Hbm Construction Inc
- Based in
- Castro Valley
- On San Francisco permits
- Jan 2019 to Sep 2026
- Last 24 months
- 22 permits filed
58 permits since 2000: 46 completed, 10 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 28, 2026 | In progress issued Sep 2026 | 2420 Clement St | structural revision to pa 202508062414 repair partial (e) stud walls & widen (e) footing on partial indicated areasDetails
structural revision to pa 202508062414 repair partial (e) stud walls & widen (e) footing on partial indicated areas | |
| Apr 17, 2026 | Completed final sign-off May 2026 | 1800 16th Av | administrative permit to document that pa# 202504154463 is not a commencement permit for pa# 201808106977, but a standalone permit with new drawings and scope of work.Details
administrative permit to document that pa# 202504154463 is not a commencement permit for pa# 201808106977, but a standalone permit with new drawings and scope of work. | |
| Apr 2, 2026 | Completed final sign-off May 2026 | 124 Jasper Pl | 2nd floor: bathroom remodel, tub to shower, new vanity.Details
2nd floor: bathroom remodel, tub to shower, new vanity. | $6,000 |
| Feb 17, 2026 | Completed final sign-off Aug 2026 | 3540 Balboa St | unit 8- remodel kitchen to include replace cabinets, countertops and lighting. no wall removal or layout change.Details
unit 8- remodel kitchen to include replace cabinets, countertops and lighting. no wall removal or layout change. | $10,000 |
| Dec 30, 2025 | Completed final sign-off Apr 2026 | 978 Page St | soft story retrofit per sfebc 2022 appendix a404. to comply with nov# 201803574.Details
soft story retrofit per sfebc 2022 appendix a404. to comply with nov# 201803574. | $120,000 |
| Oct 27, 2025 | In progress issued Jul 2026 | 2420 Clement St | tenant improvement to be early childhood learning center & day care at 1st floor. vertical addition that will create two new dwelling units at the 2nd floor.Details
tenant improvement to be early childhood learning center & day care at 1st floor. vertical addition that will create two new dwelling units at the 2nd floor. | $650,000 |
| Oct 16, 2025 | Completed final sign-off Mar 2026 | 1306 California St | demo (e) stucco at front of building (esterior) and put new 3-ply stucco. no structural work.Details
demo (e) stucco at front of building (esterior) and put new 3-ply stucco. no structural work. | $12,000 |
| Aug 27, 2025 | Completed final sign-off Jan 2026 | 2951 San Bruno Av | demo existing stucco at back of building (exterior) and put new coate of stucco, no structrual work.Details
demo existing stucco at back of building (exterior) and put new coate of stucco, no structrual work. | $15,000 |
| Aug 27, 2025 | Completed final sign-off Feb 2026 | 2951 San Bruno Av | unit #4 & #8 only: addition of new partition walls and doors to generate an additional bedroom. remodel kitchen & bathroom. all other units are for reference only - no work to be performed. dishwasher proposed like for like bathroomsDetails
unit #4 & #8 only: addition of new partition walls and doors to generate an additional bedroom. remodel kitchen & bathroom. all other units are for reference only - no work to be performed. dishwasher proposed like for like bathrooms | $60,000 |
| Aug 8, 2025 | Completed final sign-off Jan 2026 | 205 10th Av | unit 205 and 207: remove and add new partition walls, renew bath and add laundry.Details
unit 205 and 207: remove and add new partition walls, renew bath and add laundry. | $5,000 |
| Jul 7, 2025 | In progress issued Jul 2025 | 1306 California St | changing 2 windows facing the street in kind replacement. front of home.Details
changing 2 windows facing the street in kind replacement. front of home. | $20,000 |
| May 29, 2025 | Completed final sign-off Jun 2025 | 2951 San Bruno Av | permit for 2 rear decks built without permit.Details
permit for 2 rear decks built without permit. | $10,000 |
