Cruz Construction
- Based in
- Oakley
- On San Francisco permits
- Jul 2001 to Dec 2017
- Last 24 months
- 0 permits filed
7 permits since 2000: 4 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 11, 2017 | Completed final sign-off Jul 2018 | 438 Alvarado St | convert ground floor storage area into new studio dwelling unit, resulting in a 2-unit building.Details
convert ground floor storage area into new studio dwelling unit, resulting in a 2-unit building. | $50,000 |
| Aug 4, 2014 | Completed final sign-off Aug 2014 | 4450 18th St | construction of new storage mezzanine within existing ground floor commercial space.Details
construction of new storage mezzanine within existing ground floor commercial space. | $5,000 |
| Feb 6, 2007 | Never finaled issued Feb 2007, no final | 2911 Jackson St | bathroom remodel to include replacement of console vanity lav with new console vanity lav, replacement of toilet w/ low flow toilet., replacement of clawfoot tub with new tub and tile surround w. glass door, new floor tile, new dry wall to replace lathe and plaster, new trim around (e) door & windowDetails
bathroom remodel to include replacement of console vanity lav with new console vanity lav, replacement of toilet w/ low flow toilet., replacement of clawfoot tub with new tub and tile surround w. glass door, new floor tile, new dry wall to replace lathe and plaster, new trim around (e) door & window | $20,000 |
| Mar 27, 2006 | Never finaled issued Mar 2006, no final | 4437 18th St | deck modificationDetails
deck modification | |
| Mar 24, 2006 | Completed final sign-off Dec 2006 | 191 Douglass St | kitchen upgrade. flourescent lighting.Details
kitchen upgrade. flourescent lighting. | $19,000 |
| Jun 10, 2004 | Never finaled issued Jun 2004, no final | 85 Ora Wy | replace kitchen cabinets bath room vanity and toilet replace tiles and counter top work done in unitDetails
replace kitchen cabinets bath room vanity and toilet replace tiles and counter top work done in unit | $8,000 |
| Jul 2, 2001 | Completed final sign-off Jan 2002 | 20 Cumberland St | repair back porch stair. dry rot repair. work to comply w/ complaint#200117550.Details
repair back porch stair. dry rot repair. work to comply w/ complaint#200117550. | $5,000 |