Lawrence Liao
- Listed as
- architect, authorized agent-others, engineer, pmt consultant/expediter
- Firm
- Lawrence Liao Str. Eng
- Based in
- Fremont
- On San Francisco permits
- Oct 2003 to Oct 2026
759 permits since 2000 (engineer on 732 permits, architect on 24 permits, authorized agent-others on 2 permits, pmt consultant/expediter on 1 permit): 554 completed, 89 in progress, 49 never finaled, 67 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 759.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 2072 Ellis St | 1st flr: add media, sauna, 1 full bath. 2nd flr: remodel kitchen and 1/2 bath. 3rd flr: remodel 2 bath, add 1 full bath. 4th flr: remodel bath reconfigure interior stairs, replace all windows w/ aluminum clad wood. add deck at rear. nfpa 13d under separate permit.Details
1st flr: add media, sauna, 1 full bath. 2nd flr: remodel kitchen and 1/2 bath. 3rd flr: remodel 2 bath, add 1 full bath. 4th flr: remodel bath reconfigure interior stairs, replace all windows w/ aluminum clad wood. add deck at rear. nfpa 13d under separate permit. | $550,000 | |
| Sep 28, 2026 | In progress issued Sep 2026 | 2420 Clement St | Hbm Construction Inc | structural revision to pa 202508062414 repair partial (e) stud walls & widen (e) footing on partial indicated areasDetails
structural revision to pa 202508062414 repair partial (e) stud walls & widen (e) footing on partial indicated areas | |
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 944 Madrid St | 1st fl: add 2 new bedrooms, 2 full baths, media room with wetbar. relocate laundry. 2nd fl reconfigure e kitche, living, dining, bedrms and bathroom. add 1 full bath. infill at rear and add new deck. remove shingles siding and replace to stucco. replace front windows with vinyl. subject to ab-112.Details
1st fl: add 2 new bedrooms, 2 full baths, media room with wetbar. relocate laundry. 2nd fl reconfigure e kitche, living, dining, bedrms and bathroom. add 1 full bath. infill at rear and add new deck. remove shingles siding and replace to stucco. replace front windows with vinyl. subject to ab-112. | $200,000 | |
| Sep 17, 2026 | In progress issued Sep 2026 | 149 Buchanan St | Cbs Construction Inc. | remodel kitchen and bath. add 1 bathDetails
remodel kitchen and bath. add 1 bath | $60,000 |
| Sep 17, 2026 | In progress filed Sep 2026, not yet issued | 209 Lincoln Wy | revision to pa# 202006309365 & 202306291189. 1/f: unit a & b, add laundry, 2/f: unit 1 & 3, add laudnry, 3/f: unit 5 & 7 add laundry.Details
revision to pa# 202006309365 & 202306291189. 1/f: unit a & b, add laundry, 2/f: unit 1 & 3, add laudnry, 3/f: unit 5 & 7 add laundry. | $5,000 | |
| Sep 10, 2026 | In progress issued Oct 2026 | 436 Edinburgh St | Integrity Design And Build Group | 1st flr: infill under sunroom. add 1 bedroom, 1 full bath, and family with wetbar. 2nd flr: remodel (e) living and dining room. reconfigure kitchen and powder room. 3rd flr: remodel (e) bedrooms and bathroom. add 1 full bath. replace front windows in kind with vinyl. replace vinyl siding withDetails
1st flr: infill under sunroom. add 1 bedroom, 1 full bath, and family with wetbar. 2nd flr: remodel (e) living and dining room. reconfigure kitchen and powder room. 3rd flr: remodel (e) bedrooms and bathroom. add 1 full bath. replace front windows in kind with vinyl. replace vinyl siding with | $280,000 |
| Aug 27, 2026 | In progress filed Aug 2026, not yet issued | 1423 31st Av | 1st flr: add 1 bedroom, 2 baths, den and media room. relocate laundry. 2nd flr: remove (e) kitchen, kitchen, dining. bathroom and 2 bedrooms per layout. add 1 bathroom and office. infill light-wells. new skylights and patio. project is subject to ab112 all-electric ordinance.Details
1st flr: add 1 bedroom, 2 baths, den and media room. relocate laundry. 2nd flr: remove (e) kitchen, kitchen, dining. bathroom and 2 bedrooms per layout. add 1 bathroom and office. infill light-wells. new skylights and patio. project is subject to ab112 all-electric ordinance. | $380,000 | |
| Aug 18, 2026 | In progress issued Sep 2026 | 1725 16th Av | K & J General Construction | interior remodel, at 1st flr, remodel (e) floor space to (n)bedorooms, bathrooms, wetbar, and laundry at 2nd flr. remodel kitchen, bathroom and dining, new pantry, powder room, and bathroom, new inerior stair. ab112Details
interior remodel, at 1st flr, remodel (e) floor space to (n)bedorooms, bathrooms, wetbar, and laundry at 2nd flr. remodel kitchen, bathroom and dining, new pantry, powder room, and bathroom, new inerior stair. ab112 | $235,000 |
| Aug 11, 2026 | In progress filed Aug 2026, not yet issued | 711 York St | 1st fl/ add 2 bedrooms, 2 full bathrooms, and 1 family room, 2nd floor: remodel kitchen and baths. add interior stairs and replace front windows with aluminum clad wood. ab112Details
1st fl/ add 2 bedrooms, 2 full bathrooms, and 1 family room, 2nd floor: remodel kitchen and baths. add interior stairs and replace front windows with aluminum clad wood. ab112 | $320,000 | |
| Aug 5, 2026 | In progress issued Aug 2026 | 50 28th St | Mdc Drilling | revision to permit 2022 0802 9754. redesign change in kitchen location floor 2 and bedrooms location floor 3.Details
revision to permit 2022 0802 9754. redesign change in kitchen location floor 2 and bedrooms location floor 3. | |
