Brendan Waters Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2004 to Aug 2026
- Last 24 months
- 9 permits filed
204 permits since 2000: 162 completed, 6 in progress, 25 never finaled, 11 expired or cancelled.
Of the 25 never-finaled permits, 2 are 3 to 5 years old, 5 are 5 to 10 years old, 18 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 204.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2026 | In progress issued Sep 2026 | 36 Camp St | interior remodel 3rd floor only remove existing interior wall between existing bedroom and existing living room.Details
interior remodel 3rd floor only remove existing interior wall between existing bedroom and existing living room. | $10,000 |
| Aug 14, 2026 | In progress issued Aug 2026 | 1379 06th Av | 1 primary bathroom and 1 power room remodel in kind. all like for like. 1 kitchen remodel like for like. all work interior. poweder room and kitchen 1st flr and primary bathroom 2nd flr.Details
1 primary bathroom and 1 power room remodel in kind. all like for like. 1 kitchen remodel like for like. all work interior. poweder room and kitchen 1st flr and primary bathroom 2nd flr. | $120,000 |
| Aug 14, 2026 | In progress issued Aug 2026 | 314 Locust St | first floor: bathroom remodel like for like, no conversions, no walls being moved. all like for like.Details
first floor: bathroom remodel like for like, no conversions, no walls being moved. all like for like. | $15,000 |
| Jan 15, 2026 | Completed final sign-off Apr 2026 | 47 Melrose Av | kitchen remodel in kind. cabinets replacement counters appliances.Details
kitchen remodel in kind. cabinets replacement counters appliances. | $25,000 |
| Jul 18, 2025 | In progress issued Aug 2025 | 181 De Soto St | remodel kitchen and half bath on main level; remodel bathroom and add bathroom on upper level. no exterior workDetails
remodel kitchen and half bath on main level; remodel bathroom and add bathroom on upper level. no exterior work | $50,000 |
| Jul 1, 2025 | In progress issued Jul 2025 | 181 De Soto St | replace bathroom fixtures and tile in kind basement bathroom no wall demolition or construction. no change in plumbing fixture count.Details
replace bathroom fixtures and tile in kind basement bathroom no wall demolition or construction. no change in plumbing fixture count. | $15,000 |
| Jun 27, 2025 | Expired or cancelled withdrawn Jul 2025 | 181 De Soto St | all interior work. remodel kitchen & bathroom on main level. remodel upper fl bathroom and add bathroom. remodel lower level bathroomDetails
all interior work. remodel kitchen & bathroom on main level. remodel upper fl bathroom and add bathroom. remodel lower level bathroom | $180,000 |
| Jan 7, 2025 | Completed final sign-off Oct 2025 | 44 Hartford St | residential alteration kitchen remodel and enlarge opening to dining room replace exterior rear door and window. addition of lav in (e) toilet room. relocation of laundry to 2nd floor addition of bathroom on top level . pitched roof to be raised over (n) bathroom and (e) closetDetails
residential alteration kitchen remodel and enlarge opening to dining room replace exterior rear door and window. addition of lav in (e) toilet room. relocation of laundry to 2nd floor addition of bathroom on top level . pitched roof to be raised over (n) bathroom and (e) closet | $150,000 |
| Dec 31, 2024 | Completed final sign-off Apr 2025 | 1949 Hayes St | open wall between living room and parlor. remove (e) parlor door and frame in doorway. addition of transome window from parlor to hall way. interior work only.Details
open wall between living room and parlor. remove (e) parlor door and frame in doorway. addition of transome window from parlor to hall way. interior work only. | $8,000 |
| Aug 27, 2024 | Completed final sign-off Dec 2025 | 1238 26th Av | remodel to existing 3-story single family dwelling including existing kitchen and bathrooms plus a new 1/2 bath. no additional square footing and no explansion of existing building envelope.Details
remodel to existing 3-story single family dwelling including existing kitchen and bathrooms plus a new 1/2 bath. no additional square footing and no explansion of existing building envelope. | $200,000 |
| Aug 8, 2024 | Completed final sign-off May 2025 | 267 States St | alteration of (e) r-3 residence to remove (e) non conforming fire escape enclosed (e) court and install (n) 2- stop elevatorDetails
