7 Hills Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2013 to Sep 2026
- Last 24 months
- 37 permits filed
81 permits since 2000: 63 completed, 15 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2026 | In progress issued Sep 2026 | 2200 Pacific Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl with 1 shower pan(s). | $31,683 |
| Aug 31, 2026 | In progress issued Aug 2026 | 616 39th Av | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s). | $42,244 |
| Jul 30, 2026 | Completed final sign-off Sep 2026 | 160 Broadmoor Dr | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $11,000 |
| Jun 30, 2026 | Completed final sign-off Aug 2026 | 23 Esquina Dr | in-kind remodeling of 1 kitchen(s) in 2nd flDetails
in-kind remodeling of 1 kitchen(s) in 2nd fl | $20,000 |
| Jun 18, 2026 | Completed final sign-off Jun 2026 | 1733 Stockton St | rear stair dryrot repair less than 50% repair. non street facing.Details
rear stair dryrot repair less than 50% repair. non street facing. | $1,500 |
| May 21, 2026 | Completed final sign-off May 2026 | 555 04th St | unit 102: remove unpermitted partition wall, non structual, no electrical and plumbing.Details
unit 102: remove unpermitted partition wall, non structual, no electrical and plumbing. | $2,000 |
| Apr 23, 2026 | In progress issued Apr 2026 | 301 Union St | exploratory demo in floors, walls and ceiling for furture permit set. interior only ~100 sq ft demo.Details
exploratory demo in floors, walls and ceiling for furture permit set. interior only ~100 sq ft demo. | $3,000 |
| Apr 2, 2026 | Completed final sign-off Apr 2026 | 80 Jersey St | remodel bathroom inkind. all fixture replaced no relocation.Details
remodel bathroom inkind. all fixture replaced no relocation. | $20,000 |
| Apr 2, 2026 | Completed final sign-off Jul 2026 | 153 Divisadero St | bathroom remodel in-kind. all fixtures replaced, no utility relocation.Details
bathroom remodel in-kind. all fixtures replaced, no utility relocation. | $20,000 |
| Feb 6, 2026 | In progress issued Jun 2026 | 2226 Taraval St | installation of 2 bays and 1 puttview area. retail area. new non-structural partitions.Details
installation of 2 bays and 1 puttview area. retail area. new non-structural partitions. | $40,000 |
| Jan 27, 2026 | Completed final sign-off Jun 2026 | 2848 Union St | in-kind remodeling of 1 kitchen(s) in 1st fl installing gas line.Details
in-kind remodeling of 1 kitchen(s) in 1st fl installing gas line. | $16,000 |
| Jan 12, 2026 | Completed final sign-off Mar 2026 | 2518 25th Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 1 shower pan(s). | $32,000 |
| Nov 26, 2025 | In progress issued Aug 2026 | 1145 Wisconsin St | demolish rear detached type v-b, u, 1-story. to comply with nov 200671601 and 200671238, removal of the unauthorized accessory structure.Details
demolish rear detached type v-b, u, 1-story. to comply with nov 200671601 and 200671238, removal of the unauthorized accessory structure. | |
| Oct 2, 2025 | Completed final sign-off Oct 2025 | 550 09th Av | revision to pa # 2025-0917-5490 clarify framing around kitchen skylightDetails
revision to pa # 2025-0917-5490 clarify framing around kitchen skylight | |
| Sep 19, 2025 | Completed final sign-off Dec 2025 | 354 Castro St | interior remodel only of lower level apartment in two residence building. convert a laundry nook and empty area into a third bedroom. proposal adds a closet in the principal bedroom. no exterior work. all (e) windows to remain.Details
interior remodel only of lower level apartment in two residence building. convert a laundry nook and empty area into a third bedroom. proposal adds a closet in the principal bedroom. no exterior work. all (e) windows to remain. | $15,000 |
| Sep 19, 2025 | Completed final sign-off Feb 2026 | 2329 North Point St | remodel (2) bathroom to the studs. no utility relocation . all (n) fixtures and finishes. replace tub and shower in kind. no wall removal or layout change.Details