| Jul 29, 2026 | In progress issued Aug 2026 | 2315 17th Av | Turbo Construction | revision to pa#: 202506138705. 2nd flr: infill lightwell. reconfigure layout. add skylights an suntube. additional living space of 73 sqftDetails
revision to pa#: 202506138705. 2nd flr: infill lightwell. reconfigure layout. add skylights an suntube. additional living space of 73 sqft | $25,000 |
| Jul 27, 2026 | In progress filed Jul 2026, not yet issued | 519 12th Av | 1/f: add family room with wet bar, bedroom, 1 full bath and office. 2/f: remodel (e) kitchen, dining and living room. add powder and breakfast nook. 3/f: remodel (e) bedrooms and bathroom. add 1 full bath, office and laundry. new deck at rear.Details
1/f: add family room with wet bar, bedroom, 1 full bath and office. 2/f: remodel (e) kitchen, dining and living room. add powder and breakfast nook. 3/f: remodel (e) bedrooms and bathroom. add 1 full bath, office and laundry. new deck at rear. | $320,000 | |
| Jul 22, 2026 | In progress issued Jul 2026 | 325 07th Av | Skytec General Engineering | associated to bpa: 202606243861 - underpinDetails
associated to bpa: 202606243861 - underpin | $2,000 |
| Jul 14, 2026 | Completed final sign-off Sep 2026 | 39 Chenery St | Cbs Construction Inc. | 1st floor - add 1 media and 1 entertainment room. no exterior work.Details
1st floor - add 1 media and 1 entertainment room. no exterior work. | $12,000 |
| Jul 8, 2026 | In progress filed Jul 2026, not yet issued | 1165 Holloway Av | 1/f:remodel/excavate (e) space to bedrooms, bathrooms, home office and family. new west side lightwell. 2/f: full interior remodel for entire flr per plan, new stair to 1st and 3rd flr. remodel (e) attic space to new 3/f w/ bedrooms and bathrooms with dormers.Details
1/f:remodel/excavate (e) space to bedrooms, bathrooms, home office and family. new west side lightwell. 2/f: full interior remodel for entire flr per plan, new stair to 1st and 3rd flr. remodel (e) attic space to new 3/f w/ bedrooms and bathrooms with dormers. | $550,000 | |
| Jul 1, 2026 | Completed final sign-off Jul 2026 | 1136 Mason St | Momentum Construction & Development Llc | administrative permit to 202602206271. revise unit number for scope of work from unit 1136 to 1138.Details
administrative permit to 202602206271. revise unit number for scope of work from unit 1136 to 1138. | |
| Jun 24, 2026 | In progress filed Jun 2026, not yet issued | 1771 16th Av | new adu per state program.1/f: new conditioned space, rear 1 story addition. 2/f: repalce rear windows and new roof deck on 3/f. remodel/relcoate master bath, new door and new deck. legalize (e) front roof deck and door.Details
new adu per state program.1/f: new conditioned space, rear 1 story addition. 2/f: repalce rear windows and new roof deck on 3/f. remodel/relcoate master bath, new door and new deck. legalize (e) front roof deck and door. | $279,600 | |
| Jun 24, 2026 | In progress issued Jul 2026 | 329 07th Av | Skytec General Engineering | comply to nov# 202657569. revision to pa# 202511189833. revise structural planDetails
comply to nov# 202657569. revision to pa# 202511189833. revise structural plan | |
| Jun 5, 2026 | Completed final sign-off Sep 2026 | 680 Los Palmos Dr | California Building And Remodeling | 2nd fl: turn powder room into full bathDetails
2nd fl: turn powder room into full bath | $12,000 |
| Jun 5, 2026 | In progress issued Jun 2026 | 307 Capp St | Bc United Construction Inc | change right/south side siding to hardie plank, left/north side back siding to hardie plank.Details
change right/south side siding to hardie plank, left/north side back siding to hardie plank. | $5,000 |
| May 29, 2026 | Expired or cancelled withdrawn Jun 2026 | 436 Edinburgh St | 1/f: add a family room, one bathroom, one bedroom as infill space. 2/f: total remodel, add washer and dryer. 3/f: total remodel, add one new bathroom and new roof deck above existing sunroom below.Details
1/f: add a family room, one bathroom, one bedroom as infill space. 2/f: total remodel, add washer and dryer. 3/f: total remodel, add one new bathroom and new roof deck above existing sunroom below. | $200,000 | |
| May 27, 2026 | Completed final sign-off Jun 2026 | 50 Cascade Wk | Skytec General Engineering | replace front fence with 6' tall.Details
replace front fence with 6' tall. | $1,200 |
| May 20, 2026 | Completed final sign-off Jun 2026 | 2558 24th Av | 1st flr: add media room. add 2 bedroom. no plumbing fixtures.Details
1st flr: add media room. add 2 bedroom. no plumbing fixtures. | $8,000 | |
| May 18, 2026 | In progress issued May 2026 | 1338 Noe St | Carpentry Incorporated | revision 202603248197- replace (e) structrual post with engineered beam per approved structrual drawing.Details
revision 202603248197- replace (e) structrual post with engineered beam per approved structrual drawing. | |
| Apr 17, 2026 | In progress issued May 2026 | 515 29th St | Amador General Construction Inc | at 2nd floor, remodel (e) kitchenDetails
at 2nd floor, remodel (e) kitchen | $25,000 |
| Apr 14, 2026 | In progress issued Apr 2026 | 4271 24th St | Beyond The Horizon Construction Inc | revision to pa# 202509175525 and 202601306967: enclose lightwell. 2/f - reconfigure kitchen and deck layout. 3/f - remodel 1.5 baths.Details