alteration of (e) r-3 residence to remove (e) non conforming fire escape enclosed (e) court and install (n) 2- stop elevator | $150,000 |
| Jun 18, 2024 | Completed final sign-off Nov 2024 | 72 Molimo Dr | 1st fl - legalize bedroom. add 1 full bathDetails
1st fl - legalize bedroom. add 1 full bath | $65,000 |
| Apr 12, 2024 | Completed final sign-off Oct 2024 | 29 San Leandro Wy | revision to permit 202402296794 (remodel one bathroom in kind). interior remodel - 1/f: removal of foyer, dining, powder room and bathroom, (e) laundry and reconfiguration of stairs. 2/f: alteration of bedrooms and bathrooms, addition of primary suite, replacement of relocation of furnace & laundry.Details
revision to permit 202402296794 (remodel one bathroom in kind). interior remodel - 1/f: removal of foyer, dining, powder room and bathroom, (e) laundry and reconfiguration of stairs. 2/f: alteration of bedrooms and bathrooms, addition of primary suite, replacement of relocation of furnace & laundry. | $180,000 |
| Feb 29, 2024 | Completed final sign-off Oct 2024 | 29 San Leandro Wy | remove lath and plaster from interior walls in living room, dining room, and staircase walls (for engr to access). replace with gyp board after investigation. remodel one bathroom (in kind).Details
remove lath and plaster from interior walls in living room, dining room, and staircase walls (for engr to access). replace with gyp board after investigation. remodel one bathroom (in kind). | $2,000 |
| Oct 30, 2023 | Completed final sign-off Nov 2023 | 209 Upper Tr | install 7 new windows at back of house in prmary suit and bathroom.Details
install 7 new windows at back of house in prmary suit and bathroom. | $3,500 |
| Sep 6, 2023 | In progress issued Feb 2024 | 24 Romain St | replace second floor stairs to provide access to rear yard. replace replace (e) deck, repair (e) guardrail. replace (2) existing fences. new door at rear facade.Details
replace second floor stairs to provide access to rear yard. replace replace (e) deck, repair (e) guardrail. replace (2) existing fences. new door at rear facade. | $70,000 |
| Jul 31, 2023 | Completed final sign-off Sep 2023 | 804 De Haro St | replace (e) pine siding with hardie cement board siding on front facade, and back of houseDetails
replace (e) pine siding with hardie cement board siding on front facade, and back of house | $14,000 |
| Jun 2, 2023 | Completed final sign-off Nov 2023 | 209 Upper Tr | master bathroom remodel in kind- guest bathroom remodel in kind. no new wall and no existing wall relocation. all plumbing fixtures count remain same. new lighting shall comply with cec 150.0(k)5.Details
master bathroom remodel in kind- guest bathroom remodel in kind. no new wall and no existing wall relocation. all plumbing fixtures count remain same. new lighting shall comply with cec 150.0(k)5. | $20,000 |
| Jan 31, 2023 | Completed final sign-off Sep 2023 | 14 Clayton St | unit 14 & 16: remodel 2 kitchen, 2 bathroom and 1/2/ bath in both units in-kind.Details
unit 14 & 16: remodel 2 kitchen, 2 bathroom and 1/2/ bath in both units in-kind. | $140,000 |
| Nov 9, 2022 | Completed final sign-off Jan 2023 | 4752 17th St | voluntary strengthening of 1st floor framing above garage; sister new joists to existing joists, per plans.Details
voluntary strengthening of 1st floor framing above garage; sister new joists to existing joists, per plans. | $24,000 |
| Nov 1, 2022 | Completed final sign-off Dec 2022 | 1285 05th Av | repairs to garage wall to comply w/ nov 202293511. front facade repair in kind stucco, new garage wood door with same details. repair in kind.Details
repairs to garage wall to comply w/ nov 202293511. front facade repair in kind stucco, new garage wood door with same details. repair in kind. | $6,000 |
| Oct 4, 2022 | Never finaled issued Jan 2023, no final | 60 Temescal Tr | interior remodel including conversion of 252 sq ft of unconditioned space to conditioned within extg bldg envelope; includes new interior stairway, new half bath, and new laundry room.Details
interior remodel including conversion of 252 sq ft of unconditioned space to conditioned within extg bldg envelope; includes new interior stairway, new half bath, and new laundry room. | $150,000 |
| Sep 29, 2022 | Never finaled issued Sep 2022, no final | 60 Temescal Tr | two bathroom remodel: one master bath- like for like. one guest bath 70 sqft remove ada tub and install shower. no structural/ no changes to walls or openings.Details
