Cooke And Mccann Inc
- Based in
- San Bruno
- On San Francisco permits
- Aug 2014 to May 2024
- Last 24 months
- 0 permits filed
14 permits since 2000: 14 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 10, 2024 | Completed final sign-off Aug 2024 | 357 Elizabeth St | rev 202312263112 - includes changes to interior wall framing. no structural work, no work to exterior of buildingDetails
rev 202312263112 - includes changes to interior wall framing. no structural work, no work to exterior of building | |
| Dec 26, 2023 | Completed final sign-off Aug 2024 | 357 Elizabeth St | remodel to e 2 story sfd including kitchen. new bathroom in existing envelope. all associated plumbing, elec, mech included. no struc work, no expansion of e building envelope.Details
remodel to e 2 story sfd including kitchen. new bathroom in existing envelope. all associated plumbing, elec, mech included. no struc work, no expansion of e building envelope. | $65,000 |
| Jul 22, 2021 | Completed final sign-off Aug 2021 | 248 Colon Av | revision to 2019 1031 6030. reduce excavation scope @ rear yard. add wood retaining wall to accommodated access to rear yard. change opening at 1st fire wallDetails
revision to 2019 1031 6030. reduce excavation scope @ rear yard. add wood retaining wall to accommodated access to rear yard. change opening at 1st fire wall | |
| Oct 31, 2019 | Completed final sign-off Aug 2021 | 248 Colon Av | remodel 1st fl. add 2 bedrooms, den, 1 full bath & media room, relocate existing stair to connect 1st fl to 2nd fl. lower (e) rear yard to create (n) hardscape. windows to be alum wood clad.Details
remodel 1st fl. add 2 bedrooms, den, 1 full bath & media room, relocate existing stair to connect 1st fl to 2nd fl. lower (e) rear yard to create (n) hardscape. windows to be alum wood clad. | $250,000 |
| Oct 3, 2019 | Completed final sign-off Jan 2023 | 1463 43rd Av | re-configure & addition of 157 sq ft @ 3rd fl bedroom (2) corridor. remodel of kitchen, dining room on 2nd floor. structural work on 1st floor. **maher n/a**Details
re-configure & addition of 157 sq ft @ 3rd fl bedroom (2) corridor. remodel of kitchen, dining room on 2nd floor. structural work on 1st floor. **maher n/a** | $80,000 |
| Jun 25, 2018 | Completed final sign-off Oct 2018 | 4630 Balboa St | siding 100 sf max. remove & replace plywood & flahsing. in kind on east property line. to comply with complaint #201873901. work shall not encroch adjacent property.Details
siding 100 sf max. remove & replace plywood & flahsing. in kind on east property line. to comply with complaint #201873901. work shall not encroch adjacent property. | $5,000 |
| Aug 9, 2017 | Completed final sign-off Mar 2018 | 1090 Church St | soft story retrofit per sfebc chapter 4d engineering criteria appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria appendix a-4 | $75,000 |
| May 5, 2016 | Completed final sign-off Dec 2016 | 89 Heather Av | soft story retrofit as per sfbc code ch 34b, utilizing 2012 iebc appx a4Details
soft story retrofit as per sfbc code ch 34b, utilizing 2012 iebc appx a4 | $60,000 |
| Dec 23, 2015 | Completed final sign-off Apr 2016 | 607 Haight St | no structural work or exterior change, add non bearing partition & door, install electrical & mechanical & lighting, install exterior wall insulation & g.w.b. throughout unit.Details
no structural work or exterior change, add non bearing partition & door, install electrical & mechanical & lighting, install exterior wall insulation & g.w.b. throughout unit. | $52,000 |
| Sep 29, 2015 | Completed final sign-off Dec 2015 | 1019 Cole St | revision to pa 2014 0930 7611: soft story upgrade of ground floor per ab106. replace moment frame with shearwall & hardy frameDetails
revision to pa 2014 0930 7611: soft story upgrade of ground floor per ab106. replace moment frame with shearwall & hardy frame | |
| Jun 29, 2015 | Completed final sign-off Jul 2016 | 609 Haight St | change of use - create new residential unit within extg unoccupied ground floor. no structure work. non bearing only. add kitchen, 2 baths, 2 bedrooms. replace windows and doors. install 2 hour ceiling and sprinkler on ground floor per nfpa13r.Details
change of use - create new residential unit within extg unoccupied ground floor. no structure work. non bearing only. add kitchen, 2 baths, 2 bedrooms. replace windows and doors. install 2 hour ceiling and sprinkler on ground floor per nfpa13r. | $62,000 |
| May 11, 2015 | Completed final sign-off Jul 2016 | 609 Haight St | replace (e) brick foundation with (n) reinforced concrete foundation throughout. replace (e) wood posts & beams with steel members. seismic upgrade at lowest level.Details
replace (e) brick foundation with (n) reinforced concrete foundation throughout. replace (e) wood posts & beams with steel members. seismic upgrade at lowest level. | $150,000 |
| Sep 30, 2014 | Completed final sign-off Dec 2015 | 1019 Cole St | soft story upgrade of ground floor per ab-106Details
soft story upgrade of ground floor per ab-106 | $40,000 |
| Aug 8, 2014 | Completed final sign-off Jun 2016 | 605 Haight St | (n) reinforced conc. foundation throughout. replace (e) wood posts & beams w/steel members. install accessible bathroom & ramp. no exterior work.Details
(n) reinforced conc. foundation throughout. replace (e) wood posts & beams w/steel members. install accessible bathroom & ramp. no exterior work. | $120,000 |