revision to pa# 202509175525 and 202601306967: enclose lightwell. 2/f - reconfigure kitchen and deck layout. 3/f - remodel 1.5 baths. | $52,000 |
| Apr 8, 2026 | In progress issued Sep 2026 | 519 22nd Av | J & A Construction | two story rear addition: infill lightwell on south side, reconfigure interior stairs. 1st floor add 1 bedroom , family room , 1 full bath, deck at rear. 2nd floor remodel kitchen and bathroom. 3rd floor remodel bathroom, add 1 full bath, cantilever deck at rear.Details
two story rear addition: infill lightwell on south side, reconfigure interior stairs. 1st floor add 1 bedroom , family room , 1 full bath, deck at rear. 2nd floor remodel kitchen and bathroom. 3rd floor remodel bathroom, add 1 full bath, cantilever deck at rear. | $380,000 |
| Mar 27, 2026 | In progress issued Apr 2026 | 2537 Pacheco St | 1st/f: add family room with wet bar, bedroom & 1 full bath. 2nd/f: relocate e) bedrooms, kitchen & bathroom. add great room & 1 full bath. new cantilever deck & new patio at rear. infill light-well & replace front windows in kindDetails
1st/f: add family room with wet bar, bedroom & 1 full bath. 2nd/f: relocate e) bedrooms, kitchen & bathroom. add great room & 1 full bath. new cantilever deck & new patio at rear. infill light-well & replace front windows in kind | $175,000 | |
| Mar 27, 2026 | In progress issued Mar 2026 | 925 Balboa St | Skytec General Engineering | revision to bpa# 202505126284: replace front windows revised from wood to vinyl. 8 windows total.Details
revision to bpa# 202505126284: replace front windows revised from wood to vinyl. 8 windows total. | |
| Mar 25, 2026 | In progress issued Sep 2026 | 630 40th Av | Great Ocean Construction Inc. | relocate top unit to 1st floor, and merge 2nd, and 3rd floors as one unit (side two-story). side two-story addition to expand floor area at first and 2nd floors, roof deck deck; full remodel all three floors per plans; replace all windows. in-kind.Details
relocate top unit to 1st floor, and merge 2nd, and 3rd floors as one unit (side two-story). side two-story addition to expand floor area at first and 2nd floors, roof deck deck; full remodel all three floors per plans; replace all windows. in-kind. | $398,000 |
| Mar 11, 2026 | In progress filed Mar 2026, not yet issued | 49 Hill St | renovation of an (e) 4 bedroom & 3.5 baths single family house. renovate primary bath & closet on 2nd level. no increase in conditioned floor area. #a3.1 rear of house - change - east elevation - change - add 1 window.Details
renovation of an (e) 4 bedroom & 3.5 baths single family house. renovate primary bath & closet on 2nd level. no increase in conditioned floor area. #a3.1 rear of house - change - east elevation - change - add 1 window. | $72,000 | |
| Feb 20, 2026 | Completed final sign-off Aug 2026 | 378 Ralston St | Hengda Construction Inc | revision to bpa # 202510087023: revise structural foundation detail.Details
revision to bpa # 202510087023: revise structural foundation detail. | |
| Feb 20, 2026 | Completed final sign-off Jul 2026 | 1136 Mason St | Momentum Construction & Development Llc | unit 1136 and 1140 remodel 1 bath and add 1 full bath eachDetails
unit 1136 and 1140 remodel 1 bath and add 1 full bath each | $70,000 |
| Feb 20, 2026 | In progress issued Mar 2026 | 1831 14th Av | Skytec General Engineering | 1/f: reconfigure interior stairs. 2/f: remodel bath. 3/f: remodel bath and kitchen. repair (e) balcony and (e) deck. add 1 full bath and new skylights.Details
1/f: reconfigure interior stairs. 2/f: remodel bath. 3/f: remodel bath and kitchen. repair (e) balcony and (e) deck. add 1 full bath and new skylights. | $100,000 |
| Feb 20, 2026 | In progress issued Feb 2026 | 130 19th Av | Cbs Construction Inc. | 1st flr: relocate utilities. 2nd flr: reconfigure (e) kitchen, bedrooms and bathroom per layout. add (n)bedroom, laundry and powder room. 3rd flr: relocate kitchen, remodel (e) bedrooms and bathroom. and (h) office, laundry and bathroom.Details
1st flr: relocate utilities. 2nd flr: reconfigure (e) kitchen, bedrooms and bathroom per layout. add (n)bedroom, laundry and powder room. 3rd flr: relocate kitchen, remodel (e) bedrooms and bathroom. and (h) office, laundry and bathroom. | $125,000 |
| Feb 13, 2026 | In progress issued Jul 2026 | 843 14th St | Cbs Construction Inc. | remodel (e) full bath and add 1 full bath, close doorway between family and living room.Details
remodel (e) full bath and add 1 full bath, close doorway between family and living room. | $20,000 |
| Feb 6, 2026 | Completed final sign-off Jul 2026 | 159 Stillings Av | Dave Mason Building | remodel 1 kitchen and 1 bath. replace interior stairs.Details
remodel 1 kitchen and 1 bath. replace interior stairs. | $65,000 |
| Jan 27, 2026 | In progress issued Jan 2026 | 2259 27th Av | Bao Hengda Inc | revision to permit 202510097131. revise rear window sizes. reconfigure kitchen layout, and barn doors in office on 2/f. new slab and foundations.Details
revision to permit 202510097131. revise rear window sizes. reconfigure kitchen layout, and barn doors in office on 2/f. new slab and foundations. | $3,000 |
| Jan 27, 2026 | Completed final sign-off Oct 2026 | 1696 08th Av | O'pro Construction Inc. | comply with nov #202297692: 2nd fl- total remodel- 1 kitchen & 2 baths. 1st fl- convert playroom to bedroom and 1 bath. add lower deck at rear.Details