two bathroom remodel: one master bath- like for like. one guest bath 70 sqft remove ada tub and install shower. no structural/ no changes to walls or openings. | $45,000 |
| Jun 10, 2022 | Completed final sign-off Sep 2022 | 27 Howth St | replace/ rebuild rear deck and stair in kind and same footprint.Details
replace/ rebuild rear deck and stair in kind and same footprint. | $5,000 |
| May 11, 2022 | Completed final sign-off Oct 2022 | 385 Corbett Av | remodel kitchen area, add half bath on the main level per plan. all interior work.Details
remodel kitchen area, add half bath on the main level per plan. all interior work. | $40,000 |
| Mar 15, 2022 | Completed final sign-off Apr 2022 | 4320 24th St | repair interior framing of garage door opening. stucco cracked and repaired; not replaced not replaced comply with nov 202177632Details
repair interior framing of garage door opening. stucco cracked and repaired; not replaced not replaced comply with nov 202177632 | $1,700 |
| Dec 8, 2021 | Completed final sign-off Feb 2023 | 1371 08th Av | 2nd fl - remodel kitchen including removing a section of center wall; re-configure half bath and pantry. all interior workDetails
2nd fl - remodel kitchen including removing a section of center wall; re-configure half bath and pantry. all interior work | $40,000 |
| Sep 29, 2021 | Completed final sign-off Nov 2022 | 1865 24th Av | 1st fl - create 1 bedrm, family rm, full bathrm, laundry closet, storage & retain garage for 1 car parking. a new deck off the 1st fl. new interior stair connecting both floors on the 2nd fl. remodel kitchen, add bathrm, infill (e) non-share light wellDetails
1st fl - create 1 bedrm, family rm, full bathrm, laundry closet, storage & retain garage for 1 car parking. a new deck off the 1st fl. new interior stair connecting both floors on the 2nd fl. remodel kitchen, add bathrm, infill (e) non-share light well | $300,000 |
| Jul 19, 2021 | Completed final sign-off Nov 2021 | 1496 Willard St | to comply with 3r inspections. (step, handrail). to comply with physical inspection report #cc8494.Details
to comply with 3r inspections. (step, handrail). to comply with physical inspection report #cc8494. | $500 |
| Apr 6, 2021 | Completed final sign-off Mar 2022 | 222 Bocana St | revision to pa 202009305595. convert existing covered light well on 2nd flr into a closet. remove skylight and cover with roof to match existing. add new skylight over (e) bath. install air conditioning and replace a.c unit on roof.Details
revision to pa 202009305595. convert existing covered light well on 2nd flr into a closet. remove skylight and cover with roof to match existing. add new skylight over (e) bath. install air conditioning and replace a.c unit on roof. | $18,000 |
| Jan 19, 2021 | Completed final sign-off Dec 2021 | 235 Vicente St | remodel rear yard including new steel moment frame.Details
remodel rear yard including new steel moment frame. | $8,000 |
| Nov 18, 2020 | Completed final sign-off Feb 2021 | 976 Rhode Island St | remodel kitchen in kind (new cabinets and appliances)Details
remodel kitchen in kind (new cabinets and appliances) | $25,000 |
| Oct 13, 2020 | Completed final sign-off Nov 2023 | 422 Missouri St | 3-story rear addition, (n) rear deck "pop-out". interior remodel of miscellaneous spaces (including kitchen & bath), replace (e) windows w/ inkind wood windows, re-paint (e) wood siding & trim. no other changes to front (street) facade.Details
3-story rear addition, (n) rear deck "pop-out". interior remodel of miscellaneous spaces (including kitchen & bath), replace (e) windows w/ inkind wood windows, re-paint (e) wood siding & trim. no other changes to front (street) facade. | $350,000 |
| Sep 30, 2020 | Completed final sign-off Mar 2022 | 222 Bocana St | interior and in rrear of building exterior (not visible from street). 1st floor: new interior stair/open, that connects 2 floors. enlarge (e) office & add bath. relocate laundry. 2nd floor: remodel kitchen. reduce footprint of (e) sunroom , convert half to deck.replace skylights, reconfigure windowsDetails
interior and in rrear of building exterior (not visible from street). 1st floor: new interior stair/open, that connects 2 floors. enlarge (e) office & add bath. relocate laundry. 2nd floor: remodel kitchen. reduce footprint of (e) sunroom , convert half to deck.replace skylights, reconfigure windows | $95,000 |
| Sep 28, 2020 | Completed final sign-off Jul 2021 | 251 Bocana St | remodel kitchen & upstairs bathroom in-kindDetails