| May 15, 2025 | Completed final sign-off Jan 2026 | 205 10th Av | both units (205 & 207) - remove (e) bath fixtures; replace tub with shower; renew electrical, lighting, and venting. replace (e) kitchen cabinets, renew electrical and plumbing, add lighting. same work to be performed in both identical units.Details
both units (205 & 207) - remove (e) bath fixtures; replace tub with shower; renew electrical, lighting, and venting. replace (e) kitchen cabinets, renew electrical and plumbing, add lighting. same work to be performed in both identical units. | $60,000 |
| May 15, 2025 | Completed final sign-off Sep 2025 | 811 Alvarado St | unit a and unit b -unit remodel:renew kitchen and bath. add partition wall.Details
unit a and unit b -unit remodel:renew kitchen and bath. add partition wall. | $85,000 |
| Apr 22, 2025 | In progress filed Apr 2025, not yet issued | 122 Jasper Pl | creat ground floor existing legalization of apartments, addition of new partition wasll and dorrs, windows, and new ada apartment and ramp on the 1st floor unit#132 remodel, replacement of kitchen of four existing windows 9non front facing) no changes to the size or location, and the constructionDetails
creat ground floor existing legalization of apartments, addition of new partition wasll and dorrs, windows, and new ada apartment and ramp on the 1st floor unit#132 remodel, replacement of kitchen of four existing windows 9non front facing) no changes to the size or location, and the construction | $100,000 |
| Apr 17, 2025 | In progress issued Apr 2025 | 1306 California St | units 2, 3 & 6 replace (e) winddows in kind. reframe dryrot walls, add walls to create space for washer/dryer. plumbing and electrical for washer and dryerDetails
units 2, 3 & 6 replace (e) winddows in kind. reframe dryrot walls, add walls to create space for washer/dryer. plumbing and electrical for washer and dryer | $75,000 |
| Apr 15, 2025 | Completed final sign-off May 2026 | 1800 16th Av | commencement of work not started under previously approved permit application pa# 201808106977Details
commencement of work not started under previously approved permit application pa# 201808106977 | $38,000 |
| Mar 28, 2025 | In progress issued Apr 2025 | 1534 Larkin St | revision to pa #202408269495: repair and reframe existing dry rotted walls in the bathroom and laundry room.Details
revision to pa #202408269495: repair and reframe existing dry rotted walls in the bathroom and laundry room. | $2,000 |
| Mar 18, 2025 | In progress issued Mar 2025 | 132 Jasper Pl | revision to permit 202502069841. reframe dry-rot and damaged walls in bathroom and bedroom. add washer/dryer into living room.Details
revision to permit 202502069841. reframe dry-rot and damaged walls in bathroom and bedroom. add washer/dryer into living room. | $5,000 |
| Feb 6, 2025 | Completed final sign-off May 2025 | 132 Jasper Pl | kitchen and bath remodel, no layout change. replace elec & plumbing fixtures. replace 4 existing windows with no change to size or location, not visible from the front street.Details
kitchen and bath remodel, no layout change. replace elec & plumbing fixtures. replace 4 existing windows with no change to size or location, not visible from the front street. | $50,000 |
| Nov 25, 2024 | In progress issued Apr 2025 | 2565 Washington St | replace 12 (e) windows. 4 windows in unit 1, 4 windows in unit 2 and 4 windows in unit 5 no change in size or location. not visible from streetDetails
replace 12 (e) windows. 4 windows in unit 1, 4 windows in unit 2 and 4 windows in unit 5 no change in size or location. not visible from street | $5,000 |
| Nov 25, 2024 | Completed final sign-off Apr 2025 | 1534 Larkin St | replace 13 (e) windows in unit 1534. no change in size or location. not visible from streetDetails
replace 13 (e) windows in unit 1534. no change in size or location. not visible from street | $6,000 |
| Aug 26, 2024 | In progress issued Aug 2024 | 1534 Larkin St | kitchen and bathroom remodel in-kind. no layout change. no moving walls. replace plumbing fixtures. replace electrical fixtures and add recessed lights.Details