comply with nov #202297692: 2nd fl- total remodel- 1 kitchen & 2 baths. 1st fl- convert playroom to bedroom and 1 bath. add lower deck at rear. | $120,000 |
| Jan 27, 2026 | In progress issued Apr 2026 | 647 24th Av | Zhuo Zhang Construction Inc | revision to 202511240355. remodel e 1st fl to family, bathroom, bedroom, new 1 level rear deck, replace 3 rear and side windowsDetails
revision to 202511240355. remodel e 1st fl to family, bathroom, bedroom, new 1 level rear deck, replace 3 rear and side windows | $135,000 |
| Jan 20, 2026 | In progress issued Jan 2026 | 9 Juri St | Yefa Construction Inc | revision to pa # 2024-0409-9652: revise structural plans to reflect work. correct scope of work to " rebuild exterior stairs and replace windows at rear of front building. exploratory demo for dry rotDetails
revision to pa # 2024-0409-9652: revise structural plans to reflect work. correct scope of work to " rebuild exterior stairs and replace windows at rear of front building. exploratory demo for dry rot | |
| Jan 20, 2026 | In progress issued Jan 2026 | 5830 California St | Yiu Cheong Construction Co Inc | revision to approved pa: 202511189903. correct a permit clerical error replace sheet s3.1 and 3.2 to reflect the actual works and conditions.Details
revision to approved pa: 202511189903. correct a permit clerical error replace sheet s3.1 and 3.2 to reflect the actual works and conditions. | |
| Jan 20, 2026 | In progress issued Mar 2026 | 2342 26th Av | Hong's General Construction Inc | 1st fl - relocate family, bathrm and laundry; add wet bar and bedrm; 2nd fl - reconfigure family, kitchen and dining rooms; remodel (e) bedrooms and bathrooms per layout; new patio at rear; new skylightDetails
1st fl - relocate family, bathrm and laundry; add wet bar and bedrm; 2nd fl - reconfigure family, kitchen and dining rooms; remodel (e) bedrooms and bathrooms per layout; new patio at rear; new skylight | $230,000 |
| Jan 15, 2026 | In progress issued Jan 2026 | 1476 Portola Dr | Integrity General Construction Inc | revision to pa # 2022-0809-0182 & 2025-0410-4171: revise entire 3rd fl layout. new 3' tall fence at front setback.Details
revision to pa # 2022-0809-0182 & 2025-0410-4171: revise entire 3rd fl layout. new 3' tall fence at front setback. | $3,000 |
| Jan 15, 2026 | In progress issued Jan 2026 | 727 33rd Av | D Construction Inc | 1/f: infill rear. add 1 bedroom. family room, den and 1.5 baths. 2/f: remodel (e) kitchen and bathroom. add 1 full bathroom. reconfigure interior stairs.Details
1/f: infill rear. add 1 bedroom. family room, den and 1.5 baths. 2/f: remodel (e) kitchen and bathroom. add 1 full bathroom. reconfigure interior stairs. | $300,000 |
| Jan 15, 2026 | In progress issued Aug 2026 | 407 Teresita Bl | Brendan J Uniacke Construction | full remodel (e) 3 story bldg. (n) cantilever decks w/ sliding doors. infill (e) lightwell and replace front window & exterior wall finishes. remodel 1st flr space to (n) family w/ bathroom & wetbar. 2nd: create master suite and laundry. 3rd: remodel kitchen bathroom, lightwell infill. and skylightsDetails
full remodel (e) 3 story bldg. (n) cantilever decks w/ sliding doors. infill (e) lightwell and replace front window & exterior wall finishes. remodel 1st flr space to (n) family w/ bathroom & wetbar. 2nd: create master suite and laundry. 3rd: remodel kitchen bathroom, lightwell infill. and skylights | $450,000 |
| Jan 13, 2026 | In progress issued May 2026 | 459 Valley St | Zhuo Zhang Construction Inc | rear horizontal addition @ basement, 1st floor and 2nd floor. new roof decks and rear 1-level deck. full interior remodel for the entire house per plan. new garage at 1st floor with roll up door and new driveway. replace all front window and doorsDetails
rear horizontal addition @ basement, 1st floor and 2nd floor. new roof decks and rear 1-level deck. full interior remodel for the entire house per plan. new garage at 1st floor with roll up door and new driveway. replace all front window and doors | $450,000 |
| Dec 30, 2025 | In progress issued Jan 2026 | 5545 Diamond Heights Bl | Winder Construction Inc. | 1st flr: add 1 bedroom. 1.5 baths and family. 2nd flr: remodel kitchen and bathrooms add home office. infill lightwell. replace front windows (vinyl).Details
1st flr: add 1 bedroom. 1.5 baths and family. 2nd flr: remodel kitchen and bathrooms add home office. infill lightwell. replace front windows (vinyl). | $120,000 |
| Dec 30, 2025 | In progress filed Dec 2025, not yet issued | 895 31st Av | create 1 adu on g/f per state program. 1/f add 1 bedroom, kitchen and great room. add laundry room.Details
create 1 adu on g/f per state program. 1/f add 1 bedroom, kitchen and great room. add laundry room. | $120,000 | |
| Dec 30, 2025 | Completed final sign-off Apr 2026 | 978 Page St | Hbm Construction Inc | soft story retrofit per sfebc 2022 appendix a404. to comply with nov# 201803574.Details
soft story retrofit per sfebc 2022 appendix a404. to comply with nov# 201803574. | $120,000 |
| Dec 23, 2025 | Completed final sign-off Sep 2026 | 1437 Cabrillo St | Lemus Construction Inc, Occidental Express | 1st floor: add great room with kitchenette, bedroom and bathroomDetails