remodel (2) bathroom to the studs. no utility relocation . all (n) fixtures and finishes. replace tub and shower in kind. no wall removal or layout change. | $30,000 |
| Sep 17, 2025 | Completed final sign-off Oct 2025 | 550 09th Av | remodel of (e) powder room in kind. (n) kitchen countertops. removal of non structural interior partitions at kitchen. removal of non structural entry closets, removal of door at dining. (n) full height closet at hall. (n) interior paintDetails
remodel of (e) powder room in kind. (n) kitchen countertops. removal of non structural interior partitions at kitchen. removal of non structural entry closets, removal of door at dining. (n) full height closet at hall. (n) interior paint | $10,000 |
| Aug 15, 2025 | Completed final sign-off Dec 2025 | 2223 44th Av | kitchen remodel . repalce all fixtures, and repalce rear patio door. no wall removed and layout changeDetails
kitchen remodel . repalce all fixtures, and repalce rear patio door. no wall removed and layout change | $30,000 |
| Jul 28, 2025 | In progress issued Jul 2025 | 21 18th Av | interior renovations only- non structural (no exterior changes). 2nd floor: remodel kitchen and powder room. 3rd floor: renovate 2 bathrooms and add w/d. divide bedroom. 4th floor: renovate primary bedroom, bath and powder.Details
interior renovations only- non structural (no exterior changes). 2nd floor: remodel kitchen and powder room. 3rd floor: renovate 2 bathrooms and add w/d. divide bedroom. 4th floor: renovate primary bedroom, bath and powder. | $110,000 |
| Jul 25, 2025 | In progress issued Jul 2025 | 578 Vermont St | in kind replacement of (e) kitchen and bathroom. the scope includes repair of (e) rear exterioir wall that is being replaced to repair dryrot & new windows. reconfiguration of select interior walls at both levels and an addtion of select walls at basement garage.Details
in kind replacement of (e) kitchen and bathroom. the scope includes repair of (e) rear exterioir wall that is being replaced to repair dryrot & new windows. reconfiguration of select interior walls at both levels and an addtion of select walls at basement garage. | $180,000 |
| Jul 16, 2025 | Completed final sign-off Jul 2025 | 2858 24th St | spot replace approx 20 sq ft of dry rot in sub floor. reinstall existing laminate floor. all interior.Details
spot replace approx 20 sq ft of dry rot in sub floor. reinstall existing laminate floor. all interior. | $800 |
| Jul 1, 2025 | Completed final sign-off Nov 2025 | 568 Vermont St | kitchen and bathroom remodel.Details
kitchen and bathroom remodel. | $15,000 |
| Jun 25, 2025 | Completed final sign-off Nov 2025 | 566 Vermont St | revision to pa# 202411255678: maintain (e) front windows - no replacement needed per change in legislation.Details
revision to pa# 202411255678: maintain (e) front windows - no replacement needed per change in legislation. | |
| Jun 12, 2025 | Completed final sign-off Sep 2025 | 396 Harrison St | restaurant remodel, interior non structural partitions, new millwork, new equipmentDetails
restaurant remodel, interior non structural partitions, new millwork, new equipment | $60,000 |
| Jun 2, 2025 | Completed final sign-off Jul 2025 | 160 Broadmoor Dr | kitchen remodel. new cabinets, counters, appliances. no structural or floor plan alteration.Details
kitchen remodel. new cabinets, counters, appliances. no structural or floor plan alteration. | $25,000 |
| May 22, 2025 | Completed final sign-off Jul 2025 | 2226 Fillmore St | facade restoration and painting, no alterations to existing facade, dry rot repair only. repair stucco as needed.Details
facade restoration and painting, no alterations to existing facade, dry rot repair only. repair stucco as needed. | $25,000 |