remodel kitchen & upstairs bathroom in-kind | $60,000 |
| Aug 24, 2020 | Completed final sign-off May 2021 | 3960 18th St | unit a: interior remodel to 1 one condo on 4th floor consisting of reconfiguring existing kitchen & bath. add a 2nd bath and a new w/d closet. all associated electrical & plumbing included. no work on exterior of building.Details
unit a: interior remodel to 1 one condo on 4th floor consisting of reconfiguring existing kitchen & bath. add a 2nd bath and a new w/d closet. all associated electrical & plumbing included. no work on exterior of building. | $125,000 |
| Jul 6, 2020 | Completed final sign-off Nov 2020 | 680 27th St | demo the (e) wall & door to the (e) interior stair on the 2/f toprovide a limited visusal connection between floors per z.a. no.1. demo (e) ext door on g/f bedroom: replace with scheduled window. add new window to g/f bed, relace door on g/f, new interior landing.Details
demo the (e) wall & door to the (e) interior stair on the 2/f toprovide a limited visusal connection between floors per z.a. no.1. demo (e) ext door on g/f bedroom: replace with scheduled window. add new window to g/f bed, relace door on g/f, new interior landing. | $25,000 |
| Mar 16, 2020 | Completed final sign-off Jan 2021 | 2471 24th Av | remodel bathroom and kitchen in kind on 2nd floor.Details
remodel bathroom and kitchen in kind on 2nd floor. | $55,000 |
| Mar 10, 2020 | Completed final sign-off Jan 2024 | 591 29th Av | interior remodel: ground fl convert 423 sf of (e) garage into a new family room accessible by (e) interior stair, 2nd fl. reconfigure layout of 2 bathrooms and 2 closets, 1st fl. add new exterior stair lower than 10' from grade within building areaDetails
interior remodel: ground fl convert 423 sf of (e) garage into a new family room accessible by (e) interior stair, 2nd fl. reconfigure layout of 2 bathrooms and 2 closets, 1st fl. add new exterior stair lower than 10' from grade within building area | $60,000 |
| Nov 1, 2019 | Completed final sign-off Oct 2020 | 4320 24th St | 2nd floor: remodel kitchen and bathroom per plan including remove a section of wall. no exterior work. (n) skylights u factor +0.32Details
2nd floor: remodel kitchen and bathroom per plan including remove a section of wall. no exterior work. (n) skylights u factor +0.32 | $30,000 |
| Mar 12, 2019 | Completed final sign-off Oct 2019 | 1949 15th St | remove a section of center bearing wall on 1st fl unit c. install new beam and new posts and new footings per planDetails
remove a section of center bearing wall on 1st fl unit c. install new beam and new posts and new footings per plan | $7,000 |
| Feb 22, 2019 | Completed final sign-off Oct 2019 | 1949 15th St | remodel kitchen & bathroom new electriacal & plumbing all staying in same location moving no wallsDetails
remodel kitchen & bathroom new electriacal & plumbing all staying in same location moving no walls | $50,000 |
| Jan 28, 2019 | Completed final sign-off Dec 2020 | 176 Gold Mine Dr | replace rear (e) balconies in-like-kind. (n) structural posts to reinforce (e) balconies in back of building/property.Details
replace rear (e) balconies in-like-kind. (n) structural posts to reinforce (e) balconies in back of building/property. | $25,000 |
| Oct 15, 2018 | Completed final sign-off Jul 2019 | 571 Page St | demo (e) wall between kitchen & living room. demo bathroom, partial kithcne remode, (n) bathroom, replace window in bath & powder room same size as (e) windows, replace exterior doors in kitchen,& bedrooms, replace interior doors througout (n) wood flooring & (n) lighting throug out,Details
demo (e) wall between kitchen & living room. demo bathroom, partial kithcne remode, (n) bathroom, replace window in bath & powder room same size as (e) windows, replace exterior doors in kitchen,& bedrooms, replace interior doors througout (n) wood flooring & (n) lighting throug out, | $120,000 |
| Aug 8, 2018 | Never finaled issued Jan 2019, no final | 2971 21st St | addition of (n) deck @ rear of house & installation of (n) sliding door from (e) kitchen to (n) deck. (n) deck & associated fire wall are less than 10 feet above finished grage. no additional conditionad square footage.Details
addition of (n) deck @ rear of house & installation of (n) sliding door from (e) kitchen to (n) deck. (n) deck & associated fire wall are less than 10 feet above finished grage. no additional conditionad square footage. | $50,000 |
