Sasso Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2009 to May 2026
- Last 24 months
- 9 permits filed
231 permits since 2000: 197 completed, 5 in progress, 19 never finaled, 10 expired or cancelled.
Of the 19 never-finaled permits, 2 are 3 to 5 years old, 6 are 5 to 10 years old, 11 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 231.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 12, 2026 | Completed final sign-off Jul 2026 | 212 Steiner St | unit a: kitchen remodel in kind.Details
unit a: kitchen remodel in kind. | $20,000 |
| Apr 14, 2026 | In progress issued Apr 2026 | 237 Hartford St | revision to 202305268680: update window locations at the shared access alleyway, a new garage man door at western front facade, update heating system from hydronic to ductless mini split unitsDetails
revision to 202305268680: update window locations at the shared access alleyway, a new garage man door at western front facade, update heating system from hydronic to ductless mini split units | $45,000 |
| Apr 1, 2026 | In progress issued Apr 2026 | 237 Hartford St | shoring design establishes a strategy for soil shoring, excavation segmented pouring for proposed foundation work under 202305268680. deferred submittal for soil shoring engineering only.Details
shoring design establishes a strategy for soil shoring, excavation segmented pouring for proposed foundation work under 202305268680. deferred submittal for soil shoring engineering only. | $5,000 |
| Jan 6, 2026 | In progress issued Jan 2026 | 237 Hartford St | replace (e) cement plaster front facade with victorian style facades. replace front window. structrually reinforce bay windows at front of residenceDetails
replace (e) cement plaster front facade with victorian style facades. replace front window. structrually reinforce bay windows at front of residence | $75,000 |
| Dec 9, 2025 | Completed final sign-off Jan 2026 | 1867 39th Av | replace stucco in kind at front of house, street visible, front of bldg. approx. 625 sq ft.Details
replace stucco in kind at front of house, street visible, front of bldg. approx. 625 sq ft. | $18,000 |
| Oct 30, 2025 | Completed final sign-off Jan 2026 | 654 Funston Av | bathroom remodel like for like. no change to walls.Details
bathroom remodel like for like. no change to walls. | $35,000 |
| Sep 17, 2025 | Completed final sign-off Dec 2025 | 1467 43rd Av | replace approx 1200 sqft siding to cement board, total of 3 walls. replace 6 windows and 1 exterior door non street visible, replace exist dryrot kitchen window header 4x12, remove and reinstall drain pipes at far end of lightwell, add new 200v exterior elec outlet, weatherprf and associate finish.Details
replace approx 1200 sqft siding to cement board, total of 3 walls. replace 6 windows and 1 exterior door non street visible, replace exist dryrot kitchen window header 4x12, remove and reinstall drain pipes at far end of lightwell, add new 200v exterior elec outlet, weatherprf and associate finish. | $20,000 |
| Apr 22, 2025 | Completed final sign-off Jul 2025 | 627 Waller St | replace front hand railing to match the orignal characterDetails
replace front hand railing to match the orignal character | $15,000 |
| Apr 10, 2025 | In progress issued Feb 2026 | 255 Henry St | the project is an kind replacement of a 2 story wood framed exit stair and covered porches. includes: new exterior finishes, windows, and exterior doors at the south facade. new shear walls and foundation at the south facade and a voluntary siesmic strengthening within the garage.Details
the project is an kind replacement of a 2 story wood framed exit stair and covered porches. includes: new exterior finishes, windows, and exterior doors at the south facade. new shear walls and foundation at the south facade and a voluntary siesmic strengthening within the garage. | $100,000 |