| Feb 14, 2025 | Completed final sign-off Nov 2025 | 566 Vermont St | revise sheets a201, a401, a601 of pa# 202411255678. remove 1/2 bath. no change to exterior.Details
revise sheets a201, a401, a601 of pa# 202411255678. remove 1/2 bath. no change to exterior. | |
| Feb 13, 2025 | In progress issued Feb 2025 | 4729 18th St | revision 202212299333- remove overhead pergola at exterior deck. change layout at ground level and kitchen . eliminate exterior at bbq area at deck . add (n) window at the rear yard.Details
revision 202212299333- remove overhead pergola at exterior deck. change layout at ground level and kitchen . eliminate exterior at bbq area at deck . add (n) window at the rear yard. | |
| Jan 29, 2025 | Completed final sign-off Aug 2025 | 733 De Haro St | interior remodel of basement floor. deck and spa replacement. bathroom plumbing fixture replacement. removal of wood deck at rear yard. upstairs deck repairDetails
interior remodel of basement floor. deck and spa replacement. bathroom plumbing fixture replacement. removal of wood deck at rear yard. upstairs deck repair | $20,000 |
| Jan 17, 2025 | Completed final sign-off Jul 2026 | 687 Kansas St | restoration of an existing 3 story 2 units residence damaged by fire with minor alterations as follows: reconfigure 1st and 3rd floor kitchens, install new windows at 1st floor rear, rebuild damaged stair, reroof, replace damaged heating and water systems.Details
restoration of an existing 3 story 2 units residence damaged by fire with minor alterations as follows: reconfigure 1st and 3rd floor kitchens, install new windows at 1st floor rear, rebuild damaged stair, reroof, replace damaged heating and water systems. | $200,000 |
| Jan 6, 2025 | Completed final sign-off Feb 2025 | 186 Jules Av | remodel kitchen. all new finishes. all locations to remain.Details
remodel kitchen. all new finishes. all locations to remain. | $40,000 |
| Jan 6, 2025 | Completed final sign-off Apr 2025 | 2225 23rd St | bathroom remodel, in kind. no wall or utility relocationDetails
bathroom remodel, in kind. no wall or utility relocation | $16,000 |
| Dec 10, 2024 | Completed final sign-off Dec 2024 | 189 Bonview St | to obtain final inspection for work approved under 202104239232. all work is completedDetails
to obtain final inspection for work approved under 202104239232. all work is completed | |
| Nov 26, 2024 | Completed final sign-off Nov 2025 | 566 Vermont St | to comply with physical inspection report #cc-8672. reference pa #202411255678 for legalization of existing( item 1a of cc-8672)Details
to comply with physical inspection report #cc-8672. reference pa #202411255678 for legalization of existing( item 1a of cc-8672) | |
| Nov 25, 2024 | Completed final sign-off Nov 2025 | 566 Vermont St | add powder room at level 1, legalize bathrooms and kitchen on level 1 and 2. legalize rear deck. replace nine front windows (report number cc8672)Details
add powder room at level 1, legalize bathrooms and kitchen on level 1 and 2. legalize rear deck. replace nine front windows (report number cc8672) | $75,000 |
| Oct 11, 2024 | In progress issued Jan 2025 | 5 Cyrus Pl | p/a to infill in various locations small voids with concrete grout beneath existing slab created by water main breakage, non-structural, no excavation proposed or authorized.Details
p/a to infill in various locations small voids with concrete grout beneath existing slab created by water main breakage, non-structural, no excavation proposed or authorized. | $7,500 |
| Oct 11, 2024 | In progress issued Jan 2025 | 3 Cyrus Pl | replace garage slab on grade.Details
replace garage slab on grade. | $18,000 |
| Sep 27, 2024 | Completed final sign-off Dec 2024 | 434 Otsego Av | cosmetic kitchen remodel, remove and replace cabinets, sink, pendent lights, no wall demolition or construction, no change in plumbing fixture count.Details