| Aug 7, 2018 | Completed final sign-off Feb 2019 | 54 Bradford St | 1st add 1 bedroom and 1 full bath, 2nd fl remodel kitchenDetails
1st add 1 bedroom and 1 full bath, 2nd fl remodel kitchen | $55,000 |
| Aug 2, 2018 | Never finaled issued Aug 2018, no final | 54 Bradford St | demo sheetrock and finish in garage for investigation purpose for comin grenovatioon project. (about 100sf area)Details
demo sheetrock and finish in garage for investigation purpose for comin grenovatioon project. (about 100sf area) | $500 |
| Jul 31, 2018 | Completed final sign-off Dec 2018 | 566 Miramar Av | kitchen remodel involving removing section of center wallDetails
kitchen remodel involving removing section of center wall | $30,000 |
| Jul 27, 2018 | Completed final sign-off Dec 2018 | 2 Carl St | mandatory soft story retrofit per sfebc ch 4d engineering criteria: cebc appendix a4Details
mandatory soft story retrofit per sfebc ch 4d engineering criteria: cebc appendix a4 | $28,000 |
| Jul 5, 2018 | Completed final sign-off Feb 2020 | 2971 21st St | interior remodel of (e) 2 story sfd. remodel kitchen and 1/2 bath plus associated structural, plumbing & electrical work. no new sq ft & no new work thatis visible from the streetDetails
interior remodel of (e) 2 story sfd. remodel kitchen and 1/2 bath plus associated structural, plumbing & electrical work. no new sq ft & no new work thatis visible from the street | $75,000 |
| Jun 21, 2018 | Completed final sign-off Sep 2018 | 1565 Page St | unit a: bathroom and kitchen remodel. change out all fixtures and cabinets. replace in kind . existing walls to remain in placeDetails
unit a: bathroom and kitchen remodel. change out all fixtures and cabinets. replace in kind . existing walls to remain in place | $65,000 |
| May 8, 2018 | Never finaled issued May 2018, no final | 2 Carl St | exploratory demo. demolition - removal of lath and plaster, drywall and plywood from walls in basement and garage. approx 350 sq ftDetails
exploratory demo. demolition - removal of lath and plaster, drywall and plywood from walls in basement and garage. approx 350 sq ft | $2,000 |
| Apr 30, 2018 | Completed final sign-off Dec 2018 | 1083 Union St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $38,000 |
| Apr 17, 2018 | Completed final sign-off Jan 2019 | 2729 Pine St | replace/rebuild existing brick foundation, interior footings per plan. remodel (e) ground floor interior space - sheetrock, painting. no change to superstructure framingDetails
replace/rebuild existing brick foundation, interior footings per plan. remodel (e) ground floor interior space - sheetrock, painting. no change to superstructure framing | $70,000 |
| Mar 21, 2018 | Completed final sign-off Oct 2018 | 151 Banks St | remodel kitchen and bathroom, add half bath, legalize full bath @ 1st floorDetails
remodel kitchen and bathroom, add half bath, legalize full bath @ 1st floor | $26,000 |
| Mar 19, 2018 | Completed final sign-off Jul 2018 | 241 Ashbury St | replace all plumbing fitcures in 1.2 bathroom and full bathroom. replace tile where neededDetails
replace all plumbing fitcures in 1.2 bathroom and full bathroom. replace tile where needed | $11,000 |
| Feb 22, 2018 | Completed final sign-off Apr 2018 | 1170 South Van Ness Av | revision to 201709289782. relocate new footing @ grid 7 leftward 3'-0". reduce s.w. length @ grid 7 to 12'-0"Details
revision to 201709289782. relocate new footing @ grid 7 leftward 3'-0". reduce s.w. length @ grid 7 to 12'-0" | |
| Nov 13, 2017 | Completed final sign-off Apr 2018 | 168 Kenwood Wy | at 1st floor -convert existing powder room to full bathroom. remodel laundry room. no structral work.Details
at 1st floor -convert existing powder room to full bathroom. remodel laundry room. no structral work. | $16,500 |
| Sep 28, 2017 | Completed final sign-off Apr 2018 | 1170 South Van Ness Av | voluntary structural strengthening @ ground floor per 2016 cebc appendix a4. (n) plywood shearwalls with (n) fnd. ftgs.Details
voluntary structural strengthening @ ground floor per 2016 cebc appendix a4. (n) plywood shearwalls with (n) fnd. ftgs. | $40,000 |
| Sep 26, 2017 | Completed final sign-off Aug 2018 | 160 Clinton Pk | remodel kitchen: replace cabinets, new countertops, new appliances, same layout; new & old.Details
remodel kitchen: replace cabinets, new countertops, new appliances, same layout; new & old. | $22,000 |