| Aug 15, 2024 | Completed final sign-off Nov 2024 | 207 Guerrero St | kitchen remodel in kind due to water damageDetails
kitchen remodel in kind due to water damage | $8,500 |
| May 2, 2024 | Completed final sign-off Nov 2024 | 207 Guerrero St | interior remodel of extg bedroom and bath in extg condominium. no structural work, and no work to the exterior envelope of building.Details
interior remodel of extg bedroom and bath in extg condominium. no structural work, and no work to the exterior envelope of building. | $35,000 |
| Apr 22, 2024 | Completed final sign-off Jan 2025 | 5455 Anza St | revision to 202401294840. demolish (e) wall at level 1 with associated structural work. remove e level 1 kitchen. repair/replace in kind (e) water damaged finishes at east side property line wall. replace in kind damaged entrance stair.Details
revision to 202401294840. demolish (e) wall at level 1 with associated structural work. remove e level 1 kitchen. repair/replace in kind (e) water damaged finishes at east side property line wall. replace in kind damaged entrance stair. | $50,000 |
| Mar 19, 2024 | Completed final sign-off Jul 2024 | 1040 Masonic Av | bath remodel in kind with (e) washer dryer replacementDetails
bath remodel in kind with (e) washer dryer replacement | $20,000 |
| Jan 29, 2024 | Completed final sign-off Jan 2025 | 5455 Anza St | remodel e family room at 2nd fl to be new kitchen location, remodel e kitchen to be sunroom, associated elec/plumbing. replace extg skylights with new thermally brocken dble paine units. in kind window replacement with new wood clad dble pane windows, not visable from streetDetails
remodel e family room at 2nd fl to be new kitchen location, remodel e kitchen to be sunroom, associated elec/plumbing. replace extg skylights with new thermally brocken dble paine units. in kind window replacement with new wood clad dble pane windows, not visable from street | $350,000 |
| Nov 16, 2023 | Completed final sign-off Nov 2023 | 3520 17th St | renew permit 202009214634 for final inspectionDetails
renew permit 202009214634 for final inspection | |
| Oct 23, 2023 | Completed final sign-off Oct 2023 | 3520 17th St | revision to bpa#202011309831 & 202310239276, remove 2-skylights in kitchen from scope of workDetails
revision to bpa#202011309831 & 202310239276, remove 2-skylights in kitchen from scope of work | |
| Oct 23, 2023 | Completed final sign-off Oct 2023 | 3520 17th St | to obtain final inspection for work approved under bpa#202011309831. all work is complete.Details
to obtain final inspection for work approved under bpa#202011309831. all work is complete. | |
| Oct 17, 2023 | Completed final sign-off Nov 2023 | 236 Hartford St | replace bathroom window in kind in lightwell area. same size, same location, max u-factor 0.30.Details
replace bathroom window in kind in lightwell area. same size, same location, max u-factor 0.30. | $400 |
| Oct 16, 2023 | Completed final sign-off Feb 2024 | 270 Valencia St | bathroom remodel in kind.Details
bathroom remodel in kind. | $25,000 |
| Sep 22, 2023 | Completed final sign-off Mar 2024 | 182 Maynard St | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $25,000 |
| Jul 11, 2023 | Completed final sign-off Nov 2023 | 236 Hartford St | one bathroom remodel in kind w/ shower pan.Details
one bathroom remodel in kind w/ shower pan. | $21,000 |
| Jun 12, 2023 | Completed final sign-off Sep 2023 | 950 Noe St | remodel one bathroom in kind- replace shower pan in kind.Details
remodel one bathroom in kind- replace shower pan in kind. | $25,000 |