cosmetic kitchen remodel, remove and replace cabinets, sink, pendent lights, no wall demolition or construction, no change in plumbing fixture count. | $15,000 |
| Jul 11, 2024 | Completed final sign-off Oct 2024 | 2331 North Point St | kitchen remodel new cabinets, new counters, new finishes & repair existing fl. no wall changes.Details
kitchen remodel new cabinets, new counters, new finishes & repair existing fl. no wall changes. | $40,000 |
| May 8, 2024 | In progress issued Apr 2026 | 1045 Divisadero St | change of occupancy from r2 to r3 to memorialize the (e) 2 unit configuration of building, which had been approved under prior building permit without the benefit of change of use or planning approval. 3rd unit will be restored under separate adu permit to address the planning enforcement action.Details
change of occupancy from r2 to r3 to memorialize the (e) 2 unit configuration of building, which had been approved under prior building permit without the benefit of change of use or planning approval. 3rd unit will be restored under separate adu permit to address the planning enforcement action. | |
| May 8, 2024 | In progress issued Apr 2026 | 1045 Divisadero St | new adu in response to planning enforcement action 2022-008315enf: reestablish previously removed 3rd unit which did not have the benefit of planning review and create a new adu at the ground floor level as 3rd unit.Details
new adu in response to planning enforcement action 2022-008315enf: reestablish previously removed 3rd unit which did not have the benefit of planning review and create a new adu at the ground floor level as 3rd unit. | $15,000 |
| May 1, 2024 | In progress issued May 2024 | 212 Edgewood Av | voluntary structural strengthing in accesible areas of garage and crawl space only. install 5/8" threaded rod w/epoxy embed 8" at 30" o.c., square washers. install 1/2" plywood sheathing w/ 10d @ 4" o.c. edge nailing. maintain all existing fire rating at walls.Details
voluntary structural strengthing in accesible areas of garage and crawl space only. install 5/8" threaded rod w/epoxy embed 8" at 30" o.c., square washers. install 1/2" plywood sheathing w/ 10d @ 4" o.c. edge nailing. maintain all existing fire rating at walls. | $1,500 |
| Mar 4, 2024 | Completed final sign-off Jun 2024 | 299 Seneca Av | remodel (e) bathroom, all new finishes except tub, spot reapir siding on interior lightwell.Details
remodel (e) bathroom, all new finishes except tub, spot reapir siding on interior lightwell. | $12,000 |
| Mar 4, 2024 | Completed final sign-off Oct 2024 | 212 Edgewood Av | remodel second floor bathroom, convert tub to shower, new finishes. no removal of wallsDetails
remodel second floor bathroom, convert tub to shower, new finishes. no removal of walls | $12,000 |
| Mar 4, 2024 | In progress issued Mar 2024 | 144 Belvedere St | remodel fist floor bathroom - convert tub to shower. all new fixtures and finishes.Details
remodel fist floor bathroom - convert tub to shower. all new fixtures and finishes. | $12,000 |
| Jan 11, 2024 | Completed final sign-off Sep 2024 | 2336 Chestnut St | ti (new use= restaurant) of (e) commercial space (current use= retail) including bathroom upgrades and associated plumbing, electrical, and mechanical work. no structural work , no expansion of building envelope and no work to street facade.Details
ti (new use= restaurant) of (e) commercial space (current use= retail) including bathroom upgrades and associated plumbing, electrical, and mechanical work. no structural work , no expansion of building envelope and no work to street facade. | $65,000 |
| Nov 22, 2023 | Completed final sign-off Jan 2024 | 2331 North Point St | 1) spot repair/replace dryrot deck lumber on rear deck(less than 50%). 2)repair/replace damaged and cracking stucco and water proofing on bottom of front bay window.Details
