-off Mar 2017 | 1 Daniel Burnham Ct | #614 - bathroom remodel to include new fixtures, tile floor and walls; no new elctricalDetails
#614 - bathroom remodel to include new fixtures, tile floor and walls; no new elctrical | $20,000 |
| Nov 23, 2016 | Completed final sign-off Apr 2018 | 166 Ewing Tr | insulate and condition e 1st fl to create new living space, full bath, new door, window. infill existing light well at 2nd level add new windowDetails
insulate and condition e 1st fl to create new living space, full bath, new door, window. infill existing light well at 2nd level add new window | $100,000 |
| Nov 7, 2016 | Completed final sign-off Mar 2017 | 3042 Jackson St | unit 4: remodel kitchen - includes: cabinetry - counter tops & appliances, no change in structural, lighting or floors.Details
unit 4: remodel kitchen - includes: cabinetry - counter tops & appliances, no change in structural, lighting or floors. | $20,000 |
| Oct 27, 2016 | Completed final sign-off Feb 2017 | 2049 Oak St | #1 - remodel one bathroom to include new tile, shower vanity & toilet; add pocket door; add new lighting kitchen, living room & hall. add new counter & back splash in kitchen.Details
#1 - remodel one bathroom to include new tile, shower vanity & toilet; add pocket door; add new lighting kitchen, living room & hall. add new counter & back splash in kitchen. | $20,000 |
| Oct 12, 2016 | Completed final sign-off Apr 2019 | 2169 Folsom St | unit m301, 3rd floor - remove (12) sprinklers & add (9) new sprinklers per nfpa #13. ref t.i. #201606150068. n/a maher ordinanceDetails
unit m301, 3rd floor - remove (12) sprinklers & add (9) new sprinklers per nfpa #13. ref t.i. #201606150068. n/a maher ordinance | $4,000 |
| Aug 31, 2016 | Completed final sign-off Sep 2016 | 342 Waller St | to obtain for final inspection for work approved under pa#2014-0711-1040. all work is complete.Details
to obtain for final inspection for work approved under pa#2014-0711-1040. all work is complete. | |
| Aug 17, 2016 | Completed final sign-off Feb 2018 | 4639 18th St | removal of two (2) posts and introduction of stiffening elements in garage level.Details
removal of two (2) posts and introduction of stiffening elements in garage level. | $50,000 |
| Aug 16, 2016 | Completed final sign-off Feb 2018 | 4639 18th St | interior remodel of 2/f- new opening at center wall kitchen. new closets and relocate laundry.Details
interior remodel of 2/f- new opening at center wall kitchen. new closets and relocate laundry. | $50,000 |
| Aug 5, 2016 | Completed final sign-off Nov 2016 | 130 Landers St | ful master bath (1st floor) & powder room ( 2nd room ) renovation to include (n) fixtures, shower &tile, plumbing and electrical update in unit hDetails
ful master bath (1st floor) & powder room ( 2nd room ) renovation to include (n) fixtures, shower &tile, plumbing and electrical update in unit h | $30,000 |
| Jun 27, 2016 | Completed final sign-off Feb 2018 | 4639 18th St | kitchen and powder room remodel. replace existing patio doors, replace (e) powder room window in lightwell(westside). replace bedroom window in lightwell (westside). replace (e) kitchen window.Details
kitchen and powder room remodel. replace existing patio doors, replace (e) powder room window in lightwell(westside). replace bedroom window in lightwell (westside). replace (e) kitchen window. | $20,000 |
| Jun 15, 2016 | Completed final sign-off Jun 2019 | 2169 Folsom St | 3rd floor, unit #m301: interior remodel to (e) live/work unit located with in the box factory. remodel includes 1.5 baths add 1 full bathroom, kitchen & stair. maher naDetails
3rd floor, unit #m301: interior remodel to (e) live/work unit located with in the box factory. remodel includes 1.5 baths add 1 full bathroom, kitchen & stair. maher na | $400,000 |
| May 19, 2016 | Completed final sign-off Aug 2016 | 1755 Filbert St | full bathroom renovation to include new fixts, shower & tile. plumbing & electrical update. new exhaust fan connecting to (e) duct. min 1 light in bath to be high efficacy.Details