| Sep 26, 2017 | Completed final sign-off Jan 2018 | 448 Gold Mine Dr | to obtain a final inspection for work approved under pa#201602179785 & 201602250569. all work is complete.Details
to obtain a final inspection for work approved under pa#201602179785 & 201602250569. all work is complete. | |
| Apr 13, 2017 | Completed final sign-off Dec 2017 | 76 Bennington St | kitchen remodel, replace in-kindDetails
kitchen remodel, replace in-kind | $25,000 |
| Jan 25, 2017 | Completed final sign-off Jan 2018 | 6 Encline Ct | bathroom and kitchen remodelDetails
bathroom and kitchen remodel | $35,000 |
| Jan 12, 2017 | Completed final sign-off Jun 2017 | 1375 08th Av | interior remodel kitchen and den area on 2nd floor. interior remodel bathrooms, walk in closet. laundry closet on 3rd floor.Details
interior remodel kitchen and den area on 2nd floor. interior remodel bathrooms, walk in closet. laundry closet on 3rd floor. | $50,000 |
| Jan 6, 2017 | Completed final sign-off Feb 2019 | 2240 North Point St | mandatory soft story retrofit iebc a4 new plywood shearwalls @ (e) fdn. new cantilever column systems @ (e) fdn. no welding no additional dwelling unit maher naDetails
mandatory soft story retrofit iebc a4 new plywood shearwalls @ (e) fdn. new cantilever column systems @ (e) fdn. no welding no additional dwelling unit maher na | $85,000 |
| Jan 6, 2017 | Completed final sign-off Jan 2018 | 565 08th Av | mandatory soft story retrofit per sfbc chapter 34b, engineering criteria per iebc a4: new plywood shearwalls @ (e) fdn. no welding no additional dwelling unitDetails
mandatory soft story retrofit per sfbc chapter 34b, engineering criteria per iebc a4: new plywood shearwalls @ (e) fdn. no welding no additional dwelling unit | $45,000 |
| Dec 28, 2016 | Never finaled issued Dec 2016, no final | 253 Bocana St | kitchen remodel: new cabinets & appliances.Details
kitchen remodel: new cabinets & appliances. | $17,000 |
| Oct 26, 2016 | Completed final sign-off Jan 2019 | 39 Avila St | remove wall in garage. install new beam and footings, remodel garage areaDetails
remove wall in garage. install new beam and footings, remodel garage area | $20,000 |
| Oct 17, 2016 | Never finaled issued Nov 2016, no final | 2601 Mission St | #602 - partial revision to 201604134675: ada access to restrooms, widen entry to 32" min, add intermdiate handrail.remove barrier at main entry, fire and mep under separate permitDetails
#602 - partial revision to 201604134675: ada access to restrooms, widen entry to 32" min, add intermdiate handrail.remove barrier at main entry, fire and mep under separate permit | |
| Oct 12, 2016 | Completed final sign-off Dec 2016 | 253 Bocana St | kitchen remodel replaceDetails
kitchen remodel replace | $35,000 |
| Sep 28, 2016 | Completed final sign-off Mar 2017 | 4909 17th St | kitchen area remodel per planDetails
kitchen area remodel per plan | $30,000 |
| May 16, 2016 | Completed final sign-off Sep 2016 | 2262 43rd Av | remodel 2nd floor kitchen and remove wall between living room and kitchen. add dishwasherDetails
remodel 2nd floor kitchen and remove wall between living room and kitchen. add dishwasher | $30,000 |
| Apr 13, 2016 | Never finaled issued Apr 2016, no final | 2601 Mission St | ste. #602: add 3 non-bearing interior partitions and 3 doors. provide light switch control for proposed offices - no change to (e) lights. provide electrical outlets and data to proposed offices. ada partial upgrade (20% rule) to restrooms and building entry.Details
ste. #602: add 3 non-bearing interior partitions and 3 doors. provide light switch control for proposed offices - no change to (e) lights. provide electrical outlets and data to proposed offices. ada partial upgrade (20% rule) to restrooms and building entry. | $30,000 |
| Apr 8, 2016 | Completed final sign-off May 2017 | 241 Francisco St | soft story retrofit per sfbc chapter 34 engineering criteria for fema p-807. new wood frame shear walls with post intalled epoxy based hold-downs.Details
soft story retrofit per sfbc chapter 34 engineering criteria for fema p-807. new wood frame shear walls with post intalled epoxy based hold-downs. | $25,000 |
| Apr 1, 2016 | Completed final sign-off Aug 2016 | 3632 24th St | fema p 807 soft story retofit. new wood frame shear walls new footing, replace front stairs in kindDetails
fema p 807 soft story retofit. new wood frame shear walls new footing, replace front stairs in kind | $30,000 |