kitchen and bathroom remodel in-kind. no layout change. no moving walls. replace plumbing fixtures. replace electrical fixtures and add recessed lights. | $30,000 |
| Aug 2, 2024 | Completed final sign-off Feb 2025 | 450 Castro St | unit #1: one kitchen and one bathroom remodel. no layout change. replace plumbing and electrical fixtures. add recessed lights.Details
unit #1: one kitchen and one bathroom remodel. no layout change. replace plumbing and electrical fixtures. add recessed lights. | $45,000 |
| Jun 18, 2024 | Completed final sign-off May 2025 | 2565 Washington St | unit #1 kitchen and bathroom remodel. no layout change. replace plumbing fixtures. replace electrical fixtures and add recessed lights.Details
unit #1 kitchen and bathroom remodel. no layout change. replace plumbing fixtures. replace electrical fixtures and add recessed lights. | $30,000 |
| Jun 18, 2024 | Completed final sign-off May 2025 | 2565 Washington St | unit #2 kitchen and bathroom remodel. no layout change. replace plumbing fixtures. replace electrical fixtures and add recessed lights.Details
unit #2 kitchen and bathroom remodel. no layout change. replace plumbing fixtures. replace electrical fixtures and add recessed lights. | $30,000 |
| Jun 18, 2024 | Completed final sign-off May 2025 | 2565 Washington St | unit #5: kitchen and bathroom remodel. no layout change. replace plumbing fixtures & custom shower pan. replace electrical fixtures and add recessed lights.Details
unit #5: kitchen and bathroom remodel. no layout change. replace plumbing fixtures & custom shower pan. replace electrical fixtures and add recessed lights. | $30,000 |
| Jun 6, 2024 | Completed final sign-off Aug 2025 | 728 Pacific Av | rev 202211045899- partial removal of (e) tiles and recladding with aluminum composite panels. no interior work.Details
rev 202211045899- partial removal of (e) tiles and recladding with aluminum composite panels. no interior work. | |
| Jan 4, 2024 | Completed final sign-off May 2024 | 708 Bay St | revision to pa 202209273256. revise shear walls.Details
revision to pa 202209273256. revise shear walls. | |
| Nov 27, 2023 | Completed final sign-off Feb 2024 | 211 Cornwall St | unit #12: remodel 2 bathrooms & kitchen. no wall change. new kitchen cabinets. all in kind.Details
unit #12: remodel 2 bathrooms & kitchen. no wall change. new kitchen cabinets. all in kind. | $20,000 |
| Nov 7, 2023 | Completed final sign-off Jun 2025 | 2951 San Bruno Av | revision to pa# 201912189949, per unforeseen conditions new concrete, foundation at rear and front, new steel beam at unit below existing steel beam, change of support in crawl space and framingDetails
revision to pa# 201912189949, per unforeseen conditions new concrete, foundation at rear and front, new steel beam at unit below existing steel beam, change of support in crawl space and framing | $25,000 |
| Nov 3, 2023 | Completed final sign-off Mar 2024 | 45 Franklin St | accessible business entrance progaram per ordinane 51-16 abe# 201902155333 technical infeasiblity requestDetails
accessible business entrance progaram per ordinane 51-16 abe# 201902155333 technical infeasiblity request | |
| Oct 13, 2023 | Completed final sign-off Feb 2024 | 1360 Clay St | unit 6: remodel 1 kitchen & 1 bathroom. new kitchen cabinets, upgrade electrical panel, new power & lightsDetails
unit 6: remodel 1 kitchen & 1 bathroom. new kitchen cabinets, upgrade electrical panel, new power & lights | $50,000 |
| Sep 25, 2023 | Completed final sign-off May 2024 | 1541 Oak St | unit #2: kitchen and bathroom remodel in kind. new painting, replace cabinets, replace kitchen cabinet plumbing. new recessed lights. replace lights in bathroom. no structural work, no floor layout change, no wall layout change.Details
unit #2: kitchen and bathroom remodel in kind. new painting, replace cabinets, replace kitchen cabinet plumbing. new recessed lights. replace lights in bathroom. no structural work, no floor layout change, no wall layout change. | $20,000 |