1st floor: add great room with kitchenette, bedroom and bathroom | $98,000 |
| Dec 18, 2025 | In progress issued Jan 2026 | 110 Forest Side Av | C Plus E Construction Inc | 1/f: add 2 bedroom, 2 full bath, office and family room. 2/f: remodel kitchen and bath, add 1.5 bath. 3/f: remodel bath.Details
1/f: add 2 bedroom, 2 full bath, office and family room. 2/f: remodel kitchen and bath, add 1.5 bath. 3/f: remodel bath. | $350,000 |
| Dec 18, 2025 | In progress issued Jan 2026 | 1434 25th Av | C Plus E Construction Inc | 1st fl: add media room, 2 full bath and 1 bedroom. 2nd fl: remodel kitchen, add 1/2 bath, replace (e) deck at rear. 3rd fl: remodel bath, add 1 full bath. add roof deck at rear.Details
1st fl: add media room, 2 full bath and 1 bedroom. 2nd fl: remodel kitchen, add 1/2 bath, replace (e) deck at rear. 3rd fl: remodel bath, add 1 full bath. add roof deck at rear. | $300,000 |
| Dec 3, 2025 | In progress issued May 2026 | 329 07th Av | Skytec General Engineering | 1/f: add family room, bedroom, 1 full bathroom, 2/f: remodel (e) kitchen & bathroom, add laundry & deck at rear. 3/f: add 2 full bathrooms, 2 bedrooms roof deck at rear.Details
1/f: add family room, bedroom, 1 full bathroom, 2/f: remodel (e) kitchen & bathroom, add laundry & deck at rear. 3/f: add 2 full bathrooms, 2 bedrooms roof deck at rear. | $300,000 |
| Nov 25, 2025 | Completed final sign-off Jun 2026 | 135 San Rafael Wy | Skytec General Engineering | revision to 202510097086. revise structural plans for new front stairs and new foundation at the rear.Details
revision to 202510097086. revise structural plans for new front stairs and new foundation at the rear. | $1,000 |
| Nov 14, 2025 | Completed final sign-off Aug 2026 | 136 09th Av | Kennie Kwong Construction | comply with nov#: 202536363. revision to bpa#: 202506047939. remove doorway at passageway and repair stucco at two locations per plans. item 2.Details
comply with nov#: 202536363. revision to bpa#: 202506047939. remove doorway at passageway and repair stucco at two locations per plans. item 2. | $500 |
| Nov 14, 2025 | In progress issued Nov 2025 | 311 Shotwell St | C Plus E Construction Inc | revision to pa# 202501037706: replace front windows with wood. revise mechanical pwoer to include radiant heating and mini split unit with ac. remove duct leakage special inspection. windows at front ot be wood or wood aluminum clad hung windowsDetails
revision to pa# 202501037706: replace front windows with wood. revise mechanical pwoer to include radiant heating and mini split unit with ac. remove duct leakage special inspection. windows at front ot be wood or wood aluminum clad hung windows | $2,000 |
| Nov 3, 2025 | In progress issued Jan 2026 | 2435 42nd Av | Ecowave Inc | 1/f: remodel (e) 2 bathrooms in kind 2/f: remodel (e) kitchen and 2 bathrooms per layout.Details
1/f: remodel (e) 2 bathrooms in kind 2/f: remodel (e) kitchen and 2 bathrooms per layout. | $70,000 |
| Nov 3, 2025 | Completed final sign-off Feb 2026 | 250 Wilde Av | Ene Construction Metal Inc. | revision to pa # 201711214600 & 202209293413: to document unpermitted work. removal/modification of unauthorized site fence/wall to meet planning requirements. removal of the pent roof structure and paving of rear yard. layout change.Details
revision to pa # 201711214600 & 202209293413: to document unpermitted work. removal/modification of unauthorized site fence/wall to meet planning requirements. removal of the pent roof structure and paving of rear yard. layout change. | $5,000 |
| Oct 27, 2025 | In progress issued Jul 2026 | 2420 Clement St | Hbm Construction Inc | tenant improvement to be early childhood learning center & day care at 1st floor. vertical addition that will create two new dwelling units at the 2nd floor.Details
tenant improvement to be early childhood learning center & day care at 1st floor. vertical addition that will create two new dwelling units at the 2nd floor. | $650,000 |
| Oct 23, 2025 | In progress issued Oct 2025 | 4271 24th St | Beyond The Horizon Construction | revision to pa# 202509175525: excavate 6" on the 1st floor.Details
revision to pa# 202509175525: excavate 6" on the 1st floor. | |
| Oct 21, 2025 | In progress issued Nov 2025 | 130 Meadowbrook Dr | Simply Building Inc | 1st fl: remodel e 1st fl space to laundry/wetbar, family and remodel e master suite. 2nd fl remodel e kitchen, bath, int stair and new bath. replace all e windows, infill south lightwellDetails
1st fl: remodel e 1st fl space to laundry/wetbar, family and remodel e master suite. 2nd fl remodel e kitchen, bath, int stair and new bath. replace all e windows, infill south lightwell | $187,000 |
| Oct 15, 2025 | Completed final sign-off Apr 2026 | 320 Willard North St | W H Construction Inc | revision to pa# 202412025953. 1/f: revise window size, 2/f: revise window size. 3/f: revise window size and bathroom and laundry room. front window replacement with vinyl windows.Details
revision to pa# 202412025953. 1/f: revise window size, 2/f: revise window size. 3/f: revise window size and bathroom and laundry room. front window replacement with vinyl windows. | |
