Brendan J Uniacke Construction
- Based in
- San Bruno
- On San Francisco permits
- Apr 2023 to Jan 2026
- Last 24 months
- 3 permits filed
8 permits since 2000: 3 completed, 3 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 15, 2026 | In progress issued Aug 2026 | 407 Teresita Bl | full remodel (e) 3 story bldg. (n) cantilever decks w/ sliding doors. infill (e) lightwell and replace front window & exterior wall finishes. remodel 1st flr space to (n) family w/ bathroom & wetbar. 2nd: create master suite and laundry. 3rd: remodel kitchen bathroom, lightwell infill. and skylightsDetails
full remodel (e) 3 story bldg. (n) cantilever decks w/ sliding doors. infill (e) lightwell and replace front window & exterior wall finishes. remodel 1st flr space to (n) family w/ bathroom & wetbar. 2nd: create master suite and laundry. 3rd: remodel kitchen bathroom, lightwell infill. and skylights | $450,000 |
| Dec 18, 2025 | In progress issued Sep 2026 | 284 Liberty St | add new ensuite full bath and walk in closet. relocate washer and dryer.Details
add new ensuite full bath and walk in closet. relocate washer and dryer. | $40,000 |
| Dec 12, 2025 | Completed final sign-off May 2026 | 100 Teresita Bl | to obtain final inspection for work aproved under pa 202309116289. all work is complete.Details
to obtain final inspection for work aproved under pa 202309116289. all work is complete. | |
| Feb 20, 2024 | Completed final sign-off Mar 2025 | 170 Everson St | 1) remodel extg kitchen and 3rd floor bedroom. 2)remodel/reconfigure 3 extg bathrooms. 3)replace extg windows throughout.Details
1) remodel extg kitchen and 3rd floor bedroom. 2)remodel/reconfigure 3 extg bathrooms. 3)replace extg windows throughout. | $150,000 |
| Sep 26, 2023 | In progress issued May 2024 | 55 Southwood Dr | interior remodel of (e) kitchen. alteration to (e) garage to create mudroom and half bath. convert (e) second floor sunroom to new ensuite bathroom. 1 street visible window replacement.Details
interior remodel of (e) kitchen. alteration to (e) garage to create mudroom and half bath. convert (e) second floor sunroom to new ensuite bathroom. 1 street visible window replacement. | $95,000 |
| Sep 11, 2023 | Never finaled issued Sep 2023, no final | 100 Teresita Bl | convert portion of (e) 2 car garage to (n) bedroom/office; new full bath and new laundry; replace (e) stairs to provide open connection between main floor and new; convert (e) window to patio door w/landingDetails
convert portion of (e) 2 car garage to (n) bedroom/office; new full bath and new laundry; replace (e) stairs to provide open connection between main floor and new; convert (e) window to patio door w/landing | $70,000 |
| Jul 7, 2023 | Never finaled issued Aug 2023, no final | 524 Lake St | remodel (e) hall bath, replace fixtures in-kind, countertops @ (e) kitchen, convert (e) laundry room to new full bath, replace lighting throughout flat.Details
remodel (e) hall bath, replace fixtures in-kind, countertops @ (e) kitchen, convert (e) laundry room to new full bath, replace lighting throughout flat. | $30,000 |
| Apr 28, 2023 | Completed final sign-off Oct 2024 | 550 Teresita Bl | expansion of conditioned living space to the 1st fl w/new interior stair, new bedrm, family rm & study; renovation & reconfiguration of kitchen, dining & bathrm; addition of a (n) primary bath and the enclosure of the interior lightwells @ 2nd flDetails
expansion of conditioned living space to the 1st fl w/new interior stair, new bedrm, family rm & study; renovation & reconfiguration of kitchen, dining & bathrm; addition of a (n) primary bath and the enclosure of the interior lightwells @ 2nd fl | $300,000 |