| Sep 12, 2023 | In progress issued Aug 2025 | 2951 San Bruno Av | units #5 & #7 (3rd floor) and units #1 & #4 (2nd floor): split living room in half. add new walls. add 2 new doors in living rooms. 16 new windowsDetails
units #5 & #7 (3rd floor) and units #1 & #4 (2nd floor): split living room in half. add new walls. add 2 new doors in living rooms. 16 new windows | $7,000 |
| Aug 17, 2023 | Completed final sign-off Dec 2023 | 341 Mississippi St | minor foundation replacementDetails
minor foundation replacement | $11,000 |
| Aug 11, 2023 | Completed final sign-off Jul 2024 | 915 Stockton St | to comply w/accessible business entrance program/ord 51-16, abe#202207081088, new power door equipment, new ada signageDetails
to comply w/accessible business entrance program/ord 51-16, abe#202207081088, new power door equipment, new ada signage | $2,500 |
| Jul 21, 2023 | Expired or cancelled cancelled Apr 2026 | 536 Divisadero St | abe compliance per ordinace no 51-16, new storefront door and power door equipments, new ada signage, repave existing ramp. abe # 201902084976Details
abe compliance per ordinace no 51-16, new storefront door and power door equipments, new ada signage, repave existing ramp. abe # 201902084976 | $5,000 |
| Apr 12, 2023 | Completed final sign-off Jun 2024 | 646 Corbett Av | to comply with nov# 202299188; soft story retrofit per sfebc chapter 4d engineering criteria 2022 cebc appendix a4Details
to comply with nov# 202299188; soft story retrofit per sfebc chapter 4d engineering criteria 2022 cebc appendix a4 | $95,000 |
| Feb 7, 2023 | Completed final sign-off Oct 2023 | 2900 Diamond St | to comply with abe program per ord 51-16, abe 201912230173. barrier removal scope/accessible business entrace improvements at existing ground floor commercial tenant. no structural work, no mep, no sidewalk workDetails
to comply with abe program per ord 51-16, abe 201912230173. barrier removal scope/accessible business entrace improvements at existing ground floor commercial tenant. no structural work, no mep, no sidewalk work | $18,000 |
| Jan 17, 2023 | Completed final sign-off May 2023 | 1360 Clay St | unit 11: remodel and refinish bathroom, new kitchen cabinets, upgrade electrical panel, new power and lights, no wall changeDetails
unit 11: remodel and refinish bathroom, new kitchen cabinets, upgrade electrical panel, new power and lights, no wall change | $27,000 |
| Dec 30, 2022 | Completed final sign-off Oct 2023 | 2572 Noriega St | abe compliance per ordiance no. 51-16. tehcnical infeasibilty request. abe# abe201912069372. new signage (ada) and door bellDetails
abe compliance per ordiance no. 51-16. tehcnical infeasibilty request. abe# abe201912069372. new signage (ada) and door bell | $500 |
| Dec 30, 2022 | Completed final sign-off Oct 2023 | 2568 Noriega St | abe compliance per ordiance no. 51-16. tehcnical infeasibilty request. abe# abe201912069369. new signage (ada) and door bellDetails
abe compliance per ordiance no. 51-16. tehcnical infeasibilty request. abe# abe201912069369. new signage (ada) and door bell | $500 |
| Dec 29, 2022 | Completed final sign-off Oct 2023 | 2588 Noriega St | abe compliance per ordinance 51-16. new signage to direct touse entrance at block 2017 lot 047 as alternate accessible entry. abe# 201912069365Details
abe compliance per ordinance 51-16. new signage to direct touse entrance at block 2017 lot 047 as alternate accessible entry. abe# 201912069365 | $500 |
| Dec 29, 2022 | Completed final sign-off Oct 2023 | 2578 Noriega St | abe compliance per ordinance 51-16. technical infeasibility request. new signage (ada) and door bell. abe#201912069360Details
abe compliance per ordinance 51-16. technical infeasibility request. new signage (ada) and door bell. abe#201912069360 | $500 |
| Nov 21, 2022 | Completed final sign-off Aug 2023 | 2990 San Bruno Av | eliminate the scope of work of approved pa #201904087422. provide ada compliant access curb ramp to retail area entrance per ordinance no. 51-16. abe #201912260310. abe programDetails