| Oct 10, 2025 | In progress filed Oct 2025, not yet issued | 636 Moultrie St | 1st floor: add 1 bedrm, 1 full bath & family room, excavate @ rear, retaining walls. 2nd floor: remodel kitchen & 1/2 bath. add interior stairs to connect 1 st floor. 3rd floor: remodel bath, add 1 full bath, roof deck @ rear. replace all front windows with aluminum clad wood. new stairs @ rear.Details
1st floor: add 1 bedrm, 1 full bath & family room, excavate @ rear, retaining walls. 2nd floor: remodel kitchen & 1/2 bath. add interior stairs to connect 1 st floor. 3rd floor: remodel bath, add 1 full bath, roof deck @ rear. replace all front windows with aluminum clad wood. new stairs @ rear. | $320,000 | |
| Oct 8, 2025 | Completed final sign-off Jul 2026 | 718 Brussels St | Bingo Builders | 1st fl: add media room, 1 full bath. 2nd fl: remodel kitchen and bath. add 1 full bath. infill at rear. reconfigure interior stairs.Details
1st fl: add media room, 1 full bath. 2nd fl: remodel kitchen and bath. add 1 full bath. infill at rear. reconfigure interior stairs. | $100,000 |
| Oct 8, 2025 | Completed final sign-off Aug 2026 | 378 Ralston St | Hengda Construction Inc | 1st fl: add media room, 1 full bath. 2nd fl: remodel kitchen and bath. add 1 full bath. infill at rear. reconfigure interior stairs. add 2 bedrooms to the 1st fl.Details
1st fl: add media room, 1 full bath. 2nd fl: remodel kitchen and bath. add 1 full bath. infill at rear. reconfigure interior stairs. add 2 bedrooms to the 1st fl. | $220,000 |
| Oct 1, 2025 | In progress filed Oct 2025, not yet issued | 822 30th Av | voluntary structural strengthening. patch openings at (e) exit passageway. new windows at rear.Details
voluntary structural strengthening. patch openings at (e) exit passageway. new windows at rear. | $45,000 | |
| Sep 24, 2025 | Completed final sign-off Oct 2025 | 1224 Athens St | Hong's General Construction Inc | revision to 202410012096 - reduce bedroom size to add an office on 1/f garage level.Details
revision to 202410012096 - reduce bedroom size to add an office on 1/f garage level. | |
| Sep 17, 2025 | In progress issued Sep 2025 | 351 Day St | Mdr Construction | revision to pa# 202104138385: replace slab and front foundation in garage.Details
revision to pa# 202104138385: replace slab and front foundation in garage. | $5,500 |
| Sep 17, 2025 | In progress issued Sep 2025 | 4271 24th St | Beyond The Horizon Construction | 1st fl: add 1 bedroom, family room, 1 full bath and media room. 2nd fl: reconfigure the deck at the rear.Details
1st fl: add 1 bedroom, family room, 1 full bath and media room. 2nd fl: reconfigure the deck at the rear. | $160,000 |
| Sep 8, 2025 | Completed final sign-off Feb 2026 | 250 Wilde Av | Ene Construction Metal Inc. | garage: comply with enforcement #2017-003312enf. remdeol detatched garage 50% in required rear setback. front bldg: revision to pa #201711214600 & 202209293413. to document unpermitted work removal/modification on unauthorized fence/wall to meet planning requirements. remove pent roof structure.Details
garage: comply with enforcement #2017-003312enf. remdeol detatched garage 50% in required rear setback. front bldg: revision to pa #201711214600 & 202209293413. to document unpermitted work removal/modification on unauthorized fence/wall to meet planning requirements. remove pent roof structure. | $15,000 |
| Sep 8, 2025 | In progress issued Sep 2025 | 37 San Jacinto Wy | Turbo Construction | 1st/f: add entertainment rm w/wet bar, 1 bedroom & 1 full bath. 2nd/f: remodel e) kitchen, dining, family rm & powder rm. 3rd fl: reconfigure e) bedrooms & bathrooms. replace deck in kind at rear & new patio on grade at lower yardDetails
1st/f: add entertainment rm w/wet bar, 1 bedroom & 1 full bath. 2nd/f: remodel e) kitchen, dining, family rm & powder rm. 3rd fl: reconfigure e) bedrooms & bathrooms. replace deck in kind at rear & new patio on grade at lower yard | $168,000 |
| Sep 2, 2025 | In progress filed Sep 2025, not yet issued | 52 Sotelo Av | at 1st floor, excavate & expand living area, remodel/expand (e) bedroom, (n) bathroom, (n) laundry and new family. at 2nd floor, remodel & expand (e) kitchen, reconstruct interior stair to garage to 1st floor and new toilet room.Details
at 1st floor, excavate & expand living area, remodel/expand (e) bedroom, (n) bathroom, (n) laundry and new family. at 2nd floor, remodel & expand (e) kitchen, reconstruct interior stair to garage to 1st floor and new toilet room. | $250,000 | |
| Aug 28, 2025 | Completed final sign-off Nov 2025 | 59 Chabot Tr | comply w/ nov 202540818: remove unpermitted unfinished framing on 3rd/fDetails
comply w/ nov 202540818: remove unpermitted unfinished framing on 3rd/f | $1,500 | |
| Aug 18, 2025 | Completed final sign-off May 2026 | 1223 Taraval St | All Homes And Construction Inc | commercial space: 1st/f add ada bathroom & ada door button (within property line)Details
commercial space: 1st/f add ada bathroom & ada door button (within property line) | $16,000 |
| Aug 15, 2025 | In progress issued Nov 2025 | 1638 11th Av | Ket Construction Inc. | 1st floor: reconfiture storage and utility. 2nd flr: remodel kitchen. add family room and powder. 3rd flr: remodel bedroom and bathroom. add 1 bedroom office and laundry replace roof deck. new deck at rear. replace front windows.Details