| May 26, 2023 | In progress issued Jan 2026 | 237 Hartford St | interior/exterior renovation of an (e)2 unit,wood framed residence,including reinforcement of(e)brick foundations & seismic stiffening.new kitchens,plumbing upgrades,electrical upgrades, new fixtures, (n)moment frames,garage/basement beams to replace column obstructions, (n) rear yard patio to allowDetails
interior/exterior renovation of an (e)2 unit,wood framed residence,including reinforcement of(e)brick foundations & seismic stiffening.new kitchens,plumbing upgrades,electrical upgrades, new fixtures, (n)moment frames,garage/basement beams to replace column obstructions, (n) rear yard patio to allow | $750,000 |
| Apr 25, 2023 | Completed final sign-off Oct 2023 | 537 Magellan Av | plywood patch and stucco replace only in rear of building. approx 900sfDetails
plywood patch and stucco replace only in rear of building. approx 900sf | $27,000 |
| Mar 28, 2023 | Completed final sign-off Nov 2024 | 950 Noe St | change of use from achitectural firm to residential use. new fence @ rear yard as per plans. no bldg expansion. adu work under separate permit.bpa#202304145790.Details
change of use from achitectural firm to residential use. new fence @ rear yard as per plans. no bldg expansion. adu work under separate permit.bpa#202304145790. | $10,000 |
| Mar 1, 2023 | Completed final sign-off Dec 2023 | 244 Hartford St | to comply w/ boa #22-090. revision to pa #202009214636: support for continous shearwalls, removal of (e) shearwalls & addition of shearwalls for remodel of top floor unit. changes in partition in north-south direction of <10% the addition of headers at new openings, revisions to (e) shearwalls onDetails
to comply w/ boa #22-090. revision to pa #202009214636: support for continous shearwalls, removal of (e) shearwalls & addition of shearwalls for remodel of top floor unit. changes in partition in north-south direction of <10% the addition of headers at new openings, revisions to (e) shearwalls on | |
| Dec 28, 2022 | Completed final sign-off Mar 2023 | 158 Corbett Av | bathroom remodel in kind.Details
bathroom remodel in kind. | $19,000 |
| Dec 2, 2022 | Completed final sign-off Jun 2023 | 18 Lansing St | we are installing a bison decking system over an already sealed roof. the project is creating a new roof deck.Details
we are installing a bison decking system over an already sealed roof. the project is creating a new roof deck. | $7,000 |
| Nov 16, 2022 | Completed final sign-off Dec 2023 | 244 Hartford St | revision to pa 2020-0921-4636 of 3rd fl remodel. minor layout change and add shear wall detail and correct extg joist span direction.Details
revision to pa 2020-0921-4636 of 3rd fl remodel. minor layout change and add shear wall detail and correct extg joist span direction. | $7,522 |
| Oct 28, 2022 | Completed final sign-off Jun 2026 | 278 Page St | new laundry and guest bedroom suite in g/f annex.Details
new laundry and guest bedroom suite in g/f annex. | $5,000 |
| Sep 9, 2022 | Completed final sign-off Dec 2022 | 468 Corbett Av | bathroom remodel in-kindDetails
bathroom remodel in-kind | $18,000 |
| Jul 11, 2022 | Completed final sign-off Mar 2023 | 3522 17th St | 2nd flr - remodel kitchen and one bathroom, drywall and insulation. replace all 9 wood windows in-kind (marvin) with integral lugs and 5 vinyl windows at the rear.Details
2nd flr - remodel kitchen and one bathroom, drywall and insulation. replace all 9 wood windows in-kind (marvin) with integral lugs and 5 vinyl windows at the rear. | $100,000 |
| Jun 10, 2022 | Completed final sign-off Nov 2023 | 537 Magellan Av | renovation on floors 1 & 2: 1st fl - kitchen remodel. incorporate portion of garage into habitable space; relocate guest bath; rebuild interior stair @ half level; 2nd fl - relocate hall bath & mater bedroom; add laundry roomDetails