1) spot repair/replace dryrot deck lumber on rear deck(less than 50%). 2)repair/replace damaged and cracking stucco and water proofing on bottom of front bay window. | $7,000 |
| Nov 22, 2023 | Completed final sign-off Jan 2024 | 2223 44th Av | remove pre-fab shower stall, install new shower/shower pan, tile glass door.Details
remove pre-fab shower stall, install new shower/shower pan, tile glass door. | $4,000 |
| Sep 28, 2023 | Completed final sign-off Feb 2024 | 2210 32nd Av | remodel existing kitchen & bathroom, like for likeDetails
remodel existing kitchen & bathroom, like for like | $70,000 |
| Sep 18, 2023 | Completed final sign-off May 2024 | 1622 11th Av | abatement of nov. restoration of a removed unit according to permit records. restore a unit door on both 1/f & 2/f. restore kitchen on 2/f. no exterior change.Details
abatement of nov. restoration of a removed unit according to permit records. restore a unit door on both 1/f & 2/f. restore kitchen on 2/f. no exterior change. | $20,000 |
| Aug 22, 2023 | Completed final sign-off Nov 2023 | 1763 Hayes St | condo conversion to comply with physical inspection report 8586 to show as-built conditions at basement storage area and electrical work.Details
condo conversion to comply with physical inspection report 8586 to show as-built conditions at basement storage area and electrical work. | $10,000 |
| Aug 9, 2023 | Completed final sign-off Nov 2023 | 271 Francisco St | change of use from baking school to bakery and retail space. new equipment and finishes.Details
change of use from baking school to bakery and retail space. new equipment and finishes. | $15,000 |
| Jul 19, 2023 | Completed final sign-off Nov 2023 | 390 Melrose Av | remodel 2 top floor bathrooms, replace all fixtures and finishes. no structural or layout changes.Details
remodel 2 top floor bathrooms, replace all fixtures and finishes. no structural or layout changes. | $15,000 |
| Jul 19, 2023 | Completed final sign-off Nov 2023 | 1763 Hayes St | to comply with physical inspection report #cc- 8586Details
to comply with physical inspection report #cc- 8586 | $3,000 |
| Jan 9, 2023 | Completed final sign-off May 2023 | 186 Jules Av | remodel bathroom, new insulation, drywall, all new finishesDetails
remodel bathroom, new insulation, drywall, all new finishes | $8,000 |
| Dec 29, 2022 | In progress issued Feb 2025 | 4729 18th St | horizontal addition in rear yard.Details
horizontal addition in rear yard. | $42,000 |
| Dec 7, 2022 | Completed final sign-off Aug 2023 | 1856 Alemany Bl | updates to kitchen and bathrooms and addition of a powder room, no change to building foot print replacement of rear yard facing windowsDetails
updates to kitchen and bathrooms and addition of a powder room, no change to building foot print replacement of rear yard facing windows | $50,000 |
| Sep 22, 2022 | Expired or cancelled cancelled May 2023 | 1856 Alemany Bl | voluntary earthquake retrofit- foundation anchor bolts, plywood sheathing on residential wood frame first floor. 5/8" all thread rod with 3x3 x .223" sq washers installed w/ epoxy.Details
voluntary earthquake retrofit- foundation anchor bolts, plywood sheathing on residential wood frame first floor. 5/8" all thread rod with 3x3 x .223" sq washers installed w/ epoxy. | $5,500 |
| Jul 5, 2022 | Completed final sign-off Jun 2023 | 273 Vienna St | interior conversion of single family dwelling from 2 bedroom 1 bath to 3 bedroom 2 bath. remove structural wall between kitchen and living room.Details
interior conversion of single family dwelling from 2 bedroom 1 bath to 3 bedroom 2 bath. remove structural wall between kitchen and living room. | $19,000 |
| Apr 19, 2022 | Completed final sign-off Aug 2022 | 80 Jersey St | remodel (e) family room, closet, bathroom to be master bedroom, closet, bathroomDetails
remodel (e) family room, closet, bathroom to be master bedroom, closet, bathroom | $50,000 |