1st floor: reconfiture storage and utility. 2nd flr: remodel kitchen. add family room and powder. 3rd flr: remodel bedroom and bathroom. add 1 bedroom office and laundry replace roof deck. new deck at rear. replace front windows. | $95,000 |
| Aug 1, 2025 | Completed final sign-off Aug 2025 | 2144 Lake St | revision to pa 2017100060688 (renewal pa under 202507030187) remove closet reconfiguration on 3rd fl from scope of work; rename proposed bedroom to bed and add pocket doors between office and denDetails
revision to pa 2017100060688 (renewal pa under 202507030187) remove closet reconfiguration on 3rd fl from scope of work; rename proposed bedroom to bed and add pocket doors between office and den | ||
| Jul 28, 2025 | Completed final sign-off Sep 2026 | 122 Flood Av | Kevin Lin Construction Inc | horizontal additions @ lvl 2, 1st floor:add family room with wet bar, bedroom, 1.5 baths, & laundry/relocate utilities. 2nd fl: remodel existing living, kitchen, dining, 2 bedrooms & bathroom. add 1 full bath. 3rd fl: remodel existing playroom, add 1 full bath. infill lightwell. new deck at rearDetails
horizontal additions @ lvl 2, 1st floor:add family room with wet bar, bedroom, 1.5 baths, & laundry/relocate utilities. 2nd fl: remodel existing living, kitchen, dining, 2 bedrooms & bathroom. add 1 full bath. 3rd fl: remodel existing playroom, add 1 full bath. infill lightwell. new deck at rear | $195,000 |
| Jul 25, 2025 | Completed final sign-off Mar 2026 | 64 Molimo Dr | Hong Shink Construction | construct 2-story rear addition for new bedrooms and bathrooms and (n) deck at rear. refence pa 202412317574:Details
construct 2-story rear addition for new bedrooms and bathrooms and (n) deck at rear. refence pa 202412317574: | $250,000 |
| Jul 10, 2025 | Completed final sign-off Sep 2025 | 559 36th Av | Cej Construction Llc | revision to pa # 2019-0215-3147. revise structural glue cam beam with psl. remove glu-lam special inspectionDetails
revision to pa # 2019-0215-3147. revise structural glue cam beam with psl. remove glu-lam special inspection | |
| Jul 10, 2025 | Completed final sign-off Sep 2025 | 627 16th Av | Zm Builders Inc | revison to pa#: 202107154484. revise title 24 report. remove qii (quantity insulation) from special inspection.Details
revison to pa#: 202107154484. revise title 24 report. remove qii (quantity insulation) from special inspection. | |
| Jul 2, 2025 | In progress issued Jan 2026 | 2825 Pacheco St | Apex General Builder Inc | rear two story addition for new bedrooms. 1st floor: remodel 1st floor space to new media, new bathroom & new laundry room. 2nd floor: remodel (e) kitchen & (e) bathroom.Details
rear two story addition for new bedrooms. 1st floor: remodel 1st floor space to new media, new bathroom & new laundry room. 2nd floor: remodel (e) kitchen & (e) bathroom. | $255,000 |
| Jun 9, 2025 | In progress issued Dec 2025 | 2334 Francisco St | Bay Concept Builder Group | full remodel with new kitchens and bathrooms. remodel (e) 1/f to new living space for 2/f unit with new interior stairs. 1-story rear addition for 2/f unit and turn new roof to roof deck. new cantilever deck for 3/f unit as open space.Details
full remodel with new kitchens and bathrooms. remodel (e) 1/f to new living space for 2/f unit with new interior stairs. 1-story rear addition for 2/f unit and turn new roof to roof deck. new cantilever deck for 3/f unit as open space. | $535,000 |
| Jun 4, 2025 | Completed final sign-off Jul 2025 | 136 09th Av | Kennie Kwong Construction | comply with nov#: 202536363; new storage room at lobby. item#: 2Details
comply with nov#: 202536363; new storage room at lobby. item#: 2 | $500 |
| May 29, 2025 | Completed final sign-off Jun 2026 | 655 37th Av | Steven Liao Construction Company | comply w/ nov 202535164: 1/f (n) bedrooms, (n) media, (n) home office, storage, & bathroom. 2/f remodel kitchen & bathroom. demo (e) stair, new interior stair. infill south facing lightwell & (n) rear 1 level deck.Details
comply w/ nov 202535164: 1/f (n) bedrooms, (n) media, (n) home office, storage, & bathroom. 2/f remodel kitchen & bathroom. demo (e) stair, new interior stair. infill south facing lightwell & (n) rear 1 level deck. | $210,800 |
| May 22, 2025 | In progress issued Nov 2025 | 925 Balboa St | Skytec General Engineering | 3-story horizontal addition. 1/f: add 1 bedroom, full bath, & patio at rear, relocate family room from 2/f to 1/f. 2/f remodel kitchen bathroom, add bedroom, & reconfigure interior stairs. 3/f: remodel bedrooms bathrooms, relocate laundry & add roof deck rear; replace 2 front windows alum-clad woodDetails
3-story horizontal addition. 1/f: add 1 bedroom, full bath, & patio at rear, relocate family room from 2/f to 1/f. 2/f remodel kitchen bathroom, add bedroom, & reconfigure interior stairs. 3/f: remodel bedrooms bathrooms, relocate laundry & add roof deck rear; replace 2 front windows alum-clad wood | $380,000 |
| May 14, 2025 | In progress issued Jun 2025 | 5828 California St | Yiu Cheong Construction Co Inc | modify existing front stair and 2nd floor entry. excavate 1st floor to expand garage and for future adu. current and proposed to remain as storage. modify existing rear yard with new retaining wall.Details
modify existing front stair and 2nd floor entry. excavate 1st floor to expand garage and for future adu. current and proposed to remain as storage. modify existing rear yard with new retaining wall. | $185,000 |