renovation on floors 1 & 2: 1st fl - kitchen remodel. incorporate portion of garage into habitable space; relocate guest bath; rebuild interior stair @ half level; 2nd fl - relocate hall bath & mater bedroom; add laundry room | $150,000 |
| May 5, 2022 | Never finaled issued Dec 2022, no final | 1981 Funston Av | apt b. remove angled wall at master bedroom. extend east wall of bedroom approx 8' south and south wall approx 8' east to create squared corner. add (n) door to (e) escape and rescue area deck. (e) bldg is fully sprinkled. 35 sf added to (e) master bedroom.Details
apt b. remove angled wall at master bedroom. extend east wall of bedroom approx 8' south and south wall approx 8' east to create squared corner. add (n) door to (e) escape and rescue area deck. (e) bldg is fully sprinkled. 35 sf added to (e) master bedroom. | $18,000 |
| Apr 25, 2022 | Never finaled filed Apr 2022, never issued | 1981 Funston Av | remove angled wall at master bedroom. extend east wall of bedroom approx 8' south and south wall approx 8' east to create squard corner. add new door to existing escape and rescue area. existing bldg is fully sprinkled. 25 sf added to existing master bedroom.Details
remove angled wall at master bedroom. extend east wall of bedroom approx 8' south and south wall approx 8' east to create squard corner. add new door to existing escape and rescue area. existing bldg is fully sprinkled. 25 sf added to existing master bedroom. | $18,000 |
| Apr 22, 2022 | Completed final sign-off May 2022 | 1570 Chestnut St | to obtain final inspection for work approved under 201807134534. all work is complete.Details
to obtain final inspection for work approved under 201807134534. all work is complete. | $5 |
| Mar 11, 2022 | Completed final sign-off Jun 2022 | 219 Eureka St | replace existing rear stairs in kind. common area stairs. reuse existing pier footings. use redwood. replace existing 4x4 post w/new 4x4 post. match existing bracing. work in common areaDetails
replace existing rear stairs in kind. common area stairs. reuse existing pier footings. use redwood. replace existing 4x4 post w/new 4x4 post. match existing bracing. work in common area | $50,000 |
| Mar 4, 2022 | Completed final sign-off Nov 2022 | 1954 48th Av | addition of restroom to 1st floor, enlargement of existing closet and relocation of washer and dryer within garage.Details
addition of restroom to 1st floor, enlargement of existing closet and relocation of washer and dryer within garage. | $20,000 |
| Mar 1, 2022 | Completed final sign-off Mar 2023 | 3522 17th St | lead demo abatement, repair burnt members in kind. hall area.Details
lead demo abatement, repair burnt members in kind. hall area. | $7,500 |
| Feb 22, 2022 | Completed final sign-off Nov 2023 | 3520 17th St | revision to fire on pa #202109027733 replace burnt members on roofDetails
revision to fire on pa #202109027733 replace burnt members on roof | $10,000 |
| Dec 21, 2021 | Completed final sign-off Dec 2021 | 1201 California St | unit #102: to obtain final inspection for work approved under pa# 201709199002 & 201709067030.Details
unit #102: to obtain final inspection for work approved under pa# 201709199002 & 201709067030. | |
| Jul 13, 2021 | Completed final sign-off Oct 2021 | 51 Douglass St | (1) bathroom remodel in-kind, non structuralDetails
(1) bathroom remodel in-kind, non structural | $16,000 |
| Jul 6, 2021 | Completed final sign-off Nov 2021 | 250 Red Rock Wy | remodel 2 bathroom, 1 powder room in kind. non structuralDetails
remodel 2 bathroom, 1 powder room in kind. non structural | $17,500 |
| Jul 6, 2021 | Completed final sign-off Aug 2021 | 3250 Laguna St | renew permit 201802090916 to commerce work. #300Details