| Jan 27, 2022 | Completed final sign-off Jun 2022 | 2999 California St | unit 701. remove and replace alll fixtures and utilities in kitchen and bathroom. no utility relocation. no wall or layout changes.Details
unit 701. remove and replace alll fixtures and utilities in kitchen and bathroom. no utility relocation. no wall or layout changes. | $45,000 |
| Jan 27, 2022 | Completed final sign-off Jan 2023 | 188 Jules Av | kitchen and two bathroom remodel. new floors, trim and paint throughout unit.Details
kitchen and two bathroom remodel. new floors, trim and paint throughout unit. | $20,000 |
| Dec 16, 2021 | Completed final sign-off Jan 2022 | 3401 California St | spot repair dryrot/damage to rear garbage corral.Details
spot repair dryrot/damage to rear garbage corral. | $3,000 |
| Dec 7, 2021 | Completed final sign-off Jun 2022 | 4343 17th St | remodel kitchen and laundry room. all utility to remain in place. upgrade to code. new cabinets, counter and floors. non structural.Details
remodel kitchen and laundry room. all utility to remain in place. upgrade to code. new cabinets, counter and floors. non structural. | $30,000 |
| Aug 18, 2021 | Completed final sign-off Jan 2022 | 3401 California St | tenant improvement of an (e) groung level resturant space, new interior non structural partitons and finishes, lighting, millwork, and kitchen equipment, fire sprinkler is design/build under a separtae permit mechanical is (e) and electrical are design/build under a sep permitDetails
tenant improvement of an (e) groung level resturant space, new interior non structural partitons and finishes, lighting, millwork, and kitchen equipment, fire sprinkler is design/build under a separtae permit mechanical is (e) and electrical are design/build under a sep permit | $146,385 |
| Jul 1, 2021 | Completed final sign-off Sep 2021 | 530 Alvarado St | remodel top floor bathroom, replace tub w/shower, shower pan, upgrade utilities, no structural or layout changes.Details
remodel top floor bathroom, replace tub w/shower, shower pan, upgrade utilities, no structural or layout changes. | $18,000 |
| Jul 1, 2021 | Completed final sign-off Dec 2021 | 83 Westgate Dr | kitchen remodel. replace cabinets, counters floor, upgrade utilities to code. no change to layout/utility locations. no structural changes.Details
kitchen remodel. replace cabinets, counters floor, upgrade utilities to code. no change to layout/utility locations. no structural changes. | $30,000 |
| Apr 23, 2021 | Completed final sign-off Dec 2024 | 189 Bonview St | update main floor kitchen, laundry room and bathroom. cosmetic only. no utility relocation no shower pan inspection.Details
update main floor kitchen, laundry room and bathroom. cosmetic only. no utility relocation no shower pan inspection. | $43,000 |
| Apr 23, 2021 | Completed final sign-off Dec 2021 | 83 Westgate Dr | remove 19 windows and 2 door on rear and sides of home, spot repair framing and studoo, install new like for like vinyl windows and wood doors in (e) openings, new trim, new stucco, new paint as required. no structural changes or alterations to (e) look of building. (not visible from street)Details
remove 19 windows and 2 door on rear and sides of home, spot repair framing and studoo, install new like for like vinyl windows and wood doors in (e) openings, new trim, new stucco, new paint as required. no structural changes or alterations to (e) look of building. (not visible from street) | $85,000 |
| Apr 14, 2021 | Completed final sign-off Jul 2021 | 868 Minnesota St | cosmetic remodel bathroom. no fixture relocations. new kitchen counter onlyDetails
cosmetic remodel bathroom. no fixture relocations. new kitchen counter only | $30,000 |
| Apr 12, 2021 | Completed final sign-off Dec 2021 | 3600 Taraval St | to comply with nov# 202173422. repair damage to kitchen, bar & ceiling caused by fire. relocate dishwashing to 104. extend service window & millwork.Details