| May 9, 2025 | In progress issued Jun 2025 | 24 Fairmount St | revision to pa #202206287317 (front building) at 2nd fl remove walls at kitchen and living areas. add full bathroom and laundry. new structural work per planDetails
revision to pa #202206287317 (front building) at 2nd fl remove walls at kitchen and living areas. add full bathroom and laundry. new structural work per plan | $55,000 | |
| Apr 29, 2025 | Expired or cancelled cancelled Feb 2026 | 362 26th Av | Kmk Construction And Design | 1st fl - add entertainment (not for sleeping purpose) & powder room. 1 hr wall & ceilingDetails
1st fl - add entertainment (not for sleeping purpose) & powder room. 1 hr wall & ceiling | $35,000 |
| Apr 23, 2025 | Completed final sign-off Sep 2025 | 627 16th Av | Zm Builders Inc | revision to pa # 2021-0715-4484 add patio at rear. 1st floor relocate landry. 2nd floor resize kitchen island, relocate pantry door, 3rd floor relocate wahser and dryer, conconfigure layout of master bath.Details
revision to pa # 2021-0715-4484 add patio at rear. 1st floor relocate landry. 2nd floor resize kitchen island, relocate pantry door, 3rd floor relocate wahser and dryer, conconfigure layout of master bath. | $8,000 |
| Apr 15, 2025 | Completed final sign-off May 2026 | 1800 16th Av | Hbm Construction Inc | commencement of work not started under previously approved permit application pa# 201808106977Details
commencement of work not started under previously approved permit application pa# 201808106977 | $38,000 |
| Apr 15, 2025 | In progress issued Apr 2025 | 1201 06th Av | Kmk Construction And Design | unit 1,2,4,5,7,8,9: add in-unit laundry. area of work convert closet to laundry at 7 units.Details
unit 1,2,4,5,7,8,9: add in-unit laundry. area of work convert closet to laundry at 7 units. | $12,600 |
| Apr 10, 2025 | In progress issued Apr 2025 | 1476 Portola Dr | Integrity General Construction Inc | revision to bpa#: 202208090182 and 202309076083. 1st flr: add bathtub in middle bathroom change rear dr to lacanina door. 2nd flr: change rear dr to lacantina door; 3rd flr: remove proposed rear bathroom window change interior stari railing with glass. new railing at rear yard. new retaining wallDetails
revision to bpa#: 202208090182 and 202309076083. 1st flr: add bathtub in middle bathroom change rear dr to lacanina door. 2nd flr: change rear dr to lacantina door; 3rd flr: remove proposed rear bathroom window change interior stari railing with glass. new railing at rear yard. new retaining wall | $5,000 |
| Apr 8, 2025 | Expired or cancelled expired May 2026 | 1667 34th Av | Integrity General Construction Inc | revision to 201605197928 and 202501108162. 2nd fl clsoe window at shower and add new furnace. 1st fl remove tub, new glass railings. new deck with stairs at rear.Details
revision to 201605197928 and 202501108162. 2nd fl clsoe window at shower and add new furnace. 1st fl remove tub, new glass railings. new deck with stairs at rear. | $20,000 |
| Apr 8, 2025 | Completed final sign-off May 2025 | 30 19th Av | 21st Century Home Improvt | revision to pa #2024-0226-6585 vault ceilings at living roomDetails
revision to pa #2024-0226-6585 vault ceilings at living room | $2,500 |
| Apr 7, 2025 | In progress filed Apr 2025, not yet issued | 39 Girard St | to erect 2 stories, type v-b, detached adu at rear. rplacing an (e) structure per state government code section 65852.2 (a) through (d).Details
to erect 2 stories, type v-b, detached adu at rear. rplacing an (e) structure per state government code section 65852.2 (a) through (d). | $150,000 | |
| Apr 1, 2025 | Completed final sign-off Aug 2025 | 14 Pueblo St | Wen Construction Inc | both units: total remodel and replace sheetrock throughtout. (no exterior work)Details
both units: total remodel and replace sheetrock throughtout. (no exterior work) | $80,000 |
| Mar 31, 2025 | Completed final sign-off Aug 2026 | 678 23rd Av | Yiu Cheong Construction Co Inc | revision to approved permit#: 202307132139. remove proposed skyights; add new skylights at home office; change structural design, drawings and calculation.Details
revision to approved permit#: 202307132139. remove proposed skyights; add new skylights at home office; change structural design, drawings and calculation. | $100 |
| Mar 25, 2025 | Expired or cancelled withdrawn Sep 2025 | 261 Waller St | 1st fl - add 1 bedroom, 1 full bath and family; add new skylights; add new deckt @ rear; 2 story addition @ rearDetails
1st fl - add 1 bedroom, 1 full bath and family; add new skylights; add new deckt @ rear; 2 story addition @ rear | $180,000 | |
| Mar 25, 2025 | Completed final sign-off Aug 2026 | 553 Laidley St | All Homes And Construction Inc | 1/f: add (2) bedrooms, 2 full baths and media. 2/f: remodel kitchen, bedroom, and bathroom. and powder room. enclose 1 garage door and remove curb cut. replace other garage door w/ wood. replace windows at facade with alum clad wood.Details
1/f: add (2) bedrooms, 2 full baths and media. 2/f: remodel kitchen, bedroom, and bathroom. and powder room. enclose 1 garage door and remove curb cut. replace other garage door w/ wood. replace windows at facade with alum clad wood. | $180,000 |