renew permit 201802090916 to commerce work. #300 | $15,000 |
| Jun 3, 2021 | Completed final sign-off Dec 2021 | 1 Daniel Burnham Ct | kitchen remodel in kindDetails
kitchen remodel in kind | $12,000 |
| Apr 9, 2021 | Completed final sign-off Jan 2022 | 925 Grove St | 1 bathroom remodel in-kind. no new wall & no (e) wall relocation. all new plumbing to be remain. at same location new lighting comply w/ cec 150.0 (k) s.Details
1 bathroom remodel in-kind. no new wall & no (e) wall relocation. all new plumbing to be remain. at same location new lighting comply w/ cec 150.0 (k) s. | $12,000 |
| Mar 12, 2021 | Completed final sign-off Mar 2022 | 5150 Diamond Heights Bl | interior remodel of unit 204 b at 3rd floor, including partial demolition of bearing wall. no work at exterior of building.Details
interior remodel of unit 204 b at 3rd floor, including partial demolition of bearing wall. no work at exterior of building. | $4,000 |
| Mar 3, 2021 | Expired or cancelled cancelled Jan 2026 | 2650 26th Av | structural repair and reenforcement for supporting (e) chimneyDetails
structural repair and reenforcement for supporting (e) chimney | $20,000 |
| Mar 3, 2021 | Expired or cancelled cancelled Oct 2023 | 2650 26th Av | add new roof deck to extg single family and replace extg roofingDetails
add new roof deck to extg single family and replace extg roofing | $15,000 |
| Feb 10, 2021 | Completed final sign-off Aug 2022 | 758 Haight St | #3. revision to app#201910154432 to remove 3 existing columns and footings and adding 2 new beamsDetails
#3. revision to app#201910154432 to remove 3 existing columns and footings and adding 2 new beams | $100 |
| Jan 6, 2021 | Completed final sign-off Apr 2021 | 427 Central Av | kitchen remodel in kind. no relocation. no plumbing moved.Details
kitchen remodel in kind. no relocation. no plumbing moved. | $20,000 |
| Dec 21, 2020 | Completed final sign-off Mar 2022 | 5150 Diamond Heights Bl | kitchen remodel in kindDetails
kitchen remodel in kind | $18,000 |
| Dec 7, 2020 | Completed final sign-off Oct 2022 | 579 07th Av | rear deck replacement.Details
rear deck replacement. | $35,000 |
| Nov 30, 2020 | Completed final sign-off Oct 2023 | 3520 17th St | interior remodel : renew kitchen, bathroom, refinished flooring, renew tiles at kitchen 7 bathroom, new water heater, new furnace.Details
interior remodel : renew kitchen, bathroom, refinished flooring, renew tiles at kitchen 7 bathroom, new water heater, new furnace. | $96,000 |
| Oct 26, 2020 | Completed final sign-off Oct 2021 | 790 Lyon St | remodel kitchen & 2 bathrooms. replace windows in-kind. remove chimney.Details
remodel kitchen & 2 bathrooms. replace windows in-kind. remove chimney. | $75,000 |
| Sep 21, 2020 | Completed final sign-off Dec 2023 | 244 Hartford St | remodel of unit 244 on 3/f.Details
remodel of unit 244 on 3/f. | $35,000 |
| Sep 21, 2020 | Completed final sign-off Apr 2021 | 1 Daniel Burnham Ct | 2 bathrom remodel in kind. apt 824Details
2 bathrom remodel in kind. apt 824 | $25,000 |
| Sep 21, 2020 | Expired or cancelled expired Nov 2023 | 3520 17th St | interior remodel: finishes, clean ouyt, repair in kind. withinb envelope. no addition. replace in kind. kitchen, cabinets & counters. mep finish, trom, fixtures. (n) switch, (n) receptacles, replace in kind. tiles back splash at kitchen and bath. new flooring, paint, replace heating furnace. no wallDetails
interior remodel: finishes, clean ouyt, repair in kind. withinb envelope. no addition. replace in kind. kitchen, cabinets & counters. mep finish, trom, fixtures. (n) switch, (n) receptacles, replace in kind. tiles back splash at kitchen and bath. new flooring, paint, replace heating furnace. no wall | $42,000 |