| Mar 17, 2016 | Completed final sign-off Mar 2018 | 230 Acadia St | horizontal addition to (e) 3rd flr to include: new bathroom, dormer, roofdeck, closet, office and enlarge existing bedroom.Details
horizontal addition to (e) 3rd flr to include: new bathroom, dormer, roofdeck, closet, office and enlarge existing bedroom. | $50,000 |
| Feb 25, 2016 | Expired or cancelled expired Jan 2018 | 448 Gold Mine Dr | remodel kitchen and baths per planDetails
remodel kitchen and baths per plan | $30,000 |
| Feb 17, 2016 | Expired or cancelled expired Jan 2018 | 448 Gold Mine Dr | remodel kitchen and master bathroom. new shower pan, double vanity from single, install fan, new tile. kitchen - all new cabinets and extractor fan. no structural work. replace in kindDetails
remodel kitchen and master bathroom. new shower pan, double vanity from single, install fan, new tile. kitchen - all new cabinets and extractor fan. no structural work. replace in kind | $45,000 |
| Jan 29, 2016 | Completed final sign-off Mar 2016 | 51 21st Av | voluntary installation of 5/8" bolts into foundation to secure mudsill to existing foundation. plywood add to wall on left and right of garage door. install 8" deep max space 48" square washes. simpson setxp. 10d common at 6" or center. apply plywood at back windowDetails
voluntary installation of 5/8" bolts into foundation to secure mudsill to existing foundation. plywood add to wall on left and right of garage door. install 8" deep max space 48" square washes. simpson setxp. 10d common at 6" or center. apply plywood at back window | $6,000 |
| Jan 19, 2016 | Completed final sign-off Feb 2016 | 950 Darien Wy | to renew bldg pa# 201401216640 for final inspection only.Details
to renew bldg pa# 201401216640 for final inspection only. | |
| Dec 17, 2015 | Completed final sign-off Aug 2016 | 1339 Cole St | demo of (e) exterior stairwell along side property line & incorporation of exterior space into new conditioned square footage at bathroom remodel of 3rd floor unit. new work at 1st and 2nd floor unit to be subject of separate permit. no work visible from street.Details
demo of (e) exterior stairwell along side property line & incorporation of exterior space into new conditioned square footage at bathroom remodel of 3rd floor unit. new work at 1st and 2nd floor unit to be subject of separate permit. no work visible from street. | $75,000 |
| Dec 17, 2015 | Completed final sign-off Aug 2016 | 1337 Cole St | demo of (e) exterior stairwell along side property line & incorporation of exterior space into new common storage room at 1st floor garage and new conditioned square - footage at bathroom remodel of 2nd floor unit. new work at 3rd floor unit to be subject of separate permit. no work visible from strDetails
demo of (e) exterior stairwell along side property line & incorporation of exterior space into new common storage room at 1st floor garage and new conditioned square - footage at bathroom remodel of 2nd floor unit. new work at 3rd floor unit to be subject of separate permit. no work visible from str | $85,000 |
| Dec 3, 2015 | Completed final sign-off Dec 2015 | 1262 05th Av | to obtain final inspection for work approved under pa 201202174385; all work is complete.Details
to obtain final inspection for work approved under pa 201202174385; all work is complete. | |
| Dec 1, 2015 | Completed final sign-off Jun 2016 | 235 Vicente St | 2nd fl remodel kitchen and bath. 3rd fl remodel bathDetails
2nd fl remodel kitchen and bath. 3rd fl remodel bath | $40,000 |
| Aug 28, 2015 | Completed final sign-off Mar 2016 | 4479 17th St | revision to pa 201411141587; minor change to front elevation.Details
revision to pa 201411141587; minor change to front elevation. | |
| Aug 17, 2015 | Never finaled issued Aug 2015, no final | 527 Hugo St | reapir deck in kind at side of building, less than 50%; deck at 3/f story of buildingDetails
reapir deck in kind at side of building, less than 50%; deck at 3/f story of building | $2,000 |
| Aug 3, 2015 | Completed final sign-off Dec 2015 | 531 Hugo St | replace kitchen cabinets & countertop, install new flooring, in-kind. no new lighting or exhaust.Details
replace kitchen cabinets & countertop, install new flooring, in-kind. no new lighting or exhaust. | $12,000 |
| Jun 4, 2015 | Completed final sign-off Dec 2015 | 787 39th Av | remove dry rot at exterior staircase and landing at front of building. re-stucco new work. less than 50%.Details
remove dry rot at exterior staircase and landing at front of building. re-stucco new work. less than 50%. | $6,000 |