eliminate the scope of work of approved pa #201904087422. provide ada compliant access curb ramp to retail area entrance per ordinance no. 51-16. abe #201912260310. abe program | |
| Nov 4, 2022 | Completed final sign-off Aug 2025 | 728 Pacific Av | exterior cladding & water preoofing replacement.Details
exterior cladding & water preoofing replacement. | $1,200,000 |
| Sep 27, 2022 | Completed final sign-off May 2024 | 708 Bay St | voluntary structural strenghening in the building.Details
voluntary structural strenghening in the building. | $60,000 |
| Sep 22, 2022 | Completed final sign-off Dec 2022 | 1360 Clay St | unit 8 remodel and refinish bathroom. new kitchen cabinets, upgrade electric panel, new power and lighs. no wall changeDetails
unit 8 remodel and refinish bathroom. new kitchen cabinets, upgrade electric panel, new power and lighs. no wall change | $27,000 |
| May 25, 2022 | Completed final sign-off Dec 2023 | 215 Middle Point Rd | to comply with nov# 201961841. repair retaining wall in back yard.Details
to comply with nov# 201961841. repair retaining wall in back yard. | $60,000 |
| Apr 1, 2022 | Completed final sign-off Aug 2024 | 2590 Sacramento St | provide new beams post and footings to support in front of the building.Details
provide new beams post and footings to support in front of the building. | $40,000 |
| Mar 30, 2022 | Completed final sign-off Jan 2024 | 629 Alvarado St | enclose 125 sf space under existing deck storage. alter existing interior stairs.Details
enclose 125 sf space under existing deck storage. alter existing interior stairs. | $39,000 |
| Mar 1, 2021 | Completed final sign-off Aug 2023 | 337 Mississippi St | foundation reinforcement and replacement. widen garage door replace planters and dryrot repair.Details
foundation reinforcement and replacement. widen garage door replace planters and dryrot repair. | $65,000 |
| Feb 8, 2021 | Completed final sign-off Nov 2023 | 1888 Clement St | revision to bpa 201304053893-s site permit & structural, foundation addendum, & final addendum including reduction is scope to 3 storiesDetails
revision to bpa 201304053893-s site permit & structural, foundation addendum, & final addendum including reduction is scope to 3 stories | |
| Jan 28, 2021 | Completed final sign-off Mar 2023 | 1360 Clay St | unit #2: remodel & refinish bathroom. new kitchen cabinet & exhaust fan. upgrade electrical panel. new power & lights.Details
unit #2: remodel & refinish bathroom. new kitchen cabinet & exhaust fan. upgrade electrical panel. new power & lights. | $20,000 |
| Dec 27, 2019 | Completed final sign-off Apr 2025 | 1400 35th Av | change of use from 2unit r3 to 3unit r-2 occupancy (not an adu)conversion of 1st fl commercial space to standard residential unit. expand (e) 1st fl unit area to include adjacent storage as bedroom, and bathroom. 1st fl voluntary structural strengtheining - front wall add shearwall.Details
change of use from 2unit r3 to 3unit r-2 occupancy (not an adu)conversion of 1st fl commercial space to standard residential unit. expand (e) 1st fl unit area to include adjacent storage as bedroom, and bathroom. 1st fl voluntary structural strengtheining - front wall add shearwall. | $40,000 |
| Dec 18, 2019 | Completed final sign-off Jun 2025 | 2951 San Bruno Av | convert ground flr retail & rear covered parking to (4) new accessory dwelling units; replace (e) 1st flr retail entries & windows w/ new adu entries per ordinance 162-16. enclose rear covered parking for new adu.Details
convert ground flr retail & rear covered parking to (4) new accessory dwelling units; replace (e) 1st flr retail entries & windows w/ new adu entries per ordinance 162-16. enclose rear covered parking for new adu. | $225,000 |
| Jan 7, 2019 | Never finaled issued Feb 2020, no final | 1306 California St | addition of one adu to an (e) 6 unit bldg within (e) envelope per ord- 162-16 for a total of 7 dwellingsDetails
addition of one adu to an (e) 6 unit bldg within (e) envelope per ord- 162-16 for a total of 7 dwellings | $85,300 |