| Aug 14, 2020 | Completed final sign-off Nov 2020 | 1378 Bacon St | unit # 2: reomdel 1 bathroom in-kind. no walls moving.Details
unit # 2: reomdel 1 bathroom in-kind. no walls moving. | $12,000 |
| Jun 16, 2020 | Expired or cancelled cancelled May 2022 | 74 Piedmont St | replace existing rear door in kind, fiberglass. not visible from street.Details
replace existing rear door in kind, fiberglass. not visible from street. | $4,000 |
| Feb 5, 2020 | Completed final sign-off Aug 2020 | 999 Green St | unit # 1105: kitchen and bath remodel in kind 9x14 bath 7x7Details
unit # 1105: kitchen and bath remodel in kind 9x14 bath 7x7 | $40,000 |
| Jan 27, 2020 | Completed final sign-off Aug 2021 | 201 Berkeley Wy | revision to pa 2020-0123-2595 2 1/2 bathrooms & garage w/1hr rating. dry wall and insulationDetails
revision to pa 2020-0123-2595 2 1/2 bathrooms & garage w/1hr rating. dry wall and insulation | $10,000 |
| Jan 23, 2020 | Completed final sign-off Aug 2021 | 201 Berkeley Wy | revision to pa# 2019-1031-6143: remodel half bathroom in kind comply w/ cec 150.0(k)5Details
revision to pa# 2019-1031-6143: remodel half bathroom in kind comply w/ cec 150.0(k)5 | $20,000 |
| Dec 20, 2019 | Completed final sign-off Jul 2020 | 4412 17th St | interior remodel, convert bsmt / garage into master suite, bonus ramily rm and mud rm. relocate kitchen, add new bath. replace 3 windows in kind in rear with metal clad. modify two bedrm relocate stairs.Details
interior remodel, convert bsmt / garage into master suite, bonus ramily rm and mud rm. relocate kitchen, add new bath. replace 3 windows in kind in rear with metal clad. modify two bedrm relocate stairs. | $65,000 |
| Oct 31, 2019 | Completed final sign-off Aug 2021 | 201 Berkeley Wy | replace three doors (external) (in kind), replace nine windows, siding (in kind), remodel kitchen in kind.Details
replace three doors (external) (in kind), replace nine windows, siding (in kind), remodel kitchen in kind. | $25,000 |
| Oct 15, 2019 | Completed final sign-off Aug 2022 | 758 Haight St | unit# 3. structural upgrades and new 320 sq ft roof deck on top of existing 2-story rear addition. new exterior door in place of existing window to access deck.Details
unit# 3. structural upgrades and new 320 sq ft roof deck on top of existing 2-story rear addition. new exterior door in place of existing window to access deck. | $60,000 |
| Oct 9, 2019 | Completed final sign-off Mar 2021 | 361 Church St | comply with nov 201984992, water heater vening and furnace.Details
comply with nov 201984992, water heater vening and furnace. | $900 |
| Aug 30, 2019 | Completed final sign-off Dec 2020 | 574 18th Av | revision to pa 201907035134. demo e 3rd fl bathroom and add 2 new baths. remodel (e) 3rd fl master bathDetails
revision to pa 201907035134. demo e 3rd fl bathroom and add 2 new baths. remodel (e) 3rd fl master bath | $25,000 |
| Aug 15, 2019 | Completed final sign-off Mar 2021 | 361 Church St | expand kitchen by removing strucutrall wall, enlarge lightwell windows to match upstairs unit 2 50x60 vinyl. convert dining room to bed room voluntary seismic anchor bolting at foundationDetails
expand kitchen by removing strucutrall wall, enlarge lightwell windows to match upstairs unit 2 50x60 vinyl. convert dining room to bed room voluntary seismic anchor bolting at foundation | $20,000 |
| Jul 22, 2019 | Completed final sign-off Nov 2019 | 242 Hartford St | remodel kitchen in kind.Details
remodel kitchen in kind. | $15,000 |
| Jul 3, 2019 | Completed final sign-off Dec 2020 | 574 18th Av | remodel of (e) kitchen, powder room, dining room, and back outdoor stairs. alteration of rear facadeDetails
remodel of (e) kitchen, powder room, dining room, and back outdoor stairs. alteration of rear facade | $50,000 |