full bathroom renovation to include new fixts, shower & tile. plumbing & electrical update. new exhaust fan connecting to (e) duct. min 1 light in bath to be high efficacy. | $20,000 |
| May 10, 2016 | Completed final sign-off Aug 2016 | 130 Landers St | unit h: kitchen demo and remodel including new cabinets, drywall repairs, and new appliances. plumbing and electrical update.Details
unit h: kitchen demo and remodel including new cabinets, drywall repairs, and new appliances. plumbing and electrical update. | $20,000 |
| Apr 20, 2016 | Completed final sign-off Apr 2016 | 17 Milton St | to obtain final inspection for wprk approved under pa#201312124051. all work is complete.Details
to obtain final inspection for wprk approved under pa#201312124051. all work is complete. | |
| Apr 20, 2016 | Expired or cancelled cancelled Jan 2026 | 4641 18th St | convert 1st floor storage to livingspace for unit #4641 18th street. including bath and infill lightwell at 1st floor only. install exterior door and 2 windows(not visible to street). new foundation and slab on grade at 1st floor. install new patio slab.Details
convert 1st floor storage to livingspace for unit #4641 18th street. including bath and infill lightwell at 1st floor only. install exterior door and 2 windows(not visible to street). new foundation and slab on grade at 1st floor. install new patio slab. | $150,000 |
| Apr 13, 2016 | Completed final sign-off Aug 2016 | 4434 23rd St | full bathroom renovation to include new fixtures, shower and tiles. plumbing and electrical update. in-kind. no walls to be removed or altered.Details
full bathroom renovation to include new fixtures, shower and tiles. plumbing and electrical update. in-kind. no walls to be removed or altered. | $25,000 |
| Mar 30, 2016 | Completed final sign-off Dec 2016 | 300 Berry St | #558 - reface kitchen cabinets, replace railing along stairs with glass railing, add vanity to downstairs bathroom, full renovation of master bathroom on 2nd floor to include new tile, fixtures & shower. n/a maher ordinanceDetails
#558 - reface kitchen cabinets, replace railing along stairs with glass railing, add vanity to downstairs bathroom, full renovation of master bathroom on 2nd floor to include new tile, fixtures & shower. n/a maher ordinance | $50,000 |
| Mar 15, 2016 | Completed final sign-off Jun 2016 | 2041 Hayes St | #3 - kitchen demo & remodel including new cabinets, drywall repairs, & new appliances, plumbing & electrical update.Details
#3 - kitchen demo & remodel including new cabinets, drywall repairs, & new appliances, plumbing & electrical update. | $25,000 |
| Mar 15, 2016 | Completed final sign-off Jun 2016 | 1587 34th Av | kitchen demo & remodel including new cabinets, drywall repairs, & new appliances, plumbing & electrical update.Details
kitchen demo & remodel including new cabinets, drywall repairs, & new appliances, plumbing & electrical update. | $25,000 |
| Feb 29, 2016 | Completed final sign-off Aug 2016 | 1755 Filbert St | unit #20, 2nd floor: - kitchen & bathroom remodel including new cabinets, drywall repairs and new appliances. new vanity and toilet and powder room. all new flooring. all in (e) rooms.Details
unit #20, 2nd floor: - kitchen & bathroom remodel including new cabinets, drywall repairs and new appliances. new vanity and toilet and powder room. all new flooring. all in (e) rooms. | $25,000 |
| Feb 10, 2016 | Completed final sign-off May 2016 | 36 Gladys St | kitchen & bathroom demo & remodel including new cabinets, drywall repairs & new appliances. plumbing & electrical updateDetails
kitchen & bathroom demo & remodel including new cabinets, drywall repairs & new appliances. plumbing & electrical update | $25,000 |
| Feb 9, 2016 | Completed final sign-off Jun 2016 | 538 39th Av | kitchen demo and remodel including new cabinets, drywall repairs and new appliances, plumbing and electrical updates. no alteration of wall, window and door.Details
kitchen demo and remodel including new cabinets, drywall repairs and new appliances, plumbing and electrical updates. no alteration of wall, window and door. | $18,000 |