to comply with nov# 202173422. repair damage to kitchen, bar & ceiling caused by fire. relocate dishwashing to 104. extend service window & millwork. | $55,000 |
| Feb 26, 2021 | Completed final sign-off Jul 2021 | 865 Corbett Av | #7: remodel kitchen. new cabinet, new countetrs, new floors, new paint. no utility relocation. no new walls & no exiting wall relocation. new lighting to comply with ces 150.0(k)3.Details
#7: remodel kitchen. new cabinet, new countetrs, new floors, new paint. no utility relocation. no new walls & no exiting wall relocation. new lighting to comply with ces 150.0(k)3. | $25,000 |
| Jan 15, 2021 | Completed final sign-off Feb 2022 | 1763 Hayes St | remodel bath and kitchen. add (n) bathroom. move laundry from back stairs to closet. install patio doors in existing opening.Details
remodel bath and kitchen. add (n) bathroom. move laundry from back stairs to closet. install patio doors in existing opening. | $70,000 |
| Dec 10, 2020 | Never finaled issued Dec 2020, no final | 1143 Rhode Island St | replace dry rot risers and railings on front entry stairs. approximately 30% replacement. seal and paint entire staircase after repairs. approximately 8 treads & risers - minimal rails.Details
replace dry rot risers and railings on front entry stairs. approximately 30% replacement. seal and paint entire staircase after repairs. approximately 8 treads & risers - minimal rails. | $3,000 |
| Aug 14, 2020 | Completed final sign-off Oct 2020 | 222 Valencia St | unit 5: bathroom remodel, in-kind. bring plumbing up to code.Details
unit 5: bathroom remodel, in-kind. bring plumbing up to code. | $9,000 |
| Jul 10, 2020 | Completed final sign-off Nov 2020 | 2274 Great Hy | remodel bathroom. new fixtures. bring plumbing up to code. the bathroom is 96" x 66" (about 44 sq ft) and is located on the 2nd flDetails
remodel bathroom. new fixtures. bring plumbing up to code. the bathroom is 96" x 66" (about 44 sq ft) and is located on the 2nd fl | $9,000 |
| Jul 10, 2020 | Completed final sign-off Oct 2020 | 2276 Great Hy | remodel bathroom. new fixtures. bring plumbing up to code. the bathroom is 96" x 66" (about 44 sq ft) and is located on the first floor.Details
remodel bathroom. new fixtures. bring plumbing up to code. the bathroom is 96" x 66" (about 44 sq ft) and is located on the first floor. | $9,000 |
| Jul 8, 2020 | Never finaled filed Jul 2020, never issued | 725 Rhode Island St | develop lower level space into legal adu per ordinance no-162-17. upgrade plumbing, electrical, add kitchen, bathroom. all work performed within existing envelope. no structural changes required.Details
develop lower level space into legal adu per ordinance no-162-17. upgrade plumbing, electrical, add kitchen, bathroom. all work performed within existing envelope. no structural changes required. | $100,000 |
| Jul 7, 2020 | Completed final sign-off Sep 2020 | 3141 Gough St | cosmetic bathroom remodel. new fixtures. replace shower with bathtub. no structural changes required. 21 sfDetails
cosmetic bathroom remodel. new fixtures. replace shower with bathtub. no structural changes required. 21 sf | $9,000 |
| May 27, 2020 | Completed final sign-off Jul 2020 | 1767 Hayes St | convert existing den/office into closet and bathroom. add new tub, sink and toilet, add fan and new lighting, divider wall, new doors into existing openings, add laundry hookups and drain. all work at middle floor.Details
convert existing den/office into closet and bathroom. add new tub, sink and toilet, add fan and new lighting, divider wall, new doors into existing openings, add laundry hookups and drain. all work at middle floor. | $17,000 |
| Nov 13, 2013 | Completed final sign-off Mar 2024 | 312 Green St | ground & 2nd floor remodel & 3rd & 4th story addition.Details
ground & 2nd floor remodel & 3rd & 4th story addition. | $440,000 |