| Jun 5, 2019 | Completed final sign-off Sep 2019 | 601 Van Ness Av | unit 809: bathroom (75 sq. ft.) & kitchen (90 sq. ft.) remodel in-kind, all walls to remainDetails
unit 809: bathroom (75 sq. ft.) & kitchen (90 sq. ft.) remodel in-kind, all walls to remain | $19,000 |
| Jun 5, 2019 | Completed final sign-off Nov 2019 | 157 Beaver St | unit 157 - legalize one window replacement. #8 cc8369, replace the vinyl window back to a wood window to original.Details
unit 157 - legalize one window replacement. #8 cc8369, replace the vinyl window back to a wood window to original. | $3,000 |
| Jun 5, 2019 | Completed final sign-off Nov 2019 | 155 Beaver St | to obtain final inspection for work approved under pa# 200601091677. all work is complete.Details
to obtain final inspection for work approved under pa# 200601091677. all work is complete. | |
| Jun 5, 2019 | Completed final sign-off Nov 2019 | 155 Beaver St | to comply with report of physcial inspection cc8369Details
to comply with report of physcial inspection cc8369 | $5,000 |
| May 15, 2019 | Completed final sign-off Sep 2019 | 545 Central Av | replace window on front and 2 in rear. in kind wood double hung all woodDetails
replace window on front and 2 in rear. in kind wood double hung all wood | $5,000 |
| Apr 1, 2019 | Completed final sign-off Jul 2019 | 1 Mercato Ct | replace kitchen cabinets in-kind; remodel 2 bathrooms in-kind.Details
replace kitchen cabinets in-kind; remodel 2 bathrooms in-kind. | $25,000 |
| Mar 27, 2019 | Never finaled issued Mar 2019, no final | 4532 17th St | remodel kitchen in-kind, no plumbing/electrical moved.Details
remodel kitchen in-kind, no plumbing/electrical moved. | $18,000 |
| Mar 27, 2019 | Completed final sign-off Aug 2019 | 1662 Union St | remodel lower bathroom in-kindDetails
remodel lower bathroom in-kind | $18,000 |
| Mar 26, 2019 | Completed final sign-off Nov 2019 | 4348 21st St | remove wall between living & dining room. remove closet & wall next to stair 7 replace w/guardrail.Details
remove wall between living & dining room. remove closet & wall next to stair 7 replace w/guardrail. | $3,000 |
| Nov 6, 2018 | Never finaled issued Nov 2018, no final | 1320 Natoma St | remodel kitchen in kind. retile bathroom, clawfoot tub to remain. to abate complaint # 201801671 & 201899081. approx 10x10 kitchen.Details
remodel kitchen in kind. retile bathroom, clawfoot tub to remain. to abate complaint # 201801671 & 201899081. approx 10x10 kitchen. | $12,500 |
| Sep 27, 2018 | Completed final sign-off Dec 2018 | 425 Upper Tr | roof deck and guardrail replacement(in-kind) roof membrane replacement (in-kind)Details
roof deck and guardrail replacement(in-kind) roof membrane replacement (in-kind) | $25,000 |
| Jul 5, 2018 | Completed final sign-off Aug 2019 | 216 Hartford St | replace stucco on front of house. replace two windows in kind--wood marvin with metal clad.Details
replace stucco on front of house. replace two windows in kind--wood marvin with metal clad. | $15,000 |
| Jun 6, 2018 | Never finaled issued Jun 2018, no final | 1 Daniel Burnham Ct | unit #423: kitchen and bath remodelDetails
unit #423: kitchen and bath remodel | $35,000 |
| May 23, 2018 | Completed final sign-off Jul 2018 | 67 Pond St | work on unit 69 pond. kitchen remodel in kind. to comply with nov# 201862204. existing store and refrige to remain. 10x10 kitchen.Details
work on unit 69 pond. kitchen remodel in kind. to comply with nov# 201862204. existing store and refrige to remain. 10x10 kitchen. | $10,000 |
| May 23, 2018 | Completed final sign-off Jun 2018 | 228 Clayton St | renew expired bldg pa# 9708722 for final inspection only.Details
renew expired bldg pa# 9708722 for final inspection only. | |