| May 8, 2015 | Completed final sign-off Apr 2016 | 20 Graystone Tr | reconfigure interior partitions in (e) 2 story house over garage & basement. renovate interior finishes. replace/reconfigure (e) doors and windows. replace and repair roof as needed.all wood windows at front.Details
reconfigure interior partitions in (e) 2 story house over garage & basement. renovate interior finishes. replace/reconfigure (e) doors and windows. replace and repair roof as needed.all wood windows at front. | $125,000 |
| Jan 30, 2015 | Completed final sign-off Jun 2015 | 397 30th St | remodel bathroom, new fixtures, new vanity & retile. cosmetic remodel in unit#397.Details
remodel bathroom, new fixtures, new vanity & retile. cosmetic remodel in unit#397. | $15,000 |
| Nov 24, 2014 | Completed final sign-off Jul 2015 | 166 Yerba Buena Av | remodel portion of garage to be music room (non-living use), create an opening in existing wall.Details
remodel portion of garage to be music room (non-living use), create an opening in existing wall. | $5,000 |
| Nov 3, 2014 | Completed final sign-off Jul 2015 | 2863 Washington St | siding dryrot repair and paint on side of building (west side) visable- repair in kindDetails
siding dryrot repair and paint on side of building (west side) visable- repair in kind | $6,500 |
| Oct 16, 2014 | Completed final sign-off Oct 2014 | 192 Laidley St | to comply with nov# 201494631 replace/repair guardrail on grade, approx 10' less than 50%. provide self-closer on side gate.Details
to comply with nov# 201494631 replace/repair guardrail on grade, approx 10' less than 50%. provide self-closer on side gate. | $900 |
| Oct 16, 2014 | Expired or cancelled expired Feb 2017 | 124 Banks St | remodel 1 bathroom and 1 kitchen, all new fixtures and cabinetry on top level unit. no change in walls & openings layout, bathroom lighting shall have main light high efficacy & others if not high efficacy to be controlled by manual on sensor. kitchen lighting min. 50% wattage high efficacy.Details
remodel 1 bathroom and 1 kitchen, all new fixtures and cabinetry on top level unit. no change in walls & openings layout, bathroom lighting shall have main light high efficacy & others if not high efficacy to be controlled by manual on sensor. kitchen lighting min. 50% wattage high efficacy. | $35,000 |
| Jul 8, 2014 | Expired or cancelled withdrawn Mar 2015 | 1002 Clayton St | reivsion to 201312275136. clarificatin of garden retaining wall. structural onlyDetails
reivsion to 201312275136. clarificatin of garden retaining wall. structural only | |
| Jun 24, 2014 | Completed final sign-off Oct 2014 | 597 Hayes St | voluntary structural upgrade at 1st floor inside exterior walls(no exterior mods not visible from street.Details
voluntary structural upgrade at 1st floor inside exterior walls(no exterior mods not visible from street. | $30,000 |
| May 28, 2014 | Completed final sign-off Oct 2014 | 577 Arkansas St | seismic upgrade, voluntary. add shear walls on existing foundation. remove post in basement and under kitchen.Details
seismic upgrade, voluntary. add shear walls on existing foundation. remove post in basement and under kitchen. | $10,000 |
| May 13, 2014 | Completed final sign-off Apr 2015 | 1270 33rd Av | provide new master bathroom, reconfigure interior walls for (2) existing closets, provide (2) new closets, (1z0 new linen closet & a hallway extension. all work on top floor).Details
provide new master bathroom, reconfigure interior walls for (2) existing closets, provide (2) new closets, (1z0 new linen closet & a hallway extension. all work on top floor). | $25,000 |
| May 7, 2014 | Never finaled issued May 2014, no final | 575 Head St | comply with nov# 201465051 by housing inspection, remove sink & counter, cap plumbing. legalize bathroom on 1/f.Details
comply with nov# 201465051 by housing inspection, remove sink & counter, cap plumbing. legalize bathroom on 1/f. | $3,000 |
| May 2, 2014 | Never finaled issued May 2014, no final | 552 Laguna St | repair sheathing and stucco on facade. remodel commercial storefront, install 3 windows, all work is visible from the street. arch., mep, fa under separate permit. n/a maher ordinance # 155-13Details
repair sheathing and stucco on facade. remodel commercial storefront, install 3 windows, all work is visible from the street. arch., mep, fa under separate permit. n/a maher ordinance # 155-13 | $10,000 |