| Apr 18, 2018 | Completed final sign-off Jul 2018 | 140 South Van Ness Av | kitchen remodel in kind 10x10Details
kitchen remodel in kind 10x10 | $19,611 |
| Mar 20, 2018 | Completed final sign-off Aug 2018 | 351 San Benito Wy | kitchen remodel in-kind 10x15. replace cabinets & counters. no remodel of walls. lighting to comply w/ cec 150.0 (k).Details
kitchen remodel in-kind 10x15. replace cabinets & counters. no remodel of walls. lighting to comply w/ cec 150.0 (k). | $25,000 |
| Jan 29, 2018 | Completed final sign-off Jun 2018 | 228 Clayton St | comply with report of physical inspection application cc-8027Details
comply with report of physical inspection application cc-8027 | $5,500 |
| Jan 29, 2018 | Completed final sign-off Apr 2018 | 1 Daniel Burnham Ct | replace bath tub and tile surround; n/a maherDetails
replace bath tub and tile surround; n/a maher | $2,000 |
| Jan 22, 2018 | Completed final sign-off Oct 2018 | 120 Cortland Av | at (e) 1st fl: rmeove (e) partition between (e) kitchen & (e) dining rm; relocate kitchen & dining room; rmeove and replace floor tile in (e) bathroom & (e) toilet rm. 2nd fl: add door to (e) study; replace (e) door to (e) bar; remove (e) bar and replace with (n) bathroom & (n) hallway;Details
at (e) 1st fl: rmeove (e) partition between (e) kitchen & (e) dining rm; relocate kitchen & dining room; rmeove and replace floor tile in (e) bathroom & (e) toilet rm. 2nd fl: add door to (e) study; replace (e) door to (e) bar; remove (e) bar and replace with (n) bathroom & (n) hallway; | $199,250 |
| Jan 12, 2018 | Completed final sign-off Apr 2018 | 1201 California St | unit 904: remove arches from hallwayDetails
unit 904: remove arches from hallway | $3,500 |
| Oct 13, 2017 | Completed final sign-off Jan 2018 | 849 Mason St | unit #2 - additional 2 bathroom remodel , ref # 201709067025Details
unit #2 - additional 2 bathroom remodel , ref # 201709067025 | $22,000 |
| Oct 3, 2017 | Completed final sign-off Oct 2017 | 217 29th St | replace steps and stringers in kind in front; landings to remain; selective newel replacement. 50% max repairDetails
replace steps and stringers in kind in front; landings to remain; selective newel replacement. 50% max repair | $8,000 |
| Sep 19, 2017 | Expired or cancelled expired Dec 2021 | 1201 California St | unit 102: kitchen remodel remove partition wall, non bearing, closets, kitchen to remainDetails
unit 102: kitchen remodel remove partition wall, non bearing, closets, kitchen to remain | $18,900 |
| Sep 19, 2017 | Completed final sign-off Jan 2019 | 2245 09th Av | kitchen remodel, master bath remodel. no walls moved, removed, added or installed. all existing layout to remain unchanged.Details
kitchen remodel, master bath remodel. no walls moved, removed, added or installed. all existing layout to remain unchanged. | $25,000 |
| Sep 6, 2017 | Completed final sign-off Jan 2018 | 849 Mason St | unit 2: hallway bathroom remodel in-kind. no walls mofidied, no layout changes.Details
unit 2: hallway bathroom remodel in-kind. no walls mofidied, no layout changes. | $11,000 |
| Sep 6, 2017 | Expired or cancelled expired Dec 2021 | 1201 California St | kitchen remodel, no walls mofied, layout unchanged.Details
kitchen remodel, no walls mofied, layout unchanged. | $18,000 |
| Jul 24, 2017 | Completed final sign-off Jan 2019 | 2245 09th Av | replace 24 windows existing aluminum repalce with architectual grade aluminum, same size , and locationDetails
replace 24 windows existing aluminum repalce with architectual grade aluminum, same size , and location | $17,000 |
| Jul 18, 2017 | Completed final sign-off Mar 2018 | 55 Palm Av | unit #1: bathroom remodel, in-kindDetails
unit #1: bathroom remodel, in-kind